Loading...
R-87-1031 - 8/13/1987WHEREAS, the City Council has determined that it would be beneficial to the City to have certain improvements completed at the Wastewater Treatment Plant; and WHEREAS, Haynie Kallman & Gray, Inc., Consulting Engineers, have submitted a letter agreement to conduct the engineering for said improvements; and WHEREAS, the Council desires to enter into said agreement with Haynie Kallman & Gray, Inc.; NOW THEREFORE BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS That the Mayor is hereby authorized and directed to execute on behalf of the City an agreement for improvements at the Wastewater Treatment Plant with Haynie Kallman & Gray, Inc., a copy of said agreement being attached hereto and incorporated herein for all purposes. RESOLVED this �3 day of a{,Ifizi ) , 1987. ATTEST: LAND, City Secretary RESOLUTION NO.( MIKE ROBINSON, Mayor City of Round Rock, Texas Jim Nuse, P.E. Director of Public Works City of Round Rock 300 S. Blair Street Round Rock, Texas 78664 Re: Wastewater Treatment Plant West Facility Improvements Project No. 1 will be for: Haynie Kallman & Gray, Inc. Consulting Ennginees Blower - 3 -125 HP Influent Piping Modifications Post Thickener Repair & Sludge Building Demolition Total Construction Cost Construction Contingency Engineering Fees (Curve A - 10.5 %) TOTAL ESTIMATED PROJECT COST 12303 Technology Blvd , Suite Austin, Texas 78727 (512) 250.8611 Civil Engineering Consultants Municipal Engineering Land Planning Surveying Dear Jim: As per our meeting with you last week concerning the above referenced project, we are forwarding the following items per your request. The Preliminary Engineering Report, of which two additional copies are enclosed, utilized information for a particular manufacturer and model of diffuser. This was utilized to demonstrate the cost savings potential for that specific diffuser system as an example of technology advancements in the wastewater industry.- In the design phase, we will work closely with your staff to evaluate alternate- equipment manufacturers to be included in the specifications to attain the best possible situation in assuring competitive bids. Based on our discussion of the work to be performed, the work effort has been prioritized into two (2) projects.- Below is a breakdown of the preliminary cost estimates involved with each project. $100,000 10,000 75,000 $185,000 19,000 19.400 $223,400 This project will be designed and constructed as quickly as possible. Page 2 Jim Nuse, P.E. - July 2, 1987 Re: Wastewater Treatment Plant West Facility Improvements Project No. 2 to be authorized by the City of Round Rock at a later date, will be for: SDK /cla Enclosures Steven D. Kaltman, P.E., R.P.S. Beadworks (Grit Chamber and Screens) Fine Bubble Diffusers Combine Existing Outfalls Total Construction Cost Construction Congingency Engineering Fee (Curve A - 8.9 %) TOTAL ESTIMATED PROJECT COST This second project would be designed and approval sought at a later date. The project will not be designed and bid until wastewater flows can be diverted to the regional facilities. We are enclosing an Engineering Services Agreement for Project No. 1. The Engineering Services Agreement is based on our -prior Engineering Services Agreements with the City -of Round Rock with certain recent modifications from our meeting this date that we had with you in your office. Following City Council approval and your authorization, we would be eager to begin work on the project immediately. If you should have any questions, please don't hesitate to contact us. Cordially, HAYNIE KALLMAN & GRAY, INC. cc: Michael Vollmar, City of Round Rock Scott- Linden, P.E., Haynie Kallman & Gray, Inc. Pat Lackey, P.E., Haynie Kallman & Gray, Inc. #103 -1854 $200,000 130,000 70.000 $400,000 40,000 35.600 $475,600 ill DATE: August 11, 1987 SUBJECT: Council Agenda, August 13, 1987 ITEM: 13D - Consider a resolution authorizing the Mayor to enter into a contract with Haynie Kallman & Gray, Inc. for Wastewater Treatment Plant Improvements. STAFF RESOURCE PERSON: Jim Nuse STAFF RECOMMENDATION: Staff recommends award to Haynie Kallman & Gray, Inc. ECONOMIC IMPACT: These improvements are necessary to meet discharge permit requirements. These improvements are more energy efficient than our current equipment and will provide us with operating costs savings.