R-89-1303 - 7/13/1989WHEREAS, the City of Round Rock, Texas desires an engineering
design for Corridor Drive, and
WHEREAS, Haynie and Kallman, Inc. has submitted a proposal for
engineering services to design Corridor Drive, and
WHEREAS, the City Council desires to accept the proposal of
Haynie and Kallman, Inc., Now Therefore,
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS
That the Mayor is hereby authorized and directed to execute on
behalf of the City of Round Rock, Texas, an agreement with Haynie and
Kallman, Inc. for the design of Corridor Drive.
RESOLVED this 13th day of July, 1989.
ATTEST:
.rr /112D) j AWL/
JO E LAND, City Secretary
C45RESENGIN
RESOLUTION NO. /J ®3 /e/
MIKE ROBINSON, Mayor
City of Round Rock, Texas
DATE: July 10, 1989
SUBJECT: Council Agenda, July 13, 1989
ITEM: 13D. Consider a resolution authorizing the Mayor to
enter into a contract with Haynie and Kallman,
Inc. for the design of Corridor Drive.
STAFF RESOURCE PERSON: Joe Vining, Jim Nuse
STAFF RECOMMENDATION:
Staff is recommending the authorization of a contract for engineering
design work on the extension of Corridor Drive. Although staff does
not have a final agreement with all the property owners on how the
City is to be repaid, District 14 of SDHPT is requesting the plans
prior to their approval of the traffic signal for Corridor Dr. and
FM 1325. Therefore, timely completion of these plans can help this
project move toward completion this year.
ECONOMIC IMPACT: The cost of this project has been approved in
the 1989 Capital Budget.
March 22, 1989
James R. Nuse, P.E.
Director of Public Works
City of Round Rock
300 S. Blair Street
Round Rock, Texas 78664
Re: Engineering Services Agreement (Revised)
Corridor Drive Street and Drainage Improvements
Dear Mr. Nuse:
Pursuant to your request, enclosed please find two revised originals of
page 1 and Attachment No. 1 for insertion in the Engineering Services
Agreements (the "Agreement ") for the Corridor Drive Street and Drainage
Improvement project which was submitted to you March 9, 1989. The
revisions reflect the cost for the eastern one -half of an approximate
1,450 L.F. 60 -foot wide face -to -face curb and gutter street section and
all associated drainage improvements rather than the full width
project. For your convenience, the changes on page 1 have been
"redlined ".
If you have any further questions or comments concerning this
Agreement, please advise.
Cordially,
HAYNIE KALLMAN & GRAY, INC.
2 , toiaka
St € ven D. Hallman, P.E., R.P.S.
SDK /c la
Enclosures
Haynie eerily, Inc.
Consulting Engineers
cc: Robert L. Bennett, AICP, City Manager; City of Round Rock
icc: A. William Waeltz, Project Manager
12303 Technology Blvd., Suite] Austin,Te us 78727 (512) 2508611
Civil Engineering Consultants Municipal Engineering land Planning Surveying
MADE AND ENTERED INTO by and between the CITY OF ROUND ROCK, TEXAS,
hereinafter called the "Owner ", and HAYNIE & KALLMAN, INC., Consulting
Engineers, hereinafter called the "Engineer ".
The Owner intends to construct CORRIDOR DRIVE STREET AND DRAINAGE
IMPROVEMENTS, including the eastern one -half of approximately 1,450
L.F. of 60 -foot face -to -face curb and gutter street and all associated
drainage improvements from existing Corridor Drive northerly to F.M.
1325 (refer to Attachment No. 1). Such improvements are hereinafter
referred to as the "Project ". The estimated cost for the„half -width
project is $136,517.40 including construction costs, engineering and
contingencies.
SECTION I
EMPLOYMENT OF ENGINEER
The Owner agrees to employ the Engineer and the Engineer agrees to
perform professional engineering services in connection with the
Project as stated in the Sections to follow, and for having rendered
such services, the Owner agrees to pay to the Engineer compensation as
stated in the Sections to follow.
The Engineer shall render the following professional services
necessary for the development of the Project.
A. PRELIMINARY PHASE
1. Attend preliminary conference with the Owner regarding the
Project.
2. Perform preliminary engineering services in connection with
the Project in sufficient detail to indicate clearly the problems
involved and the alternate solutions available to the Owner, to include
preliminary layouts, sketches, and cost estimates for the Project, and
to set forth clearly the Engineer's recommendations. If called for by
the scope of the assignment, prepare a preliminary engineering report.
ESA CORIDR (Revised 03/22/89)
ENGINEERING SERVICES AGREEMENT
RECITALS
CONTRACTUAL UNDERTAKINGS
SECTION II
CHARACTER AND EXTENT OF SERVICES
-1-
3. When a written report is prepared, furnish the Owner ten (10)
copies of the preliminary report, including preliminary layouts,
sketches and cost estimates.
B. DESIGN PHASE
1. Establish the scope, and advise the Owner, of any soil and
foundation investigations or any special surveys or special testing
which, in the opinion of the Engineer, may be required for the proper
execution of the Project; and arrange with the Owner for the conduct of
such investigations and tests. (The performance of these
investigations and tests is not a part of the Engineer's basic
services, and compensation therefore is not included in the Basic
Charge; it may be performed by the Engineer, by agreement with the
Owner, in which case compensation shall be determined by the applicable
portions of Section VI D.)
2. Furnish to the Owner, where required by the circumstances of
the assignment, the engineering data necessary for applications for
routine permits by local, state, and federal authorities (as
distinguished from detailed applications and supporting documents for
government grants -in -aid, state loan programs, planning advances or to
meet the requirements of special programs of the federal government).
3. Perform field surveys to collect information which, in the
opinion of the Engineer, is required in the design of the Project.
Construction staking for the Construction Improvements is not included
in the Basic Charge.
4. Prepare detailed specifications and contract drawings, in
pencil on paper, for construction authorized by the Owner. These
designs shall in all respects combine the application of sound
engineering principles with a high degree of economy, and shall be
submitted to the applicable local, state, and federal agencies for
approval.
5. Prepare detailed cost estimates and proposals of authorized
construction, which shall include summaries of bid items and quantities
which will be based, wherever practical, on the unit price system of
bidding. The Engineer shall not be required to guarantee the accuracy
of these estimates.
6. Furnish the Owner all necessary copies of approved plans,
specifications, notices to bidders, and proposals. All sets of plans
and specifications in excess of twenty -five (25) are to be paid for
separately. Additional sets will be paid for in accordance with
Attachment No. 4 - Hourly Rate Schedule.
-2-
7. Provide information on utilities to be relocated in
connection with the Project. The Owner will provide excavation to
determine location and depth of underground water and sewer lines.
Utilities to be relocated by others shall be noted on the plans.
City -owned utilities to be relocated also shall be noted on the plans.
Where feasible, relocation of City -owned utilities shall be included in
the construction contract.
8. Provide a letter for the Owner's signature to each utility
operating within the City of Round Rock advising them of the Project
and describing any known relocations to be performed by that utility
and setting forth a proposed construction schedule. This letter and a
complete set of plans shall be delivered to each utility by the
Engineer. The Engineer shall provide timely assistance and location
stakes as necessary for utility relocations to assure that utility
relocations do not delay the Project.
9. Provide easement and right -of -way descriptions to the Owner
in conjunction with submission of final plans. These will be provided
in the form of field notes and drawings of the affected properties.
These services will be paid for in accordance with Attachment No. 4 -
Hourly Rate Schedule.
10. Provide field note descriptions to the Owner for any site(s)
that is required for Owner to acquire that is associated with this
Project. These descriptions will be provided within thirty (30) days
after authorization by Owner, barring unforeseen and unusual
difficulties associated with the property. These services will be paid
for in accordance with Attachment No. 4 - Hourly Rate Schedule.
