R-89-1316 - 8/10/1989WHEREAS, the City of Round Rock desires a design for electrical
engineering for the wastewater system at Old Settler's Park at Palm
Valley, and
WHEREAS, Hendricks & Meyers has submitted a proposal to provide
said services, and
WHEREAS, the City Council desires to approve said proposal with
Hendricks & Meyers, Now Therefore,
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS,
That the Mayor is hereby authorized and directed to execute on
behalf of the City a proposal for professional services with
Hendricks & Meyers to provide an electrical engineering design for
the wastewater system at Old Settler's Park at Palm Valley, a copy of
said proposal being attached hereto and incorporated herein for all
purposes.
RESOLVED this 10th day of August, 1989.
ATTEST:
C- RS08109E
E LAND, City Secretary
RESOLUTION NO. L3 / ICJ te
MIKE ROBINSON, Mayor
City of Round Rock, Texas
�DRIX
NU
CONSULTING ENGINEERS
July 21, 1989
City of Round Rock
221 E. Main Street
Round Rock, Tx. 78664
ATTN: MR. BOB BENNETT, CITY MANAGER
RE: PROPOSAL FOR PROFESSIONAL ENGINEERING SERVICES
This letter is for professional engineering services related to
electrical engineering design and consultation for OLD
SETTLER'S PARK WASTEWATER SYSTEM.
We propose to perform services, as requested, with our fee
being on an hourly basis with a "not to exceed" amount of
$1,000.00. The following rate schedule will apply:
Engineers (Principals) $70.00/hr.
Engineers $55.00 /hr.
Sr. Designer $50.00 /hr.
Designer II $45.00 /hr.
Designer I $40.00 /hr.
Draftpersons $30.00 /hr.
Secretarial /Clerical $25.00 /hr.
All expenses such as printing costs, delivery costs, etc., will
be billed as reimburseable expenses.
Billing will be monthly with payments due 30 days from invoice
date.
In the event of termination of the project, Hendrix & Myers
Consulting Engineers shall be compensated for all services
performed up to the termination dated based on the percentage
of completion.
The Engineer shall not have control or charge of, and shall not
be responsible for, construction means, methods, field
coordination, techiques, sequences or procedures, for safety
precatuions and programs in connection with the work, for the
acts or omissions of the Contractor, Subcontractors or any
other person performing any of the work, or for the failure of
any of them to carry out the work in accordance with the
Contract Documents.