R-90-1453 - 5/14/1990PROJECT
FOREST CREEK GOLF COURSE ENTRANCE ROAD
IIA CF. O11 )f 1
C pDUr ( y NO
D Cit of Round Rock
i5..uoV TA/91
S1BJECT Reconciliatory C ange •r.er
DESCRIPTION
RECONCILIATORY CHANGES:
RECOMMENDED BY
ACCEPTED BY
APPROVED BY
CONTRACTOR
CHANGE ORDER
jus quay ities and scraper work `lo
remove overburden in borrow area.
ORIGINAL CONTRACT sAaszaLaEL
ADDITIONS TO DATE 6_26,,2Q6.00 THIS ADD $_1,489,.00_.
DEDUCTIONS TO DATE 5 -0- THIS DEDUCT $_3_,336._0Q___
14
Headwalls Type "B" (2 -48 ") -- Deduct 0.835 @ $1600 = (1336.00) $ --
RCP 48" -- Add 16 LF @ $56.00 = -- 896.00
Metal Beam Guard Fence -- Add 187 LF @ $9.00 = 1683.00
Sub -Total T1336.00 $2579.00
Soper Work:
Remove Overburden in -- Add 14 Hrs. @ $65 /hr = 910.00
Borrow Area TOTAL = (fTT6713UT $1489.00
REASON FOR CHANGE CCO'4 I 2,15
At.-
To obtain access to a more suitable borrow material, and adjust quantities.
1E 7a5: 98
TOTAL ADD $ 29.695.00
'I OrAL DEDUCT 5 _ 1,336.00
NEW CONTRACT AMOUNT $ _1.41.1.14
ORIGINAL CONTRACT PERIOD CAL. DAYS
EXTENSIONS TO DATE CAL. DAYS
CONTRACT PERIOD TO DATE CAL. DAYS
BAKER - AICKLE & ASSOCIATES, INC.
VE Joe M. Baker, P.E. - fires.
AUSTIN P ING COMPANY
m,./,Ada
REPRESENTATIVE Michael A. Brown
THIS EXTENSION
NEW CONTRACT PERIOD
AMENDED COMPLETION DATE
- CAL. DAYS
-- CAL. DAYS
03/18/91
DATE
03/18/91
OA 11
Ai
PROJECT
FOREST CREEK GOLF COURSE ENTRANCE ROAD
CHANGE ORDER NO.
Three (3)
OWNER
City of Round Rock
ISSUE OAT
01/23/91
ORIGINALCONTRACT S4193/85.98
ADDITIONS TO DATE $ 19 146 no
DEDUCTIONS TO DATE S -n-
RECOMMENDED BY
ACCEPTED BY
APPROVED BY
CHANGE ORDER
SUBJECT
Drainage improvements associated with the cart paths @ 10'x10' box culvert.
DESCRIPTION
Improvements include the following items of work as well as removal and replacement
of concrete cart path at pipe crossings:
#1 Green - Downstream Entrance to Box Culvert
1. 45' - CMP, Design 1 @ $28.00 = $1,260.00
2. 1 Each, SET Type II @ $500.00 = :500.00
3. 1 Each, Area Inlet @ $2500.00 = 2,500.00
4. 5 C.Y. Riprap @ $200.00 = 1,000.00
5. 1 Lump Sum Grading @ $600.00 = 600.00
$5,860.00
#7 Green - Upstream Entrance to Box Culvert
1. 1 Lump Sum Grading Swale & Berm @ $1200 = $1,200.00
TOTAL $7,060.00
REASON FOR CHANGE
To convey drainage under cart path.
ORIGINAL CONTRACT PERIOD CAL. DAYS
EXTENSIONS TO DATE CAL. DAYS
CONTRACT PERIOD TO DATE CAL. DAYS
THIS EXTENSION -- CAL. DAYS
NEW CONTRACT PERIOD -- CAL. DAYS
AMENDED COMPLETION DATE --
BAKER- AICKLEN & ASSOCIATES ES, INC.
REPRESENTATIVE
'THIS ADD $ 7,060.00
THIS DEDUCT S -0-
NEW CONTRACT AMOUNT $ 445,991.98
EJoe M. Baker, P.E. - Presiden
Q. a4,
/4532
5419. /BbIz,Y8
TOTAL ADD $ 26.206.00
TOTAL DEDUCT $
01/23/91
DATE
AUST.IN PAVING COMPANY
CONTRACTOR
m u,>q /_z4-271
DATE
e , 91
� DATE
WHEREAS, the City of Round Rock has duly advertised for bids for
the paving of the Forest Creek Golf Course entrance road, and
WHEREAS, Austin Paving has submitted the lowest and best bid, and
WHEREAS, the City Council wishes to accept the bid of Austin
Paving, Now Therefore,
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS,
That the bid of Austin Paving is hereby accepted as the lowest
and best bid, and the Mayor is hereby authorized and directed to
execute on behalf of the City a contract with Austin Paving for the
paving of the Forest Creek Golf Course entrance road, said contract
being attached hereto and incorporated herein for all purposes.
RESOLVED this 14th day of May, 1990.
ATTEST:
1. 0"...1_
NE
RS05140A
LAND, Ci y Secretary
RESOLUTION NO. P- 532,
MIKE ROBINSON, Mayor
City of Round Rock, Texas
BAKER - AICKLEN
& ASSOCIATES, INC.
Consulting Engineers
May 14, 1990
Hon. Mayor and City Council
CITY OF ROUND ROCK
221 East Main Street
Round Rock, Texas 78664
Re: Forest Creek Golf Club Entrance Road
Award of Contract
Gentlemen:
On May 8, 1990, bids were received for Forest Creek Golf Club Entrance Road.
A tabulation of the bids received is enclosed.
The low base bid including Additive Alternate No. 1 of $419,785.98 was
submitted by Austin Paving. Austin Paving has successfully completed projects
for our firm in the past and we understand for the City of Round Rock, as
well. Based on the above, it is our opinion that Austin Paving is qualified
and capable of performing the work.
Therefore, we recommend that the work be awarded to Austin Paving and the
execution of the contract should be subject to approval of the contract form,
performance and payment bonds by the City attorney.
JMB:ek
Enc.
cc: file -- 601- 013 -30
9111 Jollyville, Rd., Suite 107 Austin, Texas 78759 512/346-6980
8,585 L.F. of 24' Pavement w /1.5' Ribbon Curb,
10'010' Box Culvert
BID TABULATION
PROJECT SPONSOR:
PROJECT MANAGER'
ENGINEER =Baker - Aicklen
CITY OF ROUND ROCK BID OPENING
DATE
May 8, 1990
Jim Nuse TIME.
2:00 PM
8 Associates, Inc. LOCATION R.R. Council Chambers
' PROJECT=
LOCATION.
FOREST CREEK GOLF CLUB
C.IP PROJECT NUMBER'
CONTRACT NUMBER.
ENGINEERS'
ESTIMATE:
ROUND ROCK, TEXAS
" BID INVITATION
NUMBER:
BIDDER
I AUSTIN PAVING
2. J.L. EVANS
3. PAT CANION
4.CAPITAL EXC.
5. DAYCO CONSTR.
BB- - m oms °ECx
PROPOSAL GUARANTEE.
CTC- CERTIFIED CHECK
RECEIPT OF ADDENDA ACKNOWLEDGED.
ITEM
NO
QUANTITY
UNIT
ITEM DESCRIPTION
UNIT
PRICE
AMOUNT
UNIT
PRICE
AMOUNT
UNIT
PRICE
AMOUNT
UNIT
PRICE
AMOUNT
UNIT
PPo�
AMOUNT
110 -C
21,552
CY
Street Excavation
3.00
64,656.00
3.0C
64,656.00
2.08
44,828.16
3.70
79,742.42
2.00
43,104.00
120 -C
1,755
CY
Channel Excavation
3.70
6,493.50
3.77
6,616.35
3.96
6,949.80
4.00
7,020.00
3.00
5,265.00
132
13,762
CY
Embankment
1.00
13,762.00
1.7E
24,496.36
0.88
12,110.56
1.50
20,643.00
2.00
27,524.00
210 -A
19,176
50
Flexible Base, 14"
4.60
88,209.60
4.34
83,223.84
5.00
95,880.00
5.60
107,385.6C
5.86
112,371.36
210 -C
3,467
SY
Flexible Base, 10"
3.40
11,787.80
3.45
11,961.15
4.50
15,601.50
4.05
14,041.35
4.55
15,744.85
340 -8
22,620
SY
2" Not Mix Asphaltic Concrete
2.83
64,014.60
2.8E
63,788.40
3.46
78,265.20
2.80
63,336.00
3.00
67,860.00
430-A
115
LF
Concrete Curb 8 Gutter
4.00
460.00
8.8E
1,021.20
7.00
805.00
6.00
690.00
6.00
690.00
430 -0
14,322
LF
18" Concrete Ribbon Curb
(10 "x36" base)
3.50
50,127.00
4.47
64,019.34
4.93
70,607.46
3.10
44,398.20
4.60
65,881.20
430 -D
2,600
LF
18" Concrete Ribbon Curb
( 6 "x36" base)
3.50
9,100.00
4.47
11,622.00
4.80
12,480.00
3.10
8,060.00
4.60
11,960.00
436
452
SF
Concrete Valley Gutter
2.4C
1,084.80
3.71
1,685.96
2.00
. 904.00
2.60
1,175.20
2.20
994.40
508 -11
2
Ea
Headwalls, Type "B" (for 2 -36 ")
1,035.0C
2,070.00
3,406.00
6,812.00
880.00
1,760.00
2400.00
4,800.00
2250.00
4,500.00
TOTAL BID'
UNIT {RICE BID TABULATION -
SHEET 1 OF 6
BID TABULATION
PROJECT SPONSOR'
PROJECT MANAGER'
ENGINEER'
' BID OPENING
DATE'
TIME'
-
LOCATION'
PROJECT,
LOCATION'
FOREST CREEK GOLF CLUB (Cont'd)
Cap PROJECT NUMBER'
CONTRACT NUMBER'
ENGINEERS'
ESTIMATE:
BID INVITATION
NUMBER: I
BIDDER' •
1 AUSTIN PAVING
2 J.C. EVANS
3 PAT CANION '
4, CAPITAL EXC.
5. DAYCO CONST.
BB -BD BOND
PROPOSAL GUARANTEE' CC- CASHIERS CHECK
CTC- CERTIFIED CHECK
RECEIPT OF ADDENDA ACKNOWLEDGED'
ITEM
QUANTITY
IAJIT
REM DESCRIPTION
UNIT
PRICE
AMOUNT
UNIT
PRICE
AMOUNT
UNIT
PRICE
UNIT
AMOUNT
(MIT
PRICE
AMOUNT
508 -I
2
Ea
Headwalls, Type "B" (for 1 -42 ")
1,200.00
2,400.00
3036.00
6,072.00
1114.00
2,228.00
2200.00
4,400.00
1,875.00
3,750.00
508 -J
2
Ea
Headwalls, Type "B" (for 2 -48 ")
1,600.00
3,200.00
5383.00
10,766.00
2170.00
4,340.00
3800.00
7,600.00
3,500.00
7,000.00
510 -A
-292
LF
Pipe, 36"
36.00
10,512.00
48.00
14,016.00
37.54
10,961.68
38.0(11,096.00
30.00
8,760.00
510 -B
50
LF
Pipe, 42"
48.00
2,400.00
58.00
2,900.00
45.4C
2,270.00
50.00
2,500.00
35.00
1,750.00
510 -C
144
LF
Pipe, 48"
56.00
8,064.00
72.00
10,368.00
57.3C
8,251.20
65.00
9,360.00
40.00
5,760.00
100
LF
4" P.V.C. Conduit
6.00
600.00
8.00
800.00
2.9:
293.00
6.70
670.00
3.00
300.00
559
60
LF
Concrete Box (10'x10' with
headwalls, wingwalls)
630.00
37,800.00
575.34
34,520.40
679.00
40,740.00
520.0031,200.00
550.00
33,000.00
604 -A
35,400
SY
Seeding for Erosion Control
0.20
7 080.00
0.33
11,682.00
0.23_
8,319.00
0.3211,328.00
0.32
11,328.00
605 -A
2,700
SY
Soil Retention Blanket
5.00
13,500.00
2.13
5,751.00
8.21
22,167.00
6.5017,550.00
• 7.40
19,980.00
639
400
LF
Rock Berm
5.00
2,000.00
4.00
1,600.00
8.00
3,200.00
9.0C
3,600.00
15.00
6,000.00
704
888
LF
Metal Beam Guardrail
9.00
7,992.00
9.96
8,844.48
11.00
9,768.00
10.00
8,880.00
9.20
8,169.60
TOTAL BID'
UNIT PRICE BID TABULATION -
SHEET 2 OF 6
BID TABULATION
PROJECT SPONSOR:
PROJECT MANAGER'
ENGINEER:
BID OPENING
DATE:
TIME'
LOCATION'
PROJECT:
LOCATION.
FOREST CREEK GOLF CLUB (Cont'd)
GIP PROJECT NUMBER'
CONTRACT NUMBER:
ENGINEERS'
ESTIMATE:
BID INVITATION
NUMBER:
BIDDER:
1 AUSTIN PAVING
a J.C. EVANS
3 PAT CANION
4 CAPITAL EXC.
5. OAYCO CONSTR.
PROPOSAL GUARANTEE: CC -�I C"ECK
CTC- CERTIFIED C)EC,(
RECEIPT OF ADDENDA ACKNOWLEDGED:
ITEM
NO. QUANTITY
UNIT
ITEM DESCRIPTION
UNIT
PLAICE
AMOUNT
UNIT
PRICE
AMOUNT
UNIT
aatcE
AMOUNT
UNIT
PRICE
AMOUNT
UNIT
P,
AMOUNT
704- 12
Ea
Metal Guard Railing (terminal
anchor sec.)
260,00
3,120.00
292.88
3,514.56
322.00
3,864.00
300.00
3,600.00
j 257.00
3,084.00
806 -A, 16
LF
Pavement Marking Paint, 4"
0.16
2,704.96
0.18
3,043.08
0.19
3,212.14
0.17 2,874.02
0.16
2,704.96
TOTAL -BASE BID •
$
13,138.26
$453,780.12
;459,805.70
$ .65,947.77
5467,511.37
210 -A
799
SY
Flexible Base, 14"
4.60
3,675.40
4.34 3,467.66
5.60
4,474.40
5.60 4,474.40
11.25 8,988.75
$10 -C
144
SY
Flexible Base, 10"
3.40
489.60
3.45 496.80
5.00
720.00
4.05 583.20 6.001 864.00.
3 -8
944
SY
2" Hot Mix Asphaltic Concrete
2.83
2,671.52
2.82 2,662.08
3.80
3,587.20
2.80 2,643.201 3.00 2,832.00
604
-944
SY
Seeding for Erosion Control
0.20
- 188.80
0.33 311.52
0.25
- 236.07
0.32 302.08 j 0.32 - 302.08
TOTAL- ADDITIVE ALTERNATIVE 811 1?1
$6,647.72
$6,315.02
58,545.60
$7,398.72 1 12,382.67
BID AND ADDITIVE
BIDS:
BASE
AITFRATIVE
TOTAL BID' $419,785.98 8460,095.14 0468,351.30 $473,348.49 . 5479,894.04
UNIT MC( 80 T40UL0TION -
SKEET 3 OF 6
8,585 L.F. of 24' Pavement w /1.5' Ribbon Curb,
10'x10' Box Culvert
BID TABULATION
PROJECT SPONSOR:
PROJECT MANAGER:
ENGINEER:Baker Aicklen
CITY OF ROUND ROCK BID OPENING
DATE-
May 8, 1990
Jim Wise TIME:
2:00 PM
8 Associates, Inc. LOCATION: R.R. Council Chambers
PROJECT:
DOCATION:
FOREST CREEK GOLF CLUB
CIF. PROJECT NUMBER:
CONTRACT NUMBER:
ENGINEERS'
ESTIMATE:
ROUND ROCK, TEXAS
BID INVITATION
NUMBER:
•BIDDER:
I PARKER & ROGERS
a COFFEE EQUIP.
3 CHASCO CONTR.
4.
5.
BB -BID BOND
PROPOSAL GUARANTEE: cc -CA'.. BS [NECe
[IC-CERTIFIED CNECN
RECEIPT OF ADDENDA ACKNOWLEDGED:
ITEM
auevTrry
UNTF
ITEM DESCRIPTION
UNIT
PRICE
AMOUNT
UNIT
PRICE
AMOUNT
UNIT
PRICE
AMOUNT
UNIT
AMOUNT
MIT
PRICE
110 -C
21,552
CY
Street Excavation
4.00
86,208.00
4.48
96,552.96
6.50
140,088.01
120 -C
1,755
CY
Channel Excavation
8.00
14,040.00
6.94
12,179.70
3.50
6,142.51
132
13,762
CY
Embankment
1.35
18,578.70
1.9(
26,147.80
1.35
18,578.71
210 -A
19,176
SY
Flexible Base, 14"
4.75
91,086.00
4.92
94,537.68
4.80
92,044.81
210 -C
3,467
SY
Flexible Base, 10"
3.45
11,961.15
3.61
12,515.87
3.50
12,134.51
340 -B
22,620
SY
2" Hot Mix Asphaltic Concrete
3.20
72,384.00
3.0E
69,217.20
2.80
63,336.01
430 -A
115
LF'
Concrete Curb & Gutter
5.00
575.00
7.8C
897.00
4.90
563.5(
430 -D
14,322
LF
18" Concrete Ribbon Curb
Lip'x36" base)
3.90
55,855.80
5.4(
77,338.80
2.60
37,237.2(
430 -0
2,600
LF
18" Concrete Ribbon Curb
( 6 "x36" base)
3.60
9,360.00
5.12
13,312.00
2.60
6,760.0(
436
452
SF
Concrete Valley Gutter
3.25
1,469.00
2.4(
1,084,80
2.50
1,130.01
508 -0
2
Ea
Headwalls, Type "8" (for 2 -36 ")
1,250.00
2,500.00
2,140.0(
4,280.00
2000.00
4,000.0(
TOTAL BID:
UNIT PRICE 010 T4BUEATIOR -
SHEET 4 OF 6
BID TABULATION
PROJECT SPONSOR:
PROJECT MANAGER:
ENGINEER:
BID OPENING
DATE:
TIME
LOCATION:
PROJECT:
LOCATION:
FOREST CREEK GOLF CLUB (Cont'd)
GIP. PROJECT NUMBER:
CONTRACT NUMBER:
ENGINEERS'
ESTIMATE:
BID INVITATION
NUMBER:
• BIDDER:
I PARKER 8 ROGERS
2 COFFEE EQUIP.
3 CHASCO CONTR.
4.
5.
88- Be BOND
PROPOSAL GUARANTEE: CC- CAABERS 000
CTC- CERTIFIED CHECK
RECEIPT OF ADDENDA ACKNOWLEDGED:
ITEM
UNIT
ITEM DESCRIPTION
UNIT
PLAICE
AMOUNT
UNIT
PRIG
AMOUNT
UNIT
PRICE
UNIT
AMOUNT
UNIT
PRICE
AMOUN
508 -1
2
Ea
Headwalls, Type "8" (for 1 -42 ")
900.00
1,800.00
1735.00
3,470.00
1790.0C
3,580.0(
508 -J
2
Ea
Headwalls, Type "8" (for 2 -48 ")
1700.00
3,400.00
3130.00
6,260.00
3055.0C
6,110.01
510 -9
292
LF
Pipe, 36"
38.00
11,096.00
45.75
13,359.00
75.0C
21,900.01
510 4
50
LF
Pipe, 42"
45.00
2,250.00
78.80
3,940.00
85.00
4,250.0(
510 -1
, 144
LF
Pipe, 48"
58.00
8,352.00
88.50
12,744.00
95.0C
13,680.01
100
LF
4" P.V.C. Conduit
6.0C
600.00
11.40
1,140.00
6.0C
600.0(
559
60
LF
Concrete Box (10'x10' with
headwalls, wingwails)
490.0C
29,400.00
603.00
36,180.00
1000.0C
60,000.01
604-
35,400
SY
Seeding for Erosion Control
0.4C
14,160.00
0.43
15,222.00
0.3C
10,620.0(
605-
2,700
SY
Soil Retention Blanket
6.5C
17,550.00
7.35
19,845.00
7.0C
18,900.0(
639
400
LF
Rock Berm
10.00
4,000.00
9.20
3,680.00
10.0C
4,000.0(
704
888
LF
Metal Beam Guardrail
11.0C
9,768.00
17.20
15,273.60
10.0C
8,880.0(
TOTAL BID'
"NIT M CE &D TABULAT 09 -
SHEET 5 OF 6
BID TABULATION
PROJECT SPONSOR'
PROJECT MANAGER
ENGINEER:
BID OPENING
DATE'
TIME:
LOCATION
' PROJECT:
LOCATION-
FOREST CREEK GOLF CLUB (Cont'd)
C.IP. PROJECT NUMBER
CONTRACT NUMBER:
ENGINEERS'
ESTIMATE:
310 INVITATION
NUMBER:
BIDDER:
1 PARKER & ROGERS
2 COFFEE EQUIP.
3 CHASCO CONTR.
4
5
eo
CTC— w
PROPOSAL GUARANTEE: cc— cA9.lEns o..EC.1
CTC— Qn71F1ED CHECK
RECEIPT OF ADDENDA ACKNOWLEDGED:
ITEM
No'
I�
In
ITEM DESCRIPTION
UNIT
PRICE
AMOUNT
UNIT
PRICE
AMOUNT
UNIT
PRICE
AMOUNT
UNIT
AMOUNT
UNIT
PRICE
AMOUNT
12
Ea
Metal Guard Railing (terminal
anchor sec.
300.00
3,600.00
300.00
3,600.00
300.00
3,600.01
806 -•
■
16,906
LF
Pavement Marking Paint, 4"
0.18
3,043.08
0.26
4,395.56
0.10
1,690.01-
TOTAL -BASE BID
$.73,026.73
547,172.97
5539,825.81
799
5Y
Flexible Base, 14"
4.75
3,795.25
5.30
4,234.70
4.8C
3,835.21
. 0-
144
SY
Flexible Base, 10"
3.45
. 496.80
3.90
561.60
3.5C
504.01-
340 -I
944
SY
2" Hot Mix Asphaltic Concrete
3.20
3,020.80
3.06
2,888.64
2.8C
2,643.21-
604
■
■
-944
SY
Seeding for Erosion Control
0.40
- 377.60
0.41
- 387.04
0.3C
- 283.21-
TOTAL- ADDITIVE ALTERNATIVE BID 41
56,935.25
�_
57,297.90
-_
$6,699.21
BASE BID AND ADDITIVE B I D
BIDS:
5479,961.98
6554,470.87
5546,525.00
WIT a . r non r .. . - ...
DATE: May 14, 1990
SUBJECT: City Council Meeting, May 14, 1990
ITEM: 3.A. Consider a resolution authorizing the Mayor to
enter into a contract with Austin Paving for the
Golf Course Entrance Road.
STAFF RESOURCE PERSON: Jim Nuse
1
1
1
1
1
1
1
1,
1
1
1
1
1
1
1
1
1
1
1
PROJECT MANUAL
FOR
FOREST CREEK GOLF CLUB
ENTRANCE ROAD
Baker- Aicklerr
& Associates, Inc
CONSULTING ENGINEERS
Prepared for:
CITY OF ROUND ROCK
221 E. Main Street
Round Rock, Texas 78664
Owner
April, 1990
Job No. 601- 013 -30
P153
(SID SET NO;)
Date: 05/01/90
City of: Round Rock
Title: Forest Creek Golf Club Entrance Road
Bid Date and Time: May 8, 1990 -- 2:00 p.m.
Subject: Addendum No. 1
To Project Manual
Series 0 Bidding and Contract Requirements
Addendum #1 Section 00240
This addendum forms a part of Contract and clarifies, corrects or modifies
original bidding documents, dated April, 1990. Acknowledge receipt of this
addendum in space provided on bid form. Failure to do so may subject bidder
to disqualification.
Bids are due on May 8, 1990 at 2:00 p.m. prevailing time at the Round Rock
Council Chambers, 221 E. Main Street, Round Rock, Texas 78664.
This addendum consists of 11 pages.
End.
Joe M. Baker, P.E.
Approved by Engineer /Architect.
Lee Solis
Eshmaton
Austin Paving
An Austin Industries Company
Austin Paving Company
Austin Division
7800 Shoal Creek
South Budding. Suite 142
Austin, Teas 78757
512/451 -4082
_ _ _ _ _ _ _ _ _ _ _ _
Bid Item
Quantity
Unit
Item Description and Written Unit Price
Unit Price
Amount
110 -C
21,552
CY
Street Excavation, plan quantity,
$
per cubic yard, complete in place.
for dollars
and cents
120 -C
1,755
CY
Channel Excavation, plan quantity,
$
per cubic yard. complete in place.
for dollars
and cents
132
13,762
CY
Embankment, per cubic yard. complete
$
in place. (plan quantity)
for dollars
and cents
210 -A
19,176
SY
Flexible Base, 14 -inch, per square
$
yard. complete in place.
for dollars
_ _
and cents
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
l
City of Round Rock
221 East Main Street
Round Rock, Texas 78664
Dear Sir:
The undersigned, in compliance with your invitation for bid construction of
Forest Creek Golf Club Entrance Road for the City of Round Rock Texas, having
examined Project Manual, Plans and Addendum, the site of the proposed work and
being familiar with all of the conditions surrounding construction of the
proposed project having conducted all inquiry, tests and investigation deemed
necessary and proper purposes to furnish all labor, material and equipment and
perform all work required for construction of the project in accordance with
the Project Manual, Plans and Addendum for the following prices:
SP /00120U Rev. 03/24/88
Series 0 Bidding and Contract Requirements
Bid Section 00120
Date 19
BASE BID
Page 1A
Bid
Bid Item
Quantity
Unit
Item Description and Written Unit Price
Unit Price
Amount
210 -C
3,467
SY
Flexible Base, 10 -inch, per square
'
$
yard, complete in place.
for dollars
and cents
340 -B
22,620
SY
2" Hot Mix Asphaltic Concrete Pavement
$
type, per square yard, complete in
place.
for dollars
and cents
430 -A
115
LF
Concrete Curb & Gutter, per linear
$
foot with 10 "x36" Compacted Base
Bedding, complete in place.
for 1 dollars
and cents
430 -D
14,322
LF
18" Concrete Ribbon Curb, per linear
$
(10" base
bedding)
foot,with 10 "x36" Compacted Base
Bedding, complete in place.
for dollars
and cents
430 -D
2,600
LF
18" Concrete Ribbon Curb, per linear
$
n
bedding)
foot,with 6 "x36" Compacted Base
Bedding, complete in place.
for dollars
and cents
436
452
SF
Concrete Valley Gutter, per square
$
foot, complete in place.
for dollars
and cents
508 -H
2
Ea
Headwalls, Type "B" (modified), for
$
2- 36 " -dia. pipe, per each, complete
in place.
for dollars
and cents
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
SP /00120U Rev. 03124188
Page 2A
Bid
Bid Item
Quantity
Unit
Item Description and Written Unit Price
UnIt Price
Amount
508 -I
2
Ea
Headwalls, Type "B" (modified), for
$
1 -42" -dia. Pipe, per each, complete
in place.
for dollars
and cents
508 -J
2
Ea
Headwalls, Type "B" (modified), for
$
2 -48" -dia. Pipe, per each, complete
in place.
for dollars
and cents
510 -A
292
LF
Pipe, 36" -dia. R.C.P. (all depths),
$
including excavation and backfill,
per linear foot, complete in place.
for 1 dollars
and cents
510 -B
50
LF
Pipe, 42" -dia. R.C.P. (all depths),
$
including excavation and backfill,
per linear foot, complete in place.
for dollars
and cents
510 -C
144
LF
Pipe, 48" -dia. R.C.P. (all depths),
$
including excavation and backfill,
per linear foot, complete in place.
for dollars
and cents
--
100
LF
Pipe, 4" P.V.C. Conduit (all depths),
$
complete in place.
for dollars
and cents
559
60
LF
Concrete Box Culvert, 10'x10' with bat!
$
headwalls (modified wingwalls with
apron), per linear foot, complete in
place.
for dollars
and cents
1 �
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
SP/00120U Rev. 03124188
Page 3A
Bid
Bid Item
Quantity
Unit
Item Description and Written Unit Price
Unit Price
Amount
604 -A
35,400
SY
Seeding for Erosion Control, complete
$
in place.
for dollars
and cents
605 -A
2,700
SY
Soil Retention Blanket, nylon mono -
$
filament mat per square yard, complete
in place in locations as directed by
the Engineer.
tor dollars
and cents
639
400
LF
Rock Berm, per linear foot, complete
$
in place.
for dollars
and cents
704
888
LF
Metal Beam Guard Railing, per linear
$
foot, complete in place.
for dollars
and cents
704 -T
12
Ea
Metal Guard Railing, terminal anchor
$
section, per each, complete in place.
for dollars
and cents
860 -A
16,906
LF
Pavement Marking Paint, 4 in., per
$
linear foot, complete in place.
for dollars
and cents
Total Amount
Base Bid
Dollars $
--
words figures
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
SP /007200 Rev. 03/24/88
Page 4A
Bid
Bid Item
Quantity
Unit
Item Description and Written Unit Price
Unit Price
Amount
210 -A
799
SY
Flexible Base, 14 -inch per squara
$
yard, complete in place.
for dollars
and cents
210 -C
144
SY
Flexible Base, 10 -inch, per square
$
yard, complete in place.
for dollars
and cents
340 -B
944
SY
2" Hot Mix Asphaltic Concrete Pavement
$
per square yard, complete in place.
for dollars
and cents
604
-944
SY
Seeding for Erosion Control, complete
$
in place.
Mr dollars
and cents
Total--Additive
Alternate
_
Dollars $
Bid #1 words figures
Total Amount - -Base
Additive Alternate
Bid and Dollars $
Bid #1 words figures
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1. The award of the contract may be made on the base bid only or combination
of the Base Bid and Additive Alternate Bid #1.
SP/00120U Rev. 03124188
ADDITIVE ALTERNATE #1
Alternate #1 To Replace 24' Asphalt Pavement Section
With 25' Asphalt Pavement Section
Page 4B
Bid
INFORMATION TO BIDDERS
1.0 a. THE WORK. Delete "Tellabs Drive Extension" and replace with "a road
project ".
3.0 b. BID FORM. (1)a. Change May 1, 1990 to "May 8, 1990 ".
TECHNICAL SPECIFICATIONS
Item 120.5 Payment
Delete "7" in Pay Item No. 120 -B.
PROJECT MANUAL
Item 210.6 Payment
Change Pay Item No. 210 -A: From 11.5 in. to "14" in.
Change Pay Item No. 210 -C: From 8 in to "10" in.
Item 403.13 Payment
Delete "Wingwalls for box culvert shall be paid under Item 414 -B
"Concrete Retaining Wall "."
Item 414 Concrete Retaining Walls
Delete "entire Item No. 414 ".
Item 430.5 Payment
Method A (Pay Item No. 430 -A)
Delete the word "Excavation ".
Excavation shall be considered subsidiary to Item 110 -C.
Method D (Pay Item No. 430 -D)
Delete the word "Excavation ".
Excavation shall be considered subsidiary to Item 110 -C.
To Pay Item No. 430 -D: Concrete curb - per linear foot, ,add "with
6 "x36" or 10 "x36" compacted base bedding as called out on bid proposal."
Item 508.6 Payment
Change Pay Item No. 508 -H: From 1 -36 in. to "2 -36 in. ".
Change Pay Item No. 508 -I: From 2 -36 in. to "1 -42 in. ".
Add: Pay Item No. 508 -J: "Headwalls, Type B, 2 -48 in.
dia. pipe - per each."
Item 510.5 Payment
Delete Pay Item No. 510 -A:
Delete Pay Item No. 510 -A:
Delete Pay Item No. 510 -A:
Delete Pay Item No. 510 -A:
Delete Pay Item No. 510 -A:
Delete Pay Item No. 510 -D.
Delete Pay Item No. 510 -S.
Add "Pay Item
Pipe, 36" -dia
linear foot."
Add "Pay Item
Pipe, 42" -dia
linear foot."
Add "Pay Item
Pipe, 48" -dia
linear foot."
12" RCP.
18" RCP.
24" RCP.
30" RCP.
13 "x22" RCAP.
No. 510 -A: 36" RCP.
. (all depths), including
Excavation and Backfill per
No. 510 -B: 42" RCP.
. (all depths), including Excavation and Backfill - per
No. 510 -C: 48" RCP.
. (all depths), including Excavation and Backfill - per
Item 559.10 Payment
Change Pay Item No. 559: To read - "Concrete Box Culverts, 10 ft. x 10
ft. - per linear foot including both headwalls (modified wingwalls with
apron)."
Item 604.8 Payment
Change Pay Item No. 604 -A: From Method B - Straw to "Method B
Hydraulic Planting."
Item 605 Soil Retention Blanket
Add "entire specification item (section) ".
Item 860.6 Payment
Change Pay Item No. 860 -A: To read "Pavement Marking Paint 4 in. -
per linear foot."
CONSTRUCTION DRAWINGS
SHEET 3 General Notes
Note 10. - "Omit reference to sodding and seeding."
Note 15. - Revise statement (see Table this sheet) to read "(To be furnished
by Engineer)."
Add Note 18. - "Borrow, if required, will be Class B or better."
Add Note 19. - "Compacted Base and Subgrade Preparation shall extend 1' -0"
behind back of curb for portion of roadway with standard curb & gutter."
SHEET 3 Erosion and Sedimentation Control
Note 2 - "Omit reference to sodded & seeded."
SHEET 3 18" Ribbon Curb Detail
Change 1' -0" dimension to "1' -6 "."
Add Note: "Expansion joint dowel rod and joint material installation shall be
as shown in Section B -B, Curb & Gutter Details, Sheet 12."
SHEET 3 = Road Detail (Half Section)
Revise reference (Bid Item No. 210 -A) to read "(Bid Item No. 210 -A or Bid Item
No. 210 -C) as specified this sheet ".
Delete reference "(Bid Item No. 201)."
Revise 3.5' dimension to "36 -in."
1
1
1
1
1
1
1(
1
1
1
1
1
1
1
1
1
605.1 Description
This item shall consist of providing and placing wood fiber mat, nylon monofilament mat, reinforced paper mat or lute mesh as
soil retention blanket over seeded areas indicated or as specified by the Engineer.
605.2 Materials
(1) Jute Mat
Jute mat shall consist of heavy, smolder resistant, 1 inch uniform size strands. woven from undyed and unbleached
jute yarn, 48 inches in width and weighing an average of 1 2 pounds per linear yard of cloth with a tolerance of ;5
percent. The yarn shall be of a loosely twisted construction having an average twist of not less than 1.6 turns per inch
and shalt not vary in thickness by more than i/ its normal diameter.
(2) Excelsior Mat
Excelsior mat shall be wood excelsior, 48 inches in width, ±1 inch and weighing 0 8 pounds per square yard. -10
percent The excelsior material shall be covered with a netting to facilitate handling and to increase strength.
(3) Wood Fiber Mat
The wood fiber mat shall consist of a machine produced mat of curled wood excelsior of 80 percent, 6 inches or
longer fibers, with consistent thickness and the fiber evenly distributed over the entire area of the blanket. The top
side of the blanket shall be covered with a biodegradable, carbon - impregnated extruded plastic mesh or other. as
approved by the Engineer. The weight of the blanket shall be approximately 1.25 pounds per square yard.
(4) Nylon Monofilament Mat
(5)
Item No. 605
Soil Retention Blanket
The monofilament mat shall consist of entangled nylon monofilaments, fused at the intersections of the entangled
fibers. The three - dimensional structure so formed shall be a bulky mat with 90 percent of its volume a void capable of
being filled with soil after installation on the project site. The material of which the mat consists shall be Nylon 6 plus
a minimum 0.5 percent by weight of Carbon Black. Additionally, the nylon monofilament mat shall meet or exceed
the following requirements:
Weight 0.06 psi-7%
Thickness of mat 0.8 inch minimum
Filament diameter 0.015 inch minimum
Tensile strength — length direction 94.07Ibsfft minimum
Tensile strength — width direction 53.75 ibs /tt. minimum
Elongation — length direction 50% minimum
Elongation — width direction 50% minimum
Resiliency — immediate recovery, 5 cycles at 200 psi (14061.4 gm /sq cm) 80%
Reinforced Paper Mesh
Paper mesh shall consist of a knitted construction yarn with uniform openings interwoven with strips of biodegrada-
ble paper, furnished in rolls with suitable protection for outdoor storage. The weight of the paper mesh shall be at
least 0.12 pound per square yard
(6) Wire Staples
Wire staples shall be not less than 13 inch lengths of No. 11 wire bent to form a "If approximately 1 inch in width.
(7) Wood Stakes
Wood stakes shall be 1 x 3 inch nominal lumber at the top and tapered to a point. The length shall be 14 inches
minimum.
605.3 Construction Methods
The Soil Retention Blanket shall be placed within 24 hours after seeding operations have been completed, conforming to Item
No. 604, "Seeding for Erosion Control" or when directed by the Engineer
Page 1 04.17/86 605
•
Site Preparation:
After the site has been shaped and graded to the approved design, a friable seedbed relatively free from clods and rocks shall be
prepared. Any foreign matter that will prevent contact of the preparation mat with the soil surface shall be removed. The area
shall be smooth and free of ruts or other depressions. If the prepared seedbed becomes crusted or eroded as a result of rain or
for any reason, the Contractor shall rework the soil until it is smooth and reseed such areas which are reworked. After the area
has been properly prepared, the blanket shall be laid out flat, even and smooth, without stretching or crimping the material
Jute mesh used as a ditch lining shall be applied with the lengths running parallel to the flow of water. Where more than one width
is required. a lap joint not less than 4 inches shall be used. with the higher fabric on top.
An anchor slot shall be constructed at the upslope edge of the jute mesh placement. This is accomplished by burying at least 6
Inches of the end of the mesh vertically in a slot dug in the soil. The soil shall be firmly tamped against the jute in the slot. '
Junction slots shall be used to join the ends of successive lengths. For junction slots, the upslope end of each strip of jute mesh
shall be buried at least 6 inches in a slot dug in the earth Soil shall be firmly tamped against the jute in the slot. The ends of the
jute shall overlap at least 12 inches with the higher fabric on top
Check slots shall be constructed by placing a tight fold at least 6 inches vertically into the soil. On ditch grades of 4 percent or
less, such check slots shall be spaced so that a check or junction slot occurs within each 50 feel. On ditch grades greater than 4
percent, such slots shall occur within each 25 feel.
A terminal slot shall be placed at the bottom end of the mesh This shall be accomplished by burying the end of the mesh ver-
tically in a slot dug in the soil as indicated. The soil shall be firmly tamped against the jute in the slot.
Four inch or 6 inch lawn edging may be used as an alternate means of providing a check slot The edging material may be either
metal or rigid plastic and shall be placed under the mesh. This edging shall be driven flush with the slope or channel surface, with
staples installed through the mesh on the upslope side of the edging at 6 inch intervals.
Jute mesh shall be held in place by means of wire staples The staples shall be driven at a 90 degree angle to the plane of the
soil. Staples shall be spaced not more than 3 feet apart in 3 rows for each strip, with a row along each edge and one row
alternately spaced in the middle. All ends of mesh and check slot locations. shall be secured by staples spaced 6 inches apart
across the width. If jute mesh over sod is specified, check slots or junction slots will not be required.
The wood fiber mat or nylon monofilament mat shall be laid in the same manner as jute mesh, except that the ends and edges
are not lapped but are tightly butted together. The stapling pattern is the same as required for jute mesh. When wood fiber mat or
nylon monofilament mat is placed as a ditch liner, junction slots, check slots and anchor slots are not required. However, in lieu of
check slots, a row of staples spaced on 6 inch centers, running at right angles to the ditch line rows, shall be placed within each
50 feet on ditch grades of 4 percent or less On ditch grades greater than 4 percent, such rows of staples shall occur within each
25 feet
When jute mesh, wood fiber mat or nylon monofilament mat is used on cuts or fills, the mesh or mat may be placed with the
length running from top of slope to toe of slope or the mesh or mat may be placed with the length running horizontally or parallel
to the contour. Check slots will not be required for jute mesh placed on cuts or fills.
Immediately after the soil retention blanket has been placed and stapled, the area covered shall be sprinkled and rolled with a
light roller of sufficient weight to press the blanket into the surface of the soil. The roller shall be of such weight t9 avoid over
compaction of the seedbed
605.4 Measurement
Work and acceptable matenal for "Soil Retention Blanket will be measured by the square yard or by the acre of surface area
covered, complete in place.
605.5 Payment
The work performed and materials furnished and measured as provided under "Measurement" will be paid for at the unit price
bid for "Soil Retention Blanket ", which price shall be full compensation for furnishing wood fiber mat. nylon monofilament mat or
lute mesh and all labor. tools, equipment and incidentals necessary to complete the work No direct payment will be made for
anchor, check, terminal or junction slots and wire staples, these being considered as subsidiary work pertaining to the construc-
tion of the "Soil Retention Blanket"
Payment will be made under one of the following.
Pay Item No. 605-A: Soil Retention Blanket — Per Square Yard.
Pay Item No. 605-B: Soil Retention Blanket — Per Acre.
End
605 04/17/86 Page 2
CONTRACT DOCUMENTS AND SPECIFICATIONS
FOR
FOREST CREEK GOLF CLUB
ENTRANCE ROAD
PAVING & DRAINAGE
IMPROVEMENTS
Prepared for:
City of Round Rock •
221 East Main Street
Round Rock, Texas 78664
Prepared by:
Baker - Aicklen & Associates, Inc.
9111 Jollyville Road, Suite 107
Austin, Texas 78759
April, 1990
Item No. Category Description No. of Pages
00050 Notices
Notice to Bidders 1
00060 Bidding Requirements
Information to Bidders 2
00070 Contract Forms
140 Conditions of Contract
TABLE OF CONTENTS
Statement of Bidder's
Qualifications 2
Wage Rates 1
Bid Proposal • 3
Bid Bond 1
Agreement 1
Performance Bond 1
Payment Bond 1
Maintenance Bond 1
Texas Sales Tax Exemption 1
Certificate
Certificate of Insurance 2
General Conditions of Agreement 12
1
1
1
101 Preparing ROW 1
II 102 Clearing and Grubbing 1
110 Street Excavation 1
111 Excavation 1
120 Channel Excavation 1
130 Borrow 1
132 Embankment 2
201 Subgrade Preparation 1
II
210 Flexible Base 2
220 Sprinkling for Dust Control 1
230 Rolling (Flat Wheel) 1
232 Rolling (Pneumatic Tire) 1
234 Rolling (Tamping) 1
236 Rolling (Proof) 1
II 301 Asphalt, Oils, Emulsions 3
306 Prime Coat 1
307 Tack Coat 1
340 Hot Mix Asphaltic Concrete Pavement 9
401 Structural, Excavation & Backfill 3
403 Concrete for Structures 7
405 Concrete Admixtures 2
406 Reinforcing Steel 3
408 Concrete Joint Materials 1
409 Membrane Curing 1
410 Concrete Structures 8
411 Surface Finishes for Concrete 3
414 Concrete Retaining Walls 2
430 Concrete Curb and Gutter 1
436 Concrete Valley Gutters 1
508 Misc. Structures & Appurtenances 2
510 Pipe 38
559 Concrete Box Culverts 3
' 601 Salvaging & Placing Topsoil 1
604 Seeding for Erosion Control 2
606 Fertilizer 1
639 Rock Berm 1
704 Metal Beam Guard Railing 1
860 Pavement Marking Paint 3
900 Restoration 1
Soils Investigation
1
1
1
1
1
1
1
1
1
1
1
Item No. Category Description
Technical Specifications
No. of Pages
00220 Soils Investigation Data 1
Trinity Engineering Testing 20
Corporation -- March 1990
NOTICES
NOTICE TO BIDDERS
Project: Forest Creek Golf Club Entrance Road
Paving & Drainage Improvements
Owner: City of Round Rock
Separate sealed bids for approximately 8,500 linear feet of 24- foot -wide
asphalt with 18 -inch ribbon curbed roadway, 60- foot -long 10'x10' box culvert
and drainage improvements extending through Forest Creek Golf Club (under
construction) from County Road 122 to Twin Ridge Parkway, will be received by
the City of Round Rock at the office of the City Secretary at 221 East Main
Street, Round Rock, Texas 78664, until 2:00 o'clock p.m., May 8, 1990, and
then in the Council Chambers, publicly opened and read aloud.
