Loading...
R-87-977 - 3/31/1987ATTEST: RESOLVED this ,,..1/ day of nne Land, City Secretary RESOLUTION NO. 9 WHEREAS, in conjunction with the construction of the raw water intake facilities at Lake Georgetown, certain equipment must be ordered by Pedernales Electric Cooperative, Inc., and WHEREAS, it is imperative that the project not be delayed due to the upcoming high summer water usage, and a delay in ordering of the equipment by Pedernales Electric Cooperative, Inc. will cause a delay in completing the project, NOW THEREFORE BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS That the Mayor be and is hereby authorized to execute an agreement with Pedernales Electric Cooperative, Inc. for the purchase of equipment, a copy of said agreement being attached hereto and incorporated herein for all purposes. MIKE ROBINSON, Mayor City of Round Rock, Texas , 1987. THE STATE OF TEXAS X COUNTY OF WILLIAMSON X WHEREAS, the City of Round Rock is desirous that Pedernales Electric Cooperative, Inc. (PEC) step down the primary voltage at their raw water intake at Lake Georgetown from 24.9 KV to 12.47 KV. WHEREAS, PEC is willing to provide service at 12.47 KV. NOW, THEREFORE, it is hereby agreed between the City of Round Rock and PEC as follows: 1. City of Round Rock will make payment to PEC the estimated cost of $12,300.00 for the voltage step down. 2. PEC will purchase and install step down equipment and convert metering. Work will be completed within two weeks after receipt of equipment. 3. PEC will, upon completion of the voltage step down, refund any part of the estimated cost not used. 4. The City of Round Rock will, upon completion of the voltage step down, reimburse PEC for any cost in excess of the estimated cost up to $3000.00. EXECUTED in duplicate originals the 25 day of , 1987. KNOW ALL MEN BY THESE PRESENTS: By "ieate Title MAYOR, . By CITY OF ROUND ROCK PEDERNALES ELECTRIC COOPERATIVE, INC. Title �n�,neenv: /'1 It n Ct Electrical tariff PEDERNALES Form 717 -P (Large 500.06 Power Contract) no. section title Agreement made ELECTRIC COOPERATIVE, called "Cooperative," (if not an individual, joint association, WITNESSETH: ELECTRIC COOPERATIVE, INC. RECEIVED ; ++;', _ 5 ° name of utility 500.06 Sheet No. 1 Revision No. 1 Sheet No. 1 Effective October 3 1983 month — 3317 year PEDERNALES ELECTRIC COOPERATIVE, INC. April 28 , 1987 , between PEDERNALES INC., a Texas corporation, hereinafter and The City of Round Rock, A/C #69292100 specify if Texas corporation, partnership, etc.), hereinafter called "Consumer," Cooperative agrees to sell and deliver to Consumer, and Consumer agrees to purchase and receive from Cooperative, for Consumer's use and not for resale, electric power and energy at raw water intake Lake Georgetown hereinafter called "Point of Delivery," upon the following terms: 1. Consumer shall pay Cooperative monthly for service hereunder up to and including 1200 (#xipytg) (horsepower) hereinafter called "Contract Load" at the rates and upon the terms and conditions set forth in Rate Schedule MP1 attached hereto and made a part hereof. Should Coop adopt a different rate schedule or schedules to cover the type of load described above, or should Consumer's load requirement later exceed said Contract Load, and Cooperative is willing to furnish such excess, then Consumer agrees at such time, or times, and thereafter to pay Cooperative at the rates and upon the terms and conditions set forth in the Cooperative's rate schedule then in effect, applicable to service being rendered Consumer. Cooperative agrees to use reasonable diligence to provide the service specified above, but shall not be held liable for damages for any failure to do so. 2. The initial billing period hereunder shall Consumer begins using electric power and energy, or after Cooperative notifies Consumer in writing that available hereunder, whichever shall occur first. 3. Bills for service hereunder shall be due and payable at the office of Cooperative in Johnson Ci v , Texas, monthly within fifteen (15) days from date of bill. If Consumer shall fail to pay any such bill within such fifteen (15) day period, it will be delinquent, and the Cooperative may discontinue service hereunder seven (7) days thereafter, provided the Cooperative, at least seven (7) days prior to disconnecting Consumer, mails a notice to the Consumer that his account is delinquent and that service will be disconnected if the account is not paid in full by the specified date. The Cooperative may, at its option, terminate start when 30 days service is PEDERNALES ELECTRIC COOPERATIVE, INC. name of utility Electrical tariff 500.06 Sheet No. 2 Revision No. 1 Sheet No. 2 Form 717 -P (Large 500.06 Power Contract Effective „ ? Ocx WI no. section title month day year all of its obligations hereunder by giving ten (10) days notice in writing to Consumer following such default, and in case of such discontinuance and /or termination, Consumer shall owe Cooperative not only the amount then due for service hereunder, but as liquidated damages to Cooperative and not as a penalty, a further sum equal to the total for the unexpired term of this agreement of the monthly minimum amounts guaranteed under Cooperative's rate schedule then in effect hereunder. 4. Consumer hereby agrees to abide by all rules and regulations of the Cooperative as set forth in the Cooperative's effective Service Policy and Line Extension Policy, and by all amendments and revisions in said policies as may be made from time to time by the Board of Directors. 5. This agreement is unassignable except by written consent of both parties. 6. Venue of any litigation arising hereunder shall be in Blanco County, Texas. 7. Consumer hereby grants Cooperative rights -of -way and permits necessary for performance hereunder, over, on or upon land owned or controlled by Consumer including, upon the termination of this agreement for any reason, the right to remove from Consumer's premises all meters and other property of Cooperative. 8. This agreement shall become effective on the date first above written and shall remain in effect until years following the start of said initial billing period, a unless written notice is given by either party to the other not less than thirty (30) days before the termination of said year period, then this agreement shall be continued from month to month thereafter until terminated by such written notice given not less than thirty (30) days before the expiration of one such monthly period. IN WITNESS WHEREOF, the parties hereto have caused this agreement to be signed in triplicate as of the date and year first above written. CONSUMER PEDERNALES ELECTRIC OPERATIVE,, INC. By: �2 44-- By: /, '��m ( KO. . LS� _ = Title: MAYOR Title• �� Fnninpar9n7 ManAnpr PEDERNALES ELECTRIC COOPERATIVE, INC. name of utility Electrical 400.09 Sheet No. 1 tariff Revision No. 6 Sheet No. 1 400.09 Schedule MP -1 Effective O tc,h 3 1983 no. section title month day year A14. rates are administered uniformly throughout the Cooperative's se ice area. Form No. 2158 Res. 1, 2- 2I -55, Res. 6, 6- 17 -74, Amended by Res. 5, 6- 21 -76, Revised 4 -1 -83 and in Docket No. 5109. Effective on bills subsequent to PEDERNALES ELECTRIC COOPERATIVE, INC. MUNICIPAL POWER RATE SCHEDULE MP -1 Applicability This schedule is applicable to incorporated municipalities for electric heat, light and power requirements for the operation of water pumps and sewage disposal plants. Character of Service .Alternating current, single or three phase, sixty cycles. Voltage _supplied will be at the discretion of Cooperative and will be determined by the voltage available from distribution lines in the vicinity and /or other conditions. Rate 'Customer Charge: $6.00 per meter. Energy Charge: 5.16C per KWH. The above rate will be increased or decreased in accordance with Schedule PCA. Contract Requirement Customers taking service under this schedule shall be required to execute contracts with minimum term of one year. Payment The above rates are net, the gross rates being five percent (5%) higher. In the event that the current monthly bill is not paid within fifteen (15) days from date of bill, the gross rates shall apply. Service under this schedule is subject to the rules and regulations of the Cooperative as filed with the Public Utility Commission. March 25, 1987 Mr. James Nuse Director of Public Works 214 East Main Round Rock, Texas 78664 Dear Mr. Nuse: Transmitted herewith are duplicate originals of an agreement between PEC and The City of Round Rock for providing service to the raw water intake at Lake Georgetown. Please have the agreements signed by the proper authority and return one of the duplicate originals to this office along with a check made payable to Pedernales Electric Cooperative, Inc. in the amount of $12,300.00. Sincerely, ca PEDERNALE.S electric cooperative, ire. P.O. BOX 467 ❑ JOHNSON CITY, TEXAS ❑ 78636 -0467 Jimmie B. Allen Engineering Manager JBA /dg Encl. JOHNSON CITY BERTRAM CANYON LAKE KYLE -BUDA LAKE TRAVIS MARBLE FALLS DRIPPING SPRINGS Mayor Mike Robinson' `/Mayor Pro- tem ''���`"'v x � Mike HeUMgenstein Council Members Glenn T. King Pete Correa Ronnie Jean Charles Culpepper Trudy L. Lee City Manager Jack A. Harzke City Attorney Donald Lee Wolf • THE CITY OF ROUND ROCK 214 East Main Street Round Rock, Texas 78664 512 -255 -3612 Jimmie B. Allen Engineering Manager Pedernales Electric Cooperative P.O. Box 467 Johnson, City, Texas 78636 -0467 Dear Mr. Allen: April 2, 1987 Attached please find an original signed agreement between the City of Round Rock and your Cooperative as per your request. Also attached is our check No. 004015 in the amount of $12,300.00. If you need any further information, please do not hesitate to contact this office. Sincerely, ACCOUNT NO: DESCRIPTION GROSS DISCOUNT NET AMOUNT TO THE OBOE • of 31 11 6108. Voltage step down at their raw water intake at Lake Georgetown 11'00401511' I :3149706511: DETACH BEFORE DEPOSITING 12,300.00 0.00 THE FACE OF THIS DOCUMENT HAS A COLORED BACKGROUND ON WHITE PAPER HE CLTY �OF- ROUND " "1I4E MA f$ * O'JNO''RQC T E)CAS ?6884 '. ... a ...... .'. BHECK NO.' I1 ■408 00 27811' 12,300.00 , '0000 LNING WITH 4 •,PROUD HERITAGE ", Pedernales Electric Cooperative, Inc. THE BACK OF THIS DOCUMENT CONTAINS AN ARTIFICIAL WATERMARK — HOLD AT AN ANGLE TO VIEW 0.004015 CAPITOL'CIT/ SAVINGS ROUND 60CICTEXAS •" AMOUNT $12,300.00,;