Loading...
R-89-1218 - 1/12/1989WHEREAS, the City Council is desirous of obtaining an analysis of the surface water supply for the City of Round Rock, Texas, and WHEREAS, Haynie, Kallman and Gray, Inc., has submitted a proposal to provide said surface water analysis, Now Therefore, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City a contract with Haynie, Kallman and Gray, Inc., for a surface water analysis, a• copy of said contract being attached hereto and incorporated herein for all purposes. RESOLVED this 12th day of January, 1989. ATTEST: am( NE LAND, City Secretary C37RESHKG RESOLUTION NO. /c//i 2 MIKE ROBINSON, Mayor City of Round Rock, Texas DATE: SUBJECT: ITEM: ECONOMIC IMPACT: January 10, 1989 STAFF RESOURCE PERSON: Jim Muse Council Agenda, January 12, 1989 8G. Consider a resolution authorizing the Mayor to enter into a contract with Haynie Kallman and Gray, Inc., for Surface Water Analysis. STAFF RECOMMENDATION: Accept proposal and enter into Engineering Services Contract with Haynie Kallman & Gray. This analysis is vital to long range planning of the water utility. The purpose of this analysis is to examine current and proposed "key" elements of the delivery and treatment scheme and identify triggers for implementation. Site planning, land acquisition, and field note preparation is also included. Please note this is on an hourly rate basis and the engineers have reduced their hourly rate charge. December 21, 1988 James R. Huse, P.E. Director of Public Works City of Round Rock 300 S. Blair Street Round Rock, Texas 78664 Haynie Kallman r &Gray, Inc. Re: Proposal for Professional Services Surface Water Analysis Dear Jim: The recent dry weather has prompted the City of Round Rock to reevaluate its existing ground and surface water production capabilities. The well system is suffering from lower than normal water levels, which lowers production capacity so as not to adversely impact water quality. This has resulted in the City depending upon its surface water treatment plant to insure adequate water production. The City has subsequently requested this proposal from our firm to identify critical elements in the City's surface water production capabilities and plan for the future expansion of these facilities, based on projected needs. Haynie Kallman & Gray, Inc. is pleased to present the City with this proposal to perform this study effort. Task 1 - Analyze Key Components of the Water Production System: This effort would involve the analysis of the various production component capabilities to determine critical factors and key elements that need to be constructed to insure dependable production with increased growth and resultant demands on the water system. Facilities (i.e. water treatment plant, intake, storage, transmission lines and raw water lines) would be evaluated, as well as raw water sources (i.e. Lakes Georgetown, Granger and Stillhouse Hollow), and production management (i.e. firm yields of ground and surface water capacities, Lakes Georgetown to Granger pump- over). Project cost estimates would be developed for the recommended improvements. 12303 Technology Blvd., Suite ] Austin, Texas 78727 (512) 250-8611 Civil Engineering Consultants Municipal Engineering land Planning Surveying James R. Nuse, P.E. December 21, 1988 Page 2 Re: Proposal for Professional Services - Surface Water Analysis Task 2 - Develop "Trigger" Schedule for Improvement Implementation: Based on the results of Task 1, a critical path analysis would be developed. Projected connection or service demands would "trigger" the need to implement the necessary improvements. Schedules and engineering /construction time frames would be developed to allow sufficient lead time for implementation. Task 3 - Preliminary Engineering /Site Planning for Proposed Improvements: The required improvements will be addressed in sufficient detail to determine projected land areas needed to construct the required improvements. Key areas include the Lake Georgetown intake, raw water transmission main, and existing water treatment plant facility (water treatment plant, clearwell and pump station). Alternate sites and /or expansion of existing facilities will be evaluated and land areas established. Task 4 - Field Note Preparation for Water Plant and Raw Water Intgke Sites: Pending City approval of the recommended improvements and required facilities for the water plant or raw water intake sites, field notes and legal descriptions for the new land areas needing to be acquired would be prepared. This would assist the City in site acquisition. Should the trigger date for the next raw water transmission main indicate a need to move forward on easement acquisition, we will submit an additional separate request for authorization to prepare the field notes and permit applications for the 8 -1/2 miles of easements necessary for that improvement. We would propose to perform these services on a lump sum basis for Tasks 1, 2 and 3 and on an hourly basis in accordance with the attached Hourly Rate Schedule for Task 4. The cost for these services is as follows: James R. Nuse, P.E. December 21, 1988 Page 3 Re: Proposal for Professional Services - Surface Water Analysis We would estimate work on Tasks 1, 2 and 3 to be completed within 90 days of your authorization to proceed and Task 4 within 30 days following a City decision on the sites to be acquired. We will work closely with the City staff through Mr. Jim Nuse, and hold regular meetings to update the staff on our progress. Ten copies of all reports resulting from these tasks will be furnished to the City at no additional cost. If the terms of the proposal meet with your approval, please have Mayor Robinson or a qualified representative sign the two originals of this letter in the space provided below authorizing this expenditure. Please return one original to our office and retain one for your files. Work on the project will commence upon receipt of the signed authorization letter. As always, we thank the City for the opportunity to be of service and we look forward to working with you on this project. Cordially, HAYNIE KALLMAN & GRAY, INC. Steven D. Kallman, P.E., R.P.S. SDK /c la Attachment - Hourly Rate Schedule icc: Patrick A. Lackey, P.E., Project Manager AUTHORISED BY THE CITY OF ROUND ROCK By: Mike Robinson, Mayor Task 1 - $15,000; Task 2 - $15,000; Task 3 - $10,000; and Task 4 - $ 5.000 maximum Total - $45,000 Date HAYNIE HALLMAN & GRAY, INC. HOURLY RATE SCHEDULE CLASSIFICATION HOURLY RATE 1. Registered Professional Engineer $ 75 2. Registered Public Surveyor $ 60 3. Project Manager /Hydrologist $ 55 4. Engineer -in - Training (E.I.T.) $ 45 5. Land Planner $ 50 6. Survey Crew Coordinator $ 40 7. Project Representative (includes Vehicle and Equipment) $ 40 8. Design Technician $ 35 9. Drafter $ 30 10. Survey Calculation Technician $ 40 11. Technical Support Personnel $ 30 12. Secretarial Personnel $ 25 13. Four Man Survey Crew (includes Vehicle and Equipment) $ 80 14. Three Man Survey Crew (includes Vehicle and Equipment) $ 75 15. Two Man Survey Crew (includes Vehicle and Equipment) $ 65 16. Reimbursement for Direct Non -Labor Expenses and Sub - Contract Expenses - Cost Plus 20% Revised 1 -9 -89