The Information for Bidders, Form of Bid, Form of Contract, Plans,
Specifications, and Forms of Bid Bond Performance and Payment Bond, and other
contract documents may be examined and /or copies obtained at the office of
Baker - Aicklen & Associates, Inc. at 9111 Jollyville Road, Suite 107, Austin,
Texas 78759, (512) 346 -6980 upon payment of $100.00 for each set. A refund
will be made provided the drawings and specifications are returned in good
condition within 10 days after the bid opening.
The Owner reserves the right to waive any informalities or to reject any or
all-bids.
Each bidder must deposit with his bid, security in the amount of 5 percent of
maximum total bid, subject to the conditions provided in the Information for
Bidders.
No bidder may withdraw his bid within 30 days after the actual date of the
opening thereof.
The above referenced documents will be available for examination and to be
picked up at the location described above on or about April 23, 1990.
BIDDING REQUIREMENTS
1.0 INVITATION
a. The Work. Bids are invited on a contract for the construction of Tellabs
Drive Extension in Round Rock, Texas. The project begins at County Road
No. 122 and extends through Forest Creek Golf Club to Twin Ridge Parkway.
The work in this contract generally consists of approximately 8,500
linear feet of 24- foot -wide asphalt with 18 -inch ribbon curbed roadway,
60- foot -Tong 10'x10' box culvert and related drainage improvements.
2.0 BID PERIOD
a. Addenda. Addenda will be issued to bidders of record.
b. Questions. Submit written questions about bidding documents to the
Engineer. Inquiries must be received no later than 1 week prior to bid
opening. Necessary replies will be issued to bidders of record as
addenda, which become a part of the bidding documents. Oral instructions
do not form a part of the bidding documents.
c. Qualifications of Bidders.
(1) The owner may make any investigations deemed necessary to determine
the bidder's ability to perform the work. When requested for this
purpose, furnish such information including a list of proposed
subcontractors.
(2) The owner reserves the right to reject the bid of any bidder if
evidence or investigation indicates that the bidder is not property
qualified, in the opinion of the owner, to complete the work
satisfactorily.
3.0 BID SUBMITTAL
INFORMATION TO BIDDERS
Forest Creek Golf Club
Entrance Road
Paving and Drainage
Improvements
a. Receipt of Bids. Sealed bids will be received until the time specified
in the Notice to Bidders. Bids received after this time will not be
accepted. Bid opening will be held immediately after this time for
receipt of bids has expired. Bids will be opened publicly and read aloud
in the Round Rock Council Chambers, 221 E. Main Street, Round Rock, Texas
78664. All interested parties are invited to attend.
b. Bid Form. A bid form is bound with the specifications.
(1) Submit the proposal and other required data in an opaque, sealed
envelope. If submitted by mail, enclose bid envelope in another envelope
addressed for mailing. Plainly identify the sealed envelope with the
following information:
a. Do not open before 2:00 p.m., May $, 1990.
b. Bid for Forest Creek Golf Club Entrance Road.
c. Bidder:
(2) Submit bid on the bid form provided. Fill in all blanks: failure
to comply may be cause for rejection. If no amount is to be included,
insert zeros ( -0 -) in the spaces. No segregated bids or assignments will
be considered.
(3) Acknowledge receipt of addenda by writing the addendum number and
date in the space provided on the bid form.
(4) Do not alter the bid form with written memoranda or qualifications.
Any explanation, alternation or other statement proposed by the bidder
must be written separately, signed independently, and included in the bid
envelope.
(5) Sign in longhand below the typed name of the person authorized to
bind the bidder to a contract. When the bidder is a corporation the bid
must be signed with the legal name of the corporation followed by the
name of the state of incorporation and the legal signature of a person
authorized to bind the corporation to a contract.
c. Alternatives. Wherever in these specifications an item is identified by
a "brand name or equal" description, alternatives will be considered.
The bidder is responsible for insuring that sufficient data is provided
to the Engineer in adequate time so that the requirements concerning
questions under paragraph 2.0 BID PERIOD of this Information for Bidders
can be satisfied.
d. Completion Time.
(1) The work shall be completed within the number of calendar days given
in the bid form. The time begins from date of Notice to Proceed.
(2) Submission of a bid constitutes acceptance by the bidder of the
completion time as a part of the requirements for this work.
(3) The contractor agrees to pay the owner, or allow the owner to deduct
from the contract sum, as liquidated damages, the sum specified in the
General Conditions for each calendar day that the work remains incomplete
after expiration of the contract time and for each day the progress of
the project is delayed by the contractor's failure to complete a portion
of the work specified in the construction schedule.
e. Bid Security.
All proposals shall be accompanied by a certified cashier's check upon a
national or state bank in the amount of five (5 %) percent of the total
maximum bid price payable without recourse to The City of Round Rock, or
a bid bond in the same amount from a reliable surety company, as a
guarantee that bidder will enter into a contract and execute performance
bond within ten (10) days after notice of award of contract to him.
Provided however, if the contract price is less than $50,000.00, the
bidder shall have the option of providing a letter of credit in lieu of a
performance bond, said letter of credit to be in a form acceptable to the
City of Round Rock: The notice of award of contract shall be given by
the Owner within sixty (60) days after the bid opening. The bid security
must be enclosed in the same envelope with the bid. Bids without check
or bid bond will not be considered. All bid securities will be returned
to the respective bidders within twenty -five (25) days after bids are
opened, except those which the Owner elects to.hold until the successful
bidder has executed the contract. Thereafter, all remaining securities,
including security of the successful bidder, will be returned within
sixty (60) days.
f. Modification or Withdrawal. Bids may be withdrawn any time before bid
opening, but may not be resubmitted. Bids may not be withdrawn or
modified after bid opening.
4.0 CONTRACT REQUIREMENTS
a. Award of Contract. The owner is not obligated to accept any bid. The
owner reserves the right to reject any or all bids, and to waive any
irregularities in bids or in bidding.
b. Statement of Bidder's Qualifications. Apparent low bidder will be
required to complete a Statement of Bidder's Qualifications within 3 days
after bid opening.
c. Contract Forms. The successful bidder will be required to complete a
Contract and an affidavit included within these specifications.
d. Performance and Payment Bonds. The successful bidder must furnish
performance bond or letter of credit, if applicable, payment bond and
maintenance bond in the amount of one hundred (100 %) of the contract
price from an approved surety company holding a permit from the State of
Texas to act as surety (and acceptable according to the latest list of
companies holding certificates of authority from the Security of the
Treasury of the United States) or other surety or sureties acceptable to
the Owner, with approval prior to bid opening.
It is further agreed by the Parties to the Contract that the Contractor
will execute separate performance and payment bonds, each in the sum of
100% of the total contract price in standard forms for this purpose,
guaranteeing faithful performance of the work and the fulfillment of any
guarantees required and further guaranteeing payment to all persons
supplying labor and materials or furnishing him any equipment in the
execution of the Contract. If the contract price is less than
$50,000.00, a letter of credit may be furnished in lieu of a performance
bond. It is agreed that the Contract shall not be in effect until such
performance bonds or letters of credit, and payment bonds are furnished
and approved by the Owner. The cost of the premium for the performance
bonds or letters of credit, and payment bonds shall be included in the
price bid by the Contractor for the work under this Contract, and no
extra payment for such bonds or letters of credit will be made by the
Owner.
e. Maintenance Bond. The successful bidder shall execute a maintenance bond
in the amount of 100 per cent of the contract price. This bond shall be
in effect for two years from and after the date of acceptance of the
completed contract work by the Owner. Use maintenance bond form as
provided.
f. Notification to City. Contractor shall notify the City of Round Rock
Public Works Department (within 10 days) after accepting new contracts as
either sub or general contractors, along with a list of manpower and
equipment to be moved from this project, if any.
STATEMENT OF BIDDER'S QUALIFICATIONS
(To be completed by Low Bidder
within 3 days of bid opening.)
All questions must be answered and the data given must be clear and
comprehensive. This statement must be notarized. If necessary, questions may
be answered on separate attached sheets. The Bidder may submit any additional
information he desires.
1. Name of Bidder.
2. Permanent main office address and telephone number.
3. When organized.
4. If corporation, where incorporated.
5. How many years have you been engaged in the contracting business under
your present firm or trade name? Years.
6. Contracts on hand (or scheduled to begin within 180 days):
(Provide a schedule of these, showing name and
address of Owner, Engineer, Architect, amount of each contract, manpower
and equipment, and the approximate anticipated dates of completion.)
7. Classification of work performed by your company in which you request
prequalification by the City as a Prime Contractor by your experience
record in:
Airport Buildings _ Airport Construction Bridges
Building Remodeling _ Buildings _ Drainage
Electric, Overhead _ Electric, Underground Parks
Power Plants, New _ Power Plants, Retrofit _ Streets
_ Subdivision Electric _ Swimming Pools _ Wastewater Plants
Wastewater Storage and Pumping _ Water Plants
Water and Wastewater Distr. & Collection
Water Storage and Pumping
MBE WBE
Multiple T.B.M. Tunneling over 10,000 L.F.
Other (specify)
8. Have you completed all contracts awarded to you? yes no. If no,
submit details.
9. Has your firm ever been awarded a bonus for early completion of work?
_ yes _ no. If yes, give details.
10. Have you ever defaulted on a contract? _ If so, where and why?
11. Is your firm presently engaged in litigation with any City? yes no.
If yes, submit description and state case number, style of case and court
in which pending or in which judgment was entered.
12. Has your firm ever been assessed Liquidated Damages on any project?
_ yes _ no. If yes, submit details.
13. Attach a list of the more important projects recently completed by your
company (six most recent), stating the approximate cost for each and the
month and year completed. Attach name and address and phone number of
the person to contact for each project.
14. Attach a list of your manpower, major equipment available for this
contract, and schedule of construction.
15. List experience in construction work similar in importance to this
project. Attach name, address and phone number of person to contact from
each project.
16. Explain relations with public on past City projects.
17. Attach a copy of the OSHA Form 200, "Log and Summary of Occupational
Injuries and Illness" covering all entries for the current year and the
past 24 months together with the yearly average work force data using the
City Work Force Report, Section 00126.
.18. Attach statements of background and experience of the principal members
of your organization, including the officers, resident
Superintendent /Engineer /Architect and names of other firms the principals
are seeking prequalification or are prequalified with the City of Round
Rock.
19. Is your firm bondable?
Yes No. With whom?
What limits? $
20. Bank Credit available: $
Bid Item
f]uantity
Unit
Item Description and Written Unit rice
Unit Price
Amount
110 -C
21,552
CY
Street Excavation, plan qu• tity,
$
per cubic yard, complete n place.
for dollars
and cents
120
1,755
CY
Channel Excavation, plan quantity,
$
per cubic yar•, complete in place.
for dollars
and cents
132:
13,762
CY
Emban ent, per cubic yard. complete
$
in • ace.
.r dollars
and cents
210 -A
Flexible Base, 14 -inch, per square
. 19,176
yard. complete in place.
for __ - __. - -_ -__ _- ____ dollars
and - --
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
City of Round Rock
221 East Main Street
Round Rock, Texas 78664
Dear Sir:
SP/00120U Rev. 03124188
Series 0 Bidding and Contract Requirements
Bid Section 00120
Date M Ate' S 19 •)O
The undersigned, in compliance with your invitation for bi
Forest Creek Golf Club Entrance Road for the City of Round
examined Project Manual, Plans and Addendum, the site of
being familiar with all of the conditions surroundin
proposed project having conducted all inquiry, tests
necessary and proper purposes to furnish all labor,
perform all work required for construction of the
the Project Manual, Plans and Addendum for the fol
Page 1
construction of
ock Texas, having
e proposed work and
construction of the
d investigation deemed
terial and equipment and
roject in accordance with
owing prices:
Bid
Bid Item
Quantity
Unit
Item Description and Written Unit Price
Unit Price
Amount
210 -C
3,467
SY
Flexible Base, 10 -inch, per square
$
yard, complete in place.
for dollars
and cent •
340 -B
22,620
SY
2" Hot Mix Asphaltic Concrete Pavem• t
$
type, per square yard, complete i-
place.
for dollars
and cents
430 -B
115
LF
Concrete Curb & Gutter, .-r- linear
$
foot, complete in plat::.
for dollars
and cents
430 -C
16,922
LF
18" Concrete Ri mon Curb, per linear
$
foot, complet: in place.
for dollars
and cents
436
452
SF
Concre - Valley Gutter, per square
$
foot, complete in place.
to dollars
.nd cents
508 -H
2
Ea
Headwalls, Type "B "(modified), for
$
'
1 -36" -dia. pipe, per each, complete
in place.
for dollars
and _ cents
5081I
Ea
Headwalls, Type "B" (modified), for
$
1 -42" -dia. pipe, per each complete
in place.
for dollars
and cents
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
SP /00120U Rev. 03/24/88
Page 2
Bid
Bld Item Q
Quantity U
Unit -
- :s ;ltem'DesedptIon and Written Unit Price . .: ,
, ' UnIt Price...• ;sl' A
Amount's
1
1
1
1.
1
1
1
1
1
1
1�
1
1
1.
1
1
1
1
1
SP /00120U Bev.03124188
Page 3
Bid
Btd Item
Quantity
Unit 't`*i
%. ! item Deaerlptlon and Wrltten'Unit Prka':NN
+ • Unit Prlce`t:' +`
i s'4mtiiuiit ?l,
639
400
LF
RoclOBerm;!per linear "foot, complete
$
v :. ";�:,' ..
and•in'place.
for dollars
and cents
704
888
LF
Metal Beam Guard Railing, per linear
$
foot, complete in place.
for dollars
and c= is
704 -T
12
Ea
Metal Guard Railing, terminal an or
•
$
"
section, per each, complete in .lace.
for dollars
and cents
860
16,906
LF
Pavement Marking Pai . 4 in.. per
$
linear- foot, compl• e and in place.
for dollars
and cents
Total Amount
Dollars $
Bid
words figures
1
1
1
1
1
1
1
1
1
1
1
1
1
1
SP/00120U Rev. 03124188
.c:
gs
page 4 • Bid
Bid Item
Quantity
Unit
Item Description and Written Unit Price
Unit Price
Amount
110 - C
21,552
CY
Street Excavation, plan quantity,
s. 3°'
'* 4 6.
64 � f66 e � ■
per cubic yard, complete in place.
for Q 6- dollars
and cents
120 -C
1,755
CY
Channel Excavation, plan quantity,
$ 3�—
•
-
* (}493 50
per cubic yard. complete in place.
for f.'E- dollars
and 7fvs./z - 1 cents
132
13,762
CY
SY
Embankment, per cubic yard. complete
$ °'
4
13,10,
in place. (plan quantity)
for (.0.)e. dollars
and . 430 cents
210 -A
19,176
Flexible Base, 14 -inch, per square
4 6-5-
$
6,
' 82b9
yard, complete in place.
for fo J t<. . .. _.___ dollars
and _ . 5 11CTy - _ cents
r
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
City of Round Rock
221 East Main Street
Round Rock, Texas 78664
Dear Sir:
Series O Bidding and Contract Requirements
Bid Section 00120
Date NA .PH 8 1990
The undersigned, in compliance with your invitation for bid construction of
Forest Creek Golf Club Entrance Road for the City of Round Rock Texas, having
examined Project Manual, Plans and Addendum, the site of the proposed work and
being familiar with all of the conditions surrounding construction of the
proposed project having conducted all inquiry, tests and investigation deemed
necessary and proper purposes to furnish all labor, material and equipment and
perform all work required for construction of the project in accordance with
the Project Manual, Plans and Addendum for the following prices:
SP /00120U Rev. 03124188
BASE BID
Page 1A
Bid
'.-
' .,.' •. t i -".`t,tf v ,-,.;- .• ,, "...„:'41. , ,..., , , , 7 7 .. 0. ,—. -,, A,•.4 , ,,it ,, ,, , ....t'
Bid Item Quantity
Unit
.' Item Description and Written Unit Price ,
. Unit Price '
'',. Amount '
210-C 3,467
SY Flexible
Base, 10-inch, per square
2
$ '''—"-- 't i
eo
t,181 ----
yard,
•
complete in place.
for --f /2-f-IS- dollars
and (oft-T`f cents
340-B
22,620
SY
2" Hot Mix Asphaltic Concrete Pavement
3
,. i'1
$ t
Ee
CA 01 4 —
type, per square yard, complete in
place. •
for ( ' IT . ° dollars
and ,g, a w 1t-tn. 6 V.-- cents
430-A
115
LF
Concrete Curb & Gutter, per linear
$ I t ---
4
4o
foot with 10"x36" Compacted Base
Bedding, complete in place.
for fositz. dollars
and }-) 0 cents
430-D
14,322
LF
18" Concrete Ribbon Curb, per linear
'
9,
5 I 2 ‘": .
(10" base
bedding)
foot,with 10"x36" Compacted Base
Bedding, complete in place.
for -- 1 - 14 R. F-4.. dollars
and .91 cents
.430-D
2,600
LF
18" Concrete Ribbon Curb, per linear
-
9259
$ -,
) I 0
(6" ba Se
bedding)
•
foot,with 6"x36" Compacted Base
Bedding, complete in place.
for - 1 - 14f44.. donam
and 1,1'1 y cents
436
452
SF
Concrete Valley Gutter, per square
4 ...!:=
foot, complete in place.
for - 1 7 '.'''' dollars
and 1 'f cents
508
2
Ea
Headwalls, Type "B" (modified), for
i 2 010f-.‘f—
2 -36" -dia. pipe, per each, complete
in place.
for L a ,,, , ,,, 0 'Til i r2.-ry i yr& dollar:
_go-6
and II 0 cent:
1
1
1
1
1
1
1
1
I
1
1
1
1
1
1
1
1
SP/00120U Rev. 03/24188
Page 2A
Bid
T ,:::••-; ... :-%, tIW:j "", W.417. 4- *: ."`• ; .' 3 ' ;; ' "
Bid Item
Quantity
Unit
- , , Item Description and Written Unit Price ' .
Unit Price
Amount
508-1
2
Ea
Headwalls, Type "B" (modified), for
$ 1,2 0‘-'4-
4
'Z •=1-o0
1-42"-dia. Pipe, per each, complete
in place.
for kit- / Itir•lOg.e.r) dollars
and q . cents
508-J
2
Ea
Headwalls, Type "B" (modified), for
$ 1,6O b
•
2-48"-dia. Pipe, per each, complete
in place.
for 014.c.... - { - 4..i5,,,,, 5 . 1 dollars
and A- cents
510-A
292
LF
Pipe, 36"-dia. R.C.P. (all depths), -
-
.
'
$
.
1
including excavation and backfill,
per linear foot, complete in place.
for Tt-(4.- L$ dollars
and IL cents
510-B
50
LF
Pipe, 42"-dia. R.C.P. (all depths),
.
$ 4.9
t • 0,.
29-06 7
1
including excavation and backfill,
per linear foot, complete in place.
for Et,ez.. EtGL4 dollars
and K\ cents
510-C
144
LF
Pipe, 48"-dia. R.C.P. (all depths),
:
L.
$ 13%
1
•
including excavation and backfill,
per linear foot, complete in place.
for 1 r "T Y IX dollars
and 0 0 cents
--
100
LF
Pipe, 4" P.V.C. Conduit (all depths),
$
4-
complete in place.
for ■)t. dollars
and cents
559
60
LF
/1\1
Concrete Box Culvert, 10x10' with both
i.„ D ..,
$ —
-••
5 7,806
headwalls (modified wingwalls with
apron), per linear foot, complete_in
p
i1 P_P-E--e --- rki 9--- y. _ ___ _ dollars
and 10*. cents
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
- = • • • , , • -,4•• -
SP/00120U Rev. 03124188
Page 3A
Bid
y K . �' a k • M1
n
r.y�� , �r t ,wY
i }r,� >i. .l �G �"�
t: t• . •h ., ':St' ��' •v' �n"i%(,� •v�,, w, ..,. Y.r, .•: tt 7. z s
'' d . �: ti s ,.S' :t i } , €t` °
't' S +j� y +l' 7 �`.. ".P J.: J'` °� "�r.t'�, °• i.� 1'y
'Q �•� �'=f A � iy.1'� � . , r � •r; • - .Y���' ^"'.� I ,�'.1, �, k7. hA:}�
r �TG
1 . .
s �
t om' *i �ti � a �
illy 1 �
Bid Item
Quantity
Untt :
•''' ttem Description and`Written Unit Price
Unit Price a.
"Amoun
604 -A
35,400
SY
Seeding for Erosion Control, complete
20
$
qaa,
w y
/ 680
in place.
I�1
fo 1`r ___,_ "_ dollars
- r..._,,44.1-,1 cents
-A
2,700 SY
and
Soil Retention Blanket, nylon mono -
$
1513,500--
2 1 0 O0
_
1 992
_ 605
639
filament mat per square yard, complete
in place in locations as directed by
th
for dollars
10 cents
400
LE
and
Rock Berm, per linear foot, complete
•
a=
$
704
888
LF
in place.
.%
for r 1 ■/ 6- dollars
N A,
o cents
and
Metal Beam Guard Railing, per linear
o
0., /
$_
704 -T
foot, complete in place.
tor l`\ t 0 F- dollars
12
Ea
LF
o cents
and
Metal Guard Railing, terminal anchor
'
$ 2'3' c '
3,120
860 -A
16,906
section, per each, complete in place.
11
f �uu t'S x.10260 - ty dollars
No cents
and
Pavement Marking Paint, 4 in., per
14)
$ 0 �LT —
12,101 9 6
linear foot, complete in place.
for t`r° dollars
Sig 1 cents
and
11 - u ( tc7art c 14 NO CN c^. t ni.oi H tmv y c. rc'Uoliarss 4t, 1 5826
Total Amount - -)o, rL,4a OP-' 1
Base Bid words , figures
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
SP100120U Rev. 03124188
�v,�f -NZY 5 tK (k.uT5
Page 4 A
Bid
0
Bid Item
Quantity
Unit
Item Description and Written Unit Price
Unit Price
Amount
210 -A
799
SY
Flexible Base 14 -inch per square
/L
s - 1 -
13,675 4
yard, complete in place.
for 1 o (L dollars
and S,XT' cents
210 -C
144 .
SY
,
Flexible Base, 10 -inch, per square
4✓
$ 3
�I 8 9 60
•
yard, complete in place.
for � 0- dollars
and 1'°a1 cents
340 -B
944
SY
2" Hot Mix Asphaltic Concrete Pavement
2s3
$
4 6 �i 52
per square yard, complete in place.
for -17,4 ° dollars
and f 4t 1-l{Q- cents
604
-944
SY
Seeding for Erosion Control, complete
$ Q 2 6 4-1'-
`
` &� /1
(lt80
_
in place.
T
fo ° dollars
and IwraT'f cents
Total --
Alternate
- Y
Additive 5,, It+ a1poo 5.,r 0rµ0RLD1' f O,LTY.�IfJJ Dollars$ 6 / 4172
Bid #1 words k StYe.tsylao �„ figures
Total Amount - -Base
Additive Alternate
y e- i1JN Oh,r -A 0 .N6 -rE YL„,,,„v
anlop_O 'Et6ter r„,.E r 9 oo 8 — Dollars $ 411, 785
Bid and 5k-VC.-1 U E
Bid #1 words figures
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
SP 100120U Rev. 03/24188
ADDITIVE 'ALTERNATE #1
Page 4B
Alternate #1 To Replace 24' Asphalt Pavement Section
With 25' Asphalt Pavement Section
1. The award of the contract may be made on the base bid only or combination
of the Base Bid and Additive Alternate Bid #1.
Bid
1
1
1
1
1
1
1
1
1
1
1
1
1
Series 0 Bidding and Contract Requirements
Bid Section 00120
Enclosed with this Bid is a Cashier's or Certified Check payable to the City of Austin or Bid Bond in the amount of five
percent (5 %) of the total amount bid, (Dollars)($
It is agreed that in the event this proposal is accepted by the OWNER and the undersigned Bidder fails to execute the
Contract and furnish prescribed performance and payment bonds within ten (10) days after notice of award of contract
to him, the bid guaranty shall become the property of theOWNER, as liquidated damages, not as a penalty, but for delays
and inconveniences or the OWNER may pursue any other action allowed by law.
TIME OF FUNCTIONAL COMPLETION: The undersigned CONTRACTOR agrees to commence work within ten (10) days
alter written notice as specified in a written "Notice to Proceed" to be issued by the OWNER and to functionally complete
construction of the improvements, as required by the Project Manual, Plans and Addendum for
Forest Creek Golf Club Entrance Road
(Contract Number ) within 110
% g4104e{calendar days. The CONTRACTOR further agrees that should the CONTRACTOR fad to functionally complete
the work within the number of days indicated in Bid or as subsequently adjusted by Change Order, he shall pay the liqui-
dated damages for each consecutive day thereafter as provided below; unless the OWNER elects to pursue any other
action allowed by law.
LIQUIDATED DAMAGES: The CONTRACTOR understands and agrees that the timely completion of the described work
is of the essence. The CONTRACTOR and OWNER further agree in applying liquidated damages that such damages
cannot be precisely measured or that the ascertainment of actual damages would be unduly difficult. Therefore, the
CONTRACTOR and the OWNER agree that for each and every calendar day the work or any portion thereof, remains
functionally uncompleted after the functional completion date as established by the first sentence of the above para-
graph, "Time of Functional Completion'; the CONTRACTOR shall pay, as agreed liquidated damages, the amount of
Two Hundred and No /100
( s 200.00 ) per calendar day and that such amount shall be deducted by the OWNER from any payment
to the CONTRACTOR.
The bidder acknowledges the liquidated damages and all conditions pertaining thereto as herein established and agrees
to pay such damages if the work is not functionally complete on or before the time established herein or as subsequently
adjusted by Change Order.
The undersigned acknowledges receipt of the following addenda:
Addendum No. 1 dated S -) - 9 0 Received 5 -Z-10
Addendum No. 2 dated Received
Addendum No 3 dated Received
End
(Seal)
Secretary; ({(/Contractor is a Corporation
'Copy of corporate Resolution and minutes with
certificate of officer of Contractor as to authority of
signatory to bind Contractor to be attached.
Address
dollars
A - usr,; / AM/Mi
/,a/, e0/rl .0/1/4/y
Contractor
By
e ✓r' (/ /GE /d/eefIDE
Title
WOO Ff OAL- CF•EEG 4. 14 25
Terns 1815
SP /001200 Rev. 03 /24/88 Page 5 Bid
Alt, Insurance Company
American Home Assurance Company
Granite State Insurance Company
The Insurance Company of the State of Pennsylvania
National Union Fire Insurance Company of Pittsburgh, Pa.
New Hampshire Insurance Company •
KNOW ALL MEN BY THESE PRESENTS:
That
AMERICAN HOME ASSURANCE COMPANY ' as Surety, are held and firmly bound
unto THE CITY OF ROUND ROCK as Obligee, in the sum of
Five Percent Greatest Amount Bid Dollars
5% GAB j, for the payment of which sum, well and truly to be made, the Pnncipal and Surety bind themselves, their
heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents
WHEREAS. the Pnncipal has submitted a bid for
FOREST CREEK GOLF CLUB ENTRANCE ROAD
NOW. THEREFORE, d the Obligee shall accept the bid of the Principal and the Principal shall:enter into a Contract with the Obligee in
accordance with the terms of such bid, and give such bond or bonds as may be specified in the bidding or Contract Documents with
good and sufficient surety for the faithful performance of such Contract and for the prompt payment of labor and material furnished in ,
the prosecution thereof, or in the event of the failure of the Principal to enter such Contract and give such bond or bonds, d the
Principal shall pay to the Obligee the difference not to exceed the penalty hereof between the amount specified in satd.bid and such
larger amount for which the Obligee may in good faith contract with another party to perform the Work covered by sud bid, then this
obligation shall be null and void. otherwise to remain in full force and effect. 7
Signed, sealed and dated
V• AUSTIN PAVING COMPANY
� � s vv, f
•
(witness'
DISCLOSURE OF GUARANTY FUND NONPARTICIPATION l B ��Exec. Vice Pres.
Roee1
In the event the uC - ice n n & /r l p is unable to
fulfill ds contractural obligation under this policy
or contract or application or certificate or evidence of
coverage, the policyholder or certificateholder is not
protected by an insurance guaranty fund or other solvency
prottioubNirrangPmPnt
23373 13/841
AUSTIN PAVING COMPANY
PAVING AND DRAINAGE IMPROVEMENTS
May 8, 1990
BID BOND
(AIA 310)
e9
1 �� waMwW.
Itaaiw
American International Companies
Principal Bond Office
70 Pine Street, New York, N.Y. 10270
as Principal, and
AMERICAN HOME ASSURANCE COMPANY,
mewl
' / American Home Assurance Company -
National Union Fire Insurance Company of Pittsburgh, Pa.
Principal aond Office 70 ante Street. New York, N Y 10270
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1 23240'{ ®/a 1 *,,! ;7 , `A
a
KNOW ALL MEN BY THESE PRESENTS.
That American Home Assurance Company, a New York corporation and National Union Fire Insurance Company of Pittsburgh, Pa
a Pennsylvania corporation, does each hereby appoint
- -R.F. Siddons, Jr., Robert C. Siddons, Bettye ADu Rogers, Robert C. Fricke.
K. e Priddy, William A. Croce. Linda Colley: o: Austin, Texas; - --
Its true and lawful Attorney(st in Fact, with full authority to execute on its behalf bonds. undertakings. recognizances and other
contracts of indemnity and wrm095 obligatory in the nature thereof issued in the course of Its business , and to bind the respective
company thereby.
IN WITNESS WrIEREOF, Ame'.,:an Horne A 1,orance Company and V • oral Ur , on Fire Insurance Company of Pittsburgh Pa
have each executed these presents
STATE OF NEW YORK 1
COUNTY OF NEW YORK f "
On thn 20, day of )=L;.: r= IIltifr - -- - - -- 19 B.9_
before me came the above named officer of Amerimn Home
Assurance Company and National U,,on Fire Insurance Company
of Pittsburgh, Pa.. to me personally known to be me •ndrv,Wal and
of ficer described herein, and ecknlwfedged that he executed me
foregoing instrument and affixed the Seals of said ctwporamons
thereto by authority of ho office
CERTIFICATE
this 20 day of December
t . •
Frederick Gurba, Assist- 11th Vice President
MSEPti 0
dietary a err, Yew 04 New York
Ids. W•NO465275S
Otwaasd h WafidwsMr
Excerpts of Resolutions adopter• by the Boards of Directors of Amenren Home Assurance Company and National Union Ftri.
Insurance Company of Pittsburgh, Pa on May 18 1976
"RESOLVED, that the Chairman o the Board, the President ee any Vice President re, and herehy is, author:tea to appoint Athenay•,tni -act to
reoresent and act for and on behalf of the Company •o execute bonds undertak nrs recognizances end other contracts of indemnity and , vrroro+
obligatory in me nature thereof and to attach thereto the corporate teal of the Cornonny, ,n the transaction of no surety business
- RESOLVED, that the signatures and attests nova of such officers and the seta of the Company may be affixed to any such Power of Attorney or to
any certificate relating thereto by facsimile, and any such Power of Attorney or c.rtif,mte bearing such facsimile signatures or facsimile seal shall be
valid and binding upon the Company when so eH,xed with respect to any bond, undertaking, recognizance or other contract of indetnnity or w.iorre
obligatory in the nature threot.
"RESOLVED. that any such Attorney -m Fact delwr,ng a secretarial mrufrcenon Met the loragorng resolutions tall be m effect may insert in such
certification the date thereof, said date lobe not liter then the date of delivery thereof by etch Attorney+rvFacL'
I. Maureen P Tully, Secretary of American Prime Assurance Company and of National Union Fire Insurance Company of
Pittsburgh, Pa do hereby certr'r that the for• !•> -10 excerpt 01 Resol „• _0l0 ae( o'rd by the Boards of Directors of these corpora
dons, and the Powers of Attur.ley issued puninnt thereto are t1 .e and ,:nm.ct. and that both the Resolutions am: Mr- Power: of
Attorney are in full force and effect.
IN WITNESS WHEREOF, 1 have hereunto set my hand and affixed the facsimile seal of eadl corporation
POWER OF ATTORNEY
No AIA 310 -13
1609
this 8 thday of May t9 90
THE STATE OF,TEXAS
COUNTY OF WILLIAMSON
BIDDER'S BOND
City of Round Rock
(Must be in an amount of at least 5% of the bid. If the bid is upon
alternates, this bond must be for at least 5% of the highest amount for which
the bidder offers to do any or all the work bid upon.)
KNOW ALL MEN BY THESE PRESENTS:
THAT WE, , as principal
and the other subscriber hereto as Surety, do hereby acknowledge ourselves to
be held and firmly bound to the City of Round Rock in the sum of
Dollars.
The condition of this obligation is that:- -
WHEREAS, the said principal is submitting to the City of Round Rock his or its
bid for the doing for the City of Round Rock of certain work and construction
of which the following is a brief description to- wit: --
Approximately 8,500 Linear Feet of 24- foot -wide asphalt with 18-
inch ribbon curbed roadway, 60- foot -long 10'x10' box culvert and
related drainage improvements for Forest Creek Golf Course
Entrance Road.
NOW THEREFORE, if the said bidder is awarded the contract for such work, the
said bidder will, within the time provided in the specifications, enter into a
contract with the City of Round Rock therefor upon the form and to the purpose
and intent provided in the specifications, and will furnish a good and
sufficient construction surety bond executed by said bidder and one corporate
surety organized under the laws of the State of Texas or authorized to do
business in the State of Texas and having a fully paid up capital stock of not
less than $100,000.00 and duly licensed and qualified by the Board of
Insurance Commissioners of the State of Texas under the provisions of Articles
4969 to 4972, both inclusive, Revised Civil Statutes of the State of Texas,
which bond shall be for an amount equal to 100 per cent of the contract price
and shall be conditioned in accordance with the requirements stated in the
specifications upon which such bid is being submitted.
In the event said bidder is unable or fails to execute said contract for the
work proposed to be done or is unable or fails to furnish said construction
bond in the amount and condition as aforesaid, the undersigned principal and
surety shall be liable to said City of Round Rock for the full amount of this
obligation which is here and now agreed upon and admitted as the amount of the
damages which will be suffered by the City of Round Rock on account of the
failure of such bidder to so comply with the terms of his bid.
Executed this
day of , A.D. 19
PRINCIPAL
By
By
Surety
INSTRUCTIONS: The surety on the foregoing bid bond must be a corporate surety
meeting all of the requirements therein fixed for the Surety upon the
performance bond thereby contemplated. Unless such Surety appears on the
United States Treasury Department's current list of approved surety companies,
this bond must be accompanied by a certificate bearing date not more than five
days prior to the date fixed for the opening of the bids to which such bond
relates, by the Board of Insurance Commissioners of the State of Texas,
certifying to the fact that such Surety is licensed and qualified under the
provisions of the Texas Statutes referred to in the above bond.
Bidders and their Surety may at their peril and risk furnish a bid bond upon
some other form than the foregoing sheet itself; but any bid will be subject
to being rejected if the bid bond is upon any other form than the foregoing
and fails in any respect to comply with the City of Round Rock's requirements
as stated in the project Specifications and General Conditions.
CONTRACT FORMS
STATE OF TEXAS
COUNTY OF WILLIAMSON
AGREEMENT
THIS AGREEMENT, made and entered into this 5 day of A.D.
19 go, by and between the City of Round Rock, Texas, a Munic pal Corporation,
home rule City and political Subdivision organized and existing under the laws
of the State of Texas, acting through the City Manager or designee thereunto
duly authorized to do so, Party of the First Part, hereinafter termed OWNER,
and AUSTIN PAVING COMPANY , of the City of AUSTIN
County of TRAVIS , and State of TEXAS , Party of
the Second Part, hereinafter termed Contractor.
Witnesseth: That for and in consideration of the payments and agreements
hereinafter mentioned, to be made and performed by the -Party of the First Part
(Owner), and under the conditions expressed in the bonds bearing even date
herewith, the said Party of the Second Party (Contractor), hereby agrees with
the said Party of the First Part (Owner) to commence and complete the
construction of certain improvements described as follows:
Approximately 8,500 Linear Feet of 24- foot -wide asphalt with 18-
inch ribbon curbed roadway, 60- foot -long 10'x10' box culvert and
related drainage improvements for Forest Creek Golf Course
Entrance Road.
and all extra' work in connection therewith, under the terms as stated in the
Project Manual, Plans and Addendum; and at the Contractor's own proper cost
and expense to furnish all the materials, supplies, machinery, equipment,
tools, superintendence, labor, insurance, and other accessories and services
necessary to complete the said construction, in accordance with the conditions
and prices stated in the proposal attached hereto, and in accordance with the
Project Manual, Plans and Addendum, which includes all maps, plats, blueprints
and other drawings, and printed or written explanatory matter thereof, and the
Specifications therefor, as prepared or approved by Baker - Aicklen &
Associates, Inc. (9111 Jollyville Road, Suite 107, Austin, Texas), each of
which has been identified by the endorsement of the Contractor and the
Engineer /Architect thereon: all of which are made a part hereof by this
reference and collectively evidence and constitute the entire contract.
The Contractor hereby agrees to commence work within ten (10) days after the
date contained in the Notice to Proceed given to the Contractor, and to
complete same within 120 calendar days after the date of the written Notice to
Proceed. Time is of the essence to this contract.
The waiver by the Owner of any breach of this agreement must be in writing to
be effective, and waiver of any breach shall not constitute waiver of any
subsequent breach.
The Owner agrees to pay the Contractor from the available fund for the
performance of the contract in accordance with the Bid Proposal submitted
therefor, subject to additions and deductions, as provided in the General
Conditions of Agreement, and to make payments on account thereof as provided
therein.
Although drawn by Owner, this Contract shall, in the event of any disputes
over its meaning or application, be interpreted fairly and reasonably, and
neither more strongly for or against either party.
In Witness Whereof, the parties to these presents have executed this Agreement
in multiple originals in the year and day first above written.
ATTEST:
•
_4111L 1
..pro e. as to form
Law Department
h %� -
ecretary, i Cont actor is a
Corporation or otherwise
registered with the Secretary
of the State
End.
Party of the First Part (Owner)
City of Round Rock
AUSTIN PAVING COMPANY
Party of the Second Part
(Contractor)
Name o1U Signatory:
�Ce -fribk
Title of Signatory:
*Copy of Corporate Resolution and minutes with certificate of officer of
Contractor as to authority of signatory to bind Contractor to be attached.
2
Austin
March 21, 1990
TO WHOM IT MAY CONCERN
Austin Paving
An Austin Industries Company
Austin Paving Company
P. 0. Box 947022
Fon Wonn. Texas 76147
550 Barley Avenue
Suite *220 (76107)
817/336 -2373
The following is an excerpt from the minutes of the February 21,
1990 Annual Meeting of the Board of Directors of Austin Paving
Company.
RESOLVED, that L.W. Abel, John Barry Clark, Dwight C. Smith,
Thomas H. Leaverton and Steven D. Vincent'are hereby author-
ized to submit proposals on behalf of the Company from now
until the next Annual Meeting of the Board of Directors; and
FURTHER RESOLVED, that Roger C. Bailey, B.J. Bertram, G.E.
Dawkins, Dennis E. Feidner, William J. Neese, M. Schuler
Nelson, Charles M. Solomon and William T. Solomon are hereby
authorized to submit proposals and to execute contracts and
surety bonds on behalf of the Company from now until the
next Annual Meeting of the Board of Directors.
The undersigned Assistant Secretary of the Austin Paving Company
hereby certifies that the foregoing is a true and correct copy
of a resolution adopted by the Board of Directors of this
Corporation and that said resolution is now in full force and
effect and is duly recorded in the Corporate minutes of said
meeting.
Witness my hand and the seal of Corporation this twenty first
day of March, 1990.
Dennis E. Feidner
Vice President & Asst. Secretary
STATE OF TEXAS
COUNTY OF WILLIAMSON
PERFORMANCE BOND
Know All Men By These Presents: That AUSTIN PAVING COMPANY of the City
of AUSTIN County of TRAVIS , State of
TEXAS as Principal, and AMERIAN HOME
ASSURANCE COMPANY a solvent company authorized under
the laws of the State of Texas to act as surety on bonds for principals, are
held and firmly bound unto CITY OF ROUND ROCK TEXAS (Owner), in
the penal sum of FOUR RED 1sYT HUNDRED CII N1Nl E d 98/1000 ThI;N 'Lt1OUSAND ShVEN U.S. Dollars
($419,785.98 HUIiDT FIV U.S.) for the payment
whereof, well and truly to be made the said Principal and Surety bind
themselves, and their heirs, administrators, executors, successors and
assigns, jointly and severally, by these presents:
The conditions of this Bond or such that, whereas, the Principal has entered
into a certain written contract with the Owner, dated the
day of " , 19 , which Agreement is hereby referred
to and made a part hereof as fully and to the same extend as if copied at
length herein.
Now, Therefore, The Condition of This Obligation Is Such, that if the said
Principal shall faithfully perform said Agreement and shall in all respects
duly and faithfully observe and perform all and singular the covenants,
conditions and agreements in and by said contract agreed and covenanted by the
Principal to be observed and performed, and according to the true intent and
meaning of said Agreement hereto annexed, then this obligation shall be void;
otherwise to remain in full force and effect:
Provided, however, that this bond is executed pursuant to the provisions of
Article 5160 of the Revised Civil Statutes of Texas as amended and all
liabilities on this bond shall be determined in accordance with the provisions
of said Article to the same extent as if it were copied at length herein.
Surety, for value received, stipulates and agrees that no extension of time,
shall in anywise affect its obligation on this bond, and it does hereby waive
notice of any such extension of time.
In Witness Whereof, the said Principal and Surety have signed and sealed this
instrument this ZQ day of 1V \a� , 19 % .
AUSTIN PAVING COMPANY AMERICAN HOME ASSURANCE COMPANY
Principal Surety
The name and address of the Resident Agent of
FRANK SIDDONS INSURANCE AGENCY
Ty
Title V;e4- ti+
Address 7800 SHOAL CREEK.
SUITE 142S
AUSTIN, TEXAS 78757
End.
P.O. BOX 2125 - AUSTIN, TEXAS 78768
Title LINDA COUEY ATTY -IN- :CT
Address 2200 NORTH LOOP WEST
HOUSTON, TEXAS 77018
Surety is:
Note: A copy of the Surety Agent's "Power of Attorney" must be attached
hereto.
1�xics -OCa .
1
1
1
1
i
1
1
1
1
1
1
1
1
1
1
1
1
1
1
STATE OF TEXAS
COUNTY OF WILLIAMSON
PAYMENT BOND
'1 .. ('
Know All Men By These Presents: That AUSTIN PAVING COMPANY of the City of
AUSTIN , County of TRAVIS and State of
TEXAS , as principal, and
AMERICAN HOME ASSURANCE COMPANY a solvent corporation authorized
under the laws of the State of Texas to act as surety on bonds for principals,
are held and firmly bound unto CITY OF ROUND ROCK, TEXAS (Owner), and all
Subcontractors, workers, laborers, mechanics and E nd supplie as their interests
may appear, all FR whom shall ND SEV right V
OHthis HUNDRED nd in the
OU CII
penal sum of EI FIVE a 98 /100 U.S. Dollars
($ 419,785.98 U.S.) for the payment
whereof, well and truly to be made the said Principal and Surety bind
themselves, and their heirs, administrators, executors, successors and
assigns, jointly and severally, by these presents:
The conditions of this Bond or such that, whereas, the Principal has entered
into a certain written contract with the Owner, dated the
day of , 19 , which Agreement is hereby referred
to and made a part hereof as fully and to the same extend as if copied at
length herein.
Now, Therefore, The Condition of This Obligation Is Such, that if the said
Principal shall well and truly pay all Subcontractors, workers, laborers,
mechanics and suppliers, all monies to them oweing by said Principals for
Subcontracts, work, labor, equipment, supplies and materials done and
furnished for the construction of the improvement of said Agreement then this
obligation shall be and become null and void: otherwise to remain in full
force and effect:
Provided, however, that this bond is executed pursuant to the provisions of
Article 5160 of the Revised Civil Statutes of Texas as amended and all
liabilities on this bond shall be determined in accordance with the provisions
of said Article to the same extent as if it were copied at length herein.
Surety, for value received, stipulates and agrees that no extension of time,
shall in anywise affect its obligation on this bond, and it does hereby waive
notice of any such extension of time.
In Witness Whereof, the said_Principal and Surety h signed and sealed this
instrument this _ day of rr , 199 .
