Loading...
R-87-954 - 2/12/1987WHEREAS, the City Council has determined that it would be desirable to enter into a contract with the David Bost Group for the design of certain irrigation systems, and WHEREAS, the Council desires to enter into said contract, NOW THEREFORE BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS That the Mayor is hereby authorized and directed to enter into on behalf of the City a contract with the David Bost Group, a copy of said contract being attached hereto and incorporated herein for all purposes. RESOLVED this the �p2 day of del A ,t 1987. ATTEST: nne Land, City Secretary RESOLUTION NO. 9,57-g. MIKE ROBINSON, Mayor City of Round Rock, Texas THE DAVID BOST GROUP . L A N D S C A P E A R C H I T E C T S c.r P.O. Box 892 Round Rock, Texas 78680 512/255 -8362 A subsidiary of Brushy Oak Inc. February 6, 1987 City of Round Rock 214 East Main Street Round Rock, Texas 78664 Attn: Sharon Prete, Director Parks & Recreation Department Re: Proposal for Landscape Irrigation Design Services Buck Egger Park Greenhill Park Kinningham Park Round Rock Memorial Park Somerset Park We are pleased to present this proposal for services required for the above referenced project. This proposal is based on the following general informa- tion and represents our recommendation of design services for the project. SCOPE OF SERVICES A. Construction Documents will include the preparation of construction drawings, specifications, and contract and bid documents for the above referenced projects. These documents will provide for the taking of competitive bids, and shall include the following: 1. Head layout plans showing the location and type of irrigation heads required. 2. Piping plans showing pipe sizing and location, required sectioning, valving and related equipment, automatic controller, and pipe sleeves under pavement. 3. Construction details accompanying the above plans as needed. 4. Specifications for materials and operations outlined in the above referenced plans in sufficient detail so as to bind the contractor to perform the work as per the intent of the plans and specs. 1 5. Contract documents coordinated with the format and content of the plans, details and specifications referenced in it 1 through 4 above, a project manual with bid forms, the specifications, and a contract form for your review and approval before bidding. B. Construction Contract Administration will include the following services for those it described in the construction documents: 1. Assistance in pre - qualifying bidders, preparation of necessary contract documents, attendance at pre -bid meetings, issuance of addenda, response to questions from bidders and assistance in pre- construction meetings. 2. Attendance at scheduled construction meetings at the site to monitor the progress and quality of work, and to determine if work is proceeding in accordance with contract documents. Preparation of related reports and commmications. 3. Preparation and distribution of necessary change orders of work to be added, deleted or modified. 4. Review of applications for payment. Approval or modification for approval. 5. Performance of substantial completion inspection and preparation of a punch list of items to be completed or corrected prior to final inspection of work and final payment. COIATIOli for the above scope of services will be a lump contract sum based on the following phases: Construction Documents $1,050.00 Contract Administration $ 960.00 Total Design Fee $2,010.00 Work in addition to the above scope of services shall be charged at the rate of $30.00 per hour. The above amounts will be invoiced on the 25th of each month or upon comple- tion of a specific phase of work. Monthly invoicing shall be based upon per- centage of completion. 2 We appreciate the opportunity to present the above proposal and hope that it fulfills your project needs. If these services and fees are acceptable you may indicate your concurrence and authorization to proceed by signing this proposal in the space provided and returning one copy to our office. This proposal becomes void 30 days from the above date. Sincerely, David E. Bat, ASLA The David Bost Group Approved: 12 - iiJ7 Signature Title Date 3 DATE: February 10, 1987 SUBJECT: Council Agenda, February 12, 1987 ITEM: 13D - Consider a resolution authorizing the Mayor to enter into a contract for design of certain irrigation systems. Staff recommends that the David Bost Group 1 hired to design irrigation system and prepare construction documents for Buck Egger Park Kinningham Park Somerset Park Greenhill Park Round Rock Memorial Park This is the second phase of our ongoing park system irrigation program.