C. CONSTRUCTION PHASE
1. Assist the Owner in the advertisement of the Project for
bids.
2. Assist the Owner in the opening and tabulating of bids for
construction of the Project, and recommend to the Owner as to the
proper action on all proposals received.
3. Assist in the preparation of formal Contract Documents for
the contracts.
4. Make periodic visits to the site (as distinguished from the
continuous services of a Resident Project Representative described in
Subparagraph 6 below) to observe the progress and quality of the
executed work and to determine, in general, if the work is proceeding
in accordance with the Contract Documents. In performing this service,
the Engineer will not be required to make exhaustive or continuous
on-site inspections to check the quality or quantity of the work or
-3--
material; he will not be responsible for the techniques and sequences
of construction or the safety precautions incident thereto, and he will
not be responsible or liable in any degree for the Contractor's failure
to perform the construction work in accordance with the Contract
Documents. During visits to the construction site, and on the basis of
the Engineer's on -site observations as an experienced and qualified
design professional, he will keep the Owner informed of the extent of
the progress of the work, and advise the Owner of material and
substantial defects and deficiencies in the work of Contractors which
are discovered by the Engineer or otherwise brought to the Engineer's
attention in the course of construction, and may, on behalf of the
Owner, exercise whatever rights the Owner may have to disapprove work
and materials as failing to conform to the Contract Documents.
5. Consult with and advise the Owner; issue all instructions to
the Contractor requested by the Owner; and prepare routine change
orders as required.
6. If specifically authorized by the Owner in writing, furnish
the services of Resident Project Representatives, and other field
personnel for continuous on -the -site observation of construction and
for the performance of required construction layout surveys. (This
service is not a part of the Engineer's basic services, and
compensation therefore is not included in the Basic Charge; if
provided, compensation shall be determined under Section VI D.) The
authority and duties of such Resident Project Representatives are
limited to examining the material furnished and observing the work
done, and to reporting their findings to the Engineer. The Engineer
will use the usual degree of care and prudent judgment in the section
of competent Project Representatives, and the Engineer will use
diligence to see that the Project Representatives are on the job to
perform their required duties. It is agreed, however, that the
Engineer does not underwrite, guarantee, or insure the work done by the
Contractors, and since it is the Contractor's responsibility to perform
the work in accordance with the Contract Documents, the Engineer is not
responsible or liable for the Contractor's failure to do so, and, so
long as the Engineer has exercised the usual degree of care and prudent
judgment in selecting Project Representatives and has used diligence to
see that they are on the job to perform the work, failure by any
Project Representatives or other personnel engaged in on- the -site
observation to discover defects or deficiencies in the work of the
Contractors shall never relieve the Contractors of liability therefore
or subject the Engineer to any liability for such defects or
deficiencies.
7. Review samples, catalog data, schedules, shop drawings,
laboratory, shop and mill tests of materials and equipment and other
data which the Contractor is required to submit, only for conformance
with the design concept of the Project and compliance with the
information given by the Contract Documents; and assemble written
guarantees which are required by the Contract Documents.
-4-
8. Review monthly and final estimates for payments to
Contractors, and furnish to the Owner any necessary certifications as
to payments to Contractors and Suppliers.
9. Conduct, in company with the Owner, a final inspection of the
Project for conformance with the design concept of the Project and
compliance with the Contract Documents, and approve in writing final
payment to the Contractors.
10. Revise contract drawings, with the assistance of the Resident
Project Representatives and the Owner's representatives, to provide
record drawings of the completed Project. Furnish one set of
reproducible drawings and one set of prints of these revised drawings
to the Owner.
SECTION III
AUTHORIZATION OF SERVICES
No professional services of any nature shall be undertaken by the
Engineer under this Agreement until he has received authorization from
the Owner.
SECTION IV
PERIOD OF SERVICE
This Agreement shall be effective upon execution by the Owner and
the Engineer, and shall remain in force until terminated under the
provisions hereinafter provided in Section X.
SECTION V
COORDINATION WITH THE OWNER
The Engineer shall hold a 10% and 40% Design Review Conference
with the Owner, or its representatives, to the end that the Project, as
perfected, shall have full benefit of the Owner's experience and
knowledge of existing needs and facilities, including preliminary line
routings, approved manufacturers of materials and equipment, and other
pertinent items relative to the Project and updated cost estimates, and
consistent with its current policies and construction standards. To
implement this coordination, the Owner shall make available to the
Engineer, for use in planning the Project, all existing plans, maps,
field notes, statistics, computations, and other data in his possession
relative to existing facilities and to the Project.
-5-
SECTION VI
THE ENGINEER'S COMPENSATION
For and in consideration of the services to be rendered by the
Engineer, the Owner shall pay, and the Engineer shall receive the
compensation hereinafter set forth, for the Preliminary, Design, and
Construction Phases of the work and for Special Assignments and
Services not included in these phases. All remittances by Owner of
such compensation shall either be mailed or delivered to the Engineer's
office in Round Rock, Williamson County, Texas. Where the compensation
is based on a percentage of construction cost, the charge for each
separate phase shall be based on the "Construction Cost" of all work
authorized by the Owner at one time, and handled by the Engineer in
accordance with this Agreement.
"Construction Cost" is defined as the total cost to the Owner for
the execution of the work authorized at one time and handled in each
separate phase of engineering services, excluding fees or other cost
for engineering and legal services, the cost of land, rights -of -way,
legal and administrative expenses; but including the direct cost to the
Owner of all construction contracts, items of construction, including
labor, materials, and equipment required for the completed work
(including extras) and the total value at site of Project of all labor,
materials, and equipment purchased or furnished directly by the Owner
for the Project.
The aggregate of all sums paid to the Engineer for each phase of
construction will equal one hundred percent (100%) of the basic
compensation determined from the actual total construction costs. If
the designed facilities exceed the available funding after receiving
bids or negotiating a contract price, then the facilities which are
deleted will be paid for at a later date when they are awarded for
construction. These facilities will be considered an individual period
of construction and payment will be in an amount equal to a percentage
of the "construction cost" of this separate Project. For example: If
the available funds will only build 90% of the designed facilities, the
fee for the awarded construction will be paid as described herein.
When the remaining 10% of the work is awarded, it will be considered a
separate Project and a percentage from the curve based on the 10%
Project amount will be used to pay the basic compensation. Considering
this as an individual Project, it will be necessary to compensate the
Engineer in this manner because of the extra work involved in the
preparation of separate contract documents, organization of plans,
construction administration on the delayed Project, and the delay in
payment for the Engineering Services rendered.
In the event that proposals for construction of any of the work
authorized in the Design Phase are received within 90 days after
submission of completed contract drawings and specifications to the
Owner by the Engineer, the charge for the corresponding services in the
-6-
Design Phase and the charge for the corresponding services in the
Preliminary Phase shall be adjusted to the "construction cost" as
reflected by the lowest acceptable proposal, or lowest bona fide bid,
if no contract is awarded. Where no proposal or bona fide bids are
received, the Engineer's estimates shall be the basis for final payment
for these two phases. No reduction shall be made from the Basic Charge
on account of penalties or liquidated damages or other sums withheld
from Contractor's payments.
A. PRELIMINARY PHASE
Payment for services in the Preliminary Phase shall be made to the
Engineer on an hourly basis. See Attachment No. 4 - Hourly Rate
Schedule.
Final payment for services in the Preliminary Phase shall be
payable upon submission to the Owner of the required report, sketches,
and estimates, and upon his acceptance, which shall be within thirty
(30%) days after submission.