AUSTIN PAVING COMPANY AMERICAN HOME ASSURANCE COMPANY
Principal Surety
By '44
Tit e V •
Address
7800 SHOAL CREEK
SUITE 142S
AUSTIN, TEXAS 78757
Tit eNDA COUEY ATTY— IN —FA'T
Address 2200 NORTH LOOP WEST
HOUSTON, TEXAS 77018
The name and address of the Resident Agent of Surety is:
FRANK SIDDONS INSURANCE AGENCY
P.O. BOX 2125 — AUSTIN, TEXAS 78768
Note: A copy of the Surety Agent's "Power of Attorney" must be attached
hereto.
End.
STATE OF TEXAS
KNOW ALL MEN BY THESE PRESENTS:
COUNTY OF WILLIAMSON
THAT WE, AUSTIN PAVING COMPANY As Principal,
hereinafter called "Contractor ", and the other subscriber hereto as Surety, do
hereby acknowledge ourselves to be held and firmly bound to the City of Round
Rock in the sum of
DOLLARS ($ ) for the payment of which sum well and truly to
be made to the City of Round Rock, and its successors, the said Contractor and
Surety do bind themselves, their successors and assigns jointly and severally.
The conditions of this obligation are such that:
WHEREAS, the said Contractor has entered into a contract in writing with the
City of Round Rock, dated of even date herewith, for the construction of
approximately 8,500 linear feet of 24- foot -wide asphalt with 18 -inch curbed
roadway, 60- foot -long 10'x10' box culvert and related drainage improvements
for Forest Creek Golf Course Entrance Road, all of such work to be done as set
out in full in said contract and the plans and specifications therein referred
to, and adopted by the City Council of Round Rock.
NOW, THEREFORE, if the said Contractor shall repair, replace and restore any
and all defects in, or damages to, said
occasioned by, and resulting within two (2) years from and after the day of
the acceptance of said work by said City of Round Rock from defects in
materials furnished by, or workmanship of the Contractor, in performing the
work covered by said contract, then this obligation shall become null and
void, and shall be of no further force and effect; otherwise, the same is to
remain in full force and effect.
IN TESTIMONY WHEREOF, witness our hands this day of
, A.D. 19
CONTRACTOR
ATTEST:
APPROVED:
MAINTENANCE BOND
AMERICAN HOME ASSURANCE COMPANY
SURETY
Senior Assistant City Attorney
The foregoing bond is approved and accepted this day of
, A.D. 19
Director of Public Works
City of Round Rock, Texas
American Home Assurance Company
National Union Fire Insurance Company of Pittsburgh, Pa.
Principal Bond Office 70 Pine Street, New York, N Y. 10270
KNOW ALL MEN BY THESE PRESENTS:
That American Home Assurance Company, a New York corporation, and National Union Fire Insurance Company of Pittsburgh, Pa.,
a Pennsylvania corporation, does each hereby appoint
- -R.F. Siddons, Jr., Robert C. Siddons, Bettye Ann Rogers, Robert C. Fricke,
Kae Priddy, William A. Grote, Linda Couey: of Austin, Texas - --
Its true and lawful Attorney(s)-in-Fact, with full authority to execute on its behalf bonds, undertakings, recognizances and other
contracts of Indemnity and writings obligatory in the nature thereof, issued in the course of its business , and to bind the respective
company thereby.
IN WITNESS WHEREOF, American Home Assurance Company and National Union Fire Insurance Company of Pittsburgh, Pa.
have each executed these presents
1
23240 19/851
STATE OF NEW YORK l ss
COUNTY OF NEW YORK f
On this 70 day of DeCeinhi=r 19 89
before me came the above named officer of American Home
Assurance Company and National Union Fire Insurance Company
of Pittsburgh, Pa., to me personally known to be the individual and
officer described herein, and acknowledged that he executed the
foregoing instrument and affixed the seals of said corporations
thereto by authority of his office.
IN WITNESS WHEREOF, I have hereunto set my hand and affixed the facsimile seal of each corporation
CERTIFICATE
POWER OF ATTORNEY
No
this 20 day of December 19 89
Frederick J. Gurba, Assistait icV a President
v a i
1
JOSEPH 8 OLIO
Noler Public Siete of New York
No. 0 N04652754
Qualified in Westchest r o only
Jut Expires J 31 d de
Excerpts of Resolutions adopted by the Boards of Directors of American Home Assurance Company and National Union Fire
Insurance Company of Pittsburgh, Pa. on May 18, 1976:
"RESOLVED, that the Chairman of the Board, the President, or any Vice President be, and hereby is, authorized to appoint Attorneys- in•Fact to
represent and act for and on behalf of the Company to execute bonds, undertakings, recognizances and other contracts of indemnity and writings
obligatory in the nature thereof, and to attach thereto the corporate seal of the Company, in the transaction of its surety business;
"RESOLVED, that the signatures and attestations of such officers and the seal of the Company may be affixed to any such Power of Attorney or to
any certificate relating thereto by facsimile, and any such Power of Attorney or certificate bearing such facsimile signatures or facsimile seal shall be
valid and binding upon the Company when so affixed with respect to any bond, undertaking, recognizance or other contract of indemnity or writing
obligatory in the nature thereof;
"RESOLVED, that any such Attorney -in -Fact delivering a secretarial certification that the foregoing resolutions still be in effect may insert in such
certification the date thereof, said date to be not later than the date of delivery thereof by such Attorney -in- Pact"
I, Maureen P. Tully, Secretary of American Home Assurance Company and of National Union Fire Insurance Company of
Pittsburgh, Pa. do hereby certify that the foregoing excerpts of Resolutions adopted by the Boards of Directors of these corpora-
tions, and the Powers of Attorney issued pursuant thereto, are true and correct, and that both the Resolutions and the Powers of
Attorney are in full force and effect.
this _ day of . 19 ,
P
Maureen P. Tully, Secretary
I, the purchaser named above, claim an exemption from payment of sales taxes for the purchase of taxable items
described below or on the attached order or invoice:
Description of items to be purchased, or on the attached order or invoice:
•
Purchaser claims this exemption for the reason:
The City of Round Rock. Texas is a tax exempt municipality
• Tax exemption #74- 6017485
I understand that I will be liable for
become due for failure to comply with
and /or Metropolitan Transit Authority
Comptroller rules regarding exempt
will be determined by the price paid
or the fair market rental value for the
I understand that it is a misdemeanor
to the seller for taxable items which
will be used in a manner other than
and that upon conviction may be fined
payment of Sales Tax which may
the provisions of the State, City
Sales and Use Tax Laws and
purchases. Liability for the
for the taxable items purchased
period of time used.
to give an Exemption Certificate
I know, at the time of purchase,
that expressed in this certificate
not more than $500 per offense.
tax
Purchaser
sign for the City
here of Round Rock
Tithe
Dote
J
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
:',1;z!
TEXAS SALES TAX EXEMPTION CERTIFICATE
/Fi•m. 05 purcn..w, firm Or.O.ncy
*Odes. (Sfnef • number. P 0. Sox or Rout. num•er)
City, stet., alp code
on. (Area cod and numb,/
NOTE• This certificate cannot be issued for the purchase, lease or rental of
3 motor vehicle.
THIS CERTIFICATE DOES NOT REQUIRE A NUMBER TO BE VALID.
Sales and Use Tax "Exemption Numbers" or "Tax Exempt" Numbers do not exist.
This certlficate should be furnished to the supplier. Do not send the completed
certificate to the Comptroller of Public Accounts.
ACOI!I1. CERTIFICATE OF INSURANCE
ISSUE DATE(MM/DD/YY)
01/01/90--
PRODUCER
CONTRACTORS & MANUFACTURERS
GENERAL AGENCY
P.O. BOX 1590
DALLAS , TX 75221
CODE SUB•CODE
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS
NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AMEND,
r EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW
i COMPANIES
AFFORDING
AMERICAN
COVERAGE
■
I COMPANY A BRITISH
I LETTER
INSURANCE COMPANY
( COMPANY B
LETTER
INSURED
AUSTIN PAVING COMPANY
7800 SHOAL CREEK
SOUTH BUILDING
SUITE 142
AUSTIN, TEXAS 78757
COMPRNY C
- - - - - -- --
COMPANY
LETTER D
- - - - - -
I LETTER Y E
COVERAGES - .
THIS IS TO CERTIFY THAT THE POLICIES
INDICATED, NOTWITHSTANDING ANY
CERTIFICATE MAY BE ISSUED OR MAY
EXCLUSIONS AND CONDITIONS OF
CO TYPE OF INSURANCE
LTR
V r GENERALLIABILITY
OF INSURANCE LISTED BELOW HAVE BEEN ISSUED
REQUIREMENT, TERM OR CONDIT ON OF ANY CONTRACT
PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES
SUCH POLICIES LIMITS SHOWN MAY HAVE BEEN REDUCED
POLICY NUMBER POLICY EFFECTIVE
DATE (MM /DD /YY)
TO THE INSURED NAMED
OR OTHER DOCUMENT
DESCRIBED HEREIN
BY PAID CLAIMS.
POLICY EXPIRATION
DATE (MM /DD/YY)
ABOVE FOR THE POLICY PERIOD
WITH RESPECT TO WHICH THIS
IS SUBJECT TO ALL THE TERMS,
ALL LIMITS IN THOUSANDS
COMMERCIAL GENERAL LIABILITY
A -X.
CLAIMS MADE x OCCUR.
1-X OWNER'S & CONTRACTOR'S PROT.
I
- -' --
AUTOMOBILE LIABILITY
A �ANY AUTO
X ALL OWNED AUTOS
I SCHEDULED AUTOS
X HIRED AUTOS
,_ NON -OWNED AUTOS
_ X :
GARAGE LIABILITY
T - -
CGL -54003
---�,
01/01/90
-I—
GENERAL
RAL AGGREGATE $ 4,000
PRODUCT
01/01/91-
PERSONAL
EACH
FIRE
( MEDICAL
{
S - COMP /OP$ AGGREGATE $
1,000
B ADVERTISING INJURY $ 1,000
OCCURRENCE $ 1000-
DAMAGE (Any one Piro) $
50
EXPENSE (Any one person) $
5
I
COMBINED
CAL -54003 101/01/90 01/01/91 LIM
BODILY
(Per
BODILY
(PeURY
(Per
PROPERTY
I DAMAGE
I
I I
1 1,000,000
person) 1 INCL • '�f
$
accident) - INCL . —I
r
$
EXCESS LIABILITY
,-
i OTHER THAN UMBRELLA FORM
1
■
— I
01/01/91$ -4-
$
-
� • - A GGREGATE ---"-
OCCURRENCE
$ $
WORKER'S COMPENSATION rt i T— —*
A AND 1 WC -54003 ( 01/01/90
I ±
EMPLOYERS' LIABILITY
STATUTORY
500,000 - - (EACH ACCIDENT)
(DISEASE —POLICY LIMIT)
500,000 ---- - -
500,000 (DISEASE —EACH EMPLOYEE)
--- -- -- l-
OTHER
L _ _1
DESCRIPTION OF OPERATIONS/ LOCATIONS/VEHICLES/RESTRICTIONS /SPECIAL ITEMS
- - - - -- 1•
_- _______. -_
CERTIFICATE HOLDER CANCELLATION . ,. _ -y
City Of Round Rock
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE
EXPIRATION DATE THEREOF, THE ISSUING COMPANY WILL 6NSEAYOS TO V
MAILODAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE
LEFT, BUT FAILURE TO MAIL SUCH NOTICE SHALL IMPOSE NO OBLIGATION OR
LIABILITY OF ANY KIND UPON THE COMPANY, ITS AGENTS OR REPRESENTATIVES.
AUTHORIZED REPRESENTATIVE
ACORD 25 -S (3188) — CACORD CORPORATION 1988
THIS CERTIFICATE IS ISSUED FOR THE DURATION OF THE PROJECT AS A MATTER OF
INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS
CERTIFICATE DOES NOT AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE
POLICIES LISTED BELOW.
NAME AND ADDRESS OF AGENCY
COMPANIES AFFORDING COVERAGES
COMPANY A
LETTER
COMPANY B
LETTER
COMPANY C
LETTER
COMPANY D
LETTER
COMPANY E
LETTER
This is to certify that policies of insurance listed bel
the insured named above and are in force at this time.
requirement, term or condition of any contract or other
to which this certificate may be issued or may pertain,
by the policies described herein is subject to all the
conditions of such policies.
NAME AND ADDRESS OF INSURED
COMPANY TYPE OF
LETTER INSURANCE
GENERAL LIABILITY
POLICY
NUMBER
POLICY
EXPIRATION
DATE
BIDDING AND CONTRACT REQUIREMENTS
Bodily $
Injury
ow have been issued to
Not withstanding any
document with respect
the insurance afforded
terms, exclusions and
LIMITS OF LIABILITY IN
THOUSANDS (000)
EACH
OCCURRENCE AGGREGATE
_Comprehensive
Form Property $
_Premises- Damage
Operations
_Explosions and
Collapse Hazard Bodily $
_Underground Injury and
Hazard Property
_Products /Completed Damage
Operations Hazard Combined
_Contractual
Insurance
_Broad Form
Property Damage Personal Injury $
_Independent
Contractors
_Personal Injury
AUTOMOBILE LIABILITY
EXCESS LIABILITY
_Umbrella Form
Other than
_
Umbrella
WORKERS' COMPENSATION
AND EMPLOYER'S
LIABILITY
OTHER
Builders Risk.
Description of Operations/
Locations /Vehicles PROJECT TITLE:
C.I.P. No. PROJECT LOCATION:
Bodily Injury
(Each Person)
_Comprehensive
Form Bodily Injury
_Owned (Each Accident)
_Hired
Non -Owned
Bodily Injury and
Property Damage
Combined
Statutory
$
$
Property Damage $
$
$
(Each Account)
The City of Round Rock is named as an additional insured under all insurance,
other than Workmen's Compensation.
Cancellation: No policies will be cancelled or reduced, restricted or
limited until ten (10) days after the owner has received
written notice as evidenced by return receipt of
registered or certified letter.
NAME AND ADDRESS OF CERTIFICATE HOLDER: DATE ISSUED:
REPRESENTATIVE
CITY OF ROUND ROCK
End.
AUTHORIZED
21. Submit a copy of your most recent detailed financial statement submitted
to a bank for credit, and a current detailed financial statement together
with other pertinent information as required by the City of Round Rock.
22. Submit a list of those subcontractors you plan to use on this project.
23. The undersigned hereby authorizes and requests any person, firm or
corporation to furnish any information requested by the City of Round
Rock in verification of the recitals comprising this Statement of
Bidder's Qualifications.
Dated at
STATE OF
COUNTY OF
, 19
this day of
(Contractor)
By
Title
being duly sworn deposes and says that he is
of and that the answers to the
foregoing questions and all statements therein contained are true and correct.
Subscribed and sworn to before me this day of
My Commission Expires , 19
, 19
(Notary Public)
Classification Hourly Rate
BIDDING AND CONTRACT REQUIREMENTS
WAGE RATES
HIGHWAY- HEAVY, UTILITIES AND INDUSTRIAL BRANCH
CONSTRUCTION WAGE RATES
JANUARY 8, 1988
WAGE RATES PAID FOR HIGHWAY -HEAVY CONSTRUCTION AND PAVING UTILITIES INCIDENTAL
TO GENERAL BUILDING CONSTRUCTION IN ZONE 2 INCLUDING WILLIAMSON COUNTY:
Asphalt Heater Operator 5.40
Asphalt Raker 6.80
Carpenter 7.70
Carpenter Helper 6.10
Concrete Finisher (Paving) 7.95
Concrete Finisher Helper
(Paving) 6.50
Concrete Finisher (Struct) 7.60
Concrete Finisher Helper
(Struct) 5.90
Blaster 8.00
Blaster Helper 5.75
Electrician 9.90
Form Builder (Struct) 6.40
Form Builder Helper (Struct)5.30
Form Setter (Struct) 7.00
Form Setter Helper (Struct) 5.80
Form Setter (Paving & Curb) 6.00
Steel Worker (Struct) 15.00
Laborer (Common) 5.30
Laborer, Utility Man 6.20
Mechanic 9.25
Mechanic Helper 6.80
Mixer (16 CF or less) 8.50
Painter (Struct) 12.50
Painter Helper (Struct) 7.45
Pipelayer 6.00
Pipelayer Helper 5.30
Spreader Box Operator 6.35
Welder 9.50
Pipefitter 11.00
Pipefitter Helper 6.50
Form Loader 6.20
Classification Hourly Rate
Foundation Drill Operator
(Crawler Mounted) 9.50
Foundation Drill Operator
(Truck Mounted) 9.45
Front End Loader
(2 1/2 CY & less) 7.00
Front End Loader
(over 2 1/2 CY) 7.40
Motor Grader Operator
(Fine Grade) 10.15
Motor Grader Operator 8.90
Roller, Steel Wheel
(Plant Mix Pavements) 6.80
Roller, Steel Wheel (Other
Flat Wheel or Tamping) 5.95
Roller, Pneumatic
(Self Propelled) 5.90
Scrapers (17 CY and less) 6.40
Tractor (Crawler Type)
150 HP and less 7.00
Tractor (Crawler Type) Over
150 HP 7.40
Tractor (Pneumatic)
80 HP or less 7.75
Wagon Drill, Boring Machine
or Post Hole Driller Op. 6.00
Reinforcing Steel Setter
(Helper) 5.95
Reinforcing Steel Setter
(Struct) 8.45
Side Boom 7.10
Wage Rates
Page 2
Classification Hourly Rate
POWER EQUIPMENT OPERATORS:
Asphalt Distributor 6.70
Asphalt Paving Machine 7.65
Broom or Sweeper Operator 6.25
Bulldozer (150 HP & less) 7.25
Bulldozer (Over 150 HP) 8.40
Crane, Clamshell, Backhoe
Derrick, Dragline, Shovel
(1 1/2 CY & Over) 9.50
Classification Hourly Rate
TRUCK DRIVERS:
Single Axle, Light 5.95
Single Axle, Heavy 6.10
Tandem Axle or Semitrailer 6.30
CONDITIONS OF CONTRACT
1. DEFINITIONS . .
GENERAL CONDITIONS OF TEE AGREEMENT
CONTENTS
2. GENERAL PROVISIONS 2
2.01 Engineer's Status and Authority . 2
"2.02 Right of engineer to Modify Methods'
and Equipment 3
2.03 Changes and 'Alterations 3
2.04 Damages 4
2.05 Losses from Natural Causes 4
2.06 Laws and Ordinances 4
2.07 Licenses, Permits, and Certificates 4
2.08 Royalties and Patents 4
2.09 Keeping of Plans and Specifications
Accessible 4
2.10 Discrepancies and Omissions 4
2.11 Contractor's Understanding 5
2.12 Extra Work 5
2.13 Payment for Extra Work 5
2.14 Assignment and Subletting 6
2.15 Subcontractors 6
2.16 Owner's Status . . . 7
2.17 Completed Portions of Work 7
2.18 Materials 7
2.19 Receiving,and Storage of Materials 7
2.20 "Or Equal" Clause 7
2.21 Completed Work 7
2.22 Materials Furnished by the Owner 7
2.23 Protection of Property 8
2.24 Shelters for Workmen and Materials 8
2.25 Sanitary Facilities 8
3. CONTRACTOR'S OBLIGATIONS AND RESPONSIBILITIES 8
3.01 Labor, Equipment, Materials and
Construction Plant 8
3.02 Performance and Payment Bonds 8
3.03 Contractor's Ability to Perform 9
3.04 Superintendence and Inspection 9
3.05 Character of Employees 9
3.06 Contractor's Duty to Protect Persons
and Property 10
3.07 Safety Codes 10
3.08 Barricades 10
3.09 Minimum Wages 10
3.10 Unsuitable Work or Materials 10
3.11 No Waiver of Contractor's Obligation 11
3.12 Site Clean Up 11
3.13 Guarantee 11
(CONTENTS CONTINUED)
4. OWNER'S OBLIGATIONS AND RESPONSIBILITIES
4.01 Lines and Grades
4.02 Right of Entry
4.03 Owner's Inspectors
4.04 Collateral Work
4.05 Right -of -Way
4.06 Adequacy of Design
Page
12
12
12
12
1 2
13
13
1
1
1
5. SCHEDULING AND PROGRESS OF WORK 13 ,
5.01 Order and Prosecution of the Work 13
5.02 Rate of Progress 13
5.03 Sunday. Holiday. and Night Work 13 '
5.04 Hindrances and Delays 14
5.05 Extensions of Time 14
5.06 Liquidated Damages for Failure to
Complete on Time 14 '
6. INDEMNITY 15
6.01 Contractor's Indemnity Provision 15 '
6.02 Workmen's Compensation Insurance 15
6.03 Comprehensive General Liability Insurance 16
6.04 Owner's Protective Insurance 16 ,
6.05 Comprehensive Automobile Liability
Insurance 16
6.06 Insurance Certificate 16
7. TERMINATION OF CONTRACT 17 ,
7.01 Right of Owner to Terminate 17
7.02 Right of Contractor to Terminate 17 '
7.03 Removal of Equipment 17
8. ABANDONMENT OF CONTRACT BY CONTRACTOR 17
8.01 Notification of Contractor 17
8.02 Retention.of Contractor's Equipment
and Materials by Owner 17
8.03 Methods of Completing the Work 18
8.04 Final Acceptance 19
8.05 Disposition of Contractor's Equipment 19
9. MEASUREMENT AND PAYMENT 19
9.01 Character of Measurements 19
9.02 Estimated vs. Actual Quantities 19
9.03 Payment 20
9.04 Monthly Estimates and Payments 20
9.05 Certificates of Completion 21
9.06 Final Estimate and Payment 21
9.07 Notarized Affidavit 21
9.08 Release of Liability 21
9.09 Contractor's Obligation 22
9.10 Payments Withheld 22
1
1
1
1
1
1
1
GENERAL CONDITIONS OF THE AGREEMENT
1. DEFINITIONS
1.01 Calendar Day. A calendar day shall be the 24 hour period from one
midnight to the next consecutive midnight.
1.02 Contract Documents. The Contract Documents shall consist of the
Notice to Contractors; Advertisement; thelnformation to Bidders; the
Bid Proposal; Signed Agreement; Performance, Payment and Maintenance
Bonds; the General Conditions of the Agreement; the Special
Conditions of the Agreement; the Specifications; the Plans; the
Standard Drawings; Addenda; and duly authorized Change Orders. The
Contract Documents are complementary. and what is called for by any
one shall be as binding as if called for by all. In case of
conflict between any of the Contract Documents, priority of
interpretation shall be in the following order: Signed Agreement.
Performance, Payment and Maintenance Bonds; Addenda, Proposal, Special
Conditions of the Agreement. Notice to Contractors, Specifications,
Plans. and General Conditions of the Agreement.
1.03 Contractor. "Contractor" shall mean the business organization or
individual named and designated in the Contract Agreement as the
"Party of the Second Part ", who has entered into this contract for
the performance of the work covered thereby. and its. his, or their
duly authorized agents and other legal representatives.
1.04 Engineer. "Engineer" shall mean Baker— Aicklen & Assoc., Inc. or such
other Engineer, supervisor, or inspector who has been designated.
appointed, or otherwise employed or delegated by the Owner for this
work, or their duly authorized agents, such agents acting within
the scope of the particular duties entrusted to them in each case.
1.05 Extra Work. The term "extra work" as used in this contract shall
be understood to mean and include all work that may be required by
the Engineer or Owner to be done by the Contractor to accomplish
any change, alteration, or addition to the work shown on the Plans,
or reasonably implied by the Specifications, and not covered by the
Contractor's Proposal. except as provided under "Changes and
Alterations ", herein.
1.06 Owner. "Owner" shall mean The City of Round Rock, named and
designated in the Agreement as the "Party of the First Part" acting
through its duly authorized officers and agents.
1.07 Plans. "Plans" shall mean and include (a) all drawings prepared by
the owner as a basis for proposal, (b) all supplementary drawings
furnished by the Engineer as and when required to clarify the
intent and meaning of the drawings submitted by the owner to the
Contractor, and (c) drawings submitted by the Contractor to the
Owner when and as approved by the Engineer.
GC -1
1.08 Specifications. "Specifications" shall mean (a) all written
descriptions. methods and instructions prepared by the Owner as a
basis for proposals. (b) all supplementary written material
furnished by the Engineer as and when required to clarify the
intent or meaning of all written descriptions. methods and
instructions submitted by the Owner to the Contractor, and (c)
written descriptions submitted by the Contractor to the Owner when
and as approved by the Engineer.
1.09 Subcontractor. "Subcontractor" shall mean and refer only to a
business organization or individual having a direct contract with
the Contractor for (a) performing a portion of the Contract work,
or (b) furnishing material worked to a special design according to
the Contract plans or specifications; it does not. however, include
one who merely furnishes material not so worked.
1.10 Substantially Completed. The term "substantially completed" shall
mean that the structure or facility has been made suitable for use
and is in a conditiontoserve its intended purpose. but still may
require minor miscellaneous work and adjustments.
1.11 Work. "Work" shall mean the work to be done and the equipment.
supplies. material. and services to be furnished under the Contract
unless some other meaning is indicated by the context.
1.12 Working Day. A "working day" is defined as any day not including
Sundays or any legal holidays, in which weather or other
conditions, not under the control of the Contractor, will permit
construction of the principal units of the work for a continuous
period of not less than seven (7) hours between 7:00 a.m. and 6:00
p.m.
1.13 Written Notice. "Written notice" shall be deemed to have been duly
served if delivered in person to the individual or to a member of
the firm or to an officer of the corporation for whom it is
intended, or if delivered at or sent by certified or registered
mail to the last business address known to him who gives the
notice.
2. GENERAL PROVISIONS
2.01 Engineer's Status and Authority. It is mutually agreed by and
between the parties to this Contract that the Engineer shall have
general supervision and direction of the work included herein. In
order to prevent delays and disputes and to discourage litigation
it is further agreed by and between the parties of this Contract
that the Engineer shall in all cases determine the amounts and
quantities of the several kinds of work which are to be paid for
under the Contract; that he shall determine all questions in
GC -2
relation to said work and the construction thereof. that he shall
in all cases decide every question which may arise relative to the
execution of the Contract on the part of the Contractor; that his
decisions and findings shall be the conditions precedent to the
right of the parties hereto to arbitration or to any action on the
Contract and to the rights of the Contractor to receive any money
under this Contract; provided. however, that should the Engineer
render any decision or give any direction which in the opinion of
either party hereto is not in accordance with the meaning and
intent of this Contract, either party may file with the Engineer
within 30 days a written objection to the decision or direction so
rendered. It is the intent of this Agreement that there shall be
no delay in the execution of the work. and the decision or
directions of the Engineer as rendered shall be promptly carried
out.
2.02 Right of Engineer to Modify Methods and Equipment. If at any time
the methods or equipment used by the contractor are found to be
unsafe or inadequate to secure the quality of the work or the rate
of progress required under this Contract. the Engineer may direct
the Contractor in writing to increase their safety or improve their
character and efficiency and to cease operations under this
Contract until such direction is complied with. No claims shall be
made against the Owner for damages caused by any delay resulting
from such order.
2.03 Changes and Alterations. The Contractor agrees that the Owner,
through the Engineer. may make such changes and alterations as the
Owner may see fit in the line. grade, form, dimensions, plans, or
materials for the work herein contemplated or any part thereof
either before or after the beginning of •construction without
affecting the validity of this , Contract and the accompanying
bonds. If such changes or alterations diminish the quantity of the
work to be done, they shall not constitute the basis for a claim
for damages or anticipated profits on the work that may be
dispensed with. If they increase the amount of work and the
increased work can fairly be classified under the specifications,
such increase shall be paid for according to the quantity actually
done and at the unit price established for such work under this
contract; otherwise such work shall be paid for as provided under
Section 2.12 "Extra Work ". In the event the Owner shall make such
changes or alterations which will make useless any work already
done or material already furnished or used in said work. then the
Owner shall compensate the Contractor for any materials or labor so
used. for any actual loss occasioned by such change. and for the
actual expenses incurred in preparation for the work as originally
planned.
GC -3
2.04 Damages. The right of general supervision by the Owner shall not
make the Contractor an agent of the Owner. and the liability of the
Contractor for all damages to persons. firms. and corporations
arising from the Contractor's execution of the work shall not be
lessened because of such general supervision. the Contractor is an
independent contractor in regard to work under this Contract, and
as such is solely liable for all damages to any persons, firms,
corporations, or their property as a result of the prosecution of
the work.
2.05 Losses from Natural Causes. All loss or damage arising out of the
nature of the work to be done or from the action of the elements or
from any unforeseen circumstances in the prosecution of the work or
from unusual obstructions or difficulties which may be encountered
in the prosectuion of the work shall be sustained and borne by the
Contractor at his own cost and expense.
2.06 Laws and Ordinances. The Contractor shall at all times observe and
comply with all Federal, State, and local laws, ordinances, rules
and regulations which in any manner affect the Contract or the work
and shall indemnify and save harmless the Owner against any claim
arising from the violation of any such laws and ordinances whether
by the Contractor or his employees or his subcontractors and their
employees.
2.07 Licenses, Permits and Certificates. Except as hereinafter
stipulated, all licenses. permits. certificates. etc. required for
and in connection with the work to be performed under the
provisions of these Contract Documents shall be secured by the
Contractor at his own expense. In the event a building permit is
required such permit will be obtained by the Owner at no cost to
the Contractor.
2.08 Royalties and Patents. The Contractor shall protect and save
harmless the Owner from all and every demand for damages,
royalties. or fees on any patented invention used by him in
connection with the work done or material furnished under this
Contract; provided, however, that if any patented material.
machinery. appliance, or invention is clearly specified in this
Contract, the cost of procuring the rights of use and the legal
release or indemnity shall be borne and paid by the Owner direct
unless such cost is determined and directed to be included in the
bid price at the time the Proposal is submitted.
2.09 Keeping of Plans and Specifications Accessible. The Engineer shall
furnish the Contractor with five (5) sets of executed Plans and
Specifications without expense to him, and the Contractor shall
keep one copy of the same constantly accessible on the work, with
the latest revisions noted thereon.
2.10 Discrepancies and Omissions. It is further agreed that it is the
intent of this Contract that all work must be done and all material
GC -4
must be furnished in accordance with the generally accepted
practice. and in the event of any discrepanciea between the
separate contract documents, the priority of interpretation defined
under "Contract Documents" shall govern. In the event that there
is still any doubt as to the meaning and intent of any portion of
the Contract. Specifications or Drawings. the Engineer shall define
which is intended to apply to the work.
2.11 Contractor's Understanding. It is understood and agreed that the
Contractor has. by careful examination. satisfied himself as to the
nature and location of the work, the conformation of the ground.
the character. quality and quantity of the materials to be
encountered, the character of equipment and facilities needed
preliminary to and during the prosecution of the work, the general
and local conditions, and all other matters which can in any way
affect the work under this Contract. No verbal agreement or
conversation with any officer, agent. or employee of the Owner,
either before or after the execution of this Contract, shall affect
or modify any of the terms or obligations herein contained.
2.12 Extra Work. The term "extra work" as used in this Contract shall
be understood to mean and include all wort. that may be required by
the Owner through the Engineer to be done by the Contractor to
accomplish any change. alteration. or addition to the work shown by
the Plans or reasonably implied by the Specifications and not
covered by the Contractor's Proposal, except as provided in Section
2.03 — "Changes and Alterations ".
It is agreed that the Contractor shall perform all
extra work under the direction of the Engineer when presented with
a written Change Order signed by the Engineer.
No claim for extra work of any kind will be allowed
unless ordered in writing by the Engineer. In case any orders or
instructions, either oral or written, appear to the Contractor to
involve extra work for which he should receive compensation. he
shall make a written request to the Engineer for a written Change
Order authorizing such extra work. Should a difference of opinion
arise as to what does or does not constitute extra work or
concerning the payment therefor and the Engineer insists upon its
performance. the Contractor shall proceed with the work after
making a written request for a written Change Order and shall keep
an accurate account of the "actual field cost" thereof as provided
under Method "C" below.
2.13 Payment for Extra Work. It is agreed that the compensation to be
paid the Contractor for performing extra work shall be determined
by one or more of the following methods:
Method "A" — By agreed unit prices;
Method "B" — By agreed lump sum; or
GC -5
Method "C" — If neither Method "A" or Method "B" can be agreed upon
before the extra work is commenced, then the Contractor shall be
paid the "actual field cost" of the work plus 15%.
Where extra work is performed under Method "C ". the term "actual
field cost" of such extra work is hereby defined to be and shall
include: (a) the payroll cost for all workmen. such as foreman,
mechanics. craftsmen, and laborers; (b) the cost of all materials
and supplies not furnished by the Owner; (c) rental for all
power — driven equipment at agreed —upon rates for the time actually
employed or used in the performance of the extra work; (d)
traneporation charges necessarily incurred in connection with any
equipment authorized by the Engineer for use on said extra work and
which is not already on the job; (e) all power, fuel, lubricants,
water. and similar operating expenses; (f) all incidental expenses
incurred as a direct result of such extra work including sales or
use taxes on materials, payroll taxes, and the additional premiums
for construction bonds, workmen's compensation, public liability
and property damage. and other insurance required by the Contract
where the premiums therefore are based on payroll and material
costs. The Engineer may direct the form in which accounts of the
"actual field costs" shall be kept and may also specify in writing
before the work commences the method of doing the work and the type
and kind of machinery and equipment to be used; otherwise these
matters shall be determined by the Contractor. Unless otherwise
agreed upon. the prices for the use of machinery and equipment
shall be incorporated in the written extra work Change Order. The
15% of the "actual field cost" to be paid the contractor shall
cover and compensate him for his profit, overhead, and general
superintendence.
2.14 Assignment and Subletting The Contractor shall not assign or
sublet the work or any part thereof without the previous written
consent of the Owner, nor shall he assign, by power of attorney or
otherwise, any of the money payable under this Contract unless by
and with the consent of the Owner to be signified in like manner.
If the Contractor assigns all or any part of any monies due or to
become due under this Contract. the instrument of assignment shall
contain a clause substantially to the effect that it is agreed that
the right of the assignee in and to any monies due or to become due
to the Contractor shall be subject to all prior liens of all
persons, firms, and corporations for services rendered or materials
supplied for the performance of the work called for in this
Contract.
2.15 Subcontractors. The Contractor shall be as fully responsible to
the Owner for the acts and omissions of his subcontractors and of
persons either directly or indirectly employed by them as he is for
the acts and omissions of persons directly employed by him. Should
any subcontractor fail to perform the work undertaken by him in a
satisfactory manner. his subcontract shall be immediately
terminated by the Contractor upon written notice from the Owner.
GC -6
2.16 Owner's Statue. Nothing contained in this Contract shall create
any contractual relation between any subcontractor and the Owner.
2.17 Completed Portions of Work. The Owner shall have the right to take
possession of and to use any completed or partially completed
portions of the work prior to completion of the entire work, but
such use shall not constitute an acceptance of any of the work not
completed in accordance with the Contract Documents. If the
Engineer determines that taking possession of and using partially
completed work substantially increases the cost of or delays
construction. the Contractor shall be entitled to extra
compensation or extension of time or both as determined by the
Engineer.
2.18 Materials. All materials furnished by the Contractor shall be as
required by the Plans and Specifications or as otherwise
stipulated. The Contractor shall not start delivery of materials
which he is to furnish until the Engineer has approved the source
of supply of such materials.
2.19 Receiving and Storage of Materials. The contractor shall make
arrangements for receiving and storing materials. The Owner will
not sign for or receive shipments of materials consigned to the
Contractor. The Owner will not furnish storage space for materials
except where the written permission of the Engineer is given.
2.20 "Or Equal" Clause. Whenever a material. product, or article is
specified or shown on the Plans by using the name of the
proprietary product or of a particular manufacturer or vendor and
is followed by the term "or equal" the Contractor may submit a
written request to the Engineer requesting approval of the use of a
material. product, or article he feels is truly equal to the one
specified. The Engineer will evaluate the request to determine if
the material. product, or article is of equal substance and
function and if it will perform identically the duties imposed by
the general design. Written approval of an "or equal" material,
product. or article must be obtained from the Engineer before it
may be incorporated into the work as a substitute for that
specified in the Contract Documents.
2.21 Completed Work. The Contractor shall maintain continuous adequate
safeguards to protect all completed work from damage. loss, or the
intrusion of foreign elements.
2.22 Materials Furnished by the Owner. The Contractor shall assume
responsibility for and safeguard any and all materials supplied by
. the Owner against loss or injury. The provision shall extend to
the taking of all necessary sanitary precautions to avoid
contamination of such materials that must be maintained and
incorporated into the work in a sanitary condition.
GC -7
2.23 Protection of Property. The Contractor shall give reasonable
notice to the owner or owners of public or private property and
utilities when such property is liable to injury or damage through
the performance of the work, and he shall make all necessary
arrangements with such owner or owners relative to the removal and
replacement or protection of such property or utilities.
The Contractor shall satisfactorily shore. support. and protect any
and all structures, and all pipes. sewers, drains. conduits. and
other facilities belonging to the Owner, and he shall be
responsible for any damage resulting thereto. The Contractor shall
not be entitled to any damages or extra pay as a result of any
postponement, interference, or delay caused by any such structures
and facilities being on the line of the work whether they are shown
on the Plans or not.
2.24 Shelters for Workmen and Materials. The building or structures for
housing men or the erection of tents or other forms of protection
for workmen or materials will be permitted only as the Engineer
shall authorize or direct. The sanitary conditions of the grounds
in or about such structures shall at all times be maintained in a
manner satisfactory to the Engineer.
2.25 .Sanitary Facilities. Necessary sanitary toilet facilities for the
use of all employees on the work shall be of a type complying with
State and local sanitary regulations and shall be properly secluded
from public observation. These facilities shall be constructed and
maintained by the Contractor in such manner and at such points as
shall be approved by the Engineer. Their use shall be strictly
enforced.
3. CONTRACTOR'S OBLIGATIONS AND RESPONSIBILITIES
3.01 Labor. Equipment. Materials and Construction Plant. The Contractor
shall provide all labor, tools. equipment, machinery. supplies and
materials necessary for the prosecution and completion of this
Contract where it is not specifically provided that the Owner shall
furnish them. The Owner shall not be held responsible for the
care. preservation, conservation, or protection of any material.
tools. or machinery on any part of the work until it is finally
completed and accepted. The Contractor shall maintain on the job
at all times sufficient labor, material, and equipment to
adequately prosecute the work.
3.02 Performance and Payment Bonds. It is further agreed by the Parties
to the Contract that the Contractor will execute separate
performance and payment bonds, each in the sum of 100% of the total
Contract price in standard forms for this purpose, guaranteeing
GC -8
faithful performance of the work and the fulfillment of any
guarantees required and further guaranteeing payment to all persons
supplying labor and materials or furnishing him any equipment in
the execution of the Contract. It is agreed that the Contract
shall not be in effect until such performance and payment bonds are
furnished and approved by the Owner. The cost of the premium for
the performance and payment bonds shall be included in the price
bid by the contractor for the work under this Contract, and no
extra payment for such bonds will be made by the Owner.
The surety company or companies underwriting the performance and
payment bonds shall be acceptable according to the latest list of
companies holding certificates of authority from the Secretary of
the Treasury of the United States, shall be duly authorized to act
under the laws of the State of Texas as Surety. and shall be
approved by the Owner.
3.03 Contractor's Ability to Perform. Upon request by the Owner the
Contractor shall furnish sufficient evidence of his ability to
perform the work which is outlined in this document. This shall
include an equipment inventory and records showing the satisfactory
completion of projects of equal magnitude in the past. It shall be
the prerogative of the'Owner to terminate the Contract as outlined
in Section 7 "Termination of Contract ", if job progress indicates
that the Contractor lacks either appropriate experience or
ability.
3.04 Superintendence and Inspection. The Contractor shall give personal
attention to the faithful prosecution and completion of the
Contract and shall keep a competent superintendent and any
necessary assistants, all of whom are satisfactory to the Engineer,
on the work continuously during its progress. The superintendent
shall represent the Contractor in his absence, and all directions
given to him by the Owner's representative shall be as binding as
if given to the Contractor.
In the event that the Contractor and the superintendent are both
absent from the site of the work for prolonged periods of time the
Engineer may order any or all work under this Contract to be
stopped until the Contractor provides continuous and proper
supervision of the work. Such stoppage shall not constitute a
basis for any claim against the Owner for damages caused by delay
for such work stoppages.
3.05 Character of Employees. The Contractor agrees to employ only
orderly. competent, and skillful persons to do the work. and
whenever the Engineer shall inform him that the work being
accomplished is of sub — standard character by reason of
carelessness, incompetence, or inexperience on the part of the
GC -9
workers the installation of ouch work shall be immediately
suspended and shall not be resumed until the Engineer is satisfied
that the conditions causing such faulty work have been corrected.
3.06 Contractor's Duty to Protect Persons and Property. In the
performance of this Contract, the Contractor shall protect the
public and the Owner fully by taking reasonable precaution to
safeguard persons from death or bodily injury and to safeguard
property of any nature whatsoever from damage. Where any dangerous
condition or nuisance exists in and around construction sites,
equipment and supply storage areas, and other areas in any way
connected with the performance of this Contract, the Contractor
shall not create excavations, obstructions, or any dangerous
condition or nuisance of any nature whatsoever in connection with
the performance of this contract unless necessary to its
performance, and in that event the Contractor shall provide and
maintain at all times reasonable means of warning of any danger or
nuisance created. The duties of the Contractor in this paragraph
shall be nondelegable, and the Contractor's compliance with the
specific recommendations and requirements of the Owner as to the
means of warning shall not excuse the Contractor from the faithful
performance of these duties should such recommendations and
requirements not be adequate or reasonable under the circumstances.
3.07 Safety Codes. The Contractor shall comply with all applicable
provisions of any Federal. State. and Municipal safety laws and
building and construction codes. All machinery, equipment, and
other physical hazards shall be guarded in accordance with the
latest edition of' the "Manual of Accident Prevention in
Construction" of the Associated General Contractors of America
except where incompatible with Federal, State. or Municipal laws or
regulations.
3.08 Barricades. When barricades are used to satisfy safety
requirements. such barricades shall be properly identified with the
Contractor's name prominently stenciled on both sides of the
barricades with letters at least 2 inches high.
3.09 Minimum Wages. All employees directly employed on the work shall
be paid not less than the established prevailing wage scale for
work of a similar character in this locality. A scale of
prevailing wages is included in the Special Conditions of these
Contract Documents. The Contractor shall pay not less than the
general prevailing wages shown on said scale and shall keep
accurate wages records accessible in accordance with Article 5159
of the Revised Civil Statutes of Texas.
3.10 Unsuitable Work or Materials. It is understood and agreed that if
the work or any part thereof or any material furnished by the
Contractor for use in the work or selected for the same shall be
GC -10
deemed by the Engineer as unsuitable or not in conformity with the
specifications, the Contractor shall, after receipt of written
notice thereof from the Contracting Officer. forthwith remove such
material and replace, rebuild, or otherwise remedy such work so
that it shall be in full accordance with this Contract.
Should the Contractor fail to initiate compliance with the above
provision within 72 hours or should he fail to properly prosecute
and complete correction of such faulty work, the Engineer may
direct that the work be done by others and that the cost of the
work be deducted from monies due the Contractor.
3.11 No Waiver of Contractor's Obligations. The Engineer. supervisor.
or inspector shall have no power to waive the obligations of this
Contract for the furnishing by the contractor of good material and
of his performing good work as herein described and in full
accordance with the plans and specifications. No failure or
omission of the Engineer. supervisor. or inspector to condemn any
defective work or material shall release the Contractor from the
obligation to at once tear out. remove, and properly replace the
same at any time prior to final acceptance upon the discovery of
said defective work or material; provided, however that the
Engineer. supervisor, or inspector shall upon request of the
contractor inspect and accept or reject any material furnished, and
once the material has been accepted by the Engineer. supervisor. or
inspector such acceptance shall be binding on the Owner unless it
can be clearly shown that such material furnished was not as
represented and does not meet with the specifications for the
work. Any questioned work may be ordered taken up or removed for
re— examination by the Engineer prior to final acceptance. and if
found not in accordance with the specifications for said work. all
expense of removing. re examination. and replacement shall be borne
by the Contractor; otherwise the expense thus incurred shall be
allowed as "Extra Work" and shall be paid for by the Owner.
3.12 Site Clean Up. The Contractor shall not allow the site of the work
to become littered with trash and waste material, but shall
maintain the site in a neat and orderly condition throughout the
construction period. The Engineer shall have the right to
determine what is waste material or rubbish and the manner and
place of disposal. On or before the completion of the work the
Contractor shall. without charge therefor, carefully clean out all
pits. pipes. chambers. or conduits. shall tear down and remove all
temporary structures built by him, shall remove all rubbish of
every kind from the tracts or grounds which he has occupied, and
shall leave them in a condition satisfactory to the Engineer.
