R-89-1335 - 9/14/1989WHEREAS, the City Council wishes to consider updating of the water system model, and WHEREAS, engineering services are necessary for the updating of the water system model, and WHEREAS, Haynie and Kallman, Inc., has submitted an engineering contract to provide said engineering services, and WHEREAS, the City Council desires to enter into said contract with Haynie and Kallman, Inc., Now Therefore, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City a contract for engineering service with Haynie and Kallman, Inc. regarding the updating of the water system model, a copy of said contract being attached hereto and incorporated herein for all purposes. RESOLVED this 14th day of September, 1989. ATTEST: sAbd C- RS09149L LAND, City Secretary RESOLUTION NO. 1335E, MIKE ROBINSON, Mayor City of Round Rock, Texas Haynie & Kaltman, Inc. CONSULTING ENGINEERS 800 Pafoma Dr_ Suite 160 Round Rock, Texas 78664 1512) 255 -7861 Environmental Engineers Transport ation Engineers Construction Managers Planners Surveyors Land Development Engineers September 6, 1989 Mr. James R. Nuse, P.E. Director of Public Works City of Round Rock 221 E. Main Street Round Rock, Texas 78664 Re: Letter of Authorization for Computer- Generated Water System Analysis Extended Period Simulation Dear Mr, Nuse: We are pleased to submit for your review and approval, this Letter of Authorization to proceed with the preparation of an Extended Period Simulation of Round Rock's complete water distribution system. The analysis will be based on a computer - generated water system simulation using the Kentucky Pipe Hydraulic Network Analysis Program ( "KYPIPE ") and the Data Entry and Editing Program ( "PIPEDATA "). The analysis will produce an Extended Period Simulation which will model the system for a 24 -hour period, with results printed for each 1 -hour interval. The Extended Period Simulation is critical in evaluation of the system's pumping and storage facilities, particularly in regards to sizing a proposed downtown elevated tank to upgrade Service Level lA to 1B. The computer analysis of the water system will provide the basis for a subsequent field verification and calibration of the system at a later date, providing the City with the most accurate distribution system simulation available. The total charge for the Extended Period Simulation will be $10,000. We can complete the simulation within 60 calendar days. If this compensation amount meets with your approval, please have Mayor Robinson sign this letter in the space provided below authorizing this expenditure. Please return one copy to our office and retain one copy for your file. The above time schedule for completion and work on the project will commence upon receipt of the signed Letter of Authorization. [!g Haynie & Kallman, Inc. CONSULTING ENGINEERS 800 Palama Dr., Suite 160 Round Rock, Texas 78664 (5121255 -7861 Enmronmental Engineers Tr Engineers construction Managers Planners Surveyors Land Development Engineers September 6, 1989 Mr. James R. Nuse, P.E. Director of Public Works City of Round Rock 221 E. Main Street Round Rock, Texas 78664 Re: City of Round Rock Computer- Generated Water System Analysis Extended Period Simulation Submittal of Letter of Authorization Dear Mr. Nuse: Enclosed please find two (2) original Letters of Authoriza- tion between the City of Round Rock and Haynie & Kallman, Inc. ( "H &K ") for the computer - generated water system analysis extended period simulation for consideration by the City for approval. If you have any questions, please don't hesitate to contact me. Following approval of the Letters of Authorization, please have Mayor Robinson sign both originals and return one to us. Cordially, HAYNIE & KALLMAN, INC. ooDD Steven D. Kallman, P.E., R.P.S. SDK /cla Enclosures icc: Timothy E. Haynie, P.E., R.P.S. Mr. James R. Nuse, P.E. September 6, 1989 Page 2 Re: Letter of Authorization for Computer- Generated Water System Analysis Extended Period Simulation ($10,000) We appreciate the opportunity to be of service to you. Cordially, HAYNIE & KALLMAN, INC. , W„et, A,.r Steven D. Kallman, P.E., R.P.S. SDK /cla icc: Timothy E. Haynie, P.E., R.P.S. AUTHORIZED BY THE CITY OF ROUND ROCK, TEXAS: The Honorable Mike Robinson, Mayor DATE: September 11, 1989 SUBJECT: Council Agenda, September 14, 1989 ITEM: 11L. Consider a resolution authorizing the Mayor to enter into a contract with Haynie & Hallman, Inc. for engineering services regarding update of the water system model. STAFF RESOURCE PERSON: Jim Nuse STAFF RECOMMENDATION: This update of the water system model is an important tool in providing detailed water system response to dynamic water demands. The current model uses static condition. Staff recommends that this modeling be provided to help evaluate the possible combination of service levels 1A and 1B. ECONOMIC IMPACT: If the service leves are combined, $45- $50,000 per year can be saved. In any event, this model will assist in evaluating timing for water system construction improvements.