B. DESIGN PHASE
Payment for services in the Design Phase shall be made to the
Engineer in a sum equal to a percentage of the "construction cost" of
the work authorized by the Owner in this Phase of the Project. This
percentage for the Design Phase shall be computed as eighty -five
percent (85%) of the Basic Charge, which Basic Charge is defined by
Attachment No. 2, less fees paid for Preliminary Phase.
The classification of the construction work (Classification "A" or
"B ") for the purpose of applying the alternate Basic Charge is that
given in Attachment No. 3 - Classification of Construction Work.
This sum will be paid in installments in proportion to the
engineer's estimate of work completed at the 10% and 40% "complete"
periods and 100% upon submission of completed plans to the Owner, up to
85% of the total Basic Charge. Payment for services authorized in the
Design Phase shall be based upon the Engineer's Preliminary Estimate of
the "construction cost" of the work. This Design Phase payment shall
then be adjusted to the actual "construction cost" within thirty (30)
days after the project is awarded and the Owner and Contractor have
executed the Contract Documents.
C. CONSTRUCTION PHASE
Payment for services in the Construction Phase shall be made to
the Engineer in a sum equal to a percentage of the "construction cost"
of the work authorized by the Owner in this Phase of the Project. This
-7-
percentage for the Construction Phase shall be computed as fifteen
percent (15 %) of the Basic Charge, which Basic Charge is defined in
Attachment No. 2.
The classification of the construction work (Classification "A" or
"B ") is that given in Attachment No. 3 - Classification of Construction
Work.
This sum will be paid in monthly installments in proportion to the
construction work completed, on the basis of the Engineer's estimates
prepared for monthly payments to contractors, plus the actual value of
all materials and equipment purchased or furnished directly by the
Owner for the Project. Upon completion of all work authorized in the
Construction Phase, the Engineer will be paid the remainder of the
charge for this Phase.
D. SPECIAL ASSIGNMENTS AND SERVICES NOT INCLUDED
IN ABOVE PERCENTAGE CHARGES
The charges above described in the Preliminary, Design and
Construction Phases shall provide compensation to the Engineer for all
services called for under this Agreement to be performed by him, or
under his direction, except the services set forth below. These
excluded services and Special Assignments, and the compensation to be
paid by the Owner to the Engineer for their performance, as required,
are as follows:
The following services (1 through 8), if authorized by the Owner,
shall be reimbursed in accordance with Attachment No. 4 - Hourly Rate
Schedule.
1. Services of a Resident Project Representative, and other
field personnel as required, for on- the -site observation of
construction.
2. Services for Design Surveys if not included in Basic Charge.
3. Services for Construction Layout Surveys (Construction
Staking).
4. Land surveys and establishment of boundaries and monuments.
5. Preparation of property or easement descriptions.
6. Preparation of any special reports required for marketing of
bonds.
7. Appearance before regulatory agencies.
-8-
8. Special investigations involving detailed consideration of
operation, maintenance and overhead expenses; preparation of rate
schedules; earnings and expense statements; special feasibility
studies; appraisals; valuations; and material audits or inventories
required for certification of force account construction performed by
the Owner.
9. Additional copies of reports and specifications (over 25) and
additional blue print copies (over 25).
10. Preparation of applications and supporting documents for
government grants, loans or planning advances for public works
projects.
11. Assistance to the Owner as an expert witness in any
litigation with third parties, arising from the development or
construction of the Project.
12. Soil and foundation investigations, as required for the
design of this Project and for Trench Safety Design, including test and
analyses of test results.
Basis of Compensation: (a) Furnished by the Owner and observed by the
Engineer in accordance with Attachment No. 4 - Hourly Rate Schedule, or
(b) Owner contract separately with qualified testing firm.
13. Detailed mill, shop and /or laboratory inspection of materials
or equipment.
Basis of Compensation: (a) Furnished directly by the Owner, or (b) By
Engineer in accordance with Attachment No. 4 - Hourly Rate Schedule.
14. Extra travel required of the Engineer and authorized by the
Owner from Round Rock to points other than the State of Texas in
connection with the Project.
Basis of Compensation: Cost of travel and living expenses plus a
twenty percent (208) service charge. Cost of labor in accordance with
Attachment No. 4 - Hourly Rate Schedule.
15. Services for location stakes associated with the Project as
necessary for utility companies operating within the City Limits of
Round Rock.
Payments to the Engineer for authorized services not in the basic
percentage charges will be made by the Owner, upon presentation of
statements by the Engineer for such services, but not until Bond or
Grant funds are in the Owner's possession.
-9-
Should the Owner fail to make payment to the Engineer of the sum
names in any partial or final statement when payment is past due for
more than thirty (30) days, then the Owner shall pay to the Engineer,
in addition to the sum shown as due by such statement, interest thereon
at the current prime rate of banking institutions in Round Rock, from
the date due, as provided herein, until fully paid, which shall fully
liquidate any injury to the Engineer arising from such delay in
payment, but the right is expressly reserved to the Engineer in event
payments are not promptly made as provided herein, at any time
thereafter to treat the Agreement as terminated by the Owner and
recover compensation as provided by Section X of this Agreement.
SECTION VII
REVISION TO DRAWINGS AND SPECIFICATIONS
The Engineer will make, without expense to the Owner, such
revisions of the preliminary drawings as may be required to meet the
needs of the Owner, but after a definite plan has been approved by the
Owner, if a decision is subsequently made by the Owner, which, for its
proper execution, involves extra services and expenses for changes in,
or addition to the drawings, specifications or other documents, or if
the Engineer is put to labor or expense by delays imposed on him from
causes not within his control, such as by (but not limited to) the
readvertisement for bids or by the delinquency or insolvency of
Contractors, the Engineer shall be compensated for such extra services
and expenses, which services and expenses shall not be considered as
covered by the percentage fee stipulated in this Agreement.
Compensation for such extra services shall be in accordance with
Attachment No. 4 - Hourly Rate Schedule. However, no extra
compensation will be granted to the Engineer for correcting errors in
the plans or errors in the design of the Project or for revising design
or plans when such design and plans prove not to be feasible for
construction.
SECTION VIII
OWNERSHIP OF DOCUMENTS
Engineer shall retain ownership of all original documents, plan
designs, and survey notes on all projects that are not completed and
for which Engineer is not compensated regardless of whether the
instruments were copyrighted. Additionally, all such documents for
which Engineer is not compensated Owner will not reuse for extensions
of the original project or new projects unless Owner shall secure the
permission of Engineer and Engineer shall be entitled to further
compensation for the use of such documents.
All original documents, plan designs, and survey notes for
completed or partially completed projects for which Engineer has been
-10-
compensated shall be the property of Owner and Engineer and
reproducible copies shall be furnished to the Owner upon request. The
use by either party of such documents is unrestricted.
SECTION IX
ARBITRATION UNDER TEXAS GENERAL ARBITRATION ACT
A. Any controversy hereafter arising between Owner and Engineer
in connection with this Agreement and any liability or claimed
liability created hereunder or incident hereto or pertaining to the
enforcement of any provision, condition or covenant herein shall be
submitted to arbitration under the terms of the Texas General
Arbitration Act. Either party may invoke this provision for
arbitration by giving the other party notice in writing demanding that
such controversy be submitted to arbitration, which notice shall also
contain the appointment of an arbitrator by the demanding party. The
party receiving such notice of arbitration must, within five (5) days
after receiving same, mail to the demanding party a notice of
appointment of a second arbitrator. Such two arbitrators shall meet
forthwith and agree in writing upon a third arbitrator, and shall
immediately give the parties written notice of the third arbitrator's
appointment.