3.13 Guarantee. During a period of 12 months from and after the date of
the final acceptance by the Owner of the work embraced by this
Contract, the Contractor shall make all needed repairs arising out
GC -11
of defective workmanship or materials, or both, which in the
judgement of the Owner shall become necessary during such period.
If within 10 days after the mailing of a notice in writing to the
Contractor or his agent the said Contractor shall neglect to make
or to undertake with due diligence the aforesaid repairs, the Owner
is hereby authorized to make such repairs at the Contractor's
expense; provided, however, that in case of an emergency where. in
the judgement of the Owner, delay would cause serious loss or
damage. repairs may be made without notice being sent to the
Contractor. and the Contractor shall pay the cost thereof.
4. OWNER'S OBLIGATIONS AND RESPONSIBILITIES
4.01 Lines and Grades. All necessary lines and grades shall be
furnished by the Engineer. Whenever necessary. work shall be
suspended to permit performance of this work. but such suspension
will be as brief as practicable. and the Contractor shall be
allowed no extra compensation therefore The Contractor shall give
the Engineer ample notice of the time and place where lines and
grades will be needed. All stakes, marks, etc. shall be carefully
preserved by the Contractor, and in case of careless destruction or
removal by him or his employees such stakes, marks, etc. shall be
replaced by the Engineer at the Contractor's expense.
4.02 Right of Entry. The Owner reserves the right for its personnel or
its agents to enter the property or location on which the work
herein contracted is being constructed or installed for the purpose
of supervising and inspecting the work or for the purpose of
constructing or installing such collateral work as the Owner may
desire.
4.03 Owner's Inspectors. It is agreed by the Contractor that the Owner
shall appoint such Engineer. supervisors, or inspectors as the said
Owner may deem necessary to inspect the material furnished and the
work done under this Contract, to see that the said material is
furnished, and to see that said work is done in accordance with the
plans and specifications therefor. The Contractor shall furnish
all reasonable aid and assistance required by the Engineer,
supervisors, or inspectors for the proper inspection and
examination of the work and all parts thereof. The Contractor
shall regard and comply with the directions and instructions of the
Engineer, supervisors, or inspectors so appointed when such
directions and instructions are consistent with the obligations of
this Contract.
4.04 Collateral Work. The Owner reserves the right to provide all labor
and material essential to the completion of work that is not
included in this Contract either by a separate contract or
otherwise. Any collateral work shall be prosecuted in such a
manner that it will not damage the Contractor nor delay the
progress of the work being accomplished under this Contract. The
respective rights of and operations of the various interests
involved shall be established and coordinated by the Engineer.
GC -12
4.05 Right—of —Way. Easements across private property and lands needed
for construction under this contract will be provided by the Owner.
4.06 Adequacy of Design. It is agreed that the Owner shall be
responsible for the adequacy of the design, sufficiency of the
Contract Documents. the safety of the structure and practicability
of the operations of the completed project; provided the Contractor
has complied with the requirements of the said Contract Documents.
all approved modifications thereof. and additions and alterations
thereto approved in writing by the Owner. The burden of proof of
such compliance shall be upon the Contractor to show that he has
complied with the said requirements of the Contract Documents,
approved modifications thereof and all approved additions and
alterations thereto.
5. SCHEDULING AND PROGRESS OF WORK
5.01 Order and Prosecution of the Work. It is the meaning and intent of
this Contract. unless otherwise herein specifically provided, that
the Contractor shall be allowed to prosecute his work at such times
and seasons in such order of precedence and in such manner as shall
be most conducive to economy of construction; provided however,
that the order and time of prosecution shall be such that the work
shall be completed as a whole or in part in accordance with this
Contract within the time of completion hereafter designated;
provided also that the Engineer may direct the time and manner of
constructing any part or parts of the work when in his opinion such
should be given priority to lessen the probability of danger to the
public or to anticipate seasonal hazards from the elements or to
coordinate with other work being done for or by the Owner.
5.02 Rate of Progress. The Contractor shall give the Engineer full
information in advance as to his plans for carrying on any part of
the work. If at any time prior to the start or during the progress
of the work any part of the Contractor's plant or equipment or any
of his methods of executing the work appear to the Engineer to be
unsafe, inefficient. or inadequate to insure the required quality
or rate of progress of the work. the Engineer may order the
Contractor to increase or improve his facilities or methods, and
the Contractor shall promptly comply with such orders; but neither
compliance with such orders; failure to comply will result in
placing Contractor in abandonment per Section 8 "Abandonment of
Contract by Contractor"; but neither compliance with such orders
nor failure of the Engineer to issue such orders shall release the
Contractor from his obligation to secure the degreee of safety, the
quality of work, and the rate of progress required by this
Contractor. The Contractor alone shall be responsible for the
safety, adequacy. and efficiency of his plant, equipment, and
methods.
5.03 Sunday. Holiday. and Night Work. Except in connection with the
care, maintenance, or protection of equipment or of work already
GC -13
done. no work shall be done between the hours of 6:00 p.m. and 7:00
a.m. or on Sundays or legal holidays without written consent of the
Engineer.
5.04 Hindrances and Delays. No claims shall be made by the Contractor
for damages, hindrances. or delays from any cause during the
progress of any portion of the work embraced by this Contract
except where the work is stopped by order of the Owner. If the
Owner stops the work for just cause because the Contractor is not
complying with the plans and specifications or the intent thereof,
the Contractor shall have no claim for damages. hindrances, or
delays. However, if the Owner stops the work for any other reason.
the Contractor shall be entitled to reimbursement paid by the Owner
for such expenses actually incurred which in the judgement of the
Engineer occurred as a result of the work stoppage.
Should delays repeatedly occur due to the Contractor's failure to
provide adequate plant. equipment. or personnel. or where the
Engineer determines that unreasonable inconvenience to the public
is due to such failure. the Contractor's operations shall be
suspended until he shall have provided adequate plant. equipment.
and personnel to properly resume and continually prosecute the
work.
5.05 Extensions of Time. Should the Contractor be delayed in the final
completion of the work by any act or neglect of the Owner or
Engineer, or of any employee of either. or by any other contractor
employed by the Owner. or by strikes, fire or other cause or causes
outside of and beyond the control of the Contractor and which the
Engineer determines could have been neither anticipated nor
avoided. then an extension of time sufficient to compensate for the
delay as determined by the Engineer shall be granted by the Owner;
provided, however, that the Contractor shall give the Owner prompt
notice in writing of the cause of delay in each case. Extensions
of time will not be granted for delays caused by unfavorable
weather, unsuitable ground conditions or inadequate construction
force.
5.06 Liquidated Damages for Failure to Complete on Time. The Contractor
agrees that time is of the essence of this Contract and that the
definite value of damages which would result from delay would be
incapable of ascertainment and uncertain, so that for each day of
delay beyond the number of days herein agreed upon for the
completion of the work herein specified and contracted for. after
due allowance for such extension of time as is provided for under
the provisions of the preceding paragraph, the Owner may withhold
permanently from the Contractor's total compensation, not as a
penalty but as liquidated damages. the sum per day given in the
following schedule:
GC -14
1
Amount of Contract
Amount of Liquidated
Damages Per Day
Less than $ 5.000.00 $ 30.00
$ 5.001.00 to $ 15.000.00 35.00
15,001.00 to 25,000.00 40.00
25,001.00 to 50.000.00 50.00
50,001.00 to 100.000.00 70.00
100,001.00 to 500.000.00 200_QQ_
500.001.00 to 1.000.000.00 300.00
1,000,001.00 to 2.000,000.00 400.00
2.000,001.00 to 5.000.000.00 500.00
6. INDEMNITY
6.01 Contractor's Indemnity Provision. To protect the Owner from the
Contractor's failure to perform any of the foregoing duties or any
of the terms of this Contract. the Contractor shall indemnify and
save harmless the Owner and the Owner's agents and employees from
all losses, damages, judgements, decrees, and expenses or costs of
any nature whatsoever arising out of or in any way connected with
any claims or actions at law or in equity brought against the Owner
and the Owner's agents and employees for the death or injury to
persons or for damage to property caused, or allegedly caused, by
any willful acts, negligence, nuisance, or breach of any term or
condition of this Contract by the Contractor, his agents, servants,
subcontractors, or employees. The Contractor shall furthermore
indemnify and save harmless the Owner and the Owner's agents and
employees from all demands of subcontractors, workers, material
persons, or suppliers of machinery and parts thereof, equipment,
power tools. and supplies incurred in connection with work to be
performed under this Contract. Property of any description,
including property of the Owner, which shall be damaged in the
performance of this Contract by the Contractor, his agents.
employees, subcontractors or their employees and subcontractors
shall be restored to its condition prior to damage by the
Contractor at the Contractor's expense.
6.02 Workmen's Compensation Insurance. The Contractor agrees to comply
with the Workmen's Compensation Act of the State of Texas, and to
pay or cause to be paid all compensation, medical or other
benefits, which may become due or payable thereunder, and to
protect and indemnify the Owner and the Owner's agents and
employees from and against any and all liabilities by reason of
accidental injury, disease or death sustained by subcontractor's
employees. The Contractor shall furnish the Owner with a
certificate from the Industrial Accident Board evidencing the
Contractor's and subcontractor's compliance with said statute.
GC -15
6.03 Comprehensive General Liability Insurance. The Contractor shall
provide and maintain during the life of this Contract and until all
work under said Contract has been completed and accepted by the
Owner. a Comprehensive General Liability insurance policy, said
policy and the issuing carrier approved by the Owner. which
specifically insures the contractual liability of the Contractor
assumed under Paragraph 6.01 above entitled "Contractor's Indemnity
Provision ". The liability coverage under this policy shall cover
Independent Contractors. Liability limits for the Comprehensive
General Liability insurance coverage under this policy shall not be
less than the following:
Bodily Injury $250,000 each person
$500,000 each accident
Property Damage
Property Damage
GC -16
$ 50,000 each accident
$100,000 aggregate
6.04 Owner's Protective Insurance. The Contractor shall provide and
maintain during the life of this Contract and until all work under
said Contract has been completed and accepted by the Owner. an
Owner's and Contractor's Protective Policy which co insures the
Owner and the Owner's agents and employees with the same
Comprehensive General Liability coverage as described in 6.03 above
entitled "Comprehensive General Liability Insurance ".
6.05 Comprehensive Automobile Liability Insurance. The Contractor shall
provide and maintain during the life of this Contract and until all
work under said Contract has been completed and accepted by the
Owner, a Comprehensive Automobile Liability insurance policy. said
policy and issuing carrier approved by the Owner, covering the
operation on or off the site of the work of all motor vehicles
licensed for highway use. whether they are owned, non - owned, or
hired by the Contractor, in which shall specifically insure
contractual liability of the Contractor assumed under the above
Paragraph 6.01 entitled "Contractor's Indemnity Provision ". The
liability limits for the Comprehensive Automobile Liability
insurance coverage shall not be less than the following:
Bodily Injury
$250,000 each person
$500,000 each accident
$100,000 each accident
6.06 Insurance Certificate. In connection with the insurance coverage
set out in sections 6.02, 6.03, 6.04 and 6.05 above. the Contractor
shall furnish the Owner with a certificate verifying said
insurance. Said certificate shall state that the Owner shall be
given 10 days advance written notice before any provisions of the
policies are changed or in the event said policies shall be
cancelled. This Certificate of Insurance shall be provided to the
Owner prior to starting any construction work in connection with
this Contract.
7. TERMINATION OF CONTRACT
7.01 Right of Owner to Terminate. If the Contractor should be guilty of
substantial violation of the Contract or any provision thereof, the
Owner. upon certification by the Engineer as to the nature and
extent of such violation. may without prejudice to any other
resources or remedy give the Contractor written notice of
termination of the employment of the Contractor 10 days subsequent
to such notice. Immediately following such date the Owner may take
possession of the site of the work and all material, equipment,
tools, and appliances thereon and may finish the work in accordance
with the provisions of Section 8 'Abandonment of Contract by
Contractor ". of these General Conditions.
7.02 Right of Contractor to Terminate. If work should be stopped by
order of any public authority or court through no act or fault of
the Contractor for a period of three (3) months or if the Owner
should substantially fail to perform the provisions of the Contract
with regard to Owner's obligations to the Contractor, then the
Contractor may, upon ten (10) days written notice to the Owner,
terminate this Contract and recover from the Owner payment for all
completed work.
7.03 Removal of Equipment. In the event that the Contract should be
terminated for any reason whatsoever, the Owner may request the
Contractor in writing to remove any or all of his equipment. tools,
and supplies. and the Contractor shall comply with the request
within ten (10) days after receipt of the notice. Should he fail
to do so within ten (10) days after receipt of such notice. the
Owner shall have the right to remove such equipment and supplies at
the expense of the Contractor and to place such equipment. tools
and supplies in storage at the risk and expense of the Contractor.
8. ABANDONMENT OF CONTRACT BY CONTRACTOR
8.01 Notification of Contractor. If the Contractor should abandon and
fail to refuse to resume work within ten (10) days after written
notification from the Owner or the Engineer or if the Contractor
fails to comply with the orders of the Engineer when such orders
are consistent with this Contract or with the specifications hereto
attached. then the Contractor shall be deemed as having abandoned
the Contract. In such event the Surety on the bond shall be
notified in writing and directed to complete the work. and a copy
of said notice shall be delivered to the Contractor.
8.02 Retention of Contractor's Equipment and Materials by Owner. After
receiving said notice of abandonment the Contractor shall not
GC -17
remove from the work any machinery, equipment, tools, materials. or
supplies then on the job, but the same together with any materials
and equipment under contract for the work may be held for use on
the work by the Owner or the Surety on the performance bond or
another contractor in completion of the work; and the Contractor
shall not receive any rental or credit therefor except when used in
connection with extra work where credit shall be allowed as
provided for under Section 2.12 entitled "Extra Work", it being
understood that the use of such equipment and materials will
ultimately reduce the cost to complete the work and will be
reflected in the final settlement.
8.03 Methods of Completing the Work. If the Surety should fail to
commence compliance with the notice for completion hereinbefore
provided within ten (10) days after service of such notice, then
the Owner may provide for completion of the work in either of the
following elective manners:
a. The Owner may thereupon employ such force of workers and use
such machinery, equipment, tools, materials, and supplies as
said Owner may deem necessary to complete the work and charge
the expense of such labor, machinery, equipment, tools,
materials, and supplies to said Contractor, and the expense
so charged shall be deducted and paid by the Owner out of
such monies as may be due or that may thereafter at any time
become due to the Contractor under and by virtue of this
Contract. In case such expense is less than the sum which
would have been payable under this Contract if the same had
been completed by the Contractor, then said Contractor shall
receive the difference. In case such expense is greater than
the sum which would have been payable under this Contract if
the same had been completed by said Contractor, then the
Contractor or his Surety shall pay the amount of such excess
to the Owner.
b. The Owner under sealed bids, after fourteen (14) days notice
published two or more times in a newspaper having a general
circulation in the county of location of the work, may let
the contract for the completion of the work under
substantially the same terms and conditions which are
provided in this Contract. In case of any increase in cost
to the Owner under the new contract as compared to what would
have been the cost under this Contract such increase shall be
charged to the Contractor, and the Surety shall be and remain
bound therefor. However, should the cost to complete any
such new contract prove to be less than what would have been
the cost to complete under this Contract, the Contractor or
his Surety shall be credited therewith.
GC -18
8.04 Final Acceptance. When the work has been completed. the Contractor
and his Surety shall be so notified and a contract Completion
Certificate as hereinafter provided shall be issued. A complete
itemized statement of the Contract accounts certified by the
Engineer as being correct shall then be prepared and delivered to
the Contractor and his Surety. whereupon the Contractor, his Surety
or the Owner. as the case may be. shall pay the balance due as
reflected by said statement within fifteen (15) days after the date
of such Contract Completion Certificate.
8.05 Disposition of Contractor's Equipment. In the event the statement
of accounts shows that the cost to complete the work is less than
that which would have been the cost to the Owner had the work been
completed by the Contractor under the terms of this Contract or
when the Contractor or his Surety pay the balance shown to be due
by them to the Owner. then all machinery. equipment. tools.
materials, or supplies left on the site of the work shall be turned
over to the Contractor or'his Surety. Should the cost to complete
the work exceed the contract price. and the Contractor or his
Surety fail to pay the amount due, the Owner within the time
designated hereinabove. and there remains any machinery, equipment,
tools. materials, or supplies on the site of the work. notice
thereof together with an itemized list of such equipment and
materials shall be mailed to the Contractor and his Surety at the
respective addresses designated in this Contract; provided.
however, that actual written notice given in any manner will
satisfy this condition. After mailing or other giving of such
notice, such property shall be held by the Owner at the risk of the
Contractor and his Surety subject only to the duty of the Owner to
exercise ordinary care to protect such property. After fifteer.
(15) days from the date of said notice. the Owner may sell such
machinery. equipment. tools, materials, or supplies and apply the
net sum derived from such sale to the credit of the Contractor and
his Surety. Such sale may be made at either public or private
sale. with or without notice. as the Owner may elect. The Owner
shall release any machinery. equipment, tools. materials. or
supplies which remain on the work and belong to persons other than
the Contractor or his Surety to their proper owners.
9. MEASUREMENT AND PAYMENT
9.01 Character of Measurements. No extra or customary measurements of
any kind will be allowed, but the actual length. area, solid
contents. number, and weight only shall be considered unless
otherwise specifically provided.
9.02 Estimated vs. Actual Quantities. Any and all estimated quantities
stipulated in the proposal form under unit price items are
approximate and are to be used only (a) as a basis for estimating
the probable cost of the work and (b) for the purpose of comparing
GC -19
the proposals submitted for the work. It is understood and agreed
that the actual amounts of work done and materials furnished under
unit price items may differ from such estimated quantities and that
the basis of payment for such work and materials shall be for the
actual amount of such work done and the actual quantity of
materials furnished.
The Contractor agrees that be. will make no claim for damages,
anticipated profits. or otherwise on account of any difference
between the amounts of work actually performed and materials
actually furnished and the amounts estimated therefor in the
proposal or other Contract Documents; provided. however. that if
the actual quantity of any item should become as much as 25 percent
more than or 25 percent less than the estimated or contemplated
quantity for such items, then either party to this Contract shall
be entitled upon demand to a revised consideration on the portion
of the work above or below 25 percent of the estimated quantity
prior to initiating work or furnishing materials for the overrun or
underrun quantities. Such revised consideration shall be
determined by agreement between the parties or otherwise by the
terms of this Contract as provided under Section 2.12 entitled
"Extra Work ".
9.03 Payment. In consideration of the furnishing of all the necessary
labor, equipment. and material and the completion• of all work by
the Contractor, and on the completion of all work and the delivery
of all material embraced in this Contract in full conformity with
the specifications and stipulations contained herein. the Owner
agrees to pay the Contractor the amounts set forth in the Proposal
attached hereto which has been made a part of this Contract. The
Contractor hereby agrees to receive such amounts in full payment
for furnishing all material and all labor required for the
aforesaid work, for all expense incurred by him, and for well and
truly performing the same and the whole thereof in the manner and
according to this Contract, the attached specifications. and
requirements of the Engineer.
9.04 Monthly Estimates and Payments. On or about the 25th day of each
month the Engineer will make an approximate estimate of the value
of work done in conformity with the plans and specifications during
the said calendar month. The Contractor shall furnish to the
Engineer such detailed information as he may request to aid him as
a guide in the preparation of monthly estimates. After each such
estimate shall have been approved by the Owner, the Owner shall pay
to the Contractor 90 percent of the amount of such estimated sum on
or before the 15th day of the next month.
It is understood, however. that in case the whole work is near to
completion and some unexpected or unusual delay occurs due to no
fault or neglect on the part of the Contractor, the Owner may, upon
written recommendation of the Engineer. pay a reasonable and
equitable portion of the retained percentage to the Contractor.
GC -20
9.05 Certificates of Completion. Within 10 days after the Contractor
has gives the Engineer notice that the work has been completed, the
Engineer shall inspect the work and satisfy himself by examination
and test that the work has been finally and fully completed in
accordance with the plans. specifications and Contract. If so, the
Engineer shall issue a Contract Completion Certificate to the Owner
and the Contractor. Such certificate when issued shall constitute
final acceptance of the work covered under this Contract.
9.06 Final Estimate and Payment. After the Contract Completion
Certificate has been issued. the Engineer shall proceed to make
final measurements and to prepare a final estimate of the work done
and materials furnished under this Contract and the value thereof.
The Engineer shall certify the Final Estimate and submit it to the
Owner within five (5) days from the date of the Contract Completion
Certificate.
The Owner shall pay the Contractor within fifteen (15) days from
the date of the Contract Completion Certificate the entire sum
shown due on the certified Final Estimate prepared by the Engineer
after deducting all amounts to be kept and retained under any
provision of this Contract. However, it is to be specifically
understood that the final payment will not be paid by the Owner to
the Contractor under any circumstances until the Notarized
Affidavit required by Section 9.07 entitled "Notarized Affidavit ",
has been submitted to the Engineer.
All prior estimates and payments shall be subject to correction in
the final estimate and payment; but in the absence of error or
manifest mistake. it is agreed that all estimates, when approved by
the Owner. shall be conclusive evidence of the work done and
materials furnished.
9.07 Notarized Affidavit. Before final payment for the work by the
Owner the Contractor shall submit to the Engineer a notarized
affidavit in duplicate stating under oath that all subcontractors,
vendors, and other persons or firms who have furnished or performed
labor or furnished materials for the work have been fully paid or
satisfactorily secured. Such affidavit shall bear or be
accompanied by a statement, signed by the Surety Company who
provided the performance bond for the work, to the effect that said
Surety Company consents to final payment to the Contractor being
made by the Owner.
9.08 Release of Liability. The acceptance by the Contractor of the last
payment shall operate as and shall be a release to the Owner and
every officer and agent thereof from all claims and liability
hereunder for anything done or furnished for or relating to the
work or for any act or neglect of the Owner or of any person
relating to or affecting the work.
GC -21
9.09 Contractor's Obligation. Neither the Contract Completion
Certificate nor the final payment nor any.provision in the Contract
Documents shall relieve the Contractor of the obligation for
fulfillment of any warranty which may be required in the Contract
Documents.
9.10 Payments Withheld. The Owner may. on account of subsequently
discovered evidence, withhold or nullify the whole or part of any
payment to such extent as may be necessary to protect himself from
loss on account of:
a. Defective work not remedied.
b. Claims filed or reasonable evidence indicating probable
filing of claims.
c. Failure of the Contractor to make payments properly to
subcontractors or for material or labor.
d. Damage to another contractor.
When the above grounds are removed or the Contractor provides a
Surety Bond satisfactory to the Owner, which will protect the owner
in the amount withheld, payment shall be made for amounts withheld
because of them.
GC -22
TECHNICAL SPECIFICATIONS
101.2 Construction Methods
hem No. 101
Preparing Right of Way
101.1 Description
This item shall consist of preparing the right of way for construction operations by removing and disposing of all obstructions from
the right of way and from designated easements, where removal of such obstructions is not otherwise indicated.
Such obstructions shall be considered to include remains of houses not completely removed by others, foundations, floor slabs,
concrete, brick, lumber, plaster, cisterns, water wells, septic tanks or basements; abandoned utility pipes, conduits or founda-
tions; underground service station tanks, equipment or other foundations; fences, retaining walls, outhouses, shacks and all
other debris.
This Item shall also include the removal of trees, stumps, roots, bushes, shrubs, curb and gutter, driveways, paved parking areas,
miscellaneous stone, brick, concrete, sidewalks, drainage structures, manholes, inlets, abandoned railroad tracks, scrap iron, all
rubbish and debris whether above or below ground except live utility facilities.
Prior to commencing this work, all erosion control and tree protection measures required shall be in place and utilities located
and protected as set forth in "General Conditions of Agreement ". Areas within the construction limits as indicated shall be cleared
of all obstructions. vegetation, abandoned structures as defined above; except trees or shrubs Indicated for preservation which
shall be carefully trimmed as directed and shall be protected from scarring, barking or other injuries during construction
operations conforming to Item No. 610, "Tree and Shrub Trimming and Preservation' Exposed ends of pruned limbs or scarred
bark shall be pruned, trimmed and treated with an approved asphaltic material within 24 hours of the pruning or injury.
Construction equipment shall not be operated within the drip line of trees, unless indicated. Construction materials shall not be
stockpiled under the canopies of trees. No excavation or embankment shall be placed within the drip line of trees until tree wells
are constructed.
Unless otherwise indicated, all underground obstructions, stumps and roots shall be removed to the following depths:
1. In areas to receive 6 inches or more embankment, a minimum of 12 inches below natural ground.
2. In areas to receive embankment less than 6 inches and areas to be excavated, 18 inches below the lower elevation
of the embankment, structure or excavation.
3. All other areas, 12 inches below natural ground.
Holes remaining after removal of all obstructions, objectionable material, trees, stumps, etc. shall be backfilled with select em-
bankment material and tamped.
When a utility in service conflicts with the construction, it shall be modified as set forth in "General Conditions of Agreement".
Where an abandoned existing underground piped utility is found, it shall be cut and plugged, with 6 inches of concrete, brick and
mortar or a precast stopper grouted in place.
Material to be removed will be designated salvageable or nonsalvageable by the Engineer prior to removal from the construction
site by the Contractor. All salvageable material. as determined by the Engineer, will remain the property of the City and will be
stored at the site or loaded on City trucks as directed by the Engineer. All nonsalvageable materials and debris shall become the
property of the Contractor and shall be removed from the site and deposited at a permitted disposal site.
101.3 Measurement
Preparing right of way for new construction, when included in the contract as a pay item, will be measured by the acre or by 100
foot stations or by lump sum. regardless of the width of the right of way.
Measurement for payment will be made only on areas indicated and classified as "Preparing Right of Way ".
101.4 Payment
This item will be considered subsidiary to Item No. 110, "Street Excavation ", Item No. 111, "Excavation ", Item No. 120, "Channel
Excavation" and Item No. 132. "Embankment" unless Included as a separate pay Item in the contract. When included for pay-
ment, it shall be paid for at the contract price bid for "Preparing Right of Way ", which price shall be full compensation for work
herein specified, including the furnishing of all materials. equipment, tools, labor and incidentals necessary to complete the work.
Payment, when included as a contract pay item, will be made under one of the following:
101 Rev. 09130/87
Page 1 Preparing Right of Way
Pay Rem No. 101-A: Preparing Right of Way — Per Acre.
Pay Rem No. 101 -B: Preparing Right of Way — Per Station.
Pay Rom No. 101-C: Preparing Right of Way — Per Lump Sum.
Ref 110, 111, 120,, 132, 610
No separate payment will be made for this iteii., Should be considered
subsidiary to items 104 & 110.
End.
101 Rev. 09/30/87
Page 2 Preparing Right of Way
Item No. 102
Clearing end Grubbing
102.1 Description
This item shall consist of removing and disposing of all trees, stumps, brush, roots, shrubs, vegetation, logs, rubbish and other
objectionable material.
102.2 Construction Methods
Prior to commencing this work, all erosion control and tree protection measures required shall be in place and all utilities located
and protected as set forth in " General Conditions of Agreement ". Areas within the construction limits or as indicated shall be
cleared of all trees, stumps. brush, etc., as defined above: except trees or shrubs indicated for preservation which shall be
carefully trimmed as directed, conforming to Item No. 610, "Tree and Shrub Trimming and Preservation" and shall be protected
from scarring, barking or other injuries duri.ig construction operations. Exposed ends of pruned limbs or scarred bark shall be
pruned, trimmed and treated with an approved asphaltic material within 24 hours of the pruning or injury.
Construction equipment shall not be operated within the drip line of trees, untess indicated. Construction materials shall not be
stockpiled under the canopies of trees. No excavation or embankment shall be placed within the drip line of trees until tree wells
are constructed.
Within the construction limits or areas indicated, all obstructions, stumps, roots, vegetation, abandoned structures, rubbish and
objectionable material shall be removed to the following depths:
1. In areas to receive 6 inches or more embankment, a minimum 0112 inches below natural ground.
2. In areas to receive embarkment less than 6 inches and areas to be excavated, 18 inches below the lower elevation
of the embankment, structure or excavation.
3. All other areas, 12 inches below natural ground.
Holes remaining after removal of all obstructions, objectionable material, trees, stumps, etc., shall be backfilled with select em-
bankment material and tamped.
All cleared and grubbed material shall be disposed of in a manner satisfactory to the Engineer. Unless otherwise provided, all
materials as described above shall become the property of the Contractor and removed from the site and disposed of at a permit-
ted disposal site.
Burning materials at the site shall conform to "General Conditions of Agreement ".
102.3 Measurement
"Clearing and Grubbing ", when included in the contract as a pay item, will be measured by the acre, 100 foot stations or lump
sum regardless of the width of the right of way.
102.4 Payment
This item will be considered subsidiary to Item No. 110, "Street Excavation" or Item No. 111, "Excavation ", unless included as a
separate pay item in the contract. When included for payment, it shall be paid for at the unit price bid for "Clearing and Grubbing ",
which price shall be lull compensation for all work herein specified, including the furnishing of all materials. equipment, tools,
labor and incidentals necessary to complete the work.
Payment. when included as a contract pay item, will be made under one of the following:
Pay Item No. 102 Clearing and Grubbing — Per Acre.
Pay Item No. 102 -B: Clearing and Grubbing — Per Station.
Pay Item No. 102 Clearing and Grubbing — Lump Sum.
No separate payment will be made for this ite1 . Should be considered subsidiary to
Items No. 104 & 110.
End.
Page 1 12/03/66 102
Item No. 110
Street Excavation
110.1 Description
This Item shall consist of excavating and properly utilizing or otherwise satisfactorily disposing of all excavated material, of what-
ever character, within the right of way or other limits of the work indicated and the constructing, compacting, shaping and fin-
ishing of all earthwork on the entire project in accordance with the specification requirements herein outlined and in conformity
with the required lines, grades and typical cross sections indicated or as directed by the Engineer. When not otherwise included
in the Contract Documents, this item shall include the work descnbed in Item No. 101, "Preparing Right of Way ", Item No. 102,
"Clearing and Grubbing ", Item No. 104, "Removing Concrete ", Item No. 132, "Embankment" and Item No. 201, "Subgrade
Preparation ".
110.2 Classification
All excavation shall be unclassified and shall include all materials encountered regardless of their nature or the manner in which
they are removed.
110.3 Construction Methods
Prior to commencing this work. all erosion control and tree protection measures required shall be in place and all utilities located
and protected as set forth in "General Conditions of Agreement ". Construction equipment shall not be operated within the drip
line of trees. unless indicated. Construction materials shall not be stockpiled under the canopies of trees. No excavation or
embankment shall be placed within the drip line of trees until tree wells are constructed conforming to Item No. 610, "Tree and
Shrub Trimming and Preservation ".
All street excavation shall be performed as specified herein and shall conform to the established alignment, grades and cross
sections. The Contractor will be required to set blue -tops for the subgrade on centerlines at quarter points and curb lines or edge
of pavement at intervals not exceeding 50 feet. Suitable excavated matenals shall be utilized, insofar as practicable, in construct-
ing required embankments. The construction of all embankments shall conform to Item No. 132, "Embankment ".
Materials with a Plasticity Index (PI) greater than the surrounding materials or with a moisture content greater than 2 percent in
excess of optimum shall be classified as unsuitable and must be manipulated to meet the above criteria before use or be
removed.
Unsuitable excavated materials or excavation in excess of that needed for construction shall be known as "Waste" and shall
become the property of the Contractor. It shall become his sole responsibility to dispose of this material otf the limits of the right
of way in an environmentally sound mariner at a permitted disposal site.
All blasting shall conform to the General Notes and to "General Conditions of Agreement ". In all cases where blasting is
permitted, a Blasting Permit must be obtained in advance from the Department of Transportation and Public Services.
110.4 Measurement
All accepted street excavation will be measured by Method A, B or C as follows:
(1) Method A
Measurement of the volune of excavation in cubic yards by the average end areas. Cross sectional areas shall be
computed from the existing ground section to the established line of the subgrade as indicated for the limits of the
right of way or other work limits shown, including parkway slopes and sidewalk areas.
(2) Method B
Measurement of the area in square yards of surface area excavated as indicated.
(3) Method C
Measurement of the volume of excavation in cubic yards, based upon the average end areas taken from pre -
construction cross sections and planned grades. The planned quantities for street excavation will be used as the
measurement for payment of this Item.
110.5 Payment
This item will be paid for at the contract unit price bid for "Street Excavation ", as provided under measurement Method A, B or C
as included in the bid, which price shall be full compensation for all work herein specified, including subgrade preparation, unless
specified otherwise and the furnishing of all materials, equipment. tools, labor and incidentals necessary to complete the work.
Page 1 12/03/86 110
Payment will be made under one of the following:
Pay Item No. 110-A: Street Excavation — Per Cubic Yard. -
Pay Item No. 110-B: Inch Street Excavation — Per Square Yard.
Pay hem No. 110-C: Street Excavation — Per Cubic Yard. Plan Quantity.
End
110 04/17/86 Page 2
Item No. 111
Excavation
111.1 Description
This item shall consist of excavating and properly utilizing or otherwise satisfactorily disposing of all excavated materials, of
whatever character, within the limits of the work and the constructing, compacting, shaping and finishing of all earthwork in the
designated areas indicated in accordance with specification requirements herein outlined and in conformity with the required
lines, grades and typical cross sections indicated or as directed by the Engineer. When not otherwise included or in the Contract
Documents, this item shall include the work described in Item No. 101, "Preparing Right of Way ", Item No. 102, "Clearing and
Grubbing ", Item No. 104, "Removing Concrete ", Item No. 132 "Embankment" and Item No. 201, "Subgrade Preparation ".
111.2 Classification
All excavation shall be unclassified and shall include all materials encountered regardless of their nature or the manner in which
they are removed.
111.3 Construction Methods
Prior to commencing this work, all erosion control and tree protection measures required shall be in place and all utilities located
and protected as set forth in "General Conditions of Agreement" Construction equipment shall not be operated within the drip
line of trees, unless otherwise indicated. Construction materials shall not be stockpiled under the canopies of trees. No
excavation or embankment shall be placed within the drip line of trees until tree wells are constructed.
All excavation shall be performed as specified herein and shall conform to the established alignment, grades and cross sections.
Suitable excavated materials shall be utilized, insofar as practical, in constructing required embankments. The construction of all
embankments shall conform to Item No. 132. "Embankment ". No material shall be stockpiled within the banks of a waterway.
Unsuitable excavated materials or excavation in excess of that needed for construction shall be known as "Waste" and shall
become the property of the Contractor and it shall become his sole responsibility to dispose of this material off the limits of the
right of way in an environmentally sound manner at a permitted disposal site.
All blasting shall conform to the Provisions of "General Conditions of Agreement ". In all cases a Blasting Permit must be obtained
in advance from the Department of Transportation and Public Services.
Adequate dewatering and drainage of excavation shall be maintained throughout the time required to complete the work
111.4 Measurement
All accepted excavation will be measured by Method A, B or C as follows:
(1) Method A
•
Measurement of the volume of excavation in cubic yards by the average end areas. Crosssectional areas shall be
computed from the existing ground section to the established line of Ile subgrade, as shown on typical sections for
the limits of the right of way or other work limits, including parkway slopes and sidewalk areas.
(2) Method B
Measurement of the area in square yards of surface area excavated as shown on the typical sections included in the
plans.
(3) Method C
Measurement of the volume of excavation is in cubic yards, based upon the average end areas taken from pre-
construction cross sections and planned grades. The planned quantities for excavation will be used as the measure-
ment for payment for this item.
111.5 Payment
This item will be paid for at the contract unit price bid for "Excavation ", as provided under measurement Method A, B or C as
included in the bid, which price shall be lull compensation for all work herein specified: including dewatering, drainage, subgrade
preparation, unless otherwise indicated and the furnishing of all matenals, equipment, tools. labor and incidentals necessary to
complete the work.
Payment will be made under one of the following:
Page 1 12/03/86 111
End.
Pay Item No. 111 -A: Excavation — Per Cubic Yard.
Pay Item No. 111-8: Inch Excavation — Per Square Yard.
Pay Item No. 111 -C: Excavation — Per Cubic Yard, Plan Quantity.
NOTE: No separate payment for Item 111 will be made. Excavation will be considered
subsidiary to Items 110 & 120.
111 04/17/86 Page 2
120.1 Description
This item shall consist of excavation for channels within the limits indicated, regardless of the type of matenal encountered.
removing and properly utilizing or otherwise satisfactorily disposing of all excavated materials and the constructing, shaping and
finishing of all earthwork involved in conformity with the required line, grades and cross sections indicated.
When not otherwise indicated, this item shall include the work described in Item 101, "Preparing Right of Way ", Item No. 102.
"Clearing and Grubbing ". Item No. 104, "Removing Concrete" and Item No. 132. "Embankment ".
120.2 Classification
All channel excavation will be unclassified and shall include all materials encountered regardless of their nature or the manner in
which they are removed.
120.3 Construction Methods
Prior to commencing this work. all erosion control and tree protection measures required shall be in place and utilities located
and protected as set forth in "General Conditions of Agreement ". Construction equipment shall not be operated within the drip
line of trees, unless indicated. Construction materials shall not be placed under the canopies of trees. No excavation or
embankment shall be placed within the drip line of trees until tree wells are constructed.
All channel excavation shall be performed as specified herein and shall conform to the established alignment, grades and cross
sections. When fill sections are required, Item No. 132, "Embankments" shall govem the construction method. Suitable exca-
vated matenats shall be utilized, insofar as practicable, in constructing required embankments. Precautions will be maintained at
all times to protect all trees in the area of construction. Where removal of trees is necessary, they shall be marked as directed by
the Engineer.
Unsuitable excavated materials or excavation in excess of that needed for construction shall be known as "Waste" and shall
become the property of the Contractor and it shall become his sole responsibility to dispose of this material off the limits of the
right of way in an environmentally sound manner at a permitted disposal site.
All blasting shall conform to "General Conditions of Agreement ". In all cases, a Blasting Permit must be obtained in advance from
the Department of Transportation and Public Services.
120.4 Measurement
End
Accepted channel excavation will be measured by Method A, B or C as follows:
(1) Method A
Measurement of the volume of excavation in cubic yards by the average end areas. Cross sectional areas shall be
computed from the existing ground sections to the established final section indicated.
(2) Method B
Measurement of the length of the channel excavated In linear feet, as shown on the typical section.
(3) Method C
Measurement of the volume of excavation is in cubic yards, based upon average end areas taken from preconstruc-
tion cross sections and the planned grades. The plan quantities for channel excavation will be used as the measure-
ment for payment of this Item.
120.5 Payment
This item will be paid for at the contract unit price bid for "Channel Excavation", as provided under measurement Method A, 8 or
C as included in the bid, which price shall be full compensation for fumishing all materials, equipment, tools, labor and incidentals
necessary to complete the work.
Payment will be made under one of the following:
Pay item No. 120-A: Channel Excavation — Per Cubic Yard.
Pay Item Nn 120 -B: Channel Excavation Foot Bottom — Per Unear Foot.
Pay Item No. 120.0 Channel Excavation — Fbr Cubic Yard, Plan quantity.
Ref. 101, 102, 104, 132
120 Rev. 09130/87
Item No. 120
Channel Excavation
Page 1 Channel Excavation
130.1 Description
This item shall consist of required excavation, removal and proper utilization of materials secured from sources obtained by the
Contractor and approved by the Engineer. Compaction of embankments constructed from borrow as provided herein shall con-
form to the method of Density Control in Item No. 132, "Embankment ".
Borrow will be resorted to only when indicated or directed by the Engineer and then only from approved sources.
130.2 Materials
All authorized borrow shall conform to one of the following classes:
Class A (Select Borrow)
This material shall 'consist of sand or other suitable granular material, free from vegetation or other objectionable
matter reasonably free from lumps of earth and when tested by standard SDHPT laboratory methods, shall meet the
following requirements:
The Liquid Limits shall not exceed 45
The Plasticity Index shall not be less than 4
nor more than 15
Class 8
This material shall consist of suitable nonswelling (soils with plasticity index less than 20) earth material such as
loam, clay or other such materials that will form a stable embankment.
Topsoil
This material shall consist of approved topsoil material and shall be clean, friable soil capable of supporting plant life.
This material shall also be free of stones and all other debris.
130.3 Construction Methods
Item No. 130
Borrow
Prior to commencing this work, all erosion control and environmental measures required shall be in place. All suitable materials
removed from excavations shall be used, insofar as practicable in the formation of embankments conforming to Item No. 132.
"Embankment" or otherwise be utilized as indicated or as directed by the Engineer and the completed work shall conform to the
established alignment. grades and cross section. Additional material necessary to complete the work described above shall be
"Borrow" of the class specified. The Contractor shall arrange for borrow from one of the following sources:
1. Existing borrow pit
2. New borrow pit
3. Surplus excavated material from a site which has a site development permit.
The Contractor shall notify the Engineer 3 weeks prior to opening pit to permit necessary testing for approval of materials. All
borrow sites shall comply with the requirements of the permit.
During construction, the borrow sources shall be kept drained, insofar as practicable, to permit final cross sections to be taken,
when required.
The Engineer shall be notified sufficiently in advance of opening any borrow source to permit necessary testing for approval of
materials.
Borrow sites shall be managed to minimize the impact of the appearance of the natural topographic features and at no time
create a potential hazard to the public.
130.4 Measurement
The measurement of Borrow and Topsoil will be measured by the cubic yard in its final position based upon the average end
areas taken from pre - construction cross sections and plan grades. The plan quantities for Borrow or Topsoil will be used as the
measurement for payment for this item.
130.5
No separate measurement for payment will be made for this item. Borrow will be
considered subsidiary to Item 132. Pagel 04/17/86 130
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
132.1 Description
132.2 Construction Methods
Item No. 132
Embankment
This item shall consist of the placing and compacting of suitable materials obtained from approved sources for utilization in the
construction of street or channel embankments, berms, levees, dikes and structures.
(1) General
Prior to placing any embankment, all tree protection, tree wells and erosion control devices shall be in place and all
Item No 101, "Preparing Right of Way" and/or Item No. 102, "Clearing and Grubbing" operations shall have been
completed on the areas over which the embankment is to be placed. Stump holes or other small excavations in the
limits of the embankments shall be backfilled with suitable material and thoroughly tamped by approved methods
before commencing embankment construction. The surface of the ground, including plowed loosened ground or
surface roughened by small washes, shall be restored to approximately its original slope and the ground surface
thus prepared shall be compacted by spnnkling and rolling.
Construction equipment shall not be operated within the drip line of trees, unless indicated. Construction materials
shall not be stockpiled under the canopies of trees. No excavation or embankment shall be placed within the drip line
of trees until tree wells are constructed conforming to Item No. 610, "Tree and Shrub Trimming and Preservation"
Unless otherwise indicated, the surface of the ground of all unpaved areas, other than rock which are to receive
embankment, shall be loosened by scarifying or plowing to a depth of not less than 4 inches. The loosened material
shall be recompacted with the new embankment as hereinafter specified.
The surface of hillsides to receive embankment shall be loosened by scarifying or plowing to a depth of not less than
4 inches and benches cut before embankment materials are placed. The embankment shall then be placed in layers.
as hereinafter specified, beginning at the low side in partial width layers and increasing the widths as the embank-
ment is raised. The material which has been loosened shall be recompacted simultaneously with the embankment
matenal placed at the same elevation.
Where embankments are to be placed adjacent to or over existing roadbeds, the roadbed slopes shall be plowed or
scanfied to a depth of not less than 6 inches and the embankment built up in successive layers, as hereinafter speci-
fied, to the level of the old roadbed before Its height is increased. Then, if indicated, the top of the old roadbed shall
be scarified and recompacted with the next layer of the new embankment. The total depth of the scanfied and added
material shall not exceed the permissible layer depth.
Trees, stumps, roots, vegetation or other unsuitable materials shall not be placed in embankment.
All embankment shall be constructed In layers approximately parallel to the finished grade and unless otherwise
indicated, each layer shall be so constructed as to provide a uniform slope of Y. inch per foot from the centerline of
the roadbed to the outside, except that on superelevated curves, each layer shall be constructed to conform to the
superelevation Indicated.
The embankment shall be continuously maintained at its finished section and grade until that portion of the work is
accepted. After completion of the embankment to the finished section and grade, the Contractor shall proof roll the
subgrade conforming to Item No. 236, "Rolling (Proof)" and revegetation procedures must commence immediately
to minimize the soil loss and air pollution.
(2) Earth Embankments
Earth embankments shall be defined as embankments composed of soil material other than rock and shall be con-
structed of acceptable material from approved sources.
