R-89-1237 - 2/9/1989WHEREAS, the City of Round Rock has requested proposals for the
design of the Chisholm Trail Fire Substation, and
WHEREAS, Opus 3 has submitted the best proposal, and
WHEREAS, the City Council wishes to accept the proposal of Opus
3, Now Therefore,
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS,
That the proposal of Opus 3 is hereby accepted as the best
proposal, and the Mayor is hereby authorized and directed to execute
on behalf of the City a contract with Opus 3 to design the Chisholm
Trail Fire Substation.
RESOLVED this 9th day of February, 1989.
ATTEST:
NE LAND, City Secretary
C37RESOPUS3
RESOLUTION NO. /22 7/:
MIKE ROBINSON, Mayor
City of Round Rock, Texas
0 P IJ S
17 January, 1989
Mr. Jim Nuse
City of Round Rock
221 East Main Avenue
Round Rock, Texas 78664
Re: Architectural Fee Proposal
Chisholm Trail Fire Sub Station
Dear Mr. Nuse:
We are pleased to present this proposal /contract for architectural services for the
above referenced project. This project is for a fire sub station to be located at the
intersection of Rawhide and Old West Drive in the Chisholm Trail Subdivision in
Round Rock, Texas. The following is a scope of services OPUS 3, Architects is
proposing to provide.
ARCHITECTURAL SERVICES
1. Written Program - Meeting with Fire Chief to ascertain requirements for the
new facility. Visit similar facilities in area with Fire Chief. Provide written
program to city of final program documents. Present approved Preliminary
Plans to City Council.
2. Preliminary Drawings:
a.)
b.)
c.)
Preliminary Site Plan with Building and Parking
Preliminary Floor Plan
Preliminary Exterior Elevations
3. Preliminary Probable Cost of Construction based on square foot costs.
4. Architectural Fees for the above services: $ 2,000.00
106 East Fannin Round Rock, Texas 78664
1704 1/2 S. Congress, Studio D Austin, Texas 78704
s
ARCHITECTS
(512) 255 -9690
(512) 442 -2159
ITEMS TO BE FURNISHED BY CITY OF ROUND ROCK:
1. Boundary, topographic, tree, utility and easement survey.
2. Geotechnical investigation with pavement recommendations.
3. Schedule for completion.
4. Any special forms for correspondence, field reports, etc.
We are able to start our services upon written acceptance of this proposal. We will
bill the City on a monthly basis for services performed. In order to insure the
orderly and continuous progress of the project, the Architect shall be compensated
for his services and expenses within ten (10) days of the billings. For accounts past
thirty (30) days the Architect may charge interest at the rate of one and one -half
(1.5%) per month from the due date. The Owner shall reimburse the Architect for
all expenses related to collections of compensation due the Architect. These
expenses consist of, but are not limited to, Attorney's fees, court cost, lost time,
etc. Work performed outside the scope of services outlined above will be billed
out on an hourly basis at the following rates:
Principal - $ 75.00
Architect - $ 60.00
Draftsman - $ 30.00
Clerical - $ 25.00
This proposal is based on the general terms and conditions of the standard AIA
Document C141a - Standard Form of Agreement Between Architect and Engineer,
1977 Edition.
If you agree with the terms of this proposal, please sign both proposals, and return
one complete contract to our office. Please retain the second contract for your
records.
Thank you for the opportunity to submit this proposal and your cooperation.
OPUS 3, Architects looks forward to working with you and having a very successful
project.
Keith A. Hickman, A.I.A.
OPUS 3, Architects
ACCEPTED:
Name
Date
RECEIVED JAN 1 7 1989
0 P IJ S 3
17 January, 1989
Mr. Jim Nuse
City of Round Rock
221 East Main Avenue
Round Rock, Texas 78664
Re: Architectural Fee Proposal
Chisholm Trail Fire Sub Station
Dear Mr. Nuse:
We are pleased to present this proposal /contract for architectural services for the
above referenced project. This project is for a fire sub station to be located at the
intersection of Rawhide and Old West Drive in the Chisholm Trail Subdivision in
Round Rock, Texas. The following is a scope of services OPUS 3, Architects is
proposing to provide.
ARCHITECTURAL SERVICES
1. Written Program - Meeting with Fire Chief to ascertain requirements for the
new facility. Visit similar facilities in area with Fire Chief. Provide written
program to city of final program documents. Present approved Preliminary
Plans to City Council.
2. Preliminary Drawings:
a.)
b.)
c.)
Preliminary Site Plan with Building and Parking
Preliminary Floor Plan
Preliminary Exterior Elevations
3. Preliminary Probable Cost of Construction based on square foot costs.
4. Architectural Fees for the above services: $ 2,000.00
106 East Fannin Round Rock, Texas 78664
1704 1/2 S. Congress, Studio D Austin, Texas 78704
ARCHITECTS
(512) 255 -9690
(512) 442 -2159
ITEMS TO BE FURNISHED BY CITY OF ROUND ROCK:
1. Boundary, topographic, tree, utility and easement survey.
2. Geotechnical investigation with pavement recommendations.
3. Schedule for completion.
4. Any special forms for correspondence, field reports, etc.
We are able to start our services upon written acceptance of this proposal. We will
bill the City on a monthly basis for services performed. In order to insure the
orderly and continuous progress of the project, the Architect shall be compensated
for his services and expenses within ten (10) days of the billings. For accounts past
thirty (30) days the Architect may charge interest at the rate of one and one -half
(1.5 %) per month from the due date. The Owner shall reimburse the Architect for
all expenses related to collections of compensation due the Architect. These
expenses consist of, but are not limited to, Attorney's fees, court cost, lost time,
etc. Work performed outside the scope of services outlined above will be billed
out on an hourly basis at the following rates:
Principal - $ 75.00
Architect - $ 60.00
Draftsman - $ 30.00
Clerical - $ 25.00
This proposal is based on the general terms and conditions of the standard AIA
Document C141a - Standard Form of Agreement Between Architect and Engineer,
1977 Edition.
If you agree with the terms of this proposal, please sign both proposals, and return
one complete contract to our office. Please retain the second contract for your
records.
Thank you for the opportunity to submit this proposal and your cooperation.
OPUS 3, Architects looks forward to working with you and having a very successful
project.
Sincerely,
Keith A. Hickman, A.I.A.
OPUS 3, Architects
ACCEPTED:
Name
Date
DATE: February 7, 1989
SUBJECT: Council Agenda, February 9, 1989
ITEM: 9H. Consider a resolution authorizing the Mayor to enter
into an agreement with Opus 3 for the design of the
Chisholm Trail Fire Sub Station.
STAFF RESOURCE PERSON: Jim Nuse /Lynn Bizzell
STAFF RECOMMENDATION: To accept the preliminary architectural
services agreement submitted by Opus 3. This is for the
preliminary design only.