B. If the party upon whom the demand for arbitration is served
fails to give the demanding party the required notice of the
appointment of the second arbitrator within the required five (5) days,
the demanding party may apply to the court under Article 226, Revised
Statutes of 1925, to appoint the second arbitrator. If the first two
arbitrators fail to agree upon a third arbitrator within ten (10) days
from the date the second arbitrator was appointed, either party may
apply to the court, under such Article 225, for the appointment of the
third arbitrator.
C. The proceedings of the arbitrators, the award made by the
arbitrators and the endorsement of such awards shall be governed by the
Texas General Arbitration Act, Articles 224 through 238 -6, inclusive,
Revised Statutes of 1925, as amended.
D. This entire Section IX providing for arbitration shall
survive the termination of this Agreement under any of its provisions,
and any controversy between Owner and Engineer existing when the
Agreement terminates shall continue to be subject to arbitration
hereunder.
SECTION X
TERMINATION
Either party to this Agreement may terminate the Agreement by
giving to the other thirty (30) days notice in writing. Upon delivery
of such notice by the Owner to the Engineer, and upon expiration of the
thirty -day period, the Engineer shall discontinue all services in
connection with the performance of this Agreement and shall proceed to
cancel promptly all existing orders and contracts insofar as such
orders or contracts are chargeable to this Agreement. As soon as
practicable after receipt of notice of termination, the Engineer shall
submit a statement, showing in detail the services performed under this
Agreement to the date of termination. The Owner shall then pay the
Engineer promptly that portion of the prescribed charges which the
services actually performed under this Agreement bear to the total
services called for under this Agreement, less such payments on account
of the charges as have been previously made. Copies of all completed
or partially completed designs, plans and specifications prepared under
this Agreement shall be delivered to the Owner when and if this
Agreement is terminated, but subject to the restrictions, as to their
use, as set forth in Section VIII.
SECTION XI
ADDRESS OF NOTICES AND COMMUNICATION
All notices and communication under this Agreement to be mailed or
delivered to Engineer shall be to the following address:
Haynie 6 Xallman, Inc.
Consulting Engineers
309 East Main Street
Round Rock, Texas 78664
All notices and communication under this Agreement to be mailed or
delivered to the Owner shall be to the following address:
City of Round Rock
221 E. Main Street
Round Rock, Texas 7B664
SECTION XII
SECTION CAPTIONS
Each Section under the Contractual Undertakings has been supplied
with a caption to serve only as a guide to the contents. The caption
does not control the meaning of any Section or in any way determine its
interpretation or application.
-12-
The Engineer will felfill the scope of services included in the
Project in a professional and timely manner. The Owner's wishes and
requirements regarding the Project will be conveyed through the City's
Director of Public Works, with whom the Engineer shall confer
frequently throughout the Design Phase of the Project. The date for
completion of the Design Phase is ninety (90) calendar days following
execution of this Agreement.
SECTION XIV
SUCCESSORS AND ASSIGNS
The Owner and thy Engineer each binds himself and his successors,
executors, administrators, and assigns to the other party of this
Agreement and to the successors, executors, administrators, and assigns
of such other party, in respect to all covenants of this Agreement.
Except as above, neither the Owner nor the Engineer shall assign,
sublet or transfer his interest in this Agreement without the written
consent of the other. Nothing herein shall be construed as creating
any public body which may be a party hereto.
EXECUTED in two counterparts (each of which is an original) on
behalf of the Engineer by its Vice President shown below, and on behalf
of the Owner by its Mayor (thereunto duly authorized) this the
day of , 198
Attest:
Joanne Land, City Secretary
Attest:
Cheryl At strong
SECTION XIII
SCHEDULE OF .COMPLETION
CITY OF ROUND ROCK
Mike Robinson, Mayor
HAYNIE & KALLMAN, INC.
Steven D. Kallman, P.E., R.P.S.
Vice President
-13-
54 4174
ATTACHMENT NO. 1
SUMMARY OF PRELIMINARY COST ESTIMATE FOR
CORRIDOR DRIVE STREET AND DRAINAGE IMPROVEMENTS
1. Eastern one -half of approximately 1,450 L.F. of
60 -foot wide face -to -face curb and gutter street,
including all associated appurtenances @ $113,764.50
20% Engineering and %.ontingencies 22,752.90
TOTAL ESTIMATED PROJECT COST $136,517.40
ATTACHMENT NO. 3
CLASSIFICATION OF CONSTRUCTION WORK
CURVE A will apply to assignments of which the following are typical
examples (payment for design surveys included with below assignments
except where shown otherwise):
Water treatment plants
Sewage and industrial waste treatment plants
Sanitary sewage collection lines under 24 -inch diameter
Water pumping stations
Sewage lift stations
Open- section streets, no curb and gutter, and associated drainage
improvements (NO DESIGN SURVEYS INCLUDED IN BASIC CHARGE)
Curb and gutter, streets and associated drainage improvements
Bridges, box culverts and major drainage structures
Water distribution lines 12" and larger (on Curve "A" due to
profile being required on Plans)
Water storage tank renovation, including re- painting, yard piping,
or tank appurtenances
CURVE B' will apply to less complicated assignments of which the
following are examples (payment for design surveys included with below
assignments except where shown otherwise):
Sanitary sewage collection lines 24" diameter and over
Water distribution lines under 12"
Water storage tanks (elevated, ground storage and standpipes)
Earthwork
Storm sewers 24" diameter and over
NOTE&
(1) When CensMictlon Colt Is ruder $100,000, the reins.
• owsable basis of compensation.
� Gasfruction cost below Is the work authorized at one time.
, where the work is to be accomplished in a number of
separate construction contracts. Men each such prefect element
should be evaluated on an Individual basis, with additional
compensation to the Engineer.
(3) The Basic Charge presented below represents median cem-
pensation. The appropriate compensation for any given assign.
14
la
la
11
10
•
•
7
a
a1111111■1111 �uuu11111
_.I11111 •.II1111
1111111111111 IN1111111111 1
11111111111111 111111•11111111
111uiu111i_ aii1111
�$UI1111! �
■11111111 1■1111111111111111
11•u111111111110IM 1111
�.. ■1111��UU�
_.uu1111_&I ■lI111
MINNIlll_st. 1111
�.��1111 ■► 1111
111111111111111111■2 ■��111
111111111111
0.mI1111
11111111111111 101111111111111 ����
1•111111111111 M11111111
�SII1111
�RIU1111
1111111111111 �uuu1111
11111111111111 111111111111111 MINI 11
MINIM
11111111111111 ��1111111
- �lu1111
111111111111111 _ _J �11au1111
la4 MUM
MINIM
1111i1111111 ∎1111111e111111 11111111111111
111UI1.111I_ 1111111 O111111111111
1111.I.IIi:!1111111111..::!I1 _ 111111111111111
111111111I1111•12■111
111m■■I111 111111111111111 11111111111111
•1ii1111 11111111111111 11111111111111
0.01
0.01 0.1
CONSTRUCTION COST
0.0
emit may my obese or below the curve, depending upon csm
Pini�•
(4) Compensation ler alteration perk should be increased by at
Nast enedhkd above Me median mien Illustrated.
(5) Curve A and Curve 0 ire es nstent with Curve A and Curve It
in Manual nears. New curves MI be luued subsequent revision m
published by ASCE.
s .
MILLIONS OF DOLLARS
10
10 ,n.0
ATTACHMENT NO. 4
HAYNIE & KALLMAN, INC.