Except as otherwise indicated, earth embankments shall be constructed in successive 6 inch layers, loose measure.
for the full width of the individual cross section and in such length as are best suited to the sprinkling and compaction
methods utilized.
Minor quantities of rocks not larger Than 4 inches, encountered in constructing earth embankment may be incorpo-
rated in the earth embankment layers, provided such placement of rock is not immediately adjacent to structures
Each layer of embankment shall be uniform as to material, density and moisture content before beginning comps ;.
lion. Where layers of unlike materials abut each other, each layer shall be feathered on a slope of 1:20 or the mate-
rial shall be so mixed as to prevent abrupt changes in the soil. No material placed in the embankment by dumping in
• agile or windrows shall be incorporated in a layer in that position, but all such piles or windrows shall be moved by
Page 1 04/17/86 132
blading or similar methods. Clods or lumps of material shall be broken and the embankment material mixed by blad-
ing, harrowing, discing or similar methods to the end that a uniform material oI uniform density is secured in each
layer.
Water required for sprinkling to bnng the matenal to the moisture content necessary for optimum compaction shall
be evenly applied and it shall be the responsibility of the Contractor to secure a uniform moisture content throughout
the layer by such methods as may be necessary.
All earth cuts, whether lull width or partial width cuts in the side of a hill. which are not required to be excavated
below subgrade elevation shall be scanfied to a uniform depth of at least 6 inches below grade and the matenal shall
be mixed and reshaped by blading and then spnnkled and rolled in accordance with the requirements outlined above
for earth embankments and to the same density as that required for the adjacent embankment.
Compaction of embankments shall conform to Item No. 201, "Subgrade Preparation ". Each layer shall be com-
pacted to the required density by any method, type and size of equipment which will give the required compaction.
Prior to and in conjunction with the rolling operation, each layer shall be brought to the moisture content necessary to
obtain the required density and shall be kept leveled with suitable equipment to insure uniform compaction over the
entire layer.
For each layer of earth embankment and select material, it is the intent of this specification to provide the density as
required herein, unless otherwise indicated. Soils shall be sprinkled as required and compacted to the extent neces-
sary to provide not less than 95 percent nor more than 105 percent of the density as determined in accordance with
SDHPT Test Method Tex -114 -E at optimum moisture content or within minus 3 percent of the optimum moisture
content. Care shall be taken to avoid overcompacting high PI expansive clays.
After each layer of earth embankment or select material is complete, tests as necessary will be made by the Engi-
neer. If the material fails to meet the density specified, the course shall be reworked as necessary to obtain the
specified compaction.
(3) Rock Embankments
Rock embankments shall be defined as those composed principally of rock and shall be constructed of accepted
matenal from approved sources. Rock embankments shall not be placed immediately adjacent to structures.
Except as otherwise indicated, rock embankments shall be constructed in successive layers for the full width of the
cross section and of 18 inches or less in depth. When, in the opinion of the Engineer, the rock sizes necessitate a
greater depth of layer than specified, the layer depth may be increased as necessary, but in no case shall the depth
of layer exceed 2 Ys feet. Each layer shall be constructed by starting at one end and dumping the rock on top of the
layer being constructed then pushing the material ahead with a bulldozer in such a manner that the larger rock will
be placed on the ground or preceding embankment layer and the interstices between the larger stones filled with
small stones and spells by the operation and from the placing of succeeding loads of material.
The maximum dimension of any rock used in embankment shall be less than the depth of the embankment layer and
in no case shall any rock over 2 feet in its greatest dimension be placed in the embankment. All oversized rocks
which are otherwise suitable for construction shall be broken to the required dimension and utilized in embankment
construction where indicated, except that when preferred by the Contractor and acceptable to the Engineer, such
rocks may be placed at other points where the embankment layer is of greater depth, thus requiring less breakage.
Each layer shall be compacted to the required density as outlined for "Earth Embankments ", above, except in those
layers where rock will make density testing difficult, the Engineer may accept the layer by visual inspection or proof
rolling conforming to Item No. 236, "Rolling (Proof) ".
Unless otherwise indicated, the upper 3 feet of the embankment shall contain no stones larger than 4 inches in their
greatest dimension and shall be composed of material so graded that the density and uniformity of the surface layer
may be secured in accordance with SDHPT Test Method Tex - 114 -E.
Exposed oversize material shall be broken up or removed.
(4) At Culverts and Bridges
Embankments adjacent to culverts and bridges which cannot be compacted by use of the blading and rolling equip-
ment used in compacting the adjoining sections of embankment shall be compacted in the manner prescribed under
Item No. 401, "Structural Excavation and Backfill ".
Embankment placed around spill through type abutments shall be constructed in 6 inch loose layers of uniform suit-
able material placed in such manner as to maintain approximately the same elevation on each side of the abutment
and all materials shall be mixed, wetted and compacted as specified above.
132 04/17/86 Page 2
132.3 Measurement
132.4 Payment
End
Embankment material placed adjacent to any portion of any structure or above the top of any culvert or similar struc-
ture shall be free of any appreciable amount of gravel or stone particles and thoroughly compacted by mechanical
compaction equipment.
All accepted embankment, when included in the contract as a separate pay item, will be measured in place and the volume
computed in cubic yards by the method of average end areas. No allowance will be made for shrinkage.
This item is usually subsidiary to excavation and/or borrow and is not paid for separately. However, when included in the contract
as a separate pay item. it shall be paid for at the contract unit price bid for "Embankment ", which price shall be full compensation
for all work herein specified, including the furnishing of all materials (except "Borrow" when paid as a separate bid item), com-
pacting, equipment, tools, labor, water for sprinkling, proof rolling and incidentals necessary to complete the work.
Payment, when included in the contract as a separate pay item, will be made under:
Pay Item No. 132: Embankment — Per Cubic Yard. -
Page 3 04/17/86 132
201.1 Description
This item shall consist of scarifying, Wading and rolling the subgrade to obtain a uniform texture and provide as nearly as prac-
ticable a uniform density for the top 6 inches of the subgrade.
201.2 Construction Methods
All preparing of the right of way and/or clearing and grubbing shall be completed before starting the subgrade preparation. The
subgrade shall be scarified and shaped in conformity with the typical sections and the lines and grades indicated or as estab-
lished by the Engineer by the removal of existing material or addition of approved matenal. All unsuitable material shall be re-
moved and replaced with approved material. All foundations, walls or other objectionable material shall be removed to a mini-
mum depth of 18 inches under all structures and 12 inches under areas to be vegetated. All holes, ruts and depressions shall be
filled with approved matenal. The surface of the subgrade shall be finished to the lines and grades as established and be in
conformity with the typical sections indicated. Any deviation in excess of i inch cross section and in a length of 10 feet measured
longitudinally shall be corrected by loosening, adding or removing material, reshaping and compacting by sprinkling and rolling.
Sufficient subgrade shall be prepared in advance to insure satisfactory prosecution of the work. The Contractor will be required to
set blue tops for the subgrade on centerline, at quarter points and curb lines or edge of pavement at intervals not exceeding 50
feet.
All suitable material removed may be utilized in the subgrade with the approval of the Engineer. All other material required for
completion of the subgrade shall also be subject to approval by the Engineer.
Subgrade materials on which structures shall be placed shall be compacted by approved mechanical tamping equipment to a
density of the total material of not less than 95 percent nor more than 100 percent of the density as determined in accordance
with SDHPT Test Method Tex -114-E. Subgrade materials on which planting or turf will be established shall be compacted to a
minimum of 85 percent of the density as determined in accordance with SDHPT Test Method Tex-114-E. Tests for density will
be made as soon as possible after compacting operations are completed. If the material fails to meet the density specified, it
shall be reworked as necessary to obtain the density required. Prior to placing any base materials, density and moisture content
of the top 6 inches of compacted subgrade shall be checked and if tests show the density to be more than 2 percent below
the specified minimum or the moisture content to be more than 3 percent above or below the optimum, the subgrade shall be
reworked as necessary to obtain the specified compaction and moisture content.
201.3 Measurement
Item No. 201
Subgrade Preparation
All acceptable subgrade preparation will be measured by the square yard. The measured area includes the entire width of the
roadway for the entire length as indicated.
201.4 Payment
This item will be considered subsidiary to Item No. 110, "Street Excavation" or Item No. 111, "Excavation" unless included as a
separate pay item in the contract. When included for payment, it shalt be measured as specified above and paid for at the con-
tract unit price bid for " Subgrade Preparation" which price shall be lull compensation for all work herein specified, including the
furnishing of all materials, equipment, tools and labor and Incidentals necessary to complete the work.
Payment, when included as a contract pay item, will be made under:
Pay hem No. 201: Subgrade Preparation — Per Square Yard.
Ref: 110, 111
No separate payment will be made for this item.
End
201 Rev. 09 /30/87
Page 1 Subgrade Preparation
Item No. 210
Flexible Base
210.1 Description
This item shall consist of a crushed stone foundation course for surfacing, pavement or other base courses, furnished and in-
stalled on a prepared surface. The "Flexible Base" shall be constructed as herein specified in one or more courses In conformity
with the typical sections and to the lines and grades as indicated or as established by the Engineer.
210.2 Material
The matenal shall be crushed argillaceous limestone meeting the requirements hereinafter specified and shall consist of durable
crushed stone and screened to the required particle size. The material shall be from approved sources.
Testing of flexible base materials shall be in accordance with the following SDHPT standard laboratory test procedures:
1) Preparation for Soil Constants and Sieve Analysis Tex -101 -E
2) Liquid Limit Tex -104 -E
3) Plastic Limit Tex -105 -E
4) Plasticity Index Tex -106 -E
5) Sieve Analysis Tex -110 -E
6) Wet Ball Mill Tex -116 -E
7) TriaxialTest Tex -117 -E (Part II)
Base material will be stockpiled after crushing, tested by the testing agency designated by the Owner and reviewed by the Owner
prior to being hauled to the project site.
The matenal shall be well graded and when properly tested, shall meet the following requirements:
Sieve Size Percent Retained.
1% inch 0
% inch 10 -35
3'e inch 30 -50
No. 4 45 -65
No. 40 70 -85
Maximum Liquid Limit 35
Maximum Plasticity Index 10
Maximum Wet Ball Mill 50
Maximum increase in passing No. 40
from Wet Ball Mill Test 20 percent
Minimum compressive strength when subjected to the biaxial test: 35 psi at 0 psi lateral pressure and 175 psi at 15 psi lateral
pressure, unless otherwise indicated.
210.3 Stockpiling, Storage and Management
(1) Managing Aggregates
Prior to stockpiling of aggregates, the area shall be cleaned of trash, weeds and grass and be relatively smooth
Stockpiles should be constructed to between 20,000 and 40,000 cubic yards in size. The size should be limited to the
ability of the available equipment to construct, mix and test the pile. The stockpile shall be constructed utilizing
equipment such as a scraper, a bottom dump or other acceptable equipment that allows spreading when dumped
without rehandling. The stockpile shall be constructed to allow dump spreading In 1 direction only. Height of stockpile
shall not exceed the capabilities of available machinery to make a full cut (bottom to top) on any of the 4 sides,
The City will test a completed stockpile. The stockpile shall not be added to after it has been tested.
The Contractor shall assure that only material from a City approved stockpile receives a weight ticket indicating an
approved stockpile number. The liability for accuracy of the weight ticket, as to items such as stockpile number or an
approved source, is solely that of the Contractor. Use full height cuts and mix the material during loading operations
The Inspector shall be given a weigh ticket at the time of delivery Indicating the source, stockpile approval number
and weight.
(2) Test Sampling
The Contractor may choose the method of sample gathering for testing by City Testing Consultants as follows:
(a1 The Contractor shall make a full height cut from each side of the stockpile. The 4 samples are then
210 Rev. 09130187
Page 1 Flexible Base
(b) As the stockpile is constructed, a perpendicular cut is to be made across the spreading direction at every
2 feet to 4 feet of height and the sample used to start a "mini" stockpile. Repeat the process, in 2 feet to 4
feet increments of heights. until the stockpile and the "mini' stockpile are completed. The Contractor
shall provide access to samples from the "mini" stockpile, as under (a) above, for the City's Testing Con-
sultant to draw its samples.
210.4 Construction Methods
(1) Preparation of Subgrade
"Flexible Base" shall not be placed until the Contractor has venfied, by proof rolling, that the subgrade has been
prepared and compacted in conformity with Item No. 201, "Subgrade Preparation" to the typical sections. lines and
grades indicated. Any deviation shall be corrected and proof rolled pnor to placement of aggregate.
Blue tops shall be set by the Contractor for subgrade on centerline, quarter points, curb lines or edge of pavement
where curb is omitted. at intervals not exceeding 50 feet. Subgrade shall be tested by proof rolling in conformity with
Item No. 236, "Rolling (Proof)" prior to placing first course of base material.
(2) First Course
Immediately before placing the base material. the subgrade shall be checked as to conformity with grade and sec-
tion. The thickness of each base course shall not exceed 6 inches, loose measure and will be equal increments of
the total depth.
The material shall be delivered in approved vehicles and it shall be the responsibility of the Contractor that the re-
quired amount of specified matenal shall be delivered. Material deposited upon the subgrade shall be spread and
shaped the same day unless otherwise approved by the Engineer. In the event inclement weather or other unfore-
seen circumstances render impractical spreading of the material dunng the first 24 hour penod, the material shall be
spread as soon as conditions allow. The material shall be sprinkled, if required, and shall then be bladed, dragged
and shaped to conform to typical sections as indicated. All areas and "nests" of segregated course or fine material
shall be corrected or removed and replaced with well graded material. If additional binder is considered desirable or
necessary after the material is spread and shaped, it shall be fumished and applied as required. Such binder mate-
rial shall be carefully and evenly incorporated with the material in place by scarifying, harrowing, brooming or by
other approved methods.
(3)
The course shall be sprinkled as required to bring it to optimum moisture content and compacted to the extent nec-
essary to provide not less than the percent density as hereinafter specified under "Density". In no case shall the
base be worked at more than 2 percent above or below optimum moisture. In addition to the requirements specified
for density, the full depth of flexible base indicated shall be compacted to the extent necessary to remain firm and
stable under construction equipment. After each section of flexible base is completed, tests as necessary will be
made by the Engineer. If the material fails to meet the density requirements, it shall be reworked as necessary to
meet these requirements. Throughout this entire operation the shape of the base course shall be maintained by
blading and the surface. upon completion, shall be smooth and in conformity with the typical section indicated and to
the established lines and grades. In that area on which pavement is to be placed any deviation in excess of Y. inch
in cross section and in length of 16 feet measured longitudinally shall be corrected by loosening, adding or removing
material, reshaping and recompacting by sprinkling and rolling. All irregulanties, depressions or weak spots which
develop shall be corrected immediately by scantying the areas affected, adding suitable material as required, re-
shaping and recompacting by sprinkling and rolling. Should the base course. due to any reason or cause, lose the
required stability, density and finish before the surfacing is complete, it shall be recompacted and refinished at the
sole expense of the Contractor.
Succeeding Courses
Construction methods shall be the same as prescribed for the first course. Blue tops shall be set by the Contractor
for finished grade on the last course of base under curb and gutter, at a maximum of 50 foot intervals. Blue tops shall
also be set by the Contractor for finished base grade on centerline, intermediate points not exceeding 11 feet be-
tween points and at pavement edge if curb and gutter are not included in the work, at 50 foot intervals.
(4) Density
210 Rev. 09/30187
combined and mixed into a single "test" specimen from which the City's Testing Consultant can draw its
samples.
Each course of flexible base shall be compacted to not less than 100 percent density when tested in accordance with
SDHPT Test Method Tex - 113 -E. Field density determination shall be made in accordance with approved methods.
The completed Flexible Base shall be tested by proof rolling in conformity with Item No. 236. "Rolling (Proof) ".
Page 2 Flexible Base
210.5 Measurement
"Flexible Base" will be measured at depths specified for the area indicated, by the square yard or by the cubic yard, complete in
place as indicated in the bid.
210.6 Payment
This item will be paid for at the contract unit price bid for "Flexible Base" which price shall be full compensation for all work herein
specified, including the furnishing, hauling, placing and compacting of all materials, rolling, proof rolling, recompacting and re-
finishing, for all water required and for all equipment, tools, labor and incidentals necessary to complete the work Payment will
be made under one of the following:
Pay Item Na 210-A: Flexible Base, 11.5 In — Per Square Yard.
Pay Item Na 210•B: Flexible Base — Ft:r Cubic Yard.
Pay Item No. 210-C: Flexible Base, 8" -- Per Square Yard.
End
Ref: 201, 236
210 Rev. 09130/87 Page 3 Flexible Base
220.1 Description
This item shall consist of the application of water or asphalt emulsion on specified streets, detours, haul routes or construction
sites for the purpose of maintaining these areas relatively free of dust.
220.2 Construction Methods
Dust control shall be achieved by the application of water or asphalt emulsion sprinkled in amounts sufficient to control the dust
to the satisfaction of the Engineer or by using equipment which is specially designed to trap dust in filters or bags. When asphalt
emulsion is to be applied, all environmental safe guards shall be in place prior to placing the emulsion.
The Contractor shall furnish and operate an approved sprinkler, equipped with valves to regulate the flow of the liquid to the
spnnkler bar so that the liquid will be evenly distributed and at a controllable rate over the entire width sprinkled. It shall be the
Contractor's continuous responsibility at all times, including nights, holidays and weekends until acceptance of the project by the
City, to maintain the specified areas relatively free of dust in a manner which will cause the least inconvenience to the public.
220.3 Measurement
Sprinkling for dust control will be considered subsidiary to other items of the contract unless included as a separate pay item in
the contract. When included for payment in the contract as a separate contract pay item, it will be measured in units of 1,000
gallons actually placed as authorized by the Engineer.
220.4 Payment
Item No. 220
Sprinkling for Dust Control
This item, when provided for in the contract as a separate pay item. will be paid for in accordance with the contract unit price. The
contract unit price shall be the total compensation for all labor, materials, tools, machinery, equipment and incidentals necessary
to complete the work as indicated.
Payment, when specified in the contract, will be made under one of the following:
Pay Item No. 220-A: Sprinkling for Dust Control (Water) — Per Unit.
Pay Item No. 220•B: Sprinkling for Dust Control (Asphalt Emulsion) — Per Unit.
No separate payment will be made for this item.
End
Page 1 04/17:86 220 •
End
230.1 Description
This item shall consist of the compaction of subgrade, embankment, flexible base, surface treatments and asphalt surfaces by
the operation of approved power rollers as herein specified and as directed by the Engineer.
230.2 Equipment
Item No. 230
Rolling (Flat Wheel)
(1) Embankments and Flexible Bases
Power rollers shall be of the 3- wheel, self - propelled type, weighing not less than 10 tons and shall provide a com-
pression on the rear wheels of not less than 325 pounds per linear inch of wheel width. All wheels shall be flat. The
rear wheels shall have a diameter of not less than 48 inches and each shall have a wheel width of not less than 20
inches.
(2) Surface Treatments and Pavements
Power rollers shall be the 3 -wheel or tandem, self - propelled type, weighing not less than 3 tons nor more than 6 tons.
All wheels shall be flat Rollers shall be equipped with an adequate scraping or cleaning device on each wheel
Rollers used to compact asphalt mixture shall be equipped with a water system which will keep all tires uniformly
wet.
(1)
In lieu of the rolling equipment specified, the Contractor may, upon wntten permission from the Engineer, operate
other compacting equipment that will produce equivalent relative compaction in the same period of time as the
specified equipment. If the substituted compaction equipment fails to produce the desired compaction within the
same period of time as would be expected of the specified equipment, as determined by the Engineer, its use shall
be discontinued.
Rollers shall be maintained in good repair and operating condition and shall be approved by the Engineer
230.3 Construction Methods
Subgrades, Embankments and Flexible Base
The subgrade or embankment layer or the base course shall be spnnkled it directed and rolling with a power roller
shall start longitudinally at the sides and proceed towards the center, overlapping on successive trips by at least Vz
the width of the rear wheel of the power roller. On superelevated curves, rolling shall begin at the low sides and
progress toward the high sides. Altemate trips of the roller shall be slightly different in length. The rollers, unless
otherwise directed, shall be operated at a speed between 2 and 3 miles per hour.
(2) Surface Treatments and Pavements
Rolling shall be done to produce a satisfactory surface as called for in surface treatment and pavement items. The
sequence of work shall be as indicated for embankment layer or base course. The operating speed shall be deter-
mined by the Contractor.
230.4 Measurement and Payment
No additional compensation will be made for materials, equipment or labor required by this item, but shall be considered subsidi-
ary to the vanous items included in the contract.
Page 1 04.17,86 230
Item No. 232
Rolling (Pneumatic Tire)
232.1 Description
This item shall consist of the compaction of embankment, flexible base, surface treatments or pavements by the operation of
approved pneumatic tire rollers as herein specified.
(1) General Requirements
•
When used on seal coats, asphaltic surface treatments and bituminous mixture pavements, the roller shall be self
propelled and equipped with smooth tread tires with 45 psi tire pressure whether "Rolling (Light Pneumatic Tire)" or
"Rolling (Medium Pneumatic Tire)" is specified. The roller shall be so constructed as to be capable of being operated
in both a forward and a reverse direction. When used on bituminous mixture pavements, the roller shall have suitable
provisions for moistening the surface of the tires while operating.
When turning is impractical or detrimental to the work and when specifically directed by the Engineer, the roller shall
be of the self - propelled type.
In lieu of the rolling equipment specified, the Contractor may operate other compacting equipment that will produce
equivalent relative compaction in the same period of time as the specified equipment. II the substituted compaction
equipment fails to produce the desired compaction within the same period of time, its use shall be discontinued.
Rollers shall be maintained in good repair and operating condition and shall be approved by the Engineer.
(2) Light Pneumatic Tire Roller
The light pneumatic tire roller shall consist of not less than 9 pneumatic tired wheels, running on axles in such man-
ner that the rear group of tires will cover the entire gap between adjacent tires of the forward group and mounted in a
rigid frame and provided with a loading platform or body suitable for ballast loading. The front axle shall be attached
to the frame in such manner that the roller may be tumed within a minimum circle. The pneumatic tire roller under
working conditions shall have an effective rolling width of approximately 60 inches and shall be so designed that by
ballast loading the total load may be varied uniformly from 9,000 pounds or less to 18,000 pounds or more. The roller
shall be equipped with tires that will afford ground contact pressures to 45 pounds per square inch or more. The
operating load and tire air pressure shall be within the range of the manufacturer's chart. The roller under working
conditions shall provide a uniform compression under all wheels. Individual tire inflation pressures shall be within ±5
psi of each other. The pneumatic tire roller shall be drawn by either a suitable crawler type tractor, a pneumatic tired
tractor, a truck of adequate tractive effort or may be of the self - propelled type and the roller, when drawn or propelled
by either type of equipment, shall be considered a light pneumatic lire roller unit.
Medium Pneumatic Tire Roller (Type A)
The medium pneumatic tire roller (Type A) shall consist of not less than 7 pneumatic tired wheels, running on axles
in such manner that the rear group of tires will cover the entire gap between adjacent tires of the forward group and
mounted in a rigid frame and provided with a loading platform or body suitable for ballast loading. The front axle shall
be attached to the frame in such a manner that the roller may be turned within a minimum circle. The pneumatic tire
roller, under working conditions, shall have an effective rolling width of approximately 84 inches and shall be so
designed that, by ballast loading, the total load may be varied uniformly from 23,500 pounds or less to 50,000
pounds or more. The roller shall be equipped with tires that will afford ground contact pressures to 80 pounds per
square inch or more. Individual tire inflation pressures shall be within ±5 psi of each other. The operating load and
tire air pressure shall be within the range of the manufacturer's chart.
The pneumatic tire roller shall be drawn by either a suitable crawler type tractor, a pneumatic tired tractor, a truck of
adequate tractive effort or may be of the self - propelled type. The roller, when drawn or propelled by any type of
equipment, shall be considered a medium pneumatic tire roller unit. The power unit shall have adequate tractive
effort to properly move the operating roller at variable uniform speeds up to approximately 5 miles per hour.
(4) Medium Pneumatic Tire Roller (Type 8)
The medium pneumatic lire roller (Type B) shall conform to the requirements for Medium Pneumatic Tire Roller
(Type A) as specified above, except that the roller shall be equipped with tires that will afford ground contact pres-
sures to 90 psi or more.
(3)
232.2 Construction Methods
Tire pressure is critical to successful operation of the roller. Contractor shall have equipment on the construction site to inflate
tires as required.
232 Rev. 09130/87 Page 1 Rolling (Pneumatic Tire)
The embankment layer or the base course shall be sprinkled if directed and rolling with a pneumatic lire roller shall start longitu-
dinally at the sides and proceed towards the center. overlapping on successive trips by at least .: of the width of the pneumatic
tire roller. On superelevated curves, rolling shall begin at the low sides and progress toward the high sides. Alternate trips of the
roller shall be slightly different in length.
The light pneumatic tire roller shall be operated at speeds between 2 and 6 miles per hour for asphalt surfacing work and all other
work.
The medium pneumatic tire roller shall be operated at speeds which produce a satisfactory product.
Sufficient rollers shall be provided to compact the material in a satisfactory manner. When operations are so isolated from one
another that 1 roller unit cannot perform the required compaction sattstactorily, additional roller units shall be provided.
232.3 Measurement and Payment
No additional compensation will be made for matenals, equipment or labor required by this item, but shall be considered subsidi-
ary to the various items of the contract.
End
232 Rev. 09/30187
Page 2 Rolling (Pneumatic The)
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
234.1 Description
This item shall consist of the compaction of embankment by the operation of approved tamping rollers as herein specified and as
directed by the Engineer.
234.2 Equipment
The tamping rollers shall consist of 2 metal rollers, drums or shells of 40 inches minimum diameter; each not less than 42 inches
in length and unit mounted in a rigid frame in such a manner that each roller may oscillate independently of the other. Each roller,
drum or shell shall be surmounted by metal studs with tamping feet projecting not less than 7 inches from the surface and spaced
not Tess than 6 inches nor more than 10 inches, measured diagonally center to center and the cross sectional area of each
tamping foot, measured perpendicularly to the axis of the stud, shall not be less than 5 nor more than 8 square inches. The roller
shall be supplemented with cleaning teeth to provide sell cleaning. The roller shall be so designed that, by ballast loading. the
load on each tamping foot may be varied uniformly from 125 to 175 psi of cross sectional area. The load per tamping foot will be
determined by dividing the total weight of the roller by the number of tamping feet in 1 row parallel to or approximately parallel to
the axis of the roller. The compression to be provided at any time shall be as directed by the Engineer. The tamping roller shall be
drawn by suitable power equipment of adequate tractive effort. Two tamping rollers, consisting of 4 cylinders, conforming to the
above prescribed requirements, drawn by approved power equipment, shall be considered a roller unit.
Where turning is impractical or detrimental to the work and when specifically directed by the Engineer. 1 tamping roller consisting
of 2 cylinders, fastened to the Iront end of approved power equipment, shall be considered a roller unit.
In lieu of the rolling equipment specified, the Contractor may, upon written permission from the Engineer, operate other compact-
ing equipment that will produce equivalent relative compaction in the same period of time as the specified equipment. If the
substituted compaction equipment fails to produce the desired compaction within the same period of time as would be expected
of the specified equipment, as determined by the Engineer, its use shall be discontinued.
Rollers shall be maintained in good repair and operating condition and shall be approved by the Engineer.
234.3 Construction Methods
End
Item No. 234
Rolling (Tamping)
This work shall be done only when ordered by the Engineer. The embankment layer or the base course shall be sprinkled if
directed and rolling with a tamping roller unit shall start longitudinally at the sides and proceed toward the center, overlapping on
successive trips by at least i/z of the width of the tamping roller unit. On superelevated curves, rolling shall begin at the low sides
and progress toward the high sides. Alternate trips of the unit shall be slightly different in length. The tamping roller unit, unless
otherwise directed, shall be operated at a speed between 2 and 3 miles per hour.
Sufficient rollers shall be provided to compact the material in a satisfactory manner. The minimum number of rolling units shall be
govemed by the progress in placing the material to be compacted. The quantity of material placed per hour shall be determined
by averaging the total quantity of material placed within any 1 working day. When operations are so isolated from one another
that one roller cannot perform the required compaction satisfactorily, additional rollers shall be provided and operated as directed
by the Engineer.
234.4 Measurement and Payment
No additional payment will be made for the materials, equipment or labor required by this item, but shall be considered subsidiary
to the various items included in the contract.
Page 1 04!17/86 234
236.1 Description
This item shalt consist of furnishing and operating heavy pneumatic tired compaction equipment for testing the compaction of
embankment, subgrade or flexible base. Proof rolling is designed to locate unstable areas.
236.2 Equipment
The proof rolling equipment shall consist of not less than 4 pneumatic tired wheels, running on axles carrying not more than 2
wheels and mounted in a ngid frame and provided with loading platform or body suitable for ballast loading. All wheels shall be
arranged so that they will carry approximately equal loads when operating on uneven surfaces
The proof roller under working conditions shall have a rolling width of from 8 feet to 10 feet and shall be so designed that, by
ballast loading, the gross load may be varied uniformly from 25 tons to 50 tons. The tires shall be capable of operating under the
various loads with variable air pressures up to 150 pounds per square Inch. The operating load and tire pressure shall be within
the range of the manufacturers chart as directed by the Engineer. The proof roller shall be drawn by a suitable crawler type
tractor or rubber tire tractor of adequate tractive effort or may be of self - propelled type. There shall be a sufficient quantity of
ballast available to load the equipment to a maximum gross weight of 50 tons. Rubber tired tractive equipment shall be used on
base courses Other type tractive equipment may be used on embankment subgrade. The heavy pneumatic tire roller unit shall
be capable of turning 180 degrees in the crown width.
In lieu of the rolling equipment specified, the Contractor may, upon written permission from the Engineer, operate other equip-
ment that will produce equivalent results as the specified equipment. If the substituted equipment fails to produce the desired
results as would be expected of the specified equipment as determined by the Engineer, its use shall be discontinued
236.3 Construction Methods
End
Item No. 236
Rolling (Proof)
This work shall be done to proof all prepared subgrades and flexible base courses or as directed by the Engineer. On embank-
ment compaction, each layer will be placed to specified thickness at optimum moisture and compacted with conventional equip-
ment to comply with the requirements of the governing embankment item. Prior to placing the overlaying course, the layer shall
be proof rolled as directed by the Engineer.
When the operation of the proof rolling unit shows an area to be unstable or nonuniform, such area shall be brought to satisfac-
tory stability and uniformity by additional compaction, by removal of unsuitable materials or replacement with suitable materials
and recompaction The surface tested shall then be checked for conformity with line and grade and any Irregularities corrected
Rollers shall be operated at speeds between 2 and 6 miles per hour or as directed by the Engineer.
236.4 Measurement and Payment
No additional payment will be made for the materials, equipment or labor required by this item, but shall be considered subsidiary
to the various items included in the contract.
Pagel 04.17'86 236
301.1 Description
This item shall consist of the requirements for oil asphalts, cut -back asphalts, road oils, emulsified asphalts, asphalt cement and
other miscellaneous asphaltic materials.
301.2 Materials
When tested according to Stale Department of Highways and Public Transportation Test Methods, the various materials shall
meet the applicable requirements of this specification.
(1) Asphalt Cement
The material shall be homogeneous, free from water, shall not loam when heated to 350 F and shall meet the follow-
ing requirements:
Viscosity
140 F
Poises
Test
Solubility in
trichloroethylene.
percent
Tests on residues
from thin film oven
test: Viscosity
140 F stokes
VISCOSITY GRADE
Item No. 301 '
Asphalts, Oils and Emulsions
AC -3 AC -5 AC -10 AC -20 AC -40
Min. Max. Min. Max. Min. Max. Min. Max. Min. Max.
300 =100 500 =100 1000 =200 2000 ±400 4000`800
Viscosity
275 F stokes 1.1, — 1.4 — 1.9 — 2.5 — 3.5 —
Penetralton 77 F,
100g, 5 sec. 210 — 135 — 85 — 55 — 35 —
Flash Point. C.O C F 425 — 425 — 450 — 450 — 450 —
99.0 — 99 0 — 99.0 — 99.0 — 99.0 —
— 900 — 1500 — 3000 — 6000 — 12000
Ductility 77 F
5 cros per min, 100 — 100 — 70 — 50 — 30
cms
Spot lest Negative for all grades
(2) Latex Additive
The minimum of 2 percent by weight, latex additive (solids basis) shall be added 10 AC -5 Asphalt when indicated
The latex additive shall conform to the following:
The latex is to be an anionic emulsion of butadiene- styrene low- temperature copolymer in water, stabilized with
fatty -acid soap so as to have good storage stability, and possessing the following properties
Monomer ratio, B/S 70/30
Minimum solids content 67%
Solids content per gal at 67% 5.3 lbs.
Coagulum on 80 - mesh screen 0.1% maximum
Type Anti- oxidant ' staining
Mooney Viscosity of Polymer (M /L 4 at 212 F)1 100 minimum
pH of Latex 9.4 -10 5
Surface tension 28 -42
dynes/cm'
Brookfield Viscosity of Latex 1200 ps maximum at
67% solids
Page 1 04.17. 86 301
The finished latex- asphalt blend shall meet the following requirements:
Viscosity at 140 F stokes 1500 maximum Ductility at 39.2 F.1 cm. per min. cm 100 minimum
(3) Cutback Asphalt
Cutback Asphalt shall conform to the following table:
CUTBACK ASPHALT
RAPID CURING TYPE CUTBACK ASPHALT
Type -Grade RC -250 RC -800 RC -3000
Properties Minimum Maximum Minimum Maximum Minimum Maximum
Water. percent — 0.2 — 0.2 — 0 2
Flash Point. T O.0 , F 80 — 80 — 80 —
Kinematic vis. or 140 F, cst 250 400 800 1600 3000 6000
Distillation Test
Distillate, percentage by volume of total distillate to 680 F
to 437 F 40 75 35 70 20 55
to 500 F 65 90 55 85 45 75
to 600 F 85 — 80 — 70 —
Residue from Distillation
Volume Percent 70 — 75 — 82 —
Tests of Distillation Residue
Penetration, 1008 100 150 100 150 100 150
5 sec.. 77 F
Ductility. 5 cmgmm. 100 — , 100 — 100 —
77F.cm
Solubility in
trichloroelhylene, % 99.0 — 9911 — 99.0 —
Spot Test ALL NEGATIVE
MEDIUM CURING TYPE CUTBACK ASPHALT
Type -Grade MC -30 MC -70 MC -250 MC -800 MC -3000
Properties Min. Max. Min. Max. Min. Max. Min. Max. Min. Max.
Water, % — 0.2 — 0.2 — 0 2 — 0 2 — 0 2
Flash Point, 100 — 100 — 150 — 150 — 150 —
T O.C., F
Kinematic vis. rii 30 60 70 140 250 500 800 1600 3000 6000
140 F. cst.
The Distillate, expressed as percent by volume to total distillate to 680 F, shall be as follows:
Off at 437 F — 25 — 20 — 10 — — — —
Off at 500 F 40 70 20 60 15 55 — 35 — 15
Off at 600 F 75 93 65 90 60 87 45 80 15 75
Residue from 680 F Distillation,
Volume Percent 50 — 55 — 67 — 75 — 80 —
301 04/17!86 Page 2
Tests on Distillation Residue:
Penetration at 77 F 100g, 5 sec.
Ductility at 77 F 5 cm /min, cms
Solubility in tnchloroethylene.
Spot Test
120 250 120 250 120 250 120 250 120 250
100' — 100' — 100' — 100' — 100' —
99 0 — 99.0 — 99.0 — 99 0 — 99 0 —
ALL NEGATIVE
'll penetration of residue is more than 200 and ductility at 77 F is less than 100 cm, the material will be acceptable it its
ductility at 60 F is more than 100.
AE -P CUTBACK ASPHALT
Type -Grade AE -P
Properties Minimum Maximum
Viscosity frr, 122 F, SF, sec. 15 150
Sieve Test, % 0.1
Demulsibdily, 50mL 0 1 N CaCI„ % 70
Storage Stability, 24 hr., % 1.0
TEST ON RESIDUE FROM CUTBACK DISTILLATION TO
680 F USINT RESIDUE FROM 500 F DISTILLATION % 40
Total Oils' from Distillation, % 20 35
Float (8 122 F on Residue from Cutback Distillation 50 200
Solubility in Trichloroethylene, T 97.5
'Cumulative total from 500 F distillation of emulsion and distillation of residue by cutback distillation to 680 F.
(4) Emulsions
The material shall be homogenous. It shall show no separation of asphalt after thorough mixing and shall meet the
viscosity requirements at any time within 30 days after delivery
ANIONIC EMULSIONS
Rapid Setting Medium Setting Slow Setting
Type -Grade RS-2 RS -2h MS -2 MS -2h MS -1 SS -1
Properties Min. Max. Min. Max. Min. Max. Min. Max. Min. Max. Min. Max.
Furol Viscosity at 77 F. sec — — — — 30 100 30 100
Furol Viscosity at 122 F, sec. 150 400 150 400 100 300 100 300 — —
Residue by Distillation, % 65 — 65 — 65 — 65 — 60 — 60 —
Oil Portion of Distillate, % — 2 — 2 — 2 — 2 — 2 — 2
Sieve Test, % — 0.1 — 0.1 — 0.1 — 0.1 — 0 1 — 0 1
Miscibility (Standard Test) — — — — Passing Passing
Coating Passing
Cement Mixing, % — — . — 2 0
Demulsibitity 50 cc of N /10 CaC6, / — — — — — — 70 — —
Demulsibility 35 cc of N /50 CaCI„ % 60 — 60 — — 30 30 — — — —
Storage Stability 1 day, % — 1 — 1 1 — 1 — 1 — 1
Page 3 04/17/86 301
ANIONIC EMULSIONS
Rapid Setting Medium Setting Slow Setting '
Type -Grade RS -2 RS -2h MS-2 MS -2h MS -1 SS -1
Properties Min. Max. Min. Max. Min. Max.. Min. Max. Min. Max. Min. Max. '
Freezing Test, 3 Cycles • — — Passing Passing Passing Passing
Tests of Residue: '
Penetration at 77 F, 100g, 5 sec. 120 160 80 110 120 160 80 110 120 160 120 160
Solubility in Tnchloroethylene, % 97.5 — 97.5 — 97.5 — 97.5 — 97.5 — 97.5 —
Ductility at 77 F, 5 cm/min, cms 100 — 100 — 100 — 100 — 100 — 100 — '
'Applies only when Engineer designates material for winter use.
CATIONIC EMULSIONS '
Rapid Setting Medium Setting Slow Setting
Type -Grade CRS -2 CRS -2h CMS -2 CMS -2h CSS -1 CSS -1h '
Min. Max. Min. Max. Min. Max. Min. Max. Min. Max. Min. Max.
Viscosity, Saybolt Furol at 77 F sec — — 20 100 20 100 '
Viscosity, Saybolt Furol at 122 F
sec ' 150 400 150 400 100 100 300 100 100 300
Storage stability test. 1 day % — 1 — 1 — 1 — 1 — 1 — 1
Demulsibility, • 35 m10.8% sodium '
dioctyl sullosuccinate %
40 — 40 — — — — — — — — —
Coating, ability & water resistance. '
Coating, dry aggregate - good good — —
Coating, after spraying — fair fair — —
Coating, wet aggregate — fair ' fair — — '
Coating, after spraying lair fair —
Particle charge test Positive Positive Positive Positive Positive Positive '
Sieve test % — 0 10 — 0.10 — 0 10 — 0 10 — 0 10 — 0 10
Cement Mixing test, % — 2 0 — 2 0 '
Distillation:
Oil distillate, by volume of emulsion,
— 3 — 3 — 12 — 12 3 — — 3
Residue, % 65 — 65 — 65 — 65 — 60 — 60 —
Tests on Residue from Distillation Test '
Penetration, 77 F, 100 g 5 sec. 120 160 80 110 120 200 80 110 120 160 80 110 '
Ductility, 77 F, 5 cm/min, cm 100 — 100 — 100 — 100 — 100 — 100 —
Solubility in tnchloroethylene, % 97.5 — 97.5 — 97.5 — 97 5 — 97.5 — 97,5 —
'The demutsibility test shall be made within 30 days from date of shipment 1
301 04/17/86 Page 4 '
1
1
1
1
1
1
1
1
1
1
1
1
1
1
(8)
1
1
1
1
(5) Fluxing Material
Fluxing material shall be Tree from foreign matter and shall conform to the following:
Properties Minimum Maximum
(6) Precoat Material
Water, % — 0.2
Kinematic Viscosity at 140 F, cst 60 120
Flash Point, C.O.C., F 250 —
Loss on Heating, 50g, 5 hrs at 325 F, % — 5
Asphalt Content of 85 to 115 penetration by
vacuum distillation weight, % 25 —
Pour Point, F — 60
Precoat material may consist of any one of the various types of asphaltic materials listed in this specification, approved by
the Engineer, including "Special Precoat Material ".
(7) High Float Emulsions
Special
Precoat Material
Properties Minimum Maximum
Water, % —
Flash, C.O.C., F 200
Kinematic Viscosity at 140 F, cst. 300
Distillation to 680 F:
Initial Boiling point, F 500
Residue by weight, % 70
Penetration residue, 77 F, 100g, 5 sec 200
Type -Grade
Properties
Type -Grade
0.2
500
300
HIGH FLOAT EMULSIONS
Rapid Setting Medium Setting
HFRS -2 AES -300
Minimum Maximum Minimum Maximum
Furol Viscosity at 77 F, sec. — — 75 400
Furol Viscosity at 122 F, sec 150 400 — —
Residue by Distillation, % 65 — 65 —
Oil Portion of Distillate, % — 2 — 7
Sieve Test, % — 0.1 — 0.1
Coating — — Passing
Demulsibility 35 cc of N /50 CaCI„ % 50 — — —
Storage Stability Test. 1 day, % — 1 — 1
Tests on Residue"
Penetration at 77 F, 100 g, 5 sec. 100 140 300
Solubility in Trichloroethylene, % 97.5 — 97.5
Ductility at 77.5 cm /min, cros 100 — — —
Float Test at 140 F, sec. 1200 — 1200 —
Catalytically -Blown Asphalt Joint and Crack Sealer
Catalytically -blown asphalt shall be uniformly blended with 10 percent diatomaceous earth tiller which passes the No. 325
sieve. It shall form a suitable joint and crack sealer which may be melted to pouring consistency in the regular asphalt kettle
at a temperature of approximately 450 F to 475 F. The material shall meet the following requirements:
68 -88 Pen 38 -45 Pen
Minimum Maximum Minimum Maximum
Penetration, 77 F, 100g, 5 sec 68 88 38 45
Penetration, 32 F, 200g, 60 sec 38 — — —
Penetration, 115 F, 50g, 5 sec — 160 — —
Softening Point, R & B, F 175 200 185 200
Flash, C.O.C., F 500 — 500 —
Page5 04/17/86 301
End
68 -88 Pen 38 -45 Pen
Type -Grade Minimum Maximum Minimum Maximum
Ductility, 77 F, 5 cm/min, cms 5 — 3 —
FIow, 140 F, cm — 05 — 05
Ash, Weight. % 8 — 8 —
Settlement Ratio — 1.02 — 1.02
Brittleness Test, 32 F No Cracking No Cracking
301.3 Storage, Heating and Application Temperatures
Asphaltic materials should be applied at the temperature which provides proper and uniform distribution and with practical limits
avoiding higher temperatures than necessary. Satisfactory application usually should be obtained within the recommended
ranges shown below. No material shall be heated above the following maximum temperatures:
Application and Mixing Heating and
Recommended Storage
Type -Grade Range, F Allowable, F Maximum, F
AC- 5,10,20.40 275 375 350
AC -3 220 -300 350 350
AE -P 100 -140 140 140
RC -250 125 -180 200 200
RC -800 170 -230 260 260
RC-3000 215 -275 285 285
MC -30 70 -150 175 175
MC -70 125 -175 200 200
MC -250 125 -210 240 240
MC -800 175 -260 275 275
MC -3000 225 -275 290 290
Cat Blown Asph 425 -475 500 500
Special Precoat Material 125 -250 275 275
SS -1, MS -1, CSS - CSS - 50 -130 140 140
RS -2. RS -2h. MS -2. MS -2h, CRS -2,
CRS -2h, CMS -2. CMS -2h, HFRS -2,
AES -300 110 -160 170 170
NOTE: Heating of asphaltic materials (except emulsions) constitutes a fire hazard to venous degrees. Proper precautions
should be used in all cases and especially with RC cutbacks.
Warning to Contractors
Attention is called to the fact that asphaltic materials are very flammable. The utmost care shall be taken to prevent
open flames from coming in contact with the asphaltic material or the gases of same. The Contractor shall be respon-
sible for any fires or accidents which may result from heating the asphaltic materials
301.4 Measurement and Payment
All asphaltic materials included in this specification will be measured and paid for conforming to the governing specifications for
the items of construction in which these materials are used.
301 04/17/86 Page 6
Item No. 306
Prime Coat
306.1 Description
This item shall consist of an application of asphaltic material on the completed base course and /or other approved areas in
accordance with these specifications as directed by the Engineer.
306.2 Materials
(1) Asphalt Materials
The asphalt material for Prime Coat shall conform to the requirements of Cutback Asphalt, MC -30, Emulsion, MS -2,
SS -1, Emulsion CSS -1 or AE -P, Item No. 301, "Asphalts, Oils and Emulsions ".
(2) Water
Water shall be furnished by the Contractor and shall be clean and free from industrial wastes and other objectionable
matter.
(3) Dispersal Agent
Detergent shall be added to water and sprayed on surfaces to be primed in accordance with asphalt manufacturer's
recommendations.
306.3 Construction Methods
When, in the opinion of the Engineer, the base course or other surface is satisfactory to receive the prime coat, the surface shall
be cleaned by sweeping or other approved methods as directed by the Engineer. The surface shall be lightly sprinkled with water
just prior to application of the asphaltic material unless this requirement is waived by the Engineer. The Contractor shall submit a
list of prime matenal(s) recommended to be applied on the work to the Engineer for approval. When emulsions are approved, a
dispersal agent shall be added to the water before sprinkling. The asphaltic material shall be applied on the clean surface by an
approved type of self - propelled pressure distributor operated so as to distribute the prime coat at a rate ranging from 0.1 to 0.3
gallons per square yard of surface area. The material shall be evenly and smoothly distributed. During the application of prime
coat, care shall be taken to prevent splattering of adjacent pavement. curb and gutters or structures. The Contractor shall be
responsible for cleaning splattered areas.
Prime Coat shall not be applied when the air temperature is below 60 F and falling, but it may be applied when the air tempera-
ture is above 50 F and rising; the air temperature being taken in the shade and away from artificial heat. Asphaltic material shall
not be placed when general weather conditions, in the opinion of the Engineer, are not suitable.
The distributor shall have been recently calibrated and the Engineer shall be furnished an accurate and satisfactory record of
such calibration. After beginning the work, should the yield on the asphaltic matenal applied appear in error, the distributor shall
be calibrated in a manner satisfactory to the Engineer before proceeding with the work.
The Contractor shall be responsible for the maintenance of the surface until the work is accepted by the Engineer. No traffic,
hauling or placement of any subsequent courses shall be permitted over the freshly applied prime coat.
All storage tanks. piping, retorts, booster tanks and distributors used in storing or handling asphaltic material shall be kept clean
and in good operating condition at all times and they shall be operated in such a manner that there will be no contamination of the
asphaltic material with foreign material. It shall be the responsibility of the Contractor to provide and maintain in good working
order a recording thermometer at the storage heating unit at all times.
The Engineer will approve the temperature of application based on the temperature - viscosity relationship that will permit applica-
tion of the asphalt within the limits recommended in Item No. 301, "Asphalts, Oils and Emulsions ". The recommended range for
the viscosity of the asphalt is 100 to 125 centistokes. The Contractor shall apply the asphalt at a temperature within 15 F of the
temperature specified in Item No. 301, "Asphalt, Oils and Emulsions ".
306.4 Measurement
Prime coat will be considered subsidiary to Item No. 340, "Hot Mix Asphaltic Concrete Pavement" unless included as a separate
pay Item in the contract. When included for payment, It shall be measured at point of delivery on the project in gallons at the
applied temperature. The quantity to be paid for shall be the number of gallons used in the accepted prime coat
Page 1 04/17/86 306
306.5 Payment
The work performed and materials furnished as prescnbed by this item, when included as a contract pay item, will be paid for at
the unit price bid per gallon for "Prime Coat ". which price shall be full compensation for cleaning the base course or other sur-
face, for furnishing, heating, hauling and distributing the prime coat specified; for all freight involved and for all manipulations,
labor, tools, equipment and incidentals necessary to complete the work.
Payment, when included as a contract pay item, will be made under:
Pay Item No. 306: Prime Coat — Per Gallon.
No separate payment will be made for this item. Should be considered subsidiary to
Item 340.
End
306 04/17/86 Page 2
307.1 Description
This item shall consist of an application of asphaltic material on the completed base course after the prime coat has sufficiently
cured, existing pavement, bituminous surface, bridge deck, slab or on a prepared surface as indicated and as directed by the
Engineer.
307.2 Materials
(1) Asphalt Materials
The asphalt material for "Tack Coat" shall meet the requirements for Cutback Asphalt or Emulsified Asphalt, Item
No. 301, "Asphalts, Oils and Emulsions" as listed below. Cutback asphalt shall be made by combining 50 to 70
percent by volume of the asphaltic material as specified for the type of paving mixture with 30 to 50 percent by
volume of gasoline and /or kerosene. The type of material shall be selected from the following table:
•
Temperature
of Surface, F. 40 -70 Over 70
RS -2 MS -2
RS -2H MS -2H
RC -250 MC -70
CRS -2 CMS -2
CRS -2H CMS -2H
(2) Water
Water shall be fumished by the Contractor and shall be clean and free from industrial wastes and other objectionable
matter.
(3) Sand
Sand may be Grade 1 conforming to Item No. 403, "Concrete Structures" or washed sand, largely siliceous, with the
following gradation:
Percent Retained by Weight
Sieve Size Natural Sand
No. 8 0
No. 16 0 -40
No. 30 25 -65
No. 50 65 -85
No. 100 85 -98
No.200 98 -100
Item No. 307
Tack Coat
There shall not be more than 50 percent of the aggregate retairied between any 2 sieves listed above and not more
than 25 percent of the aggregate retained between No. 50 and No. 100 sieve.
307.3 Construction Methods
Tack coat shall not be applied when the air temperature is below 60 F and falling, but 0 may be applied when the air temperature
is above 50 F and rising, the air temperature being taken in the shade and away from artificial heat. Asphaltic material shall not
be placed when general weather conditions, in the opinion of the Engineer, are not suitable.
Before the tack coat is applied, the surface shall be cleaned thoroughly to the satisfaction of the Engineer. The asphaltic material
shall be applied on the clean surface by an approved type of self - propelled pressure distributor, so operated as to distnbute the
tack coat at a rate not to exceed 0.10 gallon per square yard of surface, evenly and smoothly under a pressure for proper distri-
bution. Where the pavement mixture will adhere to the surface on which it is to be placed without the use of a tack coat, the tack
coat may be eliminated by the Engineer. All contact surfaces of curbs and structures and all joints shall be cleaned thoroughly
and painted with a thin uniform coat of the asphaltic material used for tack coat. The tack coat shall be rolled with a pneumatic
tire roller to distribute the asphaltic material uniformly over the tacked area. During the application of tack coat, care shall be
taken to prevent splattering of adjacent pavement, curb and gutters or structures. The Contractor shall clean splattered areas
The distributor shall have been recently calibrated and the Engineer shall be furnished an accurate and satisfactory record of
such calibration. After beginning of the work, should the yield on the asphaltic material applied appear in error, the distributor
shall be calibrated in a manner satisfactory to the Engineer before proceeding with the work.
Page 1 04/17/86 307
The Contractor shall be responsible for the maintenance of the surface until the HMAC is placed over the tack coat or the work is
accepted by the Engineer. No traffic, hauling or placement of any subsequent courses shall be permitted over the freshly applied
prime coat unless it is blotted by the application of sand as directed by the Engineer.
All storage tanks, piping, retorts, booster tanks and distributors used in stonng or handling asphaltic material shall be kept clean
and in good operating condition at all times and they shall be operated in such a manner that there will be no contamination of the
asphaltic material with foreign material. It shall be the responsibility of the Contractor to provide and maintain in good working
order a recording thermometer at the storage heating unit at all times.
The Engineer will select the temperature of application based on the temperature - viscosity relationship that will permit applica-
tion of the asphalt within the limits recommended in Item No. 301, "Asphalts. Oils and Emulsions ". The recommended range for
the viscosity of the asphalt is 100 to 125 centistokes. The Contractor shall apply the asphalt at a temperature within 15 F of 160 F.
307.4 Measurement
The asphaltic material for "Tack Coat" will be considered subsidiary to Item 340, "Hot Mix Asphaltic Concrete Pavement" unless
included as a separate pay item in the contract. When included for payment, "Tack Coat" shall be measured at point of delivery
on the project in gallons at the applied temperature. The quantity to be paid for shall be the number of gallons used.
307.5 Payment
The work performed and materials furnished as prescnbed by this item, when included as a contract pay item, will be paid for at
the unit price bid per gallon for "Tack Coat ", which price shall be full compensation for cleaning the area to receive the "Tack
Coat': for furnishing, heating, hauling and distributing the tack coat specified; for all freight involved and for all manipulations,
labor, tools, equipment and incidentals necessary to complete the work.
Payment, when included as a contract pay item, will be made under:
Pay Item No. 307: Tack Coat — Per Gallon.
No separate payment will be made for this item. Should be considered subsidiary to
Item 340.
End
307 04/17/86 Page 2
340.1 Description
Item No. 340
Hot Mix Asphaltic Concrete Pavement
This item to consist of a base course, a leveling -up course, a surface
course or a combination of these courses as indicated, each to be composed
of a compacted mixture of mineral aggregate and asphaltic material.
Pavement to be constructed on previously completed and approved subgrade,
base, existing pavement, bituminous surface or in case of a bridge, on
prepared slab, as herein specified and in accordance with details
indicated.
340.2 Materials
(1) General
Contractor to furnish materials to meet requirements and final
mixture, prior to being placed, to be as specified herein.
Contractor to be solely responsible for quality and control of his
materials.
(2) Mineral Aggregate
Mineral aggregate to be composed of course aggregate, fine
aggregate and if required, mineral filler. Samples of materials
to be submitted for testing as directed by Engineer and approval
of both material and source of supply must be obtained from
Engineer prior to delivery.
Combined mineral aggregate, prior to addition of asphalt and
mineral filler, to have a sand equivalent value of not less than
45, when tested in accordance with SDHPT Test Method Tex - 203 -P.
Mineral aggregate from each source to meet quality tests specified
herein.
(a) Coarse Aggregate
Coarse aggregate to be that part of aggregate retained on No.
10 sieve and to consist of clean, tough, durable fragments of
crushed stone or crushed gravel as hereinafter specified of
uniform quality throughout.
When coarse aggregate is tested in accordance with SDHPT Test
Method Tex -217 -F (Part I, Separation of Deleterious
Material), amount of organic matter, clay, loam or particles
coated therewith or other undesirable materials not to exceed
2 percent and when remaining part of sample is further tested
in accordance with SDHPT Test Method Tex -217 -F (Part II,
Decantation), amount of material removed not to be more than
2 percent.
Coarse aggregate (each coarse aggregate when a combination of
Hot Mix Asphaltic
340 08/15/88 Page 1 Concrete Pavement
materials is used) to have an abrasion of not more than 40
percent loss by weight when subjected to SDHPT Test Method
Tex -410 -A Los Angeles Abrasion Test.
Stone or gravel to be so crushed that 90 percent of particles
retained on No. 4 sieve shall have more than 1 crushed face
when tested in accordance with SDHPT Test Method Tex -413 -A
(Particle Count).
(b) Fine Aggregate
Fine aggregate to be that part of aggregate passing No. 10
sieve and to consist of sand, screenings or combination
thereof as hereinafter specified of uniform quality
throughout.
Fine aggregate to consist of durable particles, free from
injurious foreign matter. Screenings to be of same or
similar material as specified for coarse aggregate.
Plasticity index of that part of fine aggregate passing No.
40 sieve to be not more than 6, when calculated in accordance
with SDHPT Test Method Tex - 106 -E. Fine aggregate from each
source to meet plasticity requirements.
When stone screenings are used, they shall meet the following
grading requirements:
(c) Mineral Filler
Percent by Weight
Passing the 3/8 inch sieve 100
Passing the No. 200 sieve 5 - 25
Fine aggregate contained in coarse aggregate stockpiles to
meet above requirements when stockpile contains more than 5.0
percent by weight of aggregate passing No. 10 sieve.
Mineral filler to consist of thoroughly dry stone dust, slate
dust, Portland Cement, fly ash, lime or other mineral dust
approved by Owner. Mineral filler to be free from foreign
and other injurious matter.
Fines collected by a baghouse or other air cleaning or dust
collecting equipment may be permitted to fulfill a mineral
filler addition requirement in amounts up to 2 percent.
Addition of these fines may be permitted by Engineer in any
case in an amount that can be maintained throughout
production and uniform mixtures result. When these fines are
permitted in asphaltic mixture, they shall be introduced in
same manner prescribed for other mineral fillers.
When tested by SDHPT Test Method Tex -200 -F (Dry Sieve
Analysis), it shall meet the following grading requirements:
Hot Mix Asphaltic
340 08/15/88 Page 2 Concrete Pavement
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
(3) Asphaltic Material
(a) Paving Mixture
Percent by weight
Passing a No. 30 Sieve 95 - 100
Passing a No. 80 Sieve,
not less than 75
Passing a No. 200 Sieve,
not less than 55
Asphalt for paving mixture to conform to Item No. 301,
"Asphalts, Oils and Emulsions ", AC -20. Contractor may employ
a Job or Plant Mix Formula which has previously been reviewed
by Engineer for materials peculiar to plant selected. Source
of paving mix not to be changed during course of work without
approval of Engineer.
(b) Prime Coat or Tack Coat
Prime coat or tack coat of asphaltic material conforming to
Item Nos. 306, "Prime Coat and 206, "Tack Coat" to be as
indicated. These materials to conform to Item No. 301,
"Asphalts, Oils and Emulsions ", MC -30, SS -1, CSS -1, or
CSS -lh.
(4) Temporary Pavement Markings
Temporary pavement markings to conform to Item No. 864,
"Abbreviated Pavement Markings ".
340.3 Paving Mixtures
(1) Mix Design
Job Mix Formula to be designed by Contractor in accordance with
SDHPT Bulletin C -14 and SDHPT Test Method Tex -204 -F and tested in
accordance with SDHPT Test Method Tex - 207 -F, Tex -208 -F and
Tex -227 -F to supplement SDHPT Test Methods Tex -201 -F and
Tex - 202 -F, with the exception that laboratory density be
determined as a percentage of mixture maximum Ihenretica) density.
Maximum theoretical specific gravity to be determined in
accordance with SDHPT Tex -227 -F on trial samples of mixture near
optimum asphalt content and conform with requirements herein.
Contractor to submit Job or Plant Mix Formula for review on forms
acceptable to City for each source of supply and type of mixtures
specified. Bulk specific gravity to be determined for each
aggregate to be used in design mixture. Mixture to be designed to
produce a mixture within density and stability requirements shown
below. Work specified in this section to conform with applicable
portions of Section 00344 "Testing Laboratory Services" and to
SDHPT procedures.
Hot Mix Asphaltic
340 08/15/88 Page 3 Concrete Pavement
(2) Types
Paving mixtures to consist of a uniform mixture of coarse
aggregate, fine aggregate, asphaltic material and mineral filler,
if required. When properly proportioned, mineral aggregate shall
produce a gradation which will CONFORM TO LIMITATIONS FOR MASTER
GRADING GIVEN BELOW FOR TYPE SPECIFIED. Gradation to be
determined in accordance with SDHPT Test Method Tex -200 -F (Dry
Sieve Analysis) and to be based on aggregate only. Amount of
material to conform to limitations shown for paving type
specified.
Type A (Coarse Graded Base Course) Percent Aggregate by
Weight
Passing 2 inch sieve 100
Passing 1 3/4 inch sieve 95 to 100
Passing 1 3/4 inch sieve, retained on 7/8 inch sieve 16 to 42
Passing 7/8 inch sieve, retained on 3/8 inch sieve 16 to 42
Passing 3/8 inch sieve, retained on No. 4 sieve 10 to 26
Passing No. 4 sieve, retained on No. 10 sieve 5 to 21
Total retained on No. 10 sieve 68 to 84
Passing No. 10 sieve, retained on No. 40 sieve 5 to 21
Passing No. 40 sieve) retained on No. 80 sieve 3 to 16
Passing No. 80 sieve, retained on No. 200 sieve 2 to 16
Passing No. 200 sieve 1 to 8
Asphaltic material to form from 4.7 to 7 percent of mixture by
weight.
Type B (Fine Graded Base or Leveling -Up Course) Percent Aggregate by
Weight
Passing 1 inch sieve 100
Passing 7/8 inch sieve 95 to 100
Passing 7/8 inch sieve, retained on 3/8 inch sieve 20 to 50
Passing 3/8 inch sieve, retained on No. 4 sieve 10 to 40
Passing No. 4 sieve, retained on No. 10 sieve 5 to 25
Total retained on No. 10 sieve 55 to 70
Passing No. 10 sieve, retained on No. 40 sieve 5 to 25
Passing No. 40 sieve, retained on No. 80 sieve 5 to 25
Passing No. 80 sieve, retained on No. 200 sieve 5 to 20
Passing No. 200 sieve ' 2 to 8
Asphaltic material to form from 3.5 to 7 percent of mixture by
weight.
Hot Mix Asphaltic
340 08/15/88 Page 4 Concrete Pavement
Type C (Coarse Graded Surface Course) Percent Aggregate by
Weight
Passing 7/8 inch sieve 100
Passing 5/8 inch sieve 95 to 100
Passing 5/8 inch sieve, retained on 3/8 inch sieve 15 to 40
Passing 3/8 inch sieve, retained on No. 4 sieve 10 to 35
Passing No. 4 sieve, retained on No. 10 sieve 10 to 30
Total retained on No. 10 sieve 50 to 70
Passing No. 10 sieve, retained on No. 40 sieve 5 to 25
Passing No. 40 sieve, retained on No. 80 sieve 5 to 25
Passing No. 80 sieve, retained on No. 200 sieve 5 to 20
Passing No. 200 sieve 2 to 10
Asphaltic material to form from 3.5 to 7 percent of mixture by
weight.
Type D (Fine Graded Surface Course)
(3) Tolerances
Percent Aggregate by
Weight
Passing 1/2 inch sieve 100
Passing 3/8 inch sieve 95 to 100
Passing 3/8 inch sieve, retained on No. 4 sieve 20 to 50
Passing No. 4 sieve, retained on No. 10 sieve 10 to 30
Total retained on No. 10 sieve 50 to 70
Passing No. 10 sieve, retained on No. 40 sieve 5 to 25
Passing No. 40 sieve, retained on No. 80 sieve 5 to 25
Passing No. 80 sieve, retained on No. 200 sieve 5 to 20
Passing No. 200 sieve 2 to 8
Asphaltic material to form from 4.7 to 7 percent of mixture by
weight.
Type F (Fine Graded Surface Course) Percent Aggregate by
Weight
Passing 3/8 inch sieve 100
Passing No. 4 sieve 95 to 100
Passing No. 4 sieve, retained on No. 10 sieve 58 to 73
Passing No. 10 sieve, retained on No. 40 sieve 6 to 26
Passing No. 40 sieve, retained on No. 80 sieve 3 to 13
Passing No. 80 sieve, retained on No. 200 sieve 2 In 11
Passing No. 200 sieve 2 to 8
Asphaltic material to form from 4.7 to 7 percent of mixture by
weight.
Aggregate and asphalt portions of paving mixture produced not to
vary from Job or Plant Mix Formula by more than tolerances which
follow, but in any case allowed tolerance is also restricted to
conform to master grading ranges. Method of test for determining
Hot Mix Asphaltic
340 08/15/88 Page 5 . Concrete Pavement
aggregate gradation and asphalt content of mixture to be Test
Method Tex -210 -F or other methods of proven accuracy.
Passing 7/8 inch sieve, retained on 3/8 inch sieve
Passing 5/8 inch sieve, retained on 3/8 inch sieve
Passing 3/8 inch sieve, retained on No. 4 sieve
Passing No. 4 sieve, retained on No. 10 sieve
Total retained on No. 10 sieve
Passing No. 10 sieve, retained on No. 40 sieve
Passing No. 40 sieve, retained on No. 80 sieve
Passing No. 80 sieve, retained on No. 200 sieve
Passing No. 200 sieve
Asphalt Material
(4) Sampling and Testing
Percent by Veight
Plus or minus 5
Plus or minus 5
Plus or minus 5
Plus or minus 5
Plus or minus 5
Plus or minus 3
Plus or minus 3
Plus or minus 3
Plus or minus 3
Plus or minus 0.3
Engineer's Laboratory will perform random tests to determine if
materials and construction procedures produce a product which
meets specifications. Primary sampling point by testing
laboratory will be at project site at paving machine. Other
testing may be at job site, plant or in trucks as determined by
Engineer.
Engineer will determine sampling schedules for random testing in
accordance with SDHPT Test Method Tex - 225 -F, but in no case will
all samples be taken from a single pass of a multipass
improvement. Gradation and stability samples will be taken at
plant or on project site, as determined by Engineer. A minimum of
3 samples will be obtained for each project. Field density to be
determined by taking either 6 inch cores or sections of asphaltic
pavement at locations selected by Engineer of each type of
completed asphaltic pavement lifts for approximately every 2,000
square yards or part thereof. Acceptability will be based on the
mean of job values, unless test results appear inappropriate and
additional tests are approved by Engineer.
Initial sampling and testing of in place asphalt concrete for
entire asphalt thickness on Capital Improvement Projects will be
at no cost to Contractor, except for cost of material and
restoration of damage by testing. Retesting expense shall conform
to Section 00344, "Testing Laboratory Services."
Testing Laboratory will identify samples so cores will be
evaluated against appropriate sample.
(5) Sampling and Testing of Private Development Projects
Testing for Private Development Projects to conform to Item No.
1804.04, "General Obligations and Responsiblities" and cost of
testing to be borne by Developer.
An independent testing laboratory vill perform random tests to
Hot Mix Asphaltic
340 08/15/88 Page 6 Concrete Pavement
determine if materials and construction procedures produce a
product which meets specifications. Primary sampling point by
testing laboratory to be at project site. Other testing may be at
job site, plant or in trucks as determined by Engineer.
Engineer will determine sampling schedules for random testing in
accordance with SDHPT Test Method Tex -225 -F but in no case will
all samples be taken from a single pass of a multipass
improvement. Gradation and stability samples will be taken at
plant or on work site, as determined by Engineer. A miminum of 3
samples will be obtained for each project. Field density to be
determined by taking either 6 inch cores or sections of asphaltic
pavement, at locations selected by Engineer, of completed
asphaltic pavement lifts for approximately every 2,000 square
yards or part thereof. Acceptability will be based on the mean of
job values for entire asphalt thickness.
(6) Stability and Density
340.4 Equipment
Mixture to be designed to produce an acceptable mixture within
tolerance, at or near optimum density as indicated. Mixture
molded in laboratory in accordance with SDHPT Test Method
Tex - 206 - and bulk specific gravity of laboratory compacted
mixture determined in accordance with SDHPT Test Method Tex -207 -F
should have the following percent of maximum theoretical density
as measured by SDHPT Test Method Tex -227 -F and stability
conforming to SDHPT Test Method Tex - 208 - F:
Laboratory Density Percent Stability, Percent
(1) Mixing Plants
Min. Max. Optimum Not less than
95 97 Residential Streets 97 35 or more than 55 for
other Streets 96 residential streets and
not less than 37 or more
than 55 for other
streets and intersections.
Mixing plants that will not continuously produce a uniform mixture
meeting requirements of this specification will not be used.
(2) Asphaltic Material Heating Equipment
Asphaltic material heating equipment to be adequate to heat
asphaltic material required to desired temperature without damage
to asphalt. Direct fire heating of asphaltic materials to be
permitted, provided heater used is manufactured by a reputable
concern and there is positive circulation of asphalt throughout
heater. Agitation with steam or air will not be permitted.
Heating apparatus to be equipped with a recording thermometer with
Hot Mix Asphaltic
340 08/15/88 Page 7 Concrete Pavement
(3)
a 24 hour chart that will record temperature of asphaltic material
at highest temperature.
Spreading and Finishing Machine
Spreading and finishing machine to be of a self - propelled type
with electronic control capability and to be capable of producing
a high quality, smooth surface that will meet requirements of
typical cross section, surface test and not produce segregation.
(4) Rollers
Contractor to select rollers conforming to Item Nos. 230, "Rolling
(Flat Wheel) ", 232, "Rolling (Pneumatic Tire) ", 234, "Rolling
(Tamping)" and 236, "Rolling (Proof) ", which can satisfactorily
compact asphaltic mixture conforming to lines, grades and typical
sections such that asphaltic mixture will not stick to rollers and
rollers shall not leave rolling marks, cracks or tears in final
surface.
(5) Equipment Maintenance
Equipment to be maintained in good repair and operating condition.
(6) Straightedges and Templates
Contractor to provide an acceptable 10 foot straightedge for
surface testing. Satisfactory templates to be provided as
required by Engineer.
340.5 Stockpiling Aggregates
Prior to stockpiling of aggregates, area to be cleaned of trash, weeds and
grass and be relatively smooth. Aggregates to be stockpiled in such a
manner as to prevent mixing of one aggregate with another. Coarse
aggregates for Type B and Type C to be separated into at least 2 stockpiles
of different gradation, such as a large coarse aggregate and a small coarse
aggregate stockpile and such that grading requirements of specified type
will be net when piles are combined in asphaltic mixture. Suitable
equipment of acceptable size to be furnished by Contractor to load out
stockpiles such that segregation or contamination of aggregates does not
occur.
340.6 Mixing
(1) General
(a) Asphaltic Mixture
Asphaltic mixture from each type of mixer to be heated to a
temperature between 240 F and 350 F when discharged from
mixer and to be adjusted to provide best compaction
temperature for weather conditions. Contractor to determine
temperature and notify Engineer of value, within above
Hot Mix Asphaltic
340 08/15/88 Page 8 Concrete Pavement
340.7 Storing Mixture
limitations and mixture, when discharged from mixer not to
vary from this selected temperature more than 25 F.
(2) Batch Type Hixer
In charging of weigh box and in charging of mixer from weigh box,
such methods or devices to be used as are necessary to discharge
mixer in a manner which will prevent segregation.
(3) Dryer -Drum Hixer
Amount of aggregate and asphaltic materials entering dryer -drum
mixer and rate of travel through mixing unit to be so coordinated
that a uniform mixture of specified grading and asphalt content
will be produced without segregation.
Temporary storing or holding of asphaltic mixture may be used. When
discharged from storage bin mixture to have a moisture content not greater
than 1 percent by weight and must meet specifications. Moisture content
to be determined in accordance with SDHPT Test Method Tex -212 -F Part II.
When mixture is stored for more than 15 hours, material may be subject to
more frequent testing.
340.8 Construction Methods
Contractor to be responsible to produce, transport, place and compact
specified paving mixture in accordance with these specifications and
provide a safe environment to enable inspection forces to take samples and
check plant.
Prior to placing Hot Mix Asphaltic Concrete (MAC) Pavement, base to be
proof rolled conforming to Item No. 236 "Proof Rolling ". Soft spots to be
repaired and area proof rolled again.
Mat thickness of 1 1/2 inches and less not to be placed when temperature of
surface on which mat is to be placed is below 50 F. Air temperature to be
taken in shade away from artificial heat.
Asphaltic mixture, when placed with a motor grader for leveling, not to be
placed when air temperature is below 50 F and falling.
Asphaltic mixture, except that described above for leveling, to be placed
with a spreading and finishing machine. If, after being discharged from
mixer and prior to placing, temperature of asphaltic mixture is 50 F or
more below temperature established, all or any part of load may be rejected
and payment will not be made for rejected material. Any material placed
which is too cool to compact properly to be removed and replaced with
material which meets specifications.
Asphaltic mixture, when used as make -up material in repaving process, to
conform to requirements of this item. This material to be deposited on top
of heated, scarified, mixed and rejuvenated pavement surface.
Hot Mix Asphaltic
340 08/15/88 Page 9 Concrete Pavement
Adjacent to flush curbs, gutters, liners and structures, surface to be
finished uniformly high so that when compacted it will be slightly above
edge of the curb and flush structure. Compacted thickness of asphaltic
concrete courses to be as indicated. When surface is to be constructed in
stages and traffic is permitted on initial layer, each layer shall be not
less than 1 inch.
Final lift of MAC shall not be placed adjacent to an existing cured
rounded edge asphalt surface until existing surface has been properly
prepared.
(1) Prime Coat
If a prime coat is indicated, it is to be applied conforming to
requirements of Item No. 306, "Prime Coat ", except application
temperature to be as provided above. Asphaltic concrete not to be
applied on a previously primed flexible base until primed base has
cured to satisfaction of Engineer.
(2) Tack Coat
If a tack coat is indicated, it is to be applied conforming to
requirements of Item No. 307, "Tack Coat ". Before asphaltic
mixture is placed, surface upon which tack coat is to be placed
to be cleaned thoroughly to satisfaction of Engineer. Surface to
be given a uniform application of tack coat using asphaltic
materials indicated. Tack coat to be applied, as directed by
Engineer. Where mixture will adhere to surface of which it is to
be placed without use of a tack coat, tack coat may be eliminated
by Engineer. Contact surfaces of curbs and structures and joints
to be painted with a thin uniform coat of asphaltic material
meeting requirements for tack coat. Tack coat to be rolled with a
light pneumatic tire roller when directed by Engineer.
(3) Compacting
Mix to be compressed thoroughly and uniformly compacted
immediately after placing to required density. Vibratory and flat
wheel compaction rolling to be complete before mat cools below 175
F. Pneumatic tire rolling may be undertaken on mat below 175 F.
Rollers must be in good mechanical condition. Necvcsary
precautions to be taken to prevent dropping of gasoline, oil,
grease or other foreign matter on pavement, either when rollers
are in operation or when standing.
It is the intent of this specification that material be placed and
compacted to a minimum of 92.0 percent of maximum theoretical
density as determined by SDHPT Tex - 227 -F. Engineer will secure 6
inch core samples or sections of completed asphaltic pavement
lifts for approximately every 2,000 square yards or part thereof,
Hot Mix Asphaltic
340 08/15/88 Page 10 Concrete Pavement
of asphaltic concrete pavement placed. In place density at
sampled locations shall be determined by the following equation:
(4) Surface Tests
340.9 Acceptance Plan
(1) General
Percent in place Density = G
A x 100
G
T
Where G = Bulk specific gravity of core when tested in
A accordance with Tex -207 -F
(5) Opening to Traffic
G = Maximum theoretical specific gravity of combined
T cores when tested in accordance with Tex -227 -F
Contractor to patch surface where specimens are taken with no
extra payment being made for this work. Testing firm will remove
asphaltic concrete pavement specimens on day following placement
or as soon as practicable thereafter. Other methods of
determining in place density which correlate satisfactorily with
those results obtained by cores or sections may be used.
Surface of collector and arterial street pavements, after
compaction, to be smooth and true to established line, grade and
cross section and when tested with a 10 foot straightedge placed
parallel to centerline of roadway or tested by other equivalent
and acceptable means, except as provided herein, maximum deviation
not to exceed 1/8 inch in 10 feet and any point in surface not
meeting this requirement shall be corrected. Completed surface
to meet approval of Engineer for riding surface, finish and
appearance.
Pavement to be opened to traffic as soon as possible after
temporary pavement markings or permanent pavement markings are in
place as indicated and Engineer concurs to opening. Contractor's
attention is directed to fact that all construction traffic
allowed on pavement open to public will be subject to City
Ordinances and State Laws governing traffic on streets and
highways.
Surface raveling, cracking, segregation and other defects to be
corrected at Contractor's expense as directed by Engineer.
Traffic control expense for undertaking repairs will be at
Contractor's expense.
Surface testing to be completed prior to the use of pay adjustment _
factors for acceptance of gradation, asphalt content, stability,
Hot Mix Asphaltic
340 08/15/88 Page 11 Concrete Pavement
in place density and pavement thickness. Pay adjustments will be
based upon results of tests performed on samples taken in a random
manger. When pay adjustments for HMAC reduce unit price to zero,
any work left in place shall not be required to conform to
"Guarantee Against Defective Work" section of "General Conditions
of Agreement ". Pay adjustment for private development work shall
conform to Item No. 1804, "General Obligations and Responsibility
of the Owner".
(a) Sampling and Testing
Sampling is described above.
Engineer will deterimine sampling schedules for random
testing in accordance with SDHPT Test Method Tex 225 - F.
Samples will be taken at plant or on the project site, as
determined by Engineer.
Engineer may require that either cores or sections of
asphaltic pavement be taken at locations selected by
Engineer.
Determination of acceptability will be based on the mean of
job tests performed on each type of asphalt concrete.
When considerable time elapses between lifts due to Staged
Construction each stage will be determined separately.
However, truck loads of asphaltic mixture that are visually
inspected by Engineer and can reasonably be expected not to
meet specification requirements, such as a mixture containing
segregated material, low mixture temperature, a deficiency or
excess of asphalt, or otherwise unsuitable for placing on
street shall not be used. Any mixtures containing segregated
areas, deficiency or excess of asphalt or otherwise
unsuitable that is placed on street to be removed and
replaced with satisfactory material at Contractor's expense.
(2) Overall Good Material and Material Acceptance
For limited problem areas, Engineer would retain right to reject
portions of work and require areas to be removed and replaced.
(3) Gradation and Asphalt Content
Acceptability of mixture gradation and asphalt content to be based
on the mean of a minimum of 3 tests.
If the mean value of acceptance tests of project, for critical
sieve or for asphalt content deviates from project design by more
than tolerances shown and Engineer determines that material need
not be removed and replaced, project may be accepted at a reduced
Contract Unit Price as follows:
Hot Mix Asphaltic
340 08/15/88 Page 12 Concrete Pavement
SPECIFIED DEVIATION OF THE PERCENT CONTRACT UNIT
SIEVE SIZE MEAN FROM THE DESIGN PRICE REDUCTION
Z OF DEVIATION
FROM INTENDED
ASPHALT CONTENT
GRADATION ACCEPTANCE SCHEDULE
Total retained + 5.0 0
on #10 5.1 + 10
Passing #200 + 3.0 0
3.1 + 5
ASPHALT CONTENT ACCEPTANCE SCHEDULE
BVEEM STABILITY ACCEPTANCE SCHEDULE
above 60 20
32- 35or55 -60 10
35 - 55 0
PERCENT CONTRACT UNIT
PRICE REDUCTION
0 - 0.4 0
0.41 - 0.5 10
0.51 - 0.6 20
over 0.6 100
and. Engineer may require
a seal coat or removal and
replacement at Contractor's
expense.
(4) Stability
Acceptability of stability to be based on the mean of a minimum of
3 tests.
(a) Residential Streets
Contractor to produce a consistent mixture. If project is to
receive'a pay factor of 1.00, the mean value of stabilities
not to be less than 35 nor greater than 55, when tested in
accordance with SDHPT Test Method Tex - 208 -F. If the mean
value falls outside this range a reduction will be made in
accordance with the following table:
PERCENT CONTRACT UNIT
STABILITY VALUE PRICE REDUCTION
An asphalt mixture in place that has a stability below 32
will not be paid for by Owner and will be removed and
Hot Mix Asphaltic
340 08/15/88 Page 13 Concrete Pavement
replaced at Contractor's expense. Work may be accepted at no
cost to Owner if such request is made by Contractor and
approved by Engineer. Replacement of asphalt mixture to be
subject to same acceptance plan as original material.
(b) Other Streets and Intersections
Contractor to produce a consistent mixture. If project is to
receive a pay factor of 1.00, the mean value of stabilities
not to be less than 37 nor greater than 55, when tested in
accordance with Test Method Tex - 208 -F. 'If the mean value
falls outside this range a reduction will be made in
accordance with the following table:
PERCENT CONTRACT UNIT
STABILITY VALUE PRICE REDUCTION
35 - 36.9
37 - 55
55.1 - 60
(5) In Place Density
HVEEM STABILITY ACCEPTANCE SCHEDULE
20
0
20
An asphalt mixture in place that has a stability below 35 or
above 60 will not be paid for by Owner and to be removed and
replaced at Contractor's expense. Project may be accepted at
no cost to Owner if such request is made by Contractor and
approved by Engineer. Replacement of asphalt mixture to be
subject to same acceptance plan as original material.
Acceptability of in place density will be based on the mean of a
minimum of 3 tests. Density of mixture as determined in
accordance.with SDHPT Test Method Tex -207 -F and SDHPT Test Method
Tex -227 -F will be used to determine compliance and will be
measured and averaged. If the mean ',nine of d,•n_:iry tests on
work is greater or less than 94.5 and Engineer determines that
material need not be removed and replaced, project may be accepted
at a reduced unit price as follows:
Hot Mix Asphaltic
340 08/15/88 Page 14 Concrete Pavement
DENSITY
IN PLACE DENSITY ACCEPTANCE SCHEDULE
X CONTRACT UNIT PRICE
REDUCTION
1 1/2" Thickness Less than 1 1/2"
or Greater Thickness
above 97 100 100
92 -97 0 0
90.0 to 91.9 5 0
88.0 to 89.9 25 10
less than 88 100 100.
or Engineer may require removal at
Contractor's expense and replacement with
material which meets Specifications.
(6) Segregation
Materials placed in which segregation is present to be removed and
replaced.
(7) Straightedge and Template
Contractor to produce a final pavement surface which meets
straightedge and template requirements. If techniques produce a
pavement which doesn't meet straightedge and template
requirements, surface to be overlaid with a 1 inch layer of HMAC
unless surface can be corrected by milling which will not reduce
thickness of HMAC below minimums indicated.
No additional compensation to be made for any corrective work
required of Contractor.
(8) Thickness
Contractor to produce a pavement with minimum thickness indicated.
Core thickness greater than plan requirements shall be factored in
calculation at plan required thickness. Should the mean of core
tests indicate a variance in thickness less than plan requirements
on all paving, work shall be accepted at a reduced contract unit
price, except overlay projects, as follows:
VARIANCE PERCENT CONTRACT UNIT
PERCENT OF THICKNESS PRICE TO BE PAID
0 - 10 100
10.1 - 16 80
16.1 - 25 60
25.1 - 33 55
over 33 overlay 1 inch min as
directed by Engineer
If thickness of total asphaltic concrete lifts proves to be less
than required, Contractor may replace or overlay deficient areas
Hot Mix Asphaltic
340 08/15/88 Page 15 Concrete Pavement
340.10 Measurement
Method A
as agreed by Engineer. Overlays to be a thickness not less than 1
inch. Overlays to require milling of asphalt adjacent to concrete
curb and gutters to maintain transverse profile.
Asphaltic concrete pavement to be measured by ton (2,000 pounds) of
asphaltic concrete pavement of type actually used in completed and
accepted work in accordance with plans and specifications. When
dryer -drum process is used, measurement of tonnage used to be made on
truck scales.
Method B
Asphaltic concrete pavement to be measured by square yard of specified
total thickness of type actually used in completed and accepted work in
accordance with plans and specifications. Multiple lifts will be
considered as one for square yard measurement purposes.
340.11 Payment
Work performed and materials furnished as prescribed by this item and measured
as provided under "Measurement" will be paid for at the'unit prices bid or
pay adjusted unit price for "Asphaltic Concrete Pavement ", of types and lifts
specified, which prices shall be full compensation for furnishing all
materials, freight involved; for all heating, mixing, hauling, cleaning
existing base course or pavement, saw cutting, placing asphaltic
concrete mixture, rolling and finishing, for all manipulations, labor, tools,
equipment, temporary pavement markings and incidentals necessary to complete
work. Correcting defective work and subsequent retesting shall be considered
subsidiary to Item No. 340, "Hot Mix Asphaltic Concrete Pavement ".
Prime coat, when required, will not be measured or paid for directly but shall
be considered subsidiary to Item No. 340, "Hot Mix Asphaltic Concrete
Pavement ", unless included as a separate pay item in Contract.
Tack coat, when required, will not be measured or paid for directly but shall
be considered subsidiary to Item No. 340, "Hot Mix Asphaltic Concrete
Pavement ", unless included as a separate pay item in Contract.
Templates, straightedges, scales and other weighing and measuring d.vices
necessary for proper construction, measuring and checking of work to be
furnished, operated and maintained by Contractor at his expense.
Saw cutting as indicated or as directed by Engineer will not
be measured or paid for directly, but to be considered subsidiary to Item No.
340, "Hot Mix Asphaltic Concrete Pavement ".
Hot Mix Asphaltic
340 08/15/88 Page 16 Concrete Pavement
Payment for work meeting specifications will be made under one of the
following:
End
Pay Item No. 340 -A: Hot Mix Asphaltic Concrete Pavement, Type - Per
Ton.
Pay Item No. 340 -AL: Hot Mix Asphaltic Concrete Pavement, Type ,
Level -up Course - Per Ton.
Pay Item No. 340 -AM: Hot Mix Asphaltic Concrete Pavement, Type ,
Make -up Course - Per Ton.
Pay Item No. 340 -B: Hot Mix Asphaltic Concrete Pavement, 2 In.,
Type D - Per Square Yard.
Ref: 206, 230, 232, 234, 236, 301, 306, 307, 864, 1804
Hot Mix Asphaltic
340 08/15/88 Page 17 Concrete Pavement
Item No. 401
Structural Excavation and Backf
Description
This Item shall consist of the excavation for the placing of structures, except pipe sewers, for the disposal of such excavated
material and for the backfilling around completed structures to the level of the original ground or grade Indicated. The work shall
include all necessary pumping or bailing, sheathing, drainage and the construction and removal of any required cofferdams.
Unless otherwise Indicated, the work included hereunder shall provide for the removal of old structures or portions thereof (abut-
ments, buildings, foundations, wingwalls, piers, etc.), trees and all other obstructions necessary to the proposed construction.
Where excavation is not classified, k will be grouped under "Unclassified Structural Excavation ", which shall Include the removal
of all materials encountered regardless of their nature or the manner In which they are removed. —
Where excavation is classified, it shall be classed as "Common Structural Excavation" or "Rock Structural Excavation" in accor-
dance with the following criteria:
"Common Structural Excavation" shall Include the removal of all materials other than rock.
"Rock Structural Excavation" shall include the removal of firm and compact materials that cannot be excavated with power
equipment, without first being loosened or broken by blasting, sledging or drilling.
401.2 Materials
(1) Sand
(a) Fine aggregate sand shall be Grade 1 conforming to Item No. 302, "Aggregates for Surface Treatments ".
(b) Native Sand shall be local material obtained from approved sources and subject to the approval of the
Engineer.
(2) Flexible Base
Flexible base shall conform to item No. 210, "Flexible Base ".
(3) Lime Stabilized Base
Lime stabilized base shall conform to Item No. 202, "Hydrated Lime and Lime Slurry' and Item No. 203, "Lime
Treatment for Materials in Place ".
(4) Concrete Base
Concrete base shall conform to Class J Concrete, Item No. 403, "Concrete for Structures ".
(5) Granular Material
(a) Coarse aggregate shall conform to Item No. 403, "Concrete for Structures ".
(b) Foundation Rock
Foundation rock shall be well graded, hard, durable coarse aggregate ranging in size from 2 to 6 inches.
(c) Pea Gravel
Pea gravel shall consist of hard, durable, opaque gravel, free of clay, loam, sand or other foreign substances,
• ranging in size from i/4 inch to % inch conforming to ASTM C 33.
(6) Cement Stabilized Rockfill
Cement Stabilized base shall conform to Class .1 Concrete, Item Na 403, "Concrete for Structures".
401.3 Construction Methods
(1) Excavation shall be done in accordance with the lines and depths indicated or as established by the Engineer. Un•
less otherwise indicated or permitted by the Engineer no excavation shall be made outside a vertical plane 3 feat
from the footing lines and parallel thereto.
(2) Excavation shall conform to elevations Indicated or raised or lowered by written order of the Engineer, when such
alterations are judged proper. When deemed necessary to increase or decrease the plan depth of footings, the al-
401 Rev. 09/30187
Page 1 Structural Excavation and Backfill
(3)
terations in the details of the structure shall be as directed by the Engineer. The Engineer shall have the right to
substitute revised details resulting from consideration of changes in the design conditions.
When a structure is to rest on an excavated surface other than rock, special care shall be taken not to disturb the
bottom of the excavation and the final excavation to grade shall not be performed until just before the footing is
placed. Equipment selected and used by the Contractor for excavation which disturbs what was otherwise stable
subgrade material, as shown by laboratory tests, will not be used as a justification for payment for excavating to
extra depth or for payment for stabilizing materials which may be ordered by the Engineer.
(4) Excavated matenal required to be used for backf ill may be deposited by the Contractor In storage piles as indicated
or at points convenient for its rehandling during the backfilling operations, subject to the approval of the Engineer,
who may require that the survey center line of the structure and the transverse or hub line of any unit of the structure
be kept free of any obstruction. The Contractor shall adjust any stockpiles, to facilitate surveying and the work of
other Contractors working in the immediate proximity, as directed by the Engineer.
Excavated material required to be wasted shall be disposed of as directed by the Engineer, in a manner which will
not obstruct the stream or otherwise impair the efficiency or appearance of the structure or other part of the work.
(5)
(6) For all single and multiple box culverts, pipe culverts, pipe arch culverts and box sewers of all types, where the soil
encountered at established footing grade is a quicksand. muck or similar unstable material, the following procedure
shall be used unless other methods are indicated:
(
(8)
401.4 Cofferdams
401 Rev. 09130187
The depth to which unstable material is removed will be determined by the Engineer. It will not exceed 2 feet
below the footing of culverts that are 2 feel or more in height and will not exceed the height of culverts for those
less than 2 feet high. Excavation shall be carried at Least 1 foot horizontally beyond the limits of the structure on
all sides. All unstable sod removed shall be replaced with suitable stable material, in uniform layers of suitable
depth for compaction as directed by the Engineer. Each layer shall be wetted, if necessary and compacted by
rolling or tamping as required to provide a stable foundation for the structure. Soil which has sufficient stability
to properly sustain the adjacent sections of the roadway embankment will be considered a suitable foundation
material.
When, in the opinion of the Engineer, it is not feasible to construct a stable footing as outlined above, the
Contractor shall construct it by the use of special matenals, such as flexible base, cement stabilized base,
cement stabilized backfill or other material. as directed by the Engineer. This work will be paid for as provided
below.
Special materials used or additional excavation made for the Contractor's convenience to expedite the work
will not be paid for directly. but shall be subsidiary to the various classes of structural excavation. In addition, if
the Contractor's construction methods and equipment creates conditions necessitating usage of special mate -
nals or additional excavation, the work and materials will not be paid for directly, but shall be subsidiary to the
various classes of structural excavation.
When the material encountered at footing grade of a culvert Is found to be partially rock or incompressible material
and partially a compressible soil which is satisfactory for the foundation, the incompressible material shall be re-
moved for a depth of 6 inches below the looting grade and backfilled with a compressible material similar to that
used for the rest of the structure.
When the material encountered at footing grade of a bridge bent or pier is found to be partially of rock or in-
compressible material and partially of a compressible material. the foundation shall not be placed until the Engineer
has inspected the footing and authorized such changes found necessary to provide an adequate foundation.
The term cofferdams, whenever used in this specification, designates any temporary or removable structure constructed to hold
the surrounding earth, water or both, out of the excavation, whether the structure is formed of earth, timber, steel, concrete or a
combination of these. It includes earthen dikes, timber cribs, any type of sheet piling, removable steel shells and the like and all
necessary bracing and it shall be understood also to include the use of pumping wells or well points for the same purpose. The
cost of cofferdams. when required, shall be included as a part of the bid price for excavation.
It is the intent of this specification to require that a suitable cofferdam which will provide a safe work area be provided for all
excavation when necessary in order to control water so that the foundation may be placed in a dry condition, as to preclude
sliding and caving of the walls of the excavation. Where no ground or surface water is encountered, the cofferdam need be
sufficient only to protect the workmen and to avoid cave -ins or slides beyond the excavation limits.
The type, strength and clearance of cofferdams, insofar as such details affect the character of the finished work and the safety of
laborers and inspectors working therein, will be subject to review by the Engineer. but the Engineer's review shall in no way
relieve the Contractor of responsibility for the adequacy and safety of the cofferdam design. Other details or design will be left to
the choice of the Contractor, who will be responsible for the successful completion of the work. Approval of the drawings by the
Engineer will not relieve the Contractor of responsibility in any manner. The interior dimensions of cofferdams shall provide suffi-
Page 2 Structural Excavation and Sankt ill
dent clearance for the construction and removal of any required forms and the inspection of their exteriors and to permit pumping
outside 01 the forms.
Unless otherwise indicated, cofferdams shall be removed by the Contractor after the completion of the substructure without
disturbing or marring the structure.
401.5 Pumping or Balling
The manner of pumping or bailing from the interior of any foundation enclosure shall preclude the possibility of the movement of
water through or alongside any concrete being placed. No pumping or bailing will be permitted during the placing of concrete or
for a period of at least 24 hours thereafter, unless from a suitable sump separated from the concrete work by a water -tight wall.
401.6 Backfilling
(1) General
As soon as practicable, all portions of excavation not occupied by the permanent structure shall be backfilled. Back -
fill material shall be free from large or frozen lumps, wood or other extraneous material.
That portion of backfill which will not support any portion of completed roadbed or embankment shall be placed in
layers not more than 10 inches in depth (loose measurement) and shall be compacted to a minimum of 95 percent of
maximum density as determined by SDHPT Test Method Tex -114 -E and then re- excavated to the proper grade and
dimensions.
If the excavation has been made through a hard material resistant to erosion, the backfill around piers and in front of
abutments and wings may be ordered by the Engineer to be of stone or lean concrete. Unless otherwise indicated,
such backfill shall be paid for as extra work.
That portion of the backfill which will support any portion of the roadbed or embankment shall be placed in uniform
layers not more than 10 inches In depth (loose measurement) and shall be compacted to a minimum of 95 percent of
maximum density as determined by SDHPT Test Method Tex - 114 -E and then re- excavated to the proper grade and
wetted uniformly to the moisture content required to obtain the specified density and shall be compacted to that
density by means of mechanical tampers or rammers, except that the use of rolling equipment of the type generally
used in compaction embankments will be permitted on portions which are accessible to such equipment. All portions
of embankment too close to any portion of a structure to permit compaction by the use of the blading and rolling
equipment used on adjoining sections of embankment, shall be placed and compacted In the same manner as
specified above for backfill material. These provisions require the mechanical compaction by means of either rolling
equipment or mechanical tampers or rammers, of all backfill and embankment adjoining the barrels and wingwalls
or culverts and adjoining all sides of bridge abutments and retaining walls, regardless of whether or not such em-
bankments or backfill is above or below the original surface of the ground and regardless of whether the excavation at
structure site was performed conforming to Item Na 111, "Excavation, this item, "Structural ExcavatloM, Item Na 110,
'Street Excavatiorf or Item Na 120, "Channel Excavation*. Unless otherwise Indicated, hand tamping will not be ac-
cepted as an alternate for mechanical compaction. As a general rule, material used In filling or backfilling the por-
tions described In this paragraph shall be an earth, free of any appreciable amount of gravel or stone particles larger
than 4 Inches In greater dimension and of a gradation that permits thorough compaction. When, In the opinion of
the Engineer, such material is not readily available, the use of rock or gravel mixed with earth will be permitted, provided
that no particles larger than 12 Inches or smaller than 6 lnches may be used. The percentage of fines shall be suffi-
cient to fill voids and insure a uniform and thoroughly compacted mass of proper density. When required by the plans
or by written order of the Engineer, cement stabilized material shall be used for backfilling.
All portions of fill and backfill described In the preceding paragraph shall be compacted to the same density require-
ments specified for the adjoining sections of embankment in accordance with the goveming specifications therefor.
Where no embankment is involved on the project and no specifications therefore are included in the contract, all
backfill shall be compacted to a density comparable with the adjacent undisturbed material.
No backfill shall be placed against any abutment or retaining wall until such structure has been in place at least 7
days. No backlit' shall be placed adjacent to or over single and multiple boxes until the top slab has attained 500 psi
flexural strength. Backfill placed around abutments and piers shall be deposited on both sides to approximately the
same elevation at the same time.
Care shall be taken to prevent any wedging action of backlit' against the structure and the slopes bounding the
excavation shall be stepped or serrated to prevent such action.
(2) Plpe Culverts
The following requirements shall apply to the backfilling of pipe culverts in addition to the pertinent portions of the
general requirements given in the preceding section.
401 Rev. 09/30187 Page 3 Structural Excavation and Backfill
(3)
(
(5)
401 Rev. 09/30187
Selected materials from excavation, borrow or other approved material shall be wetted, it required and placed along
both sides of the pipe equally, in uniform layers not exceeding 6 inches in depth (loose measurement) and thor-
oughly compacted so that there shall be a berm of thoroughly compacted material on each side of the pipe. The
method and degree of compaction shall be the same as specified above for portions of backfill within the limits of
embankment or roadbed.
Filling and/or backfilling shall be continued in this manner to the elevation of the top of the pipe. Special care shall be
taken to secure thorough compaction of the material placed under the haunches of the pipe. All fill or backlit' below
the top of pipe shall be compacted mechanically In the manner and to the density prescribed above, regardless of
whether or not such material is placed within the limits of the embankment or roadbed. In the case of pipe placed in
trenches. that portion of the backlit' above the top of the pipe which supports embankment or the roadbed shall
receive mechanical compaction as specified above and the portion which will not support any portion of embank-
ment or roadbed shall be placed in layers not more than 10 inches in depth (loose measurement) and shall be com-
pacted by whatever means the Contractor chooses, to a density comparable with the adjacent, undisturbed matenal.
Embankments alone the top of pipe shall be placed conforming to Item No. 132, "Embankments". During construction
adequate cover must be provided to protect the structure from damage.
Whenever excavation is made for installing pipe culverts or box sewers across private property or beyond the limits
of the embankment. the top soil removed in excavating the trench shall be kept separate and replaced as nearly as
feasible in its original position and the entire area involved in the construction operations shall be restored to a pre-
sentable condition.
Cement Stabilized Backffil
When indicated, trenches shall be backfilled to the elevations shown with Cement Stabilized Backlit'.
Cement Stabilized Backfill below the spring line of pipe culverts shall be sufficiently plastic to completely fill all voids
in the trench. The pipe shall be held in alignment by jacks or other suitable means to prevent the mortared joints from
cracking due to displacement caused by placing the backlit! material.
Cement Stabilized Backfill above the spring line of pipe culverts may be dry enough to be transported without special
mixing equipment.
On structures other than pipe culverts. special mixing equipment will not be required to transport the cement stabi-
lized backfill unless otherwise indicated.
Hand - operated mechanical tampers may be used with approval of the Engineer for compacting this backfill.
401.7 Measurement
Unless otherwise indicated. structural excavation for pipe headwalls. inlets, manholes, culvert widening (extensionsj, bndge
abutments and side road and private entrance pipe culverts will not be measured but shall be considered subsidiary to the
various bid items. Determination of quantities for structural excavation shall be made by the method of average end -areas using
the following limits to establish templates for measurement.
For all structures requiring measurement, except the barrels of pipe culverts, no material outside of vertical planes
1 foot beyond the edges of the footings and parallel thereto will be included.
(2) For the barrels of pipe culverts o142 inches or less nominal or equivalent diameter. no material outside of vertical
planes 1 foot beyond the horizontal projection of the outside surfaces of the pipe and parallel thereto will be included.
For the barrels of pipe culverts more than 42 inches in nominal or equivalent diameter, no material outside of vertical
planes located 2 feet beyond the horizontal projection of the outside surfaces of the pipe and parallel thereto will be
included.
(3) If a cofferdam, as herein defined, is used, the 'Imitations indicated above shall apply just as if no cofferdams were
used.
(4) Where excavation in addition to that allowed for the footings is required for other portions of the structure, such as for
the cap, cross strut or tie beam of a pier or bent or for the superstructure, measurements for such additional excava-
tion will be limited laterally by vertical planes 1 foot beyond the face of the member and parallel thereto and vertically
to a depth of 1 foot below the bottom of such member.
Except as allowed by the above conditions, no account will be taken of any excavation necessary for placing fors
or falsework.
(6) Except at side road culverts, all street excavation called for on the contract plans at all structure sites shall be as-
sumed to be completed before starting the structural excavation and the measurement of structural excavation will
include only material below or outside the limits of the completed street excavation. Excavation for side road and
private entrance pipe culverts will not be measured for payment but shall be subsidiary to the Item.
Page 4 Structural Excavation and Backfill
(7) On all structures of bridge classification where the contract plans call for channel excavation at the structure site, it
shall be assumed to have been completed before starting the structural excavation and the measurement of struc-
tural excavation will include only material below or outside the limits of the completed channel s ection. The method
of measurement tor payment will be in accordance with this procedure regardless of the actual construction methods
followed.
Where excavation diagrams are indicated, they shall take precedence over these provisions.
Measurement wit not include materials removed below footing grades to compensate for anticipated swellage due to
pile driving and it will not include material required to be removed due to swellage beyond the specified limits during
pile driving operations.
(10) Measurement will not include additional yardage caused by slips, slides, cave -ins, sittings or fillings due to the action
of the elements or the carelessness of the Contractor. Water will not be classed as excavated material.
(11) Where rock, other incompressible or unstable material is undercut to provide suitable foundation for pipe or box
culverts, such material below grade, ordered by the Engineer to be removed, will be measured for payment.
(12) Except for any required undercut, quantities for "Structural Excavation ", as indicated, shall be considered as final
quantities and no further measurement will be required, unless the alignment, grades or structure locations are re-
vised by the Engineer during construction. Final determination of quantities for individual structures will be made, if
in the opinion of the Engineer or upon evidence furnished by the Contractor, substantial variations exist between
quantities indicated and actual quantities due to changes in cross sections or apparent errors. Excavation quantities
for foundations indicated where cofferdams are required shall be considered as final quantities and no further mea-
surement will be made.
(8)
(9)
(13) For any footing, foundation or other structure unit within the scope of this specification, additional measurement will
be made of the volume of excavation involved in the lowering or raising of the elevation of a footing, foundation or
structure unit; when such grade change Is authorized by the Engineer. Measurement will be made by the addition to
or the deduction from, the original quantities for the volume of excavation involved In the authorized grade change.
(14) Cement stabilized backfill shall be measured by the backfill diagram as indicated. The quantity of "Cement Stabi-
lized Backfill" as indicated shall be considered as final quantities and no further measurement will be required, un-
less alignment or grade elevations as indicated are revised by the Engineer. If such revisions result in an increase or
decrease In this quantity, the final quantity will be revised by the amount represented by the changes in alignment or
grade elevations.
401.8 Payment
Payment for all work prescribed under this item and measured as provided above will be made at the unit price bid per cubic yard
for the particular class of excavation specified on the plans in the amount shown on the plans and in the proposal. Payment for
revised quantities will be made as specified above and for the removal of unstable and incompressible material as noted below.
Payment for removal and replacement of unstable or incompressible material below the footing grades of culverts and box
sewers as indicated above will be made as follows:
When indicated or the Engineer directs the use of special materials such as flexible base, cement stabilized base, cement
stabilized backfill or other special material, payment for excavation below the footing grades shall be made at the unit price
bid for "Unclassified Structural Excavation ", "Common Structural Excavation" or "Rock Structural Excavation ", as the
case may be. Payment for tumishing, hauling, placing and compacting the flexible base, cement stabilized base, cement
stabilized backfill or other special material will be made at the unit price bid for these items In the bid or In accordance with
pertinent provisions for extra work.
Where special materials are not required or specified, the removal and replacement of the unstable material will be per-
formed as descnbed above. Payment therefore will be made at a price equal to 200 percent of the unit price bld per cubic
yard for "Unclassified Structural Excavation ", "Common Structural Excavation" or "Rock Structural Excavation ", as the
case may be, which price shall be full compensation for removing the unstable or Incompressible material, furnishing,
hauling, placing and compacting suitable material required to replace it and for all labor, equipment, tools and incidentals
necessary to complete the work.
Payment for "Concrete Base" and "Cement Stabilized Backfill" measured as prescribed above shall be made at the unit price bid
per cubic yard of "Cement Stabilized Backfill ". Such payment shall be full compensation for tumishing all materials, tools, labor,
equipment, sheathing and incidentals required to perform the applicable work prescnbed herein.
Should the Engineer judge it necessary to lower the structure footings to an elevation below the grade indicated, payment for the
"Unclassified Structural Excavation ", "Common Structural Excavation" or "Rock Structural Excavation" as the case may be,
required below plan grade down to and including an elevation 5 feet below plan grade for any individual footing will be made at a
unit price equal.to 115 percent of the contract unit bid price. Payment for the excavation from an elevation over 5 feet below plan
grade down to and including an elevation 10 feet below plan grade will be made at a unit price equal to 125 percent of the
401 Rev. 09130187
Page 5 Structural Excavation and Backfill
contract unit bid price for "Unclassified Structural Excavation", "Common Structural Excavation" or' Rock Structural Excavation"
as the case may be. No increase in unit price will be allowed for other bid items of the contract and no additional compensation
will be allowed for any required cofferdam adjustments made necessary by such lowering of footings. These provisions shall not
apply to the lowering of culverts, except when the flow line grade is lowered 1 foot or more below plan grade.
In cases where the extra depths required for any footing or footings exceeds 10 feet, a supplemental agreement shall be made
covenng the quantities removed from depths in excess of 10 feet below plan grade.
No direct payment will be made for filling or backfilling around structures. Payment for the backfilling and compacting of areas
which were removed as structural excavation shall be included in the unit prices bid for the various classes of structural
excavation.
At the end of each estimate period, the Engineer shall determine the completed portion of the total work under Item No. 401
"Structural Excavation and Backfilr" and payment shall be made accordingly.
Filling or backfilling of areas above the natural ground level or above the limits of street excavation or channel excavation sections
shall be considered as Item Na 132, 'Embankment' and payment therefore shall be Included In the unit prices bid for the various
classes of Item Na 110, "Street Excavation; Item Na 120, "Channel Excavation" or Item Na 130, 'Borrow':
Where no channel excavation is provided for at culvert sites and where it is necessary to excavate beyond the limits of structural
excavation, as herein described in order that the culvert may function properly, such excavation shall be included with structural
excavation or shall be subsidiary to structural excavation and bac>dill as may be indicated.
Payment for all work prescribed under this item shall be full compensation for all excavation and backfill including compaction, all
soundings, constructing all cofferdams, all dewatering and for fumishing all materials, labor, equipment, tools, sheathing, brac•
ing, cofferdams, pumps, drills, explosives and incidentals necessary to complete the work, except for specific allowances stated
above.
Ref: 110, 111, 120, 130, 132, 202, 203, 210, 302, 210, 403
No separate payment will be made for this item.
End
403.1 Description
This item to consist of the quality of concrete materials, storing and
handling of these materials and for the proportioning and mixing of
concrete for buildings, bridges, culverts, slabs, prestressed concrete and
incidental concrete construction.
Concrete shall be composed of Portland Cement, aggregates (fine and
coarse), admixtures if desired or required and water, proportioned and
mixed as hereinafter provided. Accelerating admixtures will not be
permitted without express approval of Engineer /Architect.
403.2 Materials
(1) Cement
(2) Hixing Water
Water for use in concrete and for curing to be potable water free
from oils, acids, organic matter or other deleterious substances
and shall not contain more than 1,000 parts per million of
chlorides as Cl nor more than 1,000 parts per million of sulfates
as SO
The Contractor may request approval of water from other sources.
The Contractor to arrange for samples to be taken from the source
and tested at his expense. Tests to be made conforming to
AASHTO Method T 26, "Standard Method of Test for Quality of Water
to be used in Concrete" except where such methods are in conflict
with provisions of this specification.
(3)
Coarse Aggregate
Item No. 403
Concrete for Structures
Portland Cement to conform to ASTM C 150, Type I (General
Purpose), Type II (General Purpose with moderate sulfate
resistance) and Type III (High Early Strength).
Either Type I or II cement to be used unless Type II is indicated.
Except when Type II is indicated, Type III cement may be used when
the anticipated air temperature for the succeeding 12 hours will
not exceed 60 F. Type III cement may be used in all precast
prestressed concrete except in piling when Type II cement is
required for substructure concrete. All cement used in a
monolithic placement to be of the same type.
Coarse aggregate to consist of durable particles of gravel,
crushed blast furnace slag, crushed stone or combinations thereof;
free from frozen material or injurious amounts of salt,
alkali, vegetable matter or other objectionable material either
free or as an adherent coating and its quality shall be reasonably
uniform throughout. It shall not contain more than 0.25 percent
403 06/10/88 1 Concrete for Structures
by weight of clay lumps, nor more than 1.0 percent by weight of
shale nor more than 5 percent by weight of laminated and /or
friable particles when tested conforming to SDHPT Test Method
Tex - 413 -A. It shall have a wear of not more than 40 percent when
tested conforming to SDHPT Test Method Tex - 410 -A.
Unless otherwise indicated, coarse aggregate may be subjected to
5 cycles of the soundness test conforming to SDHPT Test Method
Tex - 411 -A. The loss shall not be greater than 12 percent when
'sodium sulfate is used or 18 percent when magnesium sulfate is
used.
Permissible sizes and gradation of aggregate to be governed by
Tables 1, 2 and 4. Except when exposed aggregate surfaces are
required, coarse aggregate gradation will be as indicated.
When tested by approved methods, coarse aggregate,
including combinations of aggregates when used, to conform to
grading requirements shown in Table 1.
(4) Fine Aggregate
Table 1
Coarse Aggregate Gradation Chart
Aggregate Nominal Percent Retained on Each Sieve
Grade No. Size 2 1/2" 2" 1 1/2" 1" 3/4" 1/2" 3/8" No. 4 No.8
1 2 1/2 0 0 -20 15 -50 60 -80 95 -100
2 (467)* 1 1/2 0 0 - 30 -65 70 -90 95 -100
3 1 0 0 -5 10 -40 40 -75 95 -100
4 (57)* 1 0 0 -5 40 -75 90 -100 95 -100
5 (67)* 3/4_ 0 0 -10 45 -80 90 -100 95 -100
6 (7) * 1/2 0 0 -10 30 -60 85 -100
7 3/8 0 5 -30 75 -100
8 No. 4 0 0 -5 35 -60 90 -100
* Numbers in parenthesis indicate that these gradations conform to ASTM C
33.
Aggregate shall be washed. The Loss by Decantation (SDHPT Test
Method Tex - 406 -A), plus allowable weight of clay lumps, shall not
exceed 1 percent or value indicated, whichever is smaller.
If material finer than the 200 sieve is definitely established to
be dust of fracture of aggregates made primarily from crushing of
stone, essentially free from clay or shale as established by SDHPT
Test Method Tex - 406 -A, the percent may be increased to 1.5.
Fine aggregate to consist of clean, hard, durable and uncoated
particles of natural or manufactured sand or a combination
thereof, with or without a mineral filler. It is to be free from
frozen material or injurious amounts of salt, alkali, vegetable
403 06/10/88 2 Concrete for Structures
matter or other objectionable material and it shall not contain
more than 0.5 percent by weight of clay lumps. When subjected to
color test for organic impurities SDHPT Test Method Tex - 408 -A, it
shall not show a color darker than standard.
Fine aggregate to produce a mortar having a tensile strength equal
to or greater than that of Ottawa sand mortar when tested
conforming to SDHPT Test Method Tex - 317 -
Acid insoluble residue of fine aggregate used in slab concrete
subject to direct traffic shall not be less than 28 percent by
weight when tested conforming to SDHPT Test Method Tex - 612 -J.
When tested by approved methods, fine aggregate or combinations of
aggregates including mineral filler to conform to grading
requirements shown in Table 2.
Table 2
Fine Aggregate Gradation Chart
Aggregate Percent Retained on Each Sieve
Grade No. 3/8" No. 4 No. 8 No. 16 No. 30 No. 50 No. 100 No. 200
1 0 0 -5 0 -20 15 -50 35 -75 65 -90 90 -100 97 -100
NOTE 1: Where sand equivalent is greater than 85, retainage on No. 50
sieve may be 65 to 94 percent.
NOTE 2: Where manufactured sand is used in lieu of natural sand, the
percent retained on No. 200 sieve shall be 94 to 100.
Fine aggregate will be subjected to Sand Equivalent Test SDHPT
Test Method Tex - 203 -F. Sand equivalent shall not be less than 80
nor less than value indicated, whichever is greater.
For Class A, C, E and F Concrete, fineness modulus as defined
below for fine aggregates to be between 2.30 and 3.10 for grade 1
only.
For Class H Concrete, fineness modulus of fine aggregates to be
between 2.40 and 2.90.
Fineness modulus will be determined by adding the percentages by
weight retained on the following sieves and dividing by 100; Nos.
4,8, 16, 30, 50 and 100.
(5) Mineral Filler
Mineral filler to consist of stone dust, clean crushed sand or
other approved inert material.
403 06/10/88 3 Concrete for Structures
(6) Mortar (Grout)
Mortar for repair of concrete to consist of 1 part cement, 2 parts
finely graded sand and enough water to make the mixture plastic.
When required to prevent color difference, white cement shall be
added to produce color required. When required by
Engineer /Architect, latex adhesive to be added to mortar.
(7) Admixtures
Calcium chloride will not be permitted. Air entraining,
retarding and water reducing admixtures may be used in all
concrete and to conform to requirements of Item No. 405, "Concrete
Admixtures ".
403.3 Storage of Cement
Cement to be stored in well ventilated, weatherproof buildings or approved
bins which will protect it from dampness or absorption of moisture.
Storage facilities to be ample and each shipment of packaged cement to be
kept separated to provide easy access for identification and inspection.
Engineer /Architect may permit small quantities of sacked cement to be
stored in the open for a maximum of 48 hours on a raised platform and under
waterproof covering.
403.4 Storage of Aggregate
Method of handling and storing concrete aggregate to prevent
contamination with foreign materials. If aggregates are stored on ground,
sites for stockpiles to be clear of all vegetation. Bottom 6 inch layer of
aggregate not to be disturbed or used without recleaning.
When conditions require use of 2 or more sizes of aggregates, they shall be
separated to prevent intermixing. Where space is limited, stock piles
to be separated by physical barriers.
Methods of handling aggregates during stockpiling and subsequent use to be
such that segregation will be minimized.
Aggregate to be stockpiled at least 24 hours to reduce the free
moisture content.
403.5 Measurement of Materials
Measurement of materials, except water, used in batches of concrete to be
by weight or an accurate volumetric measuring method approved by
Engineer /Architect. Fine aggregate, coarse aggregate and mineral filler
to be weighed separately. Where bulk cement is used it shall be weighed
separately but batch weighing of sacked cement will not be required. Where
sacked cement is used, quantities of material per batch to be based upon
using full bags of cement. Batches involving use of fractional bags will
not be permitted. .
403 06/10/88 4 Concrete for Structures
Allowances shall be made for water content in aggregates.
Bags of cement varying more than 3 percent from the specified weight of 94
pounds may be rejected and when the average weight per bag in any
shipments, as determined by weighing 50 bags taken at random, is less than
the net weight specified, the entire shipment may be rejected. If shipment
is accepted, Engineer will adjust the concrete mix to a net weight per bag
fixed by an average of all individual weights which are less than the
average weight determined from total number weighed.
403.6 Classification and Mix Design
Contractor to furnish mix design, using a Coarse Aggregate Factor
acceptable to Engineer, for class(es) of concrete specified. Mix shall be
designed by a qualified commercial laboratory to conform with requirements
contained herein and conforming to SDHPT Bulletin C -11 and supplements •
thereto. Contractor to perform, at his own expense, the work required to
substantiate the design, including testing of strength specimens. Complete
concrete design data to be submitted to Engineer for approval. Mix design
will be valid for a period of 1 year and to be re- established for projects
which extend beyond the 1 year period or when there is a change in
materials.
Contractor to determine and measure batch quantity of each ingredient,
including all water, not only for batch designs but for all concrete
produced for the project so that the mix conforms to these specifications
and any other requirements indicated. In lieu of the above mix design
responsibility, Contractor may request approval of a current design
previously accepted by the City, if it can be shown that no substantial
change in any ingredients has been made. However, this will not relieve
Contractor of responsibility of providing concrete meeting the requirements
of these specifications.
Coarse aggregate factor shall not be more than 0.82 except that when voids
in the coarse aggregate exceed 48 percent of total dry loose volume, coarse
aggregate factor shall not exceed 0.85. Coarse aggregate factor shall not
be less than 0.68.
If strength required for the class of concrete being produced is not
secured with cement specified in Table 4, Contractor may use an approved
water reducing and retarding admixture or he shall furnish aggregates with
different characteristics which will produce required results. Additional
cement may be required or permitted as a temporary measure until redesign
is checked.
Approved water reducing or retarding agents may be used with all classes of
concrete at option of Contractor and will be required for hot weather
concreting and for continuous slab placement. Agents to conform to Item
No. 405, "Concrete Admixtures" and Item No. 410, "Concrete Structures ".
When a retarding admixture is required for hot weather concreting, the
amount to be used to conform to Item No. 405, "Concrete Admixtures ". When
used in continuous slab placement, the amount to be used will be
established by several trial batches with varying retarder content and
403 06/10/88 5 Concrete for Structures
simulating placing conditions to be encountered. When water reducing or
retarding agents are used at option of Contractor, reduced dosage of
admixture will be permitted.
Entrained air to conform to Table 4. Concrete to be designed to entrain 5
percent air when Grade 2 coarse aggregate is used and 6 percent when Grade
3 coarse aggregate is used. Concrete as placed in the structure shall
contain the proper amount as required above with a tolerance of + 1 1/2
percentage points. Variations beyond this tolerance may be cause for
rejection.
403.7 Consistency
Consistency of concrete as placed should allow completion of all finishing
operations without addition of water to surface. When field conditions are
such that additional moisture is needed for final concrete surface
finishing operation, required eater to be applied to surface by fog spray
only and to be held to a minimum. Concrete to be workable, cohesive,
possess satisfactory finishing qualities and of stiffest consistency that
can be placed and vibrated into a homogeneous mass within slump
requirements specified in Table 3. Excessive bleeding to be avoided.
Slump values to conform to SDHPT Test Method Tex - 415 -A.
Table 3
Slump Requirements
Type of Construction Slump, inches
Maximum Minimum
Piers and Cased Drilled Shafts 4 3
Reinforced foundation caissons and footings 3 1
Reinforced footings and substructure walls 3 1
Uncased Drilled Shafts 6 5
Thin - walled Sections 5 4
(9 inches or less)
Prestressed Concrete Members 5 4
Precast Drainage Structures 6 4
Wall Sections over 9 inches 4 3
Reinforced building slabs, beams, columns
and walls 4 1
Bridge Decks 4 2
Pavements
Fixed -form 2
Slip -form 1 1/2 1/2
1.
403 06/10/88 6 Concrete for Structures
Sidewalks, driveways and slabs on ground 4 2
Curbs & gutters
Hand- vibrated 3 1
Hand- tamped or spaded 4 2
Slip -form /extrusion machine 2 1/2
Heavy mass construction 2 1
High strength concrete 4 3
Riprap and other miscellaneous concrete 6 1
Under water or seal concrete 6 5
NOTE: No Concrete will be permitted with slump in excess of maximums shown
unless water reducing admixtures have previously been approved.
403.8 Quality of Concrete, General
Concrete to be uniform and workable and of a consistency acceptable to
Engineer /Architect. Cement content, maximum allowable water /cement ratio,
minimum and maximum slump, proper amount of entrained air and strength
requirements of various classes of concrete to conform to Tables 3 and 4
and as required herein. Contractor to provide concrete meeting these
requirements. Test beams or cylinders to be required for each monolithic
placement of bridge decks or superstructures, top slabs of direct traffic
culverts, cased drilled shafts, structural beams and otherwise as directed
by Engineer /Architect for "design strength" or early form removal.
Requirement for early removal or opening will be at Contractor's expense,
except when early opening or removal is required by Engineer /Architect and
specified in Item No. 410, "Concrete Structures ".
During progress of the work, Engineer /Architect, City's testing laboratory
or in absence of above, Contractor to cast test cylinders and /or beams as a
check on compressive and /or flexural strength of concrete actually placed.
Engineer /Architect or City's testing laboratory may also perform slump
tests, entrained air tests and will make temperature checks as required, to
insure compliance with specifications.
Test beams or cylinders will be required for small placements on structures
such as manholes, inlets, culverts, wingwalls, etc. Engineer /Architect may
vary the number of tests to a minimum of 1 for each 25 cubic yntds placed
over a several day period.
A strength test shall be defined as the average of breaking strength of 2
cylinders or 2 beams as the case may be. Specimens will be tested
conforming to SDHPT Test Method Tex -418 -A or Tex - 420 -A. If required
strength or consistency of class of concrete being produced cannot be
secured with minimum cement specified or without exceeding maximum
water /cement ratio, Contractor will be required to furnish different
aggregates, use a water reducing agent, an air entraining agent or increase
cement content in order to provide concrete meeting these specifications.
403 06/10/88 7 Concrete for Structures
Contractor may request beam or cylinder tests for removal of forms and /or
falsework at his own expense. Test specimens to be cured using the same
methods and under the same conditions as the concrete represented.
"Design Strength" beams and cylinders to be cured conforming to SDHPT
Bulletin C -11 and Supplement thereto.
When control of concrete quality is by 28 day compressive tests, job
control will be by 7 day flexural or compressive tests which are shown to
provide the required 28 day strength, based on results from trial batches.
Thereafter, if the required 7 day strength is not secured with the quantity
of cement specified in Table 4, changes in the batch design will be made as
specified in this item.
Table 4
Classes of Concrete
Class Min. Comp. Min. Beam Max. Water Coarse
of Sk. Cement Strength (f'c) Strength Cement Agg.
Conc. per C.Y. 28 Day psi 7 Day psi Ratio No.
A* 5.0 3000 #500 6.5 2 -3 -4 x
B 4.0 2000 300 8.0 2 -3 -4 x
C* 6.0 3600 #600 6.0 1 -2 -3 **
D 4.5 2500 #425 7.5 2 -3 -4 x
E 6.0 3000 500 7.0 2 -3
F* 6.0 to 8.0 As indicated f'c 5.5 2 -3
6
H * ** 6.0 to 8.0 As indicated N.A. 5.5 3
I 5.5 3500 575 6.2 2 -3 -4 x
J 2.0 800 2 -3 -4
K 3.0
L 5.0 5000
M 6.0 5000
N 5.5 5000 6.0 3
* Entrained Air (Slabs, piers and bent concrete)
** Grade 1 coarse Aggregate may be used in foundation only (except
cased drilled shafts).
* ** Entrained Air for slab concrete.
# When Type II Cement is used with Class C Concrete, the 7 dny beam
break requirement will be 550 psi; with'Class A, 460 psi. minimum.
X Permission to use grade 4 aggregate must have prior approval of
the Engineer.
Concrete placed in' bridge deck shall not have a temperature in excess of 85
F at time of placement.
403.9 Nixing Conditions
Concrete to be mixed in quantities required for immediate use. Any
403 06/10/88 8 Concrete for Structures
concrete which is not in place within limits outlined in item No. 410,
"Concrete Structures" shall not be used. Retempering of concrete will not
be permitted.
In threatening weather, which may result in conditions that will adversely
affect quality of concrete to be placed, Engineer shall notify Contractor
in writing that placement of work may not meet specifications and any work
placed may have to be removed and replaced. Where work has been started
and changes in weather conditions require protective measures, Contractor
to furnish adequate shelter to protect concrete against damage from
rainfall or from freezing temperatures as outlined in Item No. 410,
"Concrete Structures ". If necessary to continue operations during
rainfall, Contractor to also provide protective coverings for the material
stockpiles. Aggregate stockpiles need to be covered only to extent
necessary to control moisture conditions in aggregates to adequately
control consistency of concrete.
403.10 Mixing and Mixing Equipment
All equipment, tools and machinery used for hauling materials and
performing any part of the work to be maintained in such condition to
insure completion of the work under way without excessive delays for
repairs or replacement.
Mixing to be done in a mixer of approved type and size that will
produce uniform distribution of material throughout the mass and shall be
capable of producing concrete meeting requirements of ASTM C 94,
Ready -mixed Concrete and these specifications.
Absolute volume of concrete batch not to exceed the rated capacity of the
mixer.
Mixing equipment to be capable of producing sufficient concrete to provide
quantities required to comply with Item No. 410, "Concrete Structures ".
Entire contents of drum to be discharged before any materials are placed
therein for succeeding batch.
Improperly mixed concrete not to be placed in structure.
Delivery of concrete to the site of the work and its discharge from mixer,
agitator or nonagitating equipment to conform to Item No. 410, "Concrete
Structures ".
Mixer may be batched by either volumetric method or by weighing and to be
equipped with a suitable timing device which shall lock the discharging
mechanism and signal when specified time of mixing has elapsed.
An adequate water supply and suitable metering devices to be provided.
Water tank to be arranged so that the amount of water can be measured in
gallons accurately. When tank starts to discharge, inlet supply shall cut
off automatically and remain off until container has emptied completely and
discharge line closed.
403 06/10/88 9 Concrete for Structures
The first batch of concrete materials placed in the mixer for each
placement to contain an extra quantity of sand, cement and water sufficient
to coat the inside surface of the drum.
Upon cessation of mixing for any considerable length of time, not
exceeding a maximum of 1 hour, the mixer shall be thoroughly cleaned.
(1)
Proportioning and Mixing Equipment
For all miscellaneous concrete placements, a mobile, continuous,
volumetric mixer or a volumetric or weight batch mixer of the
rotating paddle type may be used.
When approved by Engineer in writing or when specified for use,
these mixers may be used for other types of concrete construction,
including structural concrete, if the number of mixers furnished
will supply the amount of concrete required for the particular
operation in question.
These mixers shall be designed to receive all the concrete
ingredients, including admixtures, required by the mix design in
a continuous uniform rate and mix them to the required consistency
before discharging. They may be of the volumetric or weight batch
design. Mixers shall have adequate water supply and
metering devices.
For continuous volumetric mixers, the materials delivered during a
revolution of the driving mechanism or in a selected interval,
will be considered a batch and the proportion of each ingredient
will be calculated in the same manner as for a batch type plant.
Mixing time to conform to recommendations of manufacturer of mixer
unless otherwise revised by Engineer.
Calibration of these mixers will be required.
(2) Ready -mixed Concrete
Use of ready -mixed concrete will be permitted provided the
batching plant and mixer trucks meet requirements of quality
specified herein.
When ready -mixed concrete is used, additional mortar (1 sack
cement, 3 parts sand and sufficient water) shall be added to each
batch to coat the drum of the mixer or agitator truck. Delivery
of concrete to site of the work and its discharge from truck
mixer, agitator or nonagitating equipment shall conform to Item
No. 410, "Concrete Structures ".
Ready -mixed concrete, batching plant and mixer truck operation
to include the following:
(a) A ticket system will be used that includes a copy for
403 06/10/88 10 Concrete for Structures
(3)
403.12 Heasurement
Site -mixed Concrete
construction inspector. Ticket will have machine
stamped time /date of concrete batch, weight of cement,
sand and aggregates; exact nomenclature and
written quantities of admixtures and water. Any item
missing or incomplete on ticket may be cause for
rejection of concrete.
(b) Sufficient trucks will be available to support
continuous slab placements. Contractor will satisfy
Engineer that adequate standby trucks are available to
support monolithic placement requirements.
(c) A portion of mixing water, required by batch design to
produce specified slump, may be withheld and added at
the job site, but only with permission of Engineer and
under Inspector's observation. When water is added
under these conditions, it will be thoroughly mixed
before any slump or strength samples are taken.
Hand mixing of concrete to be permitted only for small placements
or in case of an emergency and then only on authorization of
Engineer. Hand -mixed batches shall not exceed a 2 bag batch in
volume.
Job mix concrete to be concrete mixed in an approved batch mixer,
conforming to requirements stated above, conveniently located to
structure for which concrete is being mixed and moved to placement
site in nonagitating equipment.
After required materials are in mixer, concrete to be mixed not
less than 50 seconds nor more than time indicated on
manufacturer's nameplate, measured from the time the last material
enters mixer to time discharge of concretebegins.
Concrete mixer to be equipped with an automatic timing device
which is put into operation when skip is raised to its full height
and dumping. This device shall lock the discharging mechanism and
prevent emptying of mixer until materials have been mixed together
for the minimum time required and it to ring a bell after
specified time of mixing has elapsed.
403.11 Excavation, Placing of Concrete, Finishing, Curing and Backfill
Excavation, placing of concrete, finishing, curing and backfill shall
conform to Item No. 401, "Structural Excavation and Backfill" and Item No.
410, "Concrete Structures ".
Quantities of concrete of the various classifications which will
constitute the completed and accepted structure or structures in place will
be measured by the cubic yard, each, square foot, square yard, linear foot
403 06/10/88 11 Concrete for Structures
or lump sum as the case may be. Measurement will be as follows:
(1) General
(a) Concrete quantities will be based on dimensions
indicated or those established in writing by
Engineer /Architect. Diafram concrete, when required, will be
included in slab measurement.
(b) In determining quantities, no deductions will be made for
chamfers less than 2 inches, embedded portions of structural
steel or prestressed concrete beams, piling, anchor bolts,
reinforcing steel, drains, weep holes, junction boxes,
electrical conduit, conduit and /or voids for prestressed
tendons or for embedded portions of light fixtures.
(c) For Pan Girder Spans, a quantity will be included for the
screed setting required to provide proper camber in the
roadway surface after form removal.
(d) For Slabs on Steel and Prestressed Beams, a quantity for the
haunch between slab and beams will be included when required.
No measurement will be made during construction for variation
in the amount of haunch concrete due to deviation from design
camber in the beams.
(e) For Slabs on Panels or T- Beams, the combination of span
length, theoretical camber in beams, computed deflections and
plan vertical curve will be taken into account in determining
the quantity for the slab.
Additional concrete, which may be required by an adjustment
of the profile grade line during construction to insure
proper slab thickness, will not be measured for payment.
(f) Quantities revised by a change in design, measured as
specified herein, will be increased or decreased, as the case
may be and included for payment.
(g) Variations in concrete headwall quantity incurred if an
alternate bid for pipe is permitted will not be measured for
payment.
(2) Plan Quantity
For those items specified for plan quantity payment, adequate
calculations have been made conforming to "General Conditions of
Agreement ". If no adjustment is required by this item, additional
measurements or calculations will not be required.
-403 06/10/88 12 Concrete for Structures
(3) Measured in Place
403.13 Payment
For those items not specified for plan quantity payment,
measurement will be made in place.
For all structural elements in unit price contracts specified for payment
when measured by the cubic yard, the quantity to be paid for will be actual
field measurements of the quantity indicated, except as may be modified by
the following:
Plan quantities will be adjusted:
(1) When a complete structure element has been erroneously included or
omitted from the plans, quantity shown on plans for that element
will be added to or deducted from plan quantity and included for
payment. A complete structure element will be the smallest
portion of a total structure for which a quantity is included on
plans. Quantities revised in this manner will not be subject to
provisions of "General Conditions of Agreement ".
(2) When plan quantity for a complete structure element is in error by
5 percent or more, a recalculation will be made and corrected
quantity included for payment. Quantities revised in this manner
will not be subject to provisions of "General Conditions of
Agreement ".
(3) When quantities are revised by a change in design, plan quantity
will be increased or decreased by the amount involved in the
design change. Quantities revised in this manner will be subject
to provisions of "General Conditions of Agreement ".
Payment for increased or decreased costs due to a change in design, on
those items measured in "Each ", by the "Square Foot ", "Square Yard" or
"Linear Foot" will be determined by provisions of "General Conditions of
Agreement ".
Payment for additional concrete required for slab on panel or T -beam
construction due to adjustment of profile grade line will not be made under
"Additional Work" as provided in "General Conditions of Agreement ".
Unit prices bid for various classifications of concrete shown shat] he full
compensation for furnishing, hauling and mixing all concrete material;
placing, curing and finishing all concrete; all grouting and pointing;
furnishing and placing drains; furnishing and placing metal flashing
strips; furnishing and placing expansion joint material required by this
item and for all forms and falsework, labor, tools, equipment and
incidentals necessary to complete the work.
403 06/10/88 13 Concrete for Structures
Payment vill be made under appropriate bid items where structural concrete
is used as indicated and included in the bid.
Box culverts shall be paid for under Item No. 559, "Box Culverts ".
Box culverts shall be paid under Item No. 559, "Box Culverts ". Wingwalls
for box culvert shall be paid under Item 414 -B, "Concrete Retaining Wall ".
End.
403 06/10/88 14 Concrete for Structures
Item No. 405
Concrete Admixtures
405.1 Description
This item shall consist of the materials used, methods of tests and construction methods for the use of admixtures in concrete.
405.2 Materials
(1) Alr Entraining Admixture
An "Air Entraining Admixture" is defined as a material which, when added to a concrete mixture in the correct quan-
tity. will entrain uniformly dispersed microscopic air. This admixture shall conform to ASTM C 260, modified as
follows:
(a) The cement used in any series of tests shall be either the cement proposed for specific work or a "refer-
ence" Type I cement from one mill.
(b) Unless otherwise indicated, the minimum relative durability factor shall be 80.
The air entraining admixture used in the reference concrete shall be high quality neutralized Vinsol Resin.
(2) Water - reducing, Retarding Admixture
A "Water- reducing, Retarding Admixture" is defined as a material which, when added to a concrete mixture in the
correct quantity, will reduce the quantity of mixing water required to produce concrete of a given consistency and will
retard the initial set of the concrete. This admixture shall conform to ASTM C 494. Type A or D, modified as follows:
(a) The water - reducing retarder shall retard the initial set of the plastic concrete a minimum of 2 hours and a
maximum of 4 hours when the materials are at a temperature of 90 F, the dosage rate specified by the
manufacturer.
(3)
(4)
(5)
405 Rev. 09130/87
(b) The cement used in any series of tests shall be either the cement proposed for specific work or a "refer-
ence" Type I cement from one mill.
(c) All concrete tested shall contain entrained air.
Water- reducing Admixture
A "Water- reducing Admixture" is defined asa material which, when added to a concrete mixture in the correct quan-
tity, will reduce the quantity of mixing water required to produce concrete of a given consistency and required
strength. This admixture shall conform to ASTM C 494, Type A.
Accelerating Admixture
An "Accelerating Admixture" is defined as an admixture that accelerates the setting time and the early strength
development of concrete. This admixture shall conform to ASTM C 494, Type C, modified as follows:
The accelerating admixture will contain no chlorides and shall be used in the liquid form only.
High -range Water Reducing Admixtures
A "High -range Water Reducing Admixture," referred to as a superplastersizer, is defined as a synthetic polymer
material which, when added to a low slump concrete mixture increases the slump without segregation, impermea-
bility and durability of the mix. This admixture shall conform to ASTM C 494. Type F or G. modified as follows.
(a) It shall reduce the required water by a minimum 0115 percent.
(b) It shall increase the 7 day compressive strength of the concrete by a minimum of 25 percent.
The admixture when added to the mix shall produce the following:
(a) Modify a low slump concrete, without the addition of water, to produce a slump which conforms to the
range indicated.
(b) It shall prevent a temperature rise of the mix above 100 F during high ambient conditions.
(c) It shall not increase the chloride content of the mix.
Page 1 Concrete Admixtures
405.3 Certification
The Contractor shall submit the name of the admixture proposed and manufacturer's certification that products selected meet
the requirements of this item and of ASTM C 260 and C 494 as required. 11 more than one admixture is proposed in the concrete
mix, a statement of compatibility of components shall accompany certification.
The Engineer /Architect may request additional Information to be submitted such as infrared spectrophotometry scan, solids con-
tent, pH value, etc., for further identification. A change in formulation discovered by any of the tests prescribed herein or other
means and not reported and retested, may be cause to permanently bar the manufacturer from furnishing admixtures for Owner's
work.
The Owner reserves the right to perform any or all of the tests required by ASTM C 260 and C 494 as a check on the tests reported
by the manufacturer. In case of any variance, the Owner tests will govem.
405.4 Approval of Admixtures
The Engineer /Architect shall approve all admixtures and dosage. Approval of admixtures shall be based on previous perfor-
mance of the admixture. The dosage will be determined from the manufacturers recommendations, tnal mixes or current job
approved mix designs, if it is shown that no substantial change in any of the proposed ingredients has been made.
Should the Contractor desire to change the admixture or dosage approved during the progress of the work, the Contractor shall
perform trial mixes at his own expense and submit the new mix design for approval.
405.5 Construction Use of Admixtures
No concrete shall be delivered to the project until the mix design is approved. All concrete delivered shall conform to the ap-
proved job mix formula. Unless otherwise indicated, all concrete shall be air entrained. All admixtures will be added at the Batch
Plant. All admixtures shall be in the liquid state. No admixtures shall be dispensed on dry aggregates. Each admixture shall be
dispensed separately, but at the same time as the mixing water.
An approved job mix formula for normal hot weather concreting may not perform satisfactorily for extended retardation, in which
case its use will not be permitted.
The rotation of the mixer shall be sufficient to thoroughly mix the admixture into the concrete.
Admixtures shall be agitated as required to prevent separation or sedimentation of solids. Air agitation of Neutralized Vinsol
Resin will not be permitted.
Normally Air entraining agents shall be charged into the mixer at the beginning of the batch. Retarding or water reducing
admixtures. except for high -range water reducers. shall be charged into the mixer during the last part (approximately 1/.3) of the
batch when an air - entraining agent is used.
Accelerating admixtures will be used only on the written approval of the Engineer. Accelerating admixtures will not be permitted
in bridge decks, direct traffic culvert slabs at any time nor when Type II cement is specified.
All admixtures shall be of the same brand from only one manufacturer for the entire project, unless otherwise approved by the
Engineer /Architect.
Accelerators will be used only to meet special project requirements and will require the approval of the Engineer.
For individual placements of concrete of 25 cubic yards or more and for all ready -mix concrete, the admixture shall be measured
and dispensed by a readily adjustable dispenser. When set to a predetermined volume, the dispenser shall fill to the preset
amount and hold 11 positively without leakage until the operator releases the content into the mixing water by some positive
means. Unless otherwise Indicated, completely automatic dispensing will not be required, except for use with a fully automatic
plant.
The calibrated container shall be a measuring reservoir of the type where the level of the admixture is visible at all times. A strip
gauge with one ounce increments for air entraining admixtures. ten ounce increments for dispersing admixtures, shall be at-
tached securely to the measuring apparatus. This strip shall be a material possessing weather resistant qualities. The accuracy
equipment shall visibly show the total amount to be dispensed for ready check by the Engineer.
When individual placements of less than 25 cubic yards and with the concrete batched on the Job site, the Engineer /Architect
may waive the requirements for mechanical dispensing equipment.
When high range water reducing admixtures are indicated the following will be observed:
(a) Ready -mixed concrete shall be delivered in transit mixers and the capacity of the transit mixer shall be reduced for
each batch by 25 percent of the rated capacity to assure proper mixing.
405 Rev. 09/30/87 Page 2
Concrete Admixtures
(h) tt, during the placement of concrete, a change in slump resulting in a slump loss in excess of 3 inches is noted, the
remaining concrete shall be rejected.
(c) The addition of water will not be permitted at the job site.
(d) Only one liquid admixture shall be used to achieve the desired results, except where air entrainment is indicated, the
air entrainment agent will be permitted.
(e) The concrete design shall meet the following requirements:
Item Test Value
Air entrainment ASTM C 260 3 to 6 percent
High range water
reducing admixture ASTM C 494
Type F or G
Water cement ratio
Gal/Sack Max. 6.25
Minimum cement content
in Sacks (94# /sack) 6.0
Coarse aggregate factor 6.5
Slump Maximum, inches 10
Flexural strength @
7 days, psi 650
Maximum concrete
temperature, F 100
405.6 Measurement and Payment
No additional compensation will be made tor the materials, equipment tests or methods required by this item, but shall be
considered subsidiary to Item No. 360, "Concrete Pavement ", Item No. 410. "Concrete Structures" or various items included in the
contract.
End
Ref: 360, 410
405 Rev. 09/30/87
Page 3 Concrete Admixtures
406.2 Materials
(2) Welded Wire Fabric
Bar Size Nominal Nominal Area Weight per
Number Diameter Inches Square Inches Linear Foot
2 0.250 0.05 0.167
3 0.375 0.11 0.376
4 0.500 0.20 0.668
5 0.625 0.31 1.043
6 0.750 0.44 1.502
7 0.875 0.60 2.044
8 1.000 0.79 2.670
9 1.128 1.00 3.400
10 1.270 1 27 4.303
11 1.410 1.56 5.313
14 1.693 2.25 7.65
18 2.257 4.00 13.60
Item No. 406
Reinforcing Steel
406.1 Description
This item shall consist of the furnishing and placing of reinforcing steel, deformed and smooth, of the size and quantity indicated
and in accordance with these specifications.
(1) Bars -
Bar reinforcement shall be deformed and shall conform to ASTM A 615, A 616, Grades 40, 60 or 75 and shall be
open- hearth, basic oxygen or electric furnace new billet steel, unless otherwise indicated. Large diameter new biller
steel (Nos. 14 and 18), Grade 75, will be permitted for straight bars only.
Where bending of bar sizes No. 14 or 18 of Grades 40 or 60 is required, bend testing shall be performed on
representative specimens as described for smaller bars in the applicable ASTM specification. The required bend
shall be 90 degrees at a minimum temperature of 60 F around a pin having a diameter of 10 times the nominal
diameter of the bar and shall be free of cracking.
Spiral reinforcement shall be either smooth or deformed bars or wire of the minimum diameter indicated. Bars for
spiral reinforcement shall comply with ASTM A 675, A 615 or A 617. Wire shall comply with ASTM A 82. The mini-
mum yield strength for spiral reinforcement shall be 40,000 psi.
In cases where the provisions of this item are in conflict with the provisions of the ASTM Designation to which refer-
ence is made, the provisions of this item shall govern.
Report of chemical analysis showing the percentages of carbon, manganese, phosphorus and sulphur will be re-
quired for all reinforcing steel when it is to be welded, except for drill shafts. No tack welding will be allowed. All
welding shall conform to the requirements of AWS D -1 -72.
The nominal size and area and the theoretical weight (Ibs.) of reinforcing steel bars covered by these specifications
are as follows:
Smooth bars, larger than No. 4, may be steel conforming to the above or may be furnished in any steel that meets
the physical requirements of ASTM A 36.
Smooth, round bars shall be designated by size number through No. 4. Smooth bars above No. 4 shall be desig-
nated by diameter in inches.
Wire for fabric reinforcement shall be cold -drawn from rods hot - rolled from open hearth, basic oxygen or electric
furnace billet. Wire shall conform to the requirements of the Standard Specifications for Cold -Drawn Steel Wire for
Concrete Reinforcement, ASTM A 82 or A 496. Wire fabric, when used as reinforcement. shall conform to ASTM A
185 or A 497.
When wire is ordered by size numbers, the following relation between size number, diameter in inches and area shall
apply unless otherwise indicated:
Page 1 04.17.86 406
406 04/17/86
Size W
Number
31
30
26
26
24
22
20
18
16
14
12
10
8
7
6
5.5
5
4.5
4
3.5
3
2.5
2
1.5
1.2
0.5
0.628
0.618
0.597
0.575
0.553
0.529
0.505
0.479
0.451
0.422
0.391
0,357
0.319
0.299
0.276
0.265
0.252
0.239
0.226
0.211
0.195
0.178
0.160
0.138
0.124
0.113
0.080
Where deformed wire is required, the size number shall be preceded by 0 and for smooth wire the prefix W
shall be shown.
(3) Chairs and Supports
Chairs and Supports shall be steel. precast mortar or concrete blocks cast in molds meeting the approval of the
Engineer/Architect of sufficient strength to position the reinforcement as indicated when supporting the dead load of
the reinforcement, the weight of the workers placing concrete and the weight of the concrete bearing on the steel.
Chairs shall be plastic coated when indicated.
Chair Types and Applicable Uses
Structural or Architectural Elements (columns, beams,
walls, slabs) exposed to weather, not subjected to
sand blasting, water blasting or grinding.
Structural or Architectural Elements exposed to
weather and subject to sand blasting, water blasting
or grinding.
Structural or Architectural Elements not exposed to
weather or corrosive conditions.
Slabs and grade beams cast on grade.
Page 2
Nominal Nominal
Diameter (Inch) Area square inches
0.310
0.300
0.280
0.260
0.240
0.220
0.200
0.180
1.160
0.140
0.120
0.100
0.080
0.070
0.060
0.055
0.050
0.045
0.040
0.035
0.030
0.025
0.020
0.015
0.012
0.010
0.005
Galvanized steel or steel
chairs with plastic coated
feet.
Stainless steel chairs.
Uncoated steel chairs
Steel chairs with a base with
9 inch' minimum area or suf-
ficient area to prevent the
chair from sinking into fill or
subgrade. Precast mortar or
concrete blocks meeting the
requirements of this item may
be used.
406.3 Bending
The reinforcement shall be bent cold, true to the shapes indicated. Bending shall preferably be done in the shop. Irregularities in
bending shall be cause for rejection.
Unless otherwise indicated, the inside diameter of bar bends, in terms of the nominal bar diameter (d), shall be as follows:
Bends of 90 degrees and greater in stirrups, ties and other secondary bars that enclose another bar in the bend.
Bar Number Grade 40 Grade 60
3, 4, 5 3d 4d
6,7,8 4d 5d
All bends in main bars and in secondary bars not covered above.
Bar Number Grade 40 Grade 60 Grade 75
406.4 Tolerances
3 thru 8 6d 6d —
9, 10 8d 8d —
11 8d 8d 8d
14,18 10d 10d —
Fabricating tolerances for bars shall not be greater than shown on Standard 406 -1.
406.5 Storing
Steel reinforcement shall be stored above the surface of the ground upon platforms, skids or other supports and shall be pro-
tected as tar as practicable from mechanical injury and surface deterioration caused by exposure to conditions producing rust.
When placed in the work, reinforcement shall be free from dirt, paint, grease, oil or other foreign materials. Reinforcement shall
be free from injurious defects such as cracks and laminations. Rust, surface seams, surface irregularities or mill scale will not be
cause for rejection, provided the minimum dimensions, cross sectional area and tensile properties of a hand wire brushed speci-
men meets the physical requirements for the size and grade of steel indicated.
406.6 Splices
No splicing of bars, except when Indicated or specified herein, will be permitted without written approval of the Engineer /Architect.
No substitution of bars will be allowed without the approval of the Engineer /Architect. Any splicing of substituted bars shall con-
form to Table 1.
Splices not indicated will be permitted in slabs not more than 15 inches in thickness, columns, walls and parapets, but not in-
cluded for measurement, subject to the following:
Splices will not be permitted in bars 30 feet or less in plan length. For bars exceeding 30 feet in plan length, the distance
center to center of splices shall not be less than 30 feet minus 1 splice length. with no more than 1 individual bar length less
than 10 feet. Splices not indicated, but permitted hereby, shall conform to Table 1. The specified concrete cover shall be
maintained at such splices and the bars placed in contact and securely tied together.
Bar Number
Table 1
Minimum Lap Requirements
Grade 40
Grade 60
3 1 foot 0 inches 1 loot 0 inches
4 1 foot 2 inches 1 foot 9 inches
5 1 foot 5 Inches 2 feet 2 inches
6 1 foot 9 inches 2 feet 7 inches
7 2 feet 4 inches 3 feel 5 inches
No. 8 3 feet 0 inches 4 feet 6 inches
No. 9 3 feet 10 inches 5 feet 8 inches
No. 10 4 feet 10 inches 7 feet 3 inches
No. 11 5 feet 11 inches 8 feet 11 inches
Spiral steel shall be lapped a minimum of 1 turn. Bar No. 14 and No. 18 may not be lapped.
Welding of reinforcing bars may be used only where indicated or as permitted herein. All welding operations, processes, equip-
ment, materials; workmanship and inspection shall conform to the requirements indicated. All splices shall be of such dimension
and character as to develop the full strength of the bar being spliced.
End preparation for butt welding reinforcing bars shall be done in the field, except Bar No. 6 and larger shall be done in the shop.
Delivered bars shall be of sufficient length to permit this practice.
Page3 04/17/86 406
For box culvert extensions with less than 1 loot of fill, the existing longitudinal bars shall have a lap with the new bars as shown in
Table 1. For box culvert extensions with more than 1 loot of fill. a minimum lap of 6 inches will be required.
Unless otherwise indicated, dowel bars transferring tensile stresses shall have a minimum embedment equal to the minimum lap
requirements shown in Table 1. Shear transfer dowels shall have a minimum embedment 0112 inches.
406.7 Placing
Reinforcement shall be placed as near as possible in the position indicated. Unless otherwise indicated, dimensions shown for
reinforcement are to the centers of the bars. In the plane of the steel parallel to the nearest surface of concrete, bars shall not
vary from plan placement by more than ' /,z of the spacing between bars. In the plane of the steel perpendicular to the nearest
surface of concrete, bars shall not vary from plan placement by more than Y. inch. Cover of concrete to the nearest surface of
steel shall as follows:
Vertical stirrups shall always pass around the main tension members and be attached securely thereto. The reinforcing steel
shall be spaced its required distance from the form surface by means of approved galvanized metal spacers, metal spacers with
. plastic coated tips, stainless steel spacers, plastic spacers or approved precast mortar or concrete blocks. For approval of plastic
spacers on a project, representative samples of the plastic shall show no visible indications of deterioration atter immersion in a
5 percent solution of sodium hydroxide for 120 hours.
All reinforcing steel shall be tied at all intersections, except that where spacing is less than 1 foot in each direction, altemate
intersections only need be tied. For reinforcing steel cages for other structural members, the steel shall be tied at enough inter-
sections to provide a rigid cage of steel. Mats of wire fabric shall overlap each other 1 full space as a minimum to maintain a
uniform strength and shall be tied at the ends and edges.
Where prefabricated deformed wire mats are specified or if the Contractor requests. welded wire fabric may be substituted for a
comparable area of steel reinforcing bar plan, subject to the approval of the Engineer /Architect.
A suitable tie wire shall be provided in each block, to be used for anchoring to the steel. Except in unusual cases and when
specifically authorized by the Engineer, the size of the surface to be placed adjacent to the forms shall not exceed 21/2 inches
square or the equivalent thereof in cases where circular or rectangular areas are provided. Blocks shall be cast accurately to the
thickness required and the surface to be placed adjacent to the forms shall be a true plane, free of surface imperfections.
Reinforcement shall be supported and lied in such a manner that a sufficiently rigid cage of steel is provided. If the cage is not
adequately supported to resist settlement or floating upward of the steel, overturning of truss bars or movement in any direction
during concrete placement, permission to continue concrete placement will be withheld until corrective measures are taken.
Sufficient measurements shall be made during concrete placement to insure compliance with the above.
No concrete shall be deposited until the Engineer /Architect has reviewed the placement of the reinforcing steel and all mortar,
mud, dirt, etc, shall be cleaned from the reinforcement, forms, workers' boots and tools.
406.8 Measurement
Minimum Cover, Inches
(a) Concrete cast against and permanently exposed to earth 3
(b) Concrete exposed to earth or weather:
Bar No. 6 through 18 bars 2
Bar No. 5, W31 or D31 wire and smaller 11/2
(c) Concrete not exposed to weather or in contact with ground:
Slabs, walls, joists:
Bar No. 14 and 18 11
Bar No. 11 and smaller 1
Beams, columns:
Primary reinforcement, ties, stirrups, spirals
Shells, folded plate members:
Bar No. 6 and larger 1
Bar No. 5, W31 or D31 wire, and smaller 1
The measurement of quantities of reinforcement furnished and placed will be based on the calculated weight of the steel actually
placed as indicated, with no allowance made for added bar lengths for splices requested by the Contractor nor for extra steel
used when bars larger than those indicated or with a higher grade of steel are substituted with the permission of the Engineer/
406 04/17/66 Page 4
1 %z
Architect. Tie wires and supporting devices will not be included in the calculated weights. The calculated weight of bar reinforce-
ment will be determined using the theoretical bar weight set forth in this item.
Measurement required by a change in design will be computed as described above for the actual steel required to complete the
work.
406.9 Payment
This item shall be paid for at the unit price bid per pound of "Reinforcing Steer, which price shall be full compensation for
fumishing, bending, fabricating, welding and placing reinforcement, for all clips, blocks, metal spacers, ties, chairs, wire or other
materials used for fastening reinforcement in place and for all tools, labor, equipment and incidentals necessary to complete the
work.
Reinforcement in items specifically including the reinforcement shall not be paid for directly. but shall be included in the unit price
bid for the items of construction in which the reinforcing steel is used.
Payment, when included as a contract pay item, will be made under:
Pay Item No. 406: Reinforcing Steel — Per Pound.
This item shall be considered subsidiary to the contract, and no separate payment
shall be made.
End.
Page5 04/17;86 406
Item No. 408
Concrete Joint Materials
408.1 Description
This item shall govem for the furnishing and placing of all longitudinal, contraction and expansion joint material in concrete work
as herein specified in the various items of these specifications as indicated or as directed by the Engineer.
408.2 Material
(1) Preformed Asphalt Board
Preformed asphalt board formed from cane or other suitable fibers of a cellular nature securely bound together and
uniformly impregnated with a suitable asphaltic binder and meeting the requirements of the Standard Specifications
for Preformed Expansion Joint Filler for Concrete Paving and Structural Construction, ASTM D 1751.
(2) Preformed Nonbituminous Fiber Material
Preformed nonbituminous fiber material shall meet the requirements of the Standard Specifications for the Pre-
formed Expansion Joint Filler for Concrete Paving and Structural Construction, ASTM D 1751, except that the re-
quirements pertaining to bitumen content, density and water absorption shall be voided.
(3) Boards
Boards obtained from Redwood timber, of sound heartwood, Tree from sapwood, knots, clustered birdseye, checks
and splits. Occasional sound or hollow birdseye, when not in clusters, will be permitted provided the board is free
from any other defects That will impair its usefulness as a joint filler.
(4) Joint Sealer (Concrete Pavement)
This material shall be a one part low modulus silicone especially designed to cure at ambient temperatures by react-
ing with moisture in the air and shall have the following properties:
As Supplied
Color Gray
Flow, MIL- 2 -8802D Sec. 4.8.4 0.2 maximum
Working Time, minutes 10
Tack -Free Time at 77 Ft F Min. MIL- 2 -8802D Sec.4.8.7 60
Cure time, at 77 F (25 C), days 7 -14
Full Adhesion, days 14 - 21
As Cured —after 7 days at 77 F (25 C) and 40% RH
Elongation, percent minimum 1200
Durometer Hardness, Shore A, points ASTM 2240 15
Joint Movement Capability, percent +100/ -50
Tensile Strength, maximum elongation, psi 100
Peel Strength. psi 25
The joint sealer shall adhere to the sides of the concrete joint or crack and shall be an effective seal against
infiltration of water and incompressibles. The material shall not crack or break when exposed to low temperature.
(5) Backer Rod
Backer Rod shall be expanded closed cell polyethylene foam compatible with sealant. No bond or reaction shall
occur between rod and sealant. Backer Rod shall be of sufficient width to be in compression after placement and
shall be used with joint sealer
(6) Joint Sealing Material
Joint Sealing Material for other than pavement use may be a two - componenl, synthetic polymer or cold - pourable.
sell leveling type meeting the following requirements:
The material shall adhere to the sides of the concrete joint or crack and shall form an effective seal against
infiltration of water and incompressibles. The material shall not crack or break when exposed to low tempera-
tures. Curing is to be by polymerization and not by evaporation of solvent or fluxing of harder particles. It shall
cure sufficiently at an average temperature of 77 ±3 F so as not to pick up under wheels of traffic in a maximum
of 3 hours.
Page 1 04/17/86 408
End
Performance Requirements:
When tested in accordance with Test Method Tex - 525 -C, the joint sealing material shall meet the above curing
times and the requirements as follows:
It shall be of such consistency that it can be mixed and poured or mixed and extruded into joints at
temperatures above 60 F.
408.3 Construction Methods
Penetration, 77 F.
150 gm. Cone, 5 sec., max. cm 0.90
Bond and Extension 75 %, 0 F, 5 cycles:
Dry Concrete Blocks Pass
Wet Concrete Blocks Pass
Steel Blocks (Primed if specified by manufacturer) Pass
Flow at 200 F None
408 04/17/86 Page 2
Water content % by weight, max. 5.0
Resilience:
Original sample min. % (cured)
Oven -aged at 158 F. min. %
For Class 1 - material only
Cold Flow (10 min.)
50
50
None
The Contractor shall install "Concrete Joint Materials" which will function as a compatible system. Joint sealer shall not be placed
where a bond braker is present.
Asphalt. Redwood board or other materials used shall extend the full depth of the concrete and shall be perpendicular to the
exposed face. All joints shall be shaped to conform to the contour of the finished section in which they are installed. All material
shall be a minimum of 'h inch thick or as indicated. Wood materials shall be anchored to the adjacent concrete to permanently
hold them in place. Joint sealer shall be installed in accordance with the manufacturer's recommendations.
The material used for sidewalk expansion joints, shall conform to No. 3 above, unless otherwise indicated.
The material used for curb and gutter expansion joints filler shall conform to any of the above, except when placed adjacent to
concrete pavement, the joint material shall match the pavement joint material.
408.4 Measurement and Payment
No additional compensation will be made for matenals, equipment or tabor required by this item, but shall be considered subsidi-
ary to the venous items included in the contract.
409.1 Description
This item shall consist of curing concrete pavement. concrete base. pavement, curbs. gutters, retards, sidewalks, driveways.
medians, islands, concrete riprap, cement stabilized nprap, concrete structures and other concrete as indicated, by applying an
impervious liquid membrane forming material.
409.2 Material
The liquid forming membrane cunng compound shall comply with the "Standard Specification for Liquid Membrane - forming
Compounds for Curing Concrete ". ASTM C 309, Type 1 -D clear or translucent, with fugitive dye or Type 2 white pigmented The
material shall have a minimum flash point of 80 F when tested by the "Pensky -Martin Closed Tester". ASTM Designation: D 93
11 shall be of such consistency that it can be satisfactorily applied as a fine mist through an atomizing nozzle by means of ap-
proved pressure spraying equipment at atmospheric temperatures above 40 F.
It shall be of such nature that it will not produce permanent discoloration oI concrete surfaces nor react deleteriously with the
concrete or its components. Type 1 compound shall contain a fugitive dye that will be distinctly visible not less than 4 hours nor
more than 7 days atter application.
Type 2 compound shall not settle out excessively or cake in the container and shall be capable of being mixed to a uniform
consistency by moderate stirring and shall exhibit a daylight reflectance of not less than 60 percent of that of magnesium oxide
when tested as indicated.
The compound shall produce a firm. continuous. uniform, moisture impermeable film, free from pinholes and shall adhere satis-
factorily to the surfaces of damp concrete. When applied to the damp concrete surface at the rate of coverage indicated, the
compound shall dry 10 the touch in not more than 4 hours and shall not be tacky or crack oft concrete after 12 hours.
It shall adhere to horizontal and vertical surfaces in a tenacious film and shall not run oft or show an appreciable sag, disinte-
grate, check. peel or crack during the required curing period.
Under traffic, the compound shall not pick up or peel and shall gradually disintegrate from the surface
The compound shall be delivered to the job only in the manufacturer's original containers. which shall be clearly labeled with the
manufacturer's name, the trade name of the material and a batch number or symbol with which test samples may be correlated
The water retention test shall be in accordance with the following.
Percentage loss shall be defined as the water lost after the application of the curing material was applied. The permissible
percentage moisture toss (at the rate of coverage specified herein) shall not exceed the following:
24 hours after application
72 hours after application
2 percent
4 percent
Item No. 409
Membrane Curing
409.3 Construction Methods
The membrane curing compound shall be applied after the surface finishing has been completed and immediately alter the free
surface moisture has disappeared. The surface shall be sealed with a single uniform coating of the specified type of curing
compound applied at the rale of coverage recommended by the manufacturer and directed by the Engineer, but not less than
1 gallon per 180 square feet of area. The Contractor shall provide satisfactory means and facilities to properly control and check
the rate of application of the compound.
The compounds shall not be applied before the surface has become dry, but shall be applied lust after free moisture has
disappeared.
The compound shall be thoroughly agitated during its use and shall be applied by means of approved mechanical power pressure
sprayers for street and bridge applications The sprayers used to apply the membrane to concrete exposed surfaces shall travel at
a uniform speed along the forms and be mechanically driven The equipment shall be of such design that Itw:Il insure uniform and
even application of the membrane material The sprayers shall be equipped with satisfactory atomizing nozzles On small
miscellaneous items or on interim bridge deck curing the Contractor will be permitted to use hand - powered spray equipment For
all spraying equipment. the Contractor shall provide facilities to prevent loss of the compound between the nozzle and the
concrete surface during the spraying operations. .
At locations where the coating shows discontinuities, pinholes or other defects or if ram falls on the newly coated surface before
the film has dried sufficiently to resist damage, an additional coat of the compound shall be applied immediately at the same rate
of coverage specified herein.
To insure proper coverage, the Engineer shall inspect all treated areas alter application of the compound for the period of time
Page 1 12!03/86 409
designated in the specification for curing, either for membrane cunng or for other methods. Dry areas are identifiable because of
the lighter color of dry concrete as compared to damp concrete. All suspected areas shall be tested by placing a few drops of
water on the suspected areas. 11 the water stands in rounded beads or small pools which can be blown along the surface of the
concrete without wetting the surface, the water impervious film is present. 11 the water wets the surface of the concrete as deter-
mined by obvious darkening of the surface or by visible soaking into the surface, no water - impervious film is present. Should the
foregoing test indicate that any area during the cunng period is not protected by the required water. impervious film an additional
coat or coats of the compound shall be applied immediately and the rate of application of the membrane compound shall be
increased until all areas are uniformly covered by the required water - impervious film.
The compounds shall not be applied to a dry surface and if the sudace of the concrete has become dry. it shall be thoroughly
moistened prior to the application of the membrane by fogging or mist application. Sprinkling or coarse spraying will not be
allowed.
When temperatures are such as to warrant protection against freezing. cunng by this method shall be supplemented with an
approved insulating material capable of protecting the concrete for the specified curing penod.
II at any time there is reason to believe that this method of curing is unsatisfactory or is detrimental to the work, the Contractor,
when notified, shall immediately cease the use of this method and shall change to cunng by one of the other methods specified
under this contract.
Curing compounds shall be compatible with the adhesion of toppings or overlays where cunng has been applied to the concrete
base surface in order to assure adequate bond.
When forms are stnpped before the 4 minimum cunng days have passed, cunng shall continue by an approved method.
409.4 Measurement and Payment
Membrane curing will not be measured for payment. The work and materials prescribed herein will not be paid for directly, but
Shall be included in the unit price bid for the item 01 construction in which these matenals are used.
End
404 04r17 /AA Paae 2
410.1 Description
This item shall consist of the construction of all types of structures involving the use of structural concrete, except where the
requirements are waived or revised by other goveming specifications.
All concrete structures shall be constructed in accordance with the design requirements and details indicated, in conformity with
the pertinent provisions of the items contracted for, the incidental items referred to and in conformity with the requirements
herein.
410.2 Materials
(1) Concrete
Concrete shall conform to Item No. 403, "Concrete for Structures ".
The class of concrete for each type of structure or unit shall be as indicated or by pertinent governing specifications.
(2) Expansion Joint Material
(a) Preformed Fiber Material
Fiber material shall conform to Item No. 408, "Concrete Joint Matenals ".
(b) Joint Sealing Material
Sealants shall conform to Ilem No. 408, "Concrete Joint Matenals'.
(c) Asphalt Board
Asphalt Board shall conform to Item No. 408, "Concrete Joint Materials ".
(d) Rebonded Neoprene Filler
Rebonded neoprene filler shall consist of ground closed cell neoprene particles, rebonded and molded into
sheets of uniform thickness of the dimensions indicated.
(3) Waterstop
Unless otherwise indicated, copper walerstop shall be 16 ounce material conforming to Item No. 720, "Metal for
Structures ". Rubber waterstops or Polyvinyl Chloride (PVC) waterstops shall conform to Item No. 438, "Elastomeric
Matenals ".
(4) Curing Materials
410 Rev. 09130187
Filler material shall have the following physical properties and shall meet the requirements of ASTM D 1752.
Type 1 where applicable:
Property
Item No. 410
Concrete Structures
Method Requirements
Color Black
Density ASTM D 1752 Type 1 40 PCG Minimum
Recovery ASTM D 1752 Type 1 90% Minimum
Compression ASTM D 1752 Type 1 50 to 500 psi
Extrusion ASTM D 1752 Type 1 0.25 In. Maximum
Tensile strength ASTM D 1752 Type 1 20 psi Minimum
Elongation 75% Minimum
The manufacturer shall furnish the Engineer with certified test results as to the compliance with the above
requirements and a 12 inch x 12 inch x 1 inch sample from the shipment for approval.
Curing materials shall conform to Item No. 409, "Membrane Curing ", except curing of bridge decks and the top of
direct traffic culverts shall be cured with Type I (Resin Base) curing compound only.
(5) Admixtures
Retarding, water reducing and air entraining agents shall conform to Item No. 405, "Concrete Admixtures ".
Page 1 Concrete Structures
(6) City of Austin Survey Monuments
The Transportation and Public Services Department shalt furnish permanent survey monuments to be cast in con.
crete as indicated or as directed by the Engineer.
410.3 General Requirements
Before starting work, the Contractor shall inform the Engineer fully of the construction methods he proposes to use, the ade-
quacy of which shall be subject to the review by the Engineer. Plans for forms and falsework for piers and superstructure spans
over 20 feet long and for all widening details shall be submitted to the Engineer for review. if requested. Similar plans shall be
submitted for other units of the structure, if requested by the Engineer. The plans shall be prepared on standard 22 inch by 36
inch sheets and shall show all essential details of the proposed forms, falsework and bracing to permit a structural analysis. Four
sets of such plans will be required.
Concurrence on the part of the Engineer in any proposed construction methods. approval of equipment or of form and falsework
plans does not relieve the Contractor of the responsibility for the safety or correctness of his methods and adequacy of his
equipment or from carrying out the work in full accordance with the contract.
Unless otherwise indicated, the requirements in the succeeding paragraphs shall govem the time sequence in which construc-
tion operations may be carried on and for the opening of completed structures to traffic:
Superstructure members, forms. falsework or erection equipment shall not be placed on the substructure before the con-
crete therein has attained a 500 psi flexural strength.
Storage of materials on completed portions of a structure will not be permitted until all curing requirements for those partic-
ular portions have been met.
No forms shall be erected on concrete footings supported by piling or dnlled shafts until the concrete therein has attained a
minimum flexural strength of 400 psi. Such work may begin on spread footings atter the concrete therein has aged at least
2 curing days. Concrete may be placed as soon as the forms and reinforcing steel are approved.
The support of tie beam and/or forms by falsework placed on previously placed tie beams is permissible provided such
beams have attained 500 psi flexural strength, curing requirements are completed and the beams are properly supported
to eliminate stresses not provided for in the design.
Bridges and direct traffic culverts shall not be opened to construction traffic or to the traveling public until authorized by the
Engineer in accordance with the following:
Authorization may be given after the last slab concrete has been in place at least 14 days for light construction traffic
not to exceed a 3'. ton vehicle.
Authorization to pace embankments to'allow normal construction traffic and when necessary to the traveling public.
may be given after the last slab concrete has been in place 30 days or when the minimum compressive strength (tc)
has reached the 28 day strength conforming to Item No. 403, "Concrete for Structures" or as indicated.
410.4 Drains
Weep holes and roadway drains shall be installed and constructed as indicated.
410.5 Expansion Joints
Joints and devices to provide for expansion and contraction shall be constructed where and as indicated.
The bearing area under the expansion ends of concrete slabs and slab and girder spans shall be given a steel trowel finish and
finished to the exact grades required. The material used to separate expansion surfaces shall be as indicated and placed so that
concrete or mortar cannot be subsequently worked around or under it.
Concrete adjacent to armor joints and finger joints shall be placed carefully to avoid defective anchorage and porous or hon-
eycombed concrete in such areas.
All open joints and joints to be filled with expansion joint material shall be constructed using forms adaptable to loosening or early
removal. To avoid expansion or contraction damage to the adjacent concrete, these forms shall be loosened as soon as possible
after final concrete set to permit free movement of the span without requiring full form removal.
Preformed fiber joint material or other material indicated shall be used in the vertical joints of the roadway slab, curb, median or
sidewalk. The top 1 inch thereof shall be filled with joint sealing material. as specified herein. When different material is indicated
it shall be used.
410 Rev. 09130187
Page 2 Concrete Structures
Pnor to placing the sealing matenal, the vertical faces of the joint shall be cleaned of all laitance by sandblasting or by mechan-
ical routing. Cracked or spalled edges shall be repaired. The joint shall be blown clean of all foreign material and sealed.
Where preformed fiber joint material is used, it shall be anchored to the concrete on one side of the joint by light wire or nails to
prevent the material from falling out.
Finished joints shall conform to the plan details with the concrete sections completely separated by the specified opening or joint
material.
Soon after form removal and again where necessary atter surface finishing, all projecting concrete shall be removed along ex-
posed edges to secure full effectiveness of the expansion joints.
410.6 Construction Joints
The joint formed by placing plastic concrete in direct contact with concrete that has attained its Initial set shall be deemed a
construction joint. The term monolithic placement shall be interpreted to mean that the manner and sequence of concrete placing
shall not create construction joints.
Construction joints shall be of the type and at the locations Indicated. Additional joints will not be permitted without wntten autho-
rization from the Engineer and when authorized, shall have details equivalent to those indicated for joints in similar locations.
Unless otherwise provided, construction joints shall be square and normal to the forms. Bulkheads shall be provided in the forms
for all joints, except when horizontal. All vertical construction joints shall be chamfered. Ali horizontal construction joints shall be
routed or grooved.
Construction joints requiring the use of joint sealing material shall be as indicated or as directed by the Engineer. The material will
be indicated on the plans without reference to joint type.
A concrete placement terminating at a horizontal construction joint shall have the top surface roughened thoroughly as soon as
practicable after initial set is attained. The surfaces at bulkheads shall be roughened as soon as the forms are removed.
The hardened concrete surface shall be thoroughly cleaned of all loose material, laitance, dirt or foreign matter and saturated
with water so it is moist when placing fresh concrete against it. Forms shall be drawn tight against the existing concrete and the
joint surface flushed with grout just prior to placing the fresh concrete.
410.7 Foundation
Excavation for foundations shall conform to Item No. 401, "Structural Excavation and Backlill".
Concrete for foundation seals, unless otherwise indicated, shall be Class E Concrete and placed in accordance with the require•
ments herein. The top of the completed seal shall not vary from plan grade or the grade established by the Engineer.
Where a concrete seal is indicated, the design will be based on the normal water elevation as indicated. If the foundation con-
crete can be placed in the dry at the time of construction, the seal will not be required. If additional seal is necessary for the
conditions existing during the time of construction, its thickness shall be increased as deemed necessary by the Contractor and
at his expense. If the conditions existing at the time of construction require a seal for placing the foundation concrete in the dry
and none is indicated, the Contractor shall place an adequate seal at his expense.
The seal shall be allowed to set for at least 36 hours before the caisson or cofferdam is dewatered, after which the top of the seal
shall be cleaned of all laitance or other soft material and all high spots exceeding the above limitation shall be cut off and
removed.
410.8 Falsework
The Contractor is totally responsible for all talsework. He shall design and construct to safely carry the maximum anticipated
loads and to provide the necessary rigidity. Details of talsework construction shall be subject to review by the Engineer. but
Engineer's review shall in no way relieve the Contractor of responsibility of the adequacy and safety of the talsework design
All timber used in talsework centering shall be sound, in good condition and tree from defects which will impair its strength. When
wedges are used to adjust Ialsework to desired elevations, they shall be used in pairs to insure even bearing.
Sills or grillages shall be large enough to support the supenmposed load without settlement and unless founded on solid rock.
shale or other hard materials, precautions shall be taken to prevent yielding of the supporting material.
Falsework which cannot be founded on a satisfactory spread looting shall be placed on piling driven to a bearing capacity surf
cient to support the superimposed toad without settlement. The safe bearing capacity of piling shall be determined by test loads
or by such other methods that may be required or acceptable to the Engineer.
410 Rev. 09130/87 Page 3 Concrete Structures
In general, each falsework bent shall be capped transversely by a member of proper size. A short cap section forming a T -head
may be substituted to permit the removal of portions of the forms without disturbing the falsework. Caps shall be securely fas-
tened to each pile or column in the bent and set at the proper elevation to produce. in conjunction with the use of approved
wedges or jacks. permanent camber indicated, plus a construction camber covering allowance for deformation of the forms and
falsework. The use of wedges to compensate for incorrectly cut beanng surfaces will not be permitted. Each falsework bent shall
be securely braced to provide the stiffness required with the bracing securely fastened to each pile or column it crosses.
In setting falsework for arches, allowances shall be made for settlement of falsework, deflection of the arch and permanent
camber. Provision shall be made by suitable wedges, sand jacks or other acceptable devices for the controlled lowering of
falsework when the arch is swung. Falsework may be required to be placed on jacks to provide for settlement correction during
concrete placement.
When the falsework is no longer required, it shall be removed. Falsework piling shall be pulled or cut off not less than 6 inches
below finished ground level. Falsework and piling in a stream, lake or bay shall be completely removed to a point specified by the
Engineer to prevent any obstruction to the waterway.
410.9 Forms
Forms for precast prestressed concrete members and for prestressed piling shall be constructed conforming to Item No. 425,
Prestressed Concrete Structures".
(1) General
Except where otherwise indicated, forms may be of either timber or metal.
Forms for round columns exposed to view shall be of steel, except that other materials will be allowed with written
permission of the Engineer.
Forming plans shall be submitted for approval. Forms shall be designed for the pressure exerted by a liquid weighing
150 pounds per cubic foot. The rate of placing the concrete shall be taken into consideration in determining the depth
of the equivalent liquid. For job fabricated forms an additional live load of 50 pounds per square foot shall be allowed
on horizontal surfaces. The maximum unit stresses shall not exceed 125 percent of the allowable stre«5 used by
the Owner for the design of structures.
Commercially produced structural units used in form work shall not exceed the manufacturer's maximum allowable
working toad for moment, shear or end reaction. The maximum working load shall include a live load of 35 pounds
per square 100101 horizontal form surface and sufficient details and data shall be submitted for use in checking form
work details for approval.
Forms shall be practically mortar - tight, rigidly braced and strong enough to prevent bulging between supports and
maintained to the proper line and grade during concrete placement. Forms shall be maintained in a manner that will
prevent warping and shrinkage.
Deflections due to cast -in -place slab concrete and railing shown in the dead bad deflection diagram shall be taken
into account in the setting of slab forms.
All fors and footing areas shall be cleaned of any extraneous matter before placing concrete.
Permission to place concrete will not be given until all of such work is complete to the satisfaction of the Engineer.
11, at any stage of the work, the forms show signs of bulging or sagging, the portion of the concrete causing such
condition shall be removed immediately, if necessary and the fors shall be reset and securely braced against fur-
ther movement.
(2) Timber Forms
Lumber for fors shall be properly seasoned, of good quality and free from imperfections which would affect its
strength or impair the finished surface of the concrete. The lumber used for facing or sheathing shall be finished on
at least 1 side and 2 edges and shall be sized to uniform thickness.
For lining will be required for all forted surfaces. except for the inside of culvert barrels, inlets, manholes and box
girders, the bottom of bridge decks between beams or girders, surfaces that are subsequently covered by backlill
matenal or are completely enclosed and any surface formed by a single finished board. Lining will not be required
when plywood fors are used.
Form lining shall be of an approved type such as masonite or plywood. Thin membrane sheeting such as poly-
ethylene sheets shall not be used for for lining.
410 Rev. 09/30187 Page 4 Concrete Structures
410 Rev. 09/30/87
Forms may be constructed of plywood not less than h inch in thickness, with no form lining required. The grain of the
face plies on plywood forms shall be placed parallel to the span between the supporting studs or joists
Plywood used for forming surfaces which remain exposed shall be equal to that specified as B•B Plyform Class I or
Class II Exterior of the U.S. Department of Commerce, National Bureau of Standards, U.S. Product Standard, latest
edition
Forms or form lumber to be reused shall be maintained clean and in good condition. Any lumber which is split.
warped. bulged. marred or has defects that will produce inferior work shall not be used and if condemned. shall be
promptly removed from the work.
Studs and joists shall be spaced so that the facing form material remains in true alignment under the imposed loads
Wales shall be spaced close enough to hold fors securely to the designated lines and scabbed at least 4 feet on
each side of joints to provide continuity. A row of wales shall be placed near the bottom of each placement.
Facing material shall be placed with parallel and square joints and securely fastened to supporting studs.
Forms for surfaces receiving only an ordinary finish and exposed to view shall be placed with the form panels sym-
metrical. i.e., long dimensions set in the same direction. Horizontal joints shall be continuous.
Molding specified for chamfer strips or other uses shall be made of materials of a grade that will not split when nailed
and which can be maintained to a true line without warping. Wood molding shall be mill cut and dressed on all faces.
Unless otherwise indicated, fors shall be filleted at all sharp comers and edges with triangular chamfer strips mea-
suring Vi inch on the sides.
Forms for railings and ornamental work shall be constructed to standards equivