Loading...
R-88-1088 - 2/25/1988Mayor Mike Robinson Mayor Pro -tem Trudy L. Lee Council Members Mike Heitigenstein Glenn T. King Pete Correa Ronnie Jean Charles Culpepper City Manager Robert L. Bennett, Jr. City Attorney Stephen L. Sheets enc. Mr. Keith Hickman OPUS 3, Architects 106 East Fannin Round Rock, Texas 78664 Dear Keith: THE CITY OF ROUND ROCK 221 East Main Street Round Rock, Texas 78664 512- 255 -3612 March 10, 1988 Attached please find your executed copy of the proposal regarding the interior renovation of the Old City Hall Annex Building. City Staff looks forward to working with you on this project. Sincerely, Joanne Land City Secretary RESOLUTION NO. /Mk WHEREAS, architectural services are necessary for the interior renovation of the City Hall Annex for the City of Round Rock, and WHEREAS, the architectural firm of OPUS 3 has submitted an agreement to provide the needed architectural services, and WHEREAS, the City Council wishes to accept said proposal, Now Therefore, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS That the Mayor of the City of Round Rock, Texas, is hereby authorized and directed to execute on behalf of the City, an agreement submitted by OPUS 3, a copy of such agreement being attached hereto and incorporated herein for all purposes. ATTEST: RESOLVED this 25th day of February, 1988. iyunD QirvL JO NE LAND, City Secretary C21RESARCH2 MIKE ROBINSON, Mayor City of Round Rock O ) U PLANNING DESIGN: CONSTRUCTION DOCUMENTS: BIDDING AND NEGOTIATIONS: A Proposal For Architectural Services For The RENOVATION OF THE EXISTING CITY ANNEX FOR THE CITY OF ROUND ROCK, TEXAS Round Rock, Texas 5 February, 1988 This proposal shall be for As -Built Drawings, Design and Construction Documents for the Renovation of the Annex Building for the City of Round Rock, Texas. The following items are included in our range of services: Site Visits As -Built Drawings of Interior Schematic Design Design Development Meetings with Client and Others Probable Cost of Construction Architectural Drawings Specifications Issue Plans and Specifications Issue Clarifications and Addendum Assist at Bid Letting 106 East Fannin Round Rock, Texas 78664 1704 1/2 S. Congress, Studio D Austin, Texas 78704 ARCHITECTS Page 1 of 3 HHANhX.pro (512) 255 -9690 (512) 442 -2159 CONSTRUCTION OBSERVATION: Regular Site Visits Critical Phase Site Visits Shop Drawings and Product Samples Payment Certificates Verification Certificate of Substantial Completion Page 2 of 3 Additional Services will be provided upon request and billed at the following rates: Principal Staff Architect Intern Architect Clerical $ 75.00 per hour $ 50.00 per hour $ 35.00 per hour $ 25.00 per hour Payments shall be due at the end of the design development phase and on a monthly basis for the construction documents phase. A ten (10) percent retainer is included as part of our fee. The following is only an estimate and could vary either down or up, depending upon the complexity of the final design and existing conditions. APPROXIMATE FEE SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS BIDDING & NEGOTIATING CONSTRUCTION OBSERVATION $ 300.00 $ 400.00 $ 800.00 $ 100.00 $ 200.00 TOTAL S 2,000.00 RRANEX.pro The preceding costs may be be taken in whole or in part. Some phases are dependent on other phases for their completion. We welcome the opportunity to sit down with you and discuss this proposal and its costs. This proposal shall serve as the agreement between the City and OPUS 3, Architects. OPUS 3, Architects stands ready to begin this work as soon as we receive written approval to begin work and contracts have been signed by the designated parties. Thank you for allowing us to make this proposal. We look forward to working with you on your project. Approved by: .2-a -J -aO Date C i t Y of Rock polo 1988 Date OPUS 3, Architects Page 3 of 3 RRANEX.pro DATE': February 22, 1988 SUBJECT: Council Agenda, February 25, 1988 ITEM: 13B. Consider a resolution authorizing the Mayor to enter into a contract with Opus 3 for architectural services. STAFF RESOURCE PERSON: Sam Huey This contract is for work to be performed in the City Hall Annex Renovation to a Civic Center type of facility. Funds for this contract will be paid from the hotel /motel tax receipts set aside for the Civic Center project.