HOURLY RATE SCHEDULE
CLASSIFICATION HOURLY RATE
1. Registered Professional Engineer $ 75
2. Registered Public Surveyor $ 60
3. Project Manager /Hydrologist $ 55
4. Engineer -in- Training (E.I.T.) $ 45
5. Land Planner $ 50
6. Survey Crew Coordinator $ 40
7. Project Representative (includes Vehicle and Equipment) $ 40
8. Design Technician $ 35
9. Drafter $ 30
10. Survey Calculation Technician $ 40
11. Technical Support Personnel $ 30
12. Secretarial Personnel $ 25
13. Four Man Survey Crew (includes Vehicle and Equipment) $ 80
14. Three Man Survey Crew (includes Vehicle and Equipment) $ 75
15. Two Man Survey Crew (includes Vehicle and Equipment) $ 65
16. Reimbursement for Direct Non -Labor Expenses and
Sub - Contract Expenses - Cost Plus 20%
Revised 1 -9 -89
March 22, 1989
James R. Nuse, P.E.
Director of Public Works
City of Round Rock
300 S. Blair Street
Round Rock, Texas 78664
Re: Engineering Services Agreement (Revised)
Corridor Drive Street and Drainage Improvements
Dear Mr. Nuse:
Pursuant to your request, enclosed please find two revised originals of
page 1 and Attachment No. 1 for insertion in the Engineering Services
Agreements (the "Agreement ") for the Corridor Drive Street and Drainage
Improvement project which was submitted to you March 9, 1989. The
revisions reflect the cost for the eastern one -half of an approximate
1,450 L.F. 60 -foot wide face -to -face curb and gutter street section and
all associated drainage improvements rather than the full width
project. For your convenience, the changes on page 1 have been
"redlined ".
If you have any further questions or comments concerning this
Agreement, please advise.
Cordially,
HAYNIE HALLMAN & GRAY, INC.
j6 LJ i 6/(Lce.-5_
St ven D. Hallman, P.E., R.P.S.
Haynie Kaman &Gray, Inc.
Consubing Engineers
SDK /c la
Enclosures
cc: Robert L. Bennett, AICP, City Manager: City of Round Rock
icc: A. William Waeltz, Project Manager
12303 Technology Blvd., Suite.) Ausun,Taras 78727 5121 25043611
Civil Engineering Consultanis Municipal Engineering land Plmning Surveying
ENGINEERING SERVICES AGREEMENT
MADE AND ENTERED INTO by and between the CITY OF ROUND ROCK, TEXAS,
hereinafter called the "Owner ", and HAYNIE & KALLMAN, INC., Consulting
Engineers, hereinafter called the "Engineer ".
RECITALS
The Owner intends to construct CORRIDOR DRIVE STREET AND DRAINAGE
IMPROVEMENTS, including the eastern one -half of approximately 1,450
L.F. of 60 -foot face -to -face curb and gutter street and all associated
drainage improvements from existing Corridor Drive northerly to F.M.
1325 (refer to Attachment No. 1). Such improvements are hereinafter
referred to as the "Project ". The estimated cost for the„half -width
project is including construction costs, engineering and
contingencies.
ESA CORIDR (Revised 03/22/89)
CONTRACTUAL UNDERTAKINGS
SECTION I
EMPLOYMENT OF ENGINEER
The Owner agrees to employ the Engineer and the Engineer agrees to
perform professional engineering services in connection with the
Project as stated in the Sections to follow, and for having rendered
such services, the Owner agrees to pay to the Engineer compensation as
stated in the Sections to follow.
SECTION II
CHARACTER AND EXTENT OF SERVICES
The Engineer shall render the following professional services
necessary for the development of the Project.
A. PRELIMINARY PHASE
1. Attend preliminary conference with the Owner regarding the
Project.
2. Perform preliminary engineering services in connection with
the Project in sufficient detail to indicate clearly the problems
involved and the alternate solutions available to the Owner, to include
preliminary layouts, sketches, and cost estimates for the Project, and
to set forth clearly the Engineer's recommendations. If called for by
the scope of the assignment, prepare a preliminary engineering report.
3. When a written report is prepared, furnish the Owner ten (10)
copies of the preliminary report, including preliminary layouts,
sketches and cost estimates.
B. DESIGN PHASE
1. Establish the scope, and advise the Owner, of any soil and
foundation investigations or any special surveys or special testing
which, in the opinion of the Engineer, may be required for the proper
execution of the Project; and arrange with the Owner for the conduct of
such investigations and tests. (The performance of these
investigations and tests is not a part of the Engineer's basic
services, and compensation therefore is not included in the Basic
Charge; it may be performed by the Engineer, by agreement with the
Owner, in which case compensation shall be determined by the applicable
portions of Section VI D.)
2. Furnish to the Owner, where required by the circumstances of
the assignment, the engineering data necessary for applications for
routine permits by local, state, and federal authorities (as
distinguished from detailed applications and supporting documents for
government grants -in -aid, state loan programs, planning advances or to
meet the requirements of special programs of the federal government).
3. Perform field surveys to collect information which, in the
opinion of the Engineer, is required in the design of the Project.
Construction staking for the Construction Improvements is not included
in the Basic Charge.
4. Prepare detailed specifications and contract drawings, in
pencil on paper, for construction authorized by the Owner. These
designs shall in all respects combine the application of sound
engineering principles with a high degree of economy, and shall be
submitted to the applicable local, state, and federal agencies for
approval.
5. Prepare detailed cost estimates and proposals of authorized
construction, which shall include summaries of bid items and quantities
which will be based, wherever practical, on the unit price system of
bidding. The Engineer shall not be required to guarantee the accuracy
of these estimates.
6. Furnish the Owner all necessary copies of approved plans,
specifications, notices to bidders, and proposals. All sets of plans
and specifications in excess of twenty -five (25) are to be paid for
separately. Additional sets will be paid for in accordance with
Attachment No. 4 - Hourly Rate Schedule.
-2-
7. Provide information on utilities to be relocated in
connection with the Project. The Owner will provide excavation to
determine location and depth of underground water and sewer lines.
Utilities to be relocated by others shall be noted on the plans.
City -owned utilities to be relocated also shall be noted on the plans.
Where feasible, relocation of City -owned utilities shall be included in
the construction contract.
S. Provide a letter for the Owner's signature to each utility
operating within the City of Round Rock advising them of the Project
and describing any known relocations to be performed by that utility
and setting forth a proposed construction schedule. This letter and a
complete set of plans shall be delivered to each utility by the
Engineer. The Engineer shall provide timely assistance and location
stakes as necessary for utility relocations to assure that utility
relocations do not delay the Project.
9. Provide easement and right - of-way descriptions to the Owner
in conjunction with submission of final plans. These will be provided
in the form of field notes and drawings of the affected properties.
These services will be paid for in accordance with Attachment No. 4 -
Hourly Rate Schedule.
10. Provide field note descriptions to the Owner for any site(s)
that is required for Owner to acquire that is associated with this
Project. These descriptions will be provided within thirty (30) days
after authorization by Owner, barring unforeseen and unusual
difficulties associated with the property. These services will be paid
for in accordance with Attachment No. 4 - Hourly Rate Schedule.
C. CONSTRUCTION PHASE
1. Assist the Owner in the advertisement of the Project for
bids.
2. Assist the Owner in the opening and tabulating of bids for
construction of the Project, and recommend to the Owner as to the
proper action on all proposals received.
3. Assist in the preparation of formal Contract Documents for
the contracts.
4. Make periodic visits to the site (as distinguished from the
continuous services of a Resident Project Representative described in
Subparagraph 6 below) to observe the progress and quality of the
executed work and to determine, in general, if the work is proceeding
in accordance with the Contract Documents. In performing this service,
the Engineer will not be required to make exhaustive or continuous
on -site inspections to check the quality or quantity of the work or
-3-
material; he will not be responsible for the techniques and sequences
of construction or the safety precautions incident thereto, and he will
not be responsible or liable in any degree for the Contractor's failure
to perform the construction work in accordance with the Contract
Documents. During visits to the construction site, and on the basis of
the Engineer's on -site observations as an experienced and qualified
design professional, he will keep the Owner informed of the extent of
the progress of the work, and advise the Owner of material and
substantial defects and deficiencies in the work of Contractors which
are discovered by the Engineer or otherwise brought to the Engineer's
attention in the course of construction, and may, on behalf of the
Owner, exercise whatever rights the Owner may have to disapprove work
and materials as failing to conform to the Contract Documents.
5. Consult with and advise the Owner; issue all instructions to
the Contractor requested by the Owner= and prepare routine change
orders as required.
6. If specifically authorized by the Owner in writing, furnish
the services of Resident Project Representatives, and other field
personnel for continuous on- the -site observation of construction and
for the performance of required construction layout surveys. (This
service is not a part of the Engineer's basic services, and
compensation therefore is not included in the Basic Charge; if
provided, compensation shall be determined under Section VI D.) The
authority and duties of such Resident Project Representatives are
limited to examining the material furnished and observing the work
done, and to reporting their findings to the Engineer. The Engineer
will use the usual degree of care and prudent judgment in the section
of competent Project Representatives, and the Engineer will use
diligence to see that the Project Representatives are on the job to
perform their required duties. It is agreed, however, that the
Engineer does not underwrite, guarantee, or insure the work done by the
Contractors, and since it is the Contractor's responsibility to perform
the work in accordance with the Contract Documents, the Engineer is not
responsible or liable for the Contractor's failure to do so, and, so
long as the Engineer has exercised the usual degree of care and prudent
judgment in selecting Project Representatives and has used diligence to
see that they are on the job to perform the work, failure by any
Project Representatives or other personnel engaged in on- the -site
observation to discover defects or deficiencies in the work of the
Contractors shall never relieve the Contractors of liability therefore
or subject the Engineer to any liability for such defects or
deficiencies.
7. Review samples, catalog data, schedules, shop drawings,
laboratory, shop and mill tests of materials and equipment and other
data which the Contractor is required to submit, only for conformance
with the design concept of the Project and compliance with the
information given by the Contract Documents; and assemble written
guarantees which are required by the Contract Documents.
-4-
8. Review monthly and final estimates for payments to
Contractors, and furnish to the Owner any necessary certifications as
to payments to Contractors and Suppliers.
9. Conduct, in company with the Owner, a final inspection of the
Project for conformance with the design concept of the Project and
compliance with the Contract Documents, and approve in writing final
payment to the Contractors.
10. Revise contract drawings, with the assistance of the Resident
Project Representatives and the Owner's representatives, to provide
record drawings of the completed Project. Furnish one set of
reproducible drawings and one set of prints of these revised drawings
to the Owner.
SECTION III
AUTHORIZATION OF SERVICES
. No professional services of any nature shall be undertaken by the
Engineer under this Agreement until he has received authorization from
the Owner.
SECTION IV
PERIOD OF SERVICE
This Agreement shall be effective upon execution by the Owner and
the Engineer, and shall remain in force until terminated under the
provisions hereinafter provided in Section X.
SECTION V
COORDINATION WITH THE OWNER
The Engineer shall hold a 10% and 40% Design Review Conference
with the Owner, or its representatives, to the end that the Project, as
perfected, shall have full benefit of the Owner's experience and
knowledge of existing needs and facilities, including preliminary line
routings, approved manufacturers of materials and equipment, and other
pertinent items relative to the Project and updated cost estimates, and
consistent with its current policies and construction standards. To
implement this coordination, the Owner shall make available to the
Engineer, for use in planning the Project, all existing plans, maps,
field notes, statistics, computations, and other data in his possession
relative to existing facilities and to the Project.
-5-
SECTION VI
THE ENGINEER'S COMPENSATION
For and in consideration of the services to be rendered by the
Engineer, the Owner shall pay, and the Engineer shall receive the
compensation hereinafter set forth, for the Preliminary, Design, and
Construction Phases of the work and for Special Assignments and
Services not included in these phases. All remittances by Owner of
such compensation shall either be mailed or delivered to the Engineer's
office in Round Rock, Williamson County, Texas. Where the compensation
is based on a percentage of construction cost, the charge for each
separate phase shall be based on the "Construction Cost" of all work
authorized by the Owner at one time, and handled by the Engineer in
accordance with this Agreement.
"Construction Cost" is defined as the total cost to the Owner for
the execution of the work authorized at one time and handled in each
separate phase of engineering services, excluding fees or other cost
for engineering and legal services, the cost of land, rights -of -way,
legal and administrative expenses; but including the direct cost to the
Owner of all construction contracts, items of construction, including
labor, materials, and equipment required for the completed work
(including extras) and the total value at site of Project of all labor,
materials, and equipment purchased or furnished directly by the Owner
for the Project.
The aggregate of all sums paid to the Engineer for each phase of
construction will equal one hundred percent (100%) of the basic
compensation determined from the actual total construction costs. If
the designed facilities exceed the available funding after receiving
bids or negotiating a contract price, then the facilities which are
deleted will be paid for at a later date when they are awarded for
construction. These facilities will be considered an individual period
of construction and payment will be in an amount equal to a percentage
of the "construction cost" of this separate Project. For example: If
the available funds will only build 90% of the designed facilities, the
fee for the awarded construction will be paid as described herein.
When the remaining 10% of the work is awarded, it will be considered a
separate Project and a percentage from the curve based on the 10%
Project amount will be used to pay the basic compensation. Considering
this as an individual Project, it will be necessary to compensate the
Engineer in this manner because of the extra work involved in the
preparation of separate contract documents, organization of plans,
construction administration on the delayed Project, and the delay in
payment for the Engineering Services rendered.
In the event that proposals for construction of any of the work
authorized in the Design Phase are received within 90 days after
submission of completed contract drawings and specifications to the
Owner by the Engineer, the charge for the corresponding services in the
-6-
Design Phase and the charge for the corresponding services in the
Preliminary Phase shall be adjusted to the "construction cost" as
reflected by the lowest acceptable proposal, or lowest bona fide bid,
if no contract is awarded. Where no proposal or bona fide bids are
received, the Engineer's estimates shall be the basis for final payment
for these two phases. No reduction shall be made from the Basic Charge
on account of penalties or liquidated damages or other sums withheld
from Contractor's payments.
A. PRELIMINARY PHASE
Payment for services in the Preliminary Phase shall be made to the
Engineer on an hourly basis. See Attachment No. 4 - Hourly Rate
Schedule.
Final payment for services in the Preliminary Phase shall be
payable upon submission to the Owner of the required report, sketches,
and estimates, and upon his acceptance, which shall be within thirty
(30%) days after submission.
B. DESIGN PHASE
Payment for services in the Design Phase shall be made to the
Engineer in a sum equal to a percentage of the "construction cost" of
the work authorized by the Owner in this Phase of the Project. This
percentage for the Design Phase shall be computed as eighty -five
percent (85%) of the Basic Charge, which Basic Charge is defined by
Attachment No. 2, less fees paid for Preliminary Phase.
The classification of the construction work (Classification "A" or
"B") for the purpose of applying the alternate Basic Charge is that
given in Attachment No. 3 - Classification of Construction Work.
This sum will be paid in installments in proportion to the
engineer's estimate of work completed at the 10% and 40% "complete"
periods and 100% upon submission of completed plans to the Owner, up to
85% of the total Basic Charge. Payment for services authorized in the
Design Phase shall be based upon the Engineer's Preliminary Estimate of
the "construction cost" of the work. This Design Phase payment shall
then be adjusted to the actual "construction cost" within thirty (30)
days after the project is awarded and the Owner and Contractor have
executed the Contract Documents.
C. CONSTRUCTION PHASE
Payment for services in the Construction Phase shall be made to
the Engineer in a sum equal to a percentage of the "construction cost"
of the work authorized by the Owner in this Phase of the Project. This
-7-
percentage for the Construction Phase shall be computed as fifteen
percent (15%) of the Basic Charge, which Basic Charge is defined in
Attachment No. 2.
The classification of the construction work (Classification "A" or
"B ") is that given in Attachment No. 3 - Classification of Construction
Work.
This sum will be paid in monthly installments in proportion to the
construction work completed, on the basis of the Engineer's estimates
prepared for monthly payments to contractors, plus the actual value of
all materials and equipment purchased or furnished directly by the
Owner for the Project. Upon completion of all work authorized in the
Construction Phase, the Engineer will be paid the remainder of the
charge for this Phase.
D. SPECIAL ASSIGNMENTS AND SERVICES NOT INCLUDED
IN ABOVE PERCENTAGE CHARGES
The charges above described in the Preliminary, Design and
Construction Phases shall provide compensation to the Engineer for all
services called for under this Agreement to be performed by him, or
under his direction, except the services set forth below. These
excluded services and Special Assignments, and the compensation to be
paid by the Owner to the Engineer for their performance, as required,
are as follows:
The following services (1 through 8), if authorized by the Owner,
shall be reimbursed in accordance with Attachment No. 4 - Hourly Rate
Schedule.
1. Services of a Resident Project Representative, and other
field personnel as required, for on- the -site observation of
construction.
2. Services for Design Surveys if not included in Basic Charge.
3. Services for Construction Layout Surveys (Construction
Staking).
4. Land surveys and establishment of boundaries and monuments.
5. Preparation of property or easement descriptions.
6. Preparation of any special reports required for marketing of
bonds.
7. Appearance before regulatory agencies.
-8-
S. Special investigations involving detailed consideration of
operation, maintenance and overhead expenses; preparation of rate
schedules; earnings and expense statements; special feasibility
studies; appraisals; valuations; and material audits or inventories
required for certification of force account construction performed by
the Owner.
9. Additional copies of reports and specifications (over 25) and
additional blue print copies (over 25).
10. Preparation of applications and supporting documents for
government grants, loans or planning advances for public works
projects.
11. Assistance to the Owner as an expert witness in any
litigation with third parties, arising from the development or
construction of the Project.
12. Soil and foundation investigations, as required for the
design of this Project and for Trench Safety Design, including test and
analyses of test results.
Basis of Compensation: (a) Furnished by the Owner and observed by the
Engineer in accordance with Attachment No. 4 - Hourly Rate Schedule, or
(b) Owner contract separately with qualified testing firm.
13. Detailed mill, shop and /or laboratory inspection of materials
or equipment.
Basis of Compensation: (a) Furnished directly by the Owner, or (b) By
Engineer in accordance with Attachment No. 4 - Hourly Rate Schedule.
14. Extra travel required of the Engineer and authorized by the
Owner from Round Rock to points other than the State of Texas in
connection with the Project.
Basis of Compensation: Cost of travel and living expenses plus a
twenty percent (20%) service charge. Cost of labor in accordance with
Attachment No. 4 - Hourly Rate Schedule.
15. Services for location stakes associated with the Project as
necessary for utility companies operating within the City Limits of
Round Rock.
Payments to the Engineer for authorized services not in the basic
percentage charges will be made by the Owner, upon presentation of
statements by the Engineer for such services, but not until Bond or
Grant funds are in the Owner's possession.
-9-
Should the Owner fail to make payment to the Engineer of the sum
names in any partial or final statement when payment is past due for
more than thirty (30) days, then the Owner shall pay to the Engineer,
in addition to the sum shown as due by such statement, interest thereon
at the current prime rate of banking institutions in Round Rock, from
the date due, as provided herein, until fully paid, which shall fully
liquidate any injury to the Engineer arising from such delay in
payment, but the right is expressly reserved to the Engineer in event
payments are not promptly made as provided herein, at any time
thereafter to treat the Agreement as terminated by the Owner and
recover compensation as provided by Section X of this Agreement.
SECTION VII
REVISION TO DRAWINGS AND SPECIFICATIONS
The Engineer will make, without expense to the Owner, such
revisions of the preliminary drawings as may be required to meet the
needs of the Owner, but after a definite plan has been approved by the
Owner, if a decision is subsequently made by the Owner, which, for its
proper execution, involves extra services and expenses for changes in,
or addition to the drawings, specifications or other documents, or if
the Engineer is put to labor or expense by delays imposed on him from
causes not within his control, such as by (but not limited to) the
readvertisement for bids or by the delinquency or insolvency of
Contractors, the Engineer shall be compensated for such extra services
and expenses, which services and expenses shall not be considered as
covered by the percentage fee stipulated in this Agreement.
Compensation for such extra services shall be in accordance with
Attachment No. 4 - Hourly Rate Schedule. However, no extra
compensation will be granted to the Engineer for correcting errors in
the plans or errors in the design of the Project or for revising design
or plans when such design and plans prove not to be feasible for
construction.
SECTION VIII
OWNERSHIP OF DOCUMENTS
Engineer shall retain ownership of all original documents, plan
designs, and survey notes on all projects that are not completed and
for which Engineer is not compensated regardless of whether the
instruments were copyrighted. Additionally, all such documents for
which Engineer is not compensated Owner will not reuse for extensions
of the original project or new projects unless Owner shall secure the
permission of Engineer and Engineer shall be entitled to further
compensation for the use of such documents.
All original documents, plan designs, and survey notes for
completed or partially completed projects for which Engineer has been
-10-
compensated shall be the property of Owner and Engineer and
reproducible copies shall be furnished to the Owner upon request. The
use by either party of such documents is unrestricted.
SECTION IX
ARBITRATION UNDER TEXAS GENERAL ARBITRATION ACT
A. Any controversy hereafter arising between Owner and Engineer
in connection with this Agreement and any liability or claimed
liability created hereunder or incident hereto or pertaining to the
enforcement of any provision, condition or covenant herein shall be
submitted to arbitration under the terms of the Texas General
Arbitration Act. Either party may invoke this provision for
arbitration by giving the other party notice in writing demanding that
such controversy be submitted to arbitration, which notice shall also
contain the appointment of an arbitrator by the demanding party. The
party receiving such notice of arbitration must, within five (5) days
after receiving same, mail to the demanding party a notice of
appointment of a second arbitrator. Such two arbitrators shall meet
forthwith and agree in writing upon a third arbitrator, and shall
immediately give the parties written notice of the third arbitrator's
appointment.
B. If the party upon whom the demand for arbitration is served
fails to give the demanding party the required notice of the
appointment of the second arbitrator within the required five (5) days,
the demanding party may apply to the court under Article 226, Revised
Statutes of 1925, to appoint the second arbitrator. If the first two
arbitrators fail to agree upon a third arbitrator within ten (10) days
from the date the second arbitrator was appointed, either party may
apply to the court, under such Article 225, for the appointment of the
third arbitrator.
C. The proceedings of the arbitrators, the award made by the
arbitrators and the endorsement of such awards shall be governed by the
Texas General Arbitration Act, Articles 224 through 238 -6, inclusive,
Revised Statutes of 1925, as amended.
D. This entire Section IX providing for arbitration shall
survive the termination of this Agreement under any of its provisions,
and any controversy between Owner and Engineer existing when the
Agreement terminates shall continue to be subject to arbitration
hereunder.
SECTION X
TERMINATION
Either party to this Agreement may terminate the Agreement by
giving to the other thirty (30) days notice in writing. Upon delivery
of such notice by the Owner to the Engineer, and upon expiration of the
thirty -day period, the Engineer shall discontinue all services in
connection with the performance of this Agreement and shall proceed to
cancel promptly all existing orders and contracts insofar as such
orders or contracts are chargeable to this Agreement. As soon as
practicable after receipt of notice of termination, the Engineer shall
submit a statement, showing in detail the services performed under this
Agreement to the date of termination. The Owner shall then pay the
Engineer promptly that portion of the prescribed charges which the
services actually performed under this Agreement bear to the total
services called for under this Agreement, less such payments on account
of the charges as have been previously made. Copies of all completed
or partially completed designs, plans and specifications prepared under
this Agreement shall be delivered to the Owner when and if this
Agreement is terminated, but subject to the restrictions, as to their
use, as set forth in Section VIII.
SECTION XI
ADDRESS OF NOTICES AND COMMUNICATION
All notices and communication under this Agreement to be mailed or
delivered to Engineer shall be to the following address:
Haynie & Kallman, Inc.
Consulting Engineers
309 East Main Street
Round Rock, Texas 78664
All notices and communication under this Agreement to be mailed or
delivered to the Owner shall be to the following address:
City of Round Rock
221 E. Main Street
Round Rock, Texas 78664
SECTION XII
SECTION CAPTIONS
Each Section under the Contractual Undertakings has been supplied
with a caption to serve only as a guide to the contents. The caption
does not control the meaning of any Section or in any way determine its
interpretation or application.
-12--
SECTION XIII
SCHEDULE OF , OMPLETION
The Engineer will fulfill the scope of services included in the
Project in a professional and timely manner. The Owner's wishes and
requirements regarding the Project will be conveyed through the City's
Director of Public works, with whom the Engineer shall confer
frequently throughout the Design Phase of the Project. The date for
completion of the Design Phase is ninety (90) calendar days following
execution of this Agreement.
SECTION XIV
SUCCESSORS AND ASSIGNS
The Owner and the Engineer each binds himself and his successors,
executors, administrators, and assigns to the other party of this
Agreement and to the successors, executors, administrators, and assigns
of such other party, in respect to all covenants of this Agreement.
Except as above, neither the Owner nor the Engineer shall assign,
sublet or transfer his interest in this Agreement without the written
consent of the other. Nothing herein shall be construed as creating
any public body which may be a party hereto.
EXECUTED in two counterparts (each of which is an original) on
behalf of the Engineer by its Vice President shown below, and on behalf
of the Owner by its Mayor (thereunto duly authorized) this the
day of , 1989.
Attest:
Joanne Land, City Secretary Mike Robinson, Mayor
Attest: HAYNIE & KALLMAN, INC.
Cheryl strong Steven D. Kallman, P.E., R.P.S.
Vice President
CITY OF ROUND ROCK
-13-
ATTACHMENT NO. 1
SUMMARY OF PRELIMINARY COST ESTIMATE FOR
CORRIDOR DRIVE STREET AND DRAINAGE IMPROVEMENTS
1. Eastern one -half of approximately 1,450 L.F. of
60 -foot wide face -to -face curb and gutter street,
including all associated appurtenances @
20% Engineering and 1.ontingencies
TOTAL ESTIMATED PROJECT COST
$113,764.50
22,752.90
$136,517.40
ATTACHMENT NO. 3
CLASSIFICATION OF CONSTRUCTION WORK
CURVE A will apply to assignments of which the following are typical
examples (payment for design surveys included with below assignments
except where shown otherwise):
Water treatment plants
Sewage and industrial waste treatment plants
Sanitary sewage collection lines under 24 -inch diameter
Water pumping stations
Sewage lift stations
Open- section streets, no curb and gutter, and associated drainage
improvements (NO DESIGN SURVEYS INCLUDED IN BASIC CHARGE)
Curb and gutter, streets and associated drainage improvements
Bridges, box culverts and major drainage structures
Water distribution lines 12" and larger (on Curve "A" due to
profile being required on Plans)
Water storage tank renovation, including re- painting, yard piping,
or tank appurtenances
CURVE B" will apply to less complicated assignments of which the
following are examples (payment for design surveys included with below
assignments except where shown otherwise):
Sanitary sewage collection lines 24" diameter and over
Water distribution lines under 12"
Water storage tanks (elevated, ground storage and standpipes)
Earthwork
Storm sewers 24" diameter and over
NOTES: (1) rearm won Cat Is wider $100.000, use rah*
• hireable basis of conmemalion.
(2) ta:slrudien cost below Is the wort autharbed al one thee.
However, where the work is to be accomplished in a number of
separate s be ev lual.. en an contracts, i individual each with �1
compensation to the Engineer.
(3)1 Basic Charge presented below represents median com-
pensation. The appropriate compensation k► soy given assign -
14
12
13
u
1e
•
e
7
•
•
4
1•uuI1111
�aII1111
�RII1111
�uiu1111_�UuI
�R��1111 �UUI1111
111111111111111111.11111111111111111 �11■�1111\ ∎��1111111
�Uii1111�1��NU
�mui1111��uuI
�uau1111 , ■u1111
.111111111111 111: 1111
�.ii1111���l► 1111
��11111111!� ■115111
� ►
1B11111� i711111
1 0U��1111
111111111111111 - ulu1111
� �auu1111
1 11111111
� �UUI1111
1 �Rlu1111
111111111111111 •111111111111 11111111111111
� 1M 1111
11111111111111
�a��1111
11111.1111111111 1•111111111111 1111111111111 1111111111111111 � aui1111
011111111111 111111111111111 11111111111111 11•111111111111 /u
MINIM
- �
\1111I ��UN11111 �R1 11111
�� 1111 ' 1 1 1 `'�
�uuu11i.—�Ua !1 MI 11
����1111���i;111���
- U111111 �r._-1 1111 1111
�� '
11111111��11�1111 ff....- MI
r■
11•U•u1111 11111111111111 11111111111111
111111111111111 1111111111111111 11111111111111
0.01
0.01 e.1
as 1 e
MILLIONS OF DOLLARS
wad may vary above or below the curer, depending upon oar-
plasRy.
(4) cun:peaetlew far alludka work should be Increased by at
Mast emMhbd above the median eampeosatiun gbntwtsd.
n consisted r
(3) Curve A and Curs S an with Cue A and Calve •
in Manuel CIS, published by the Amok= Society of Civil Emil-
ar
nes. New curves wain be issued as subsequent revisions are
published by ASCE.
10
40 100
ATTACHMENT NO. 4
HAYNIE 6 RALLMAN, INC.
HOURLY RATE SCHEDULE
CLASSIFICATION HOURLY RATE
1. Registered Professional Engineer $ 75
2. Registered Public Surveyor $ 60
3. Project Manager /Hydrologist $ 55
4. Engineer -in- Training (E.I.T.) $ 45
5. Land Planner $ 50
6. Survey Crew Coordinator $ 40
7. Project Representative (includes Vehicle and Equipment) $ 40
B. Design Technician $ 35
9. Drafter $ 30
10. Survey Calculation Technician $ 40
11. Technical Support Personnel $ 30
12. Secretarial Personnel $ 25
13. Four Man Survey Crew (includes Vehicle and Equipment) $ 80
14. Three Man Survey Crew (includes Vehicle and Equipment) $ 75
15. Two Man Survey Crew (includes Vehicle and Equipment) $ 65
16. Reimbursement for Direct Non -Labor Expenses and
Sub - Contract Expenses - Cost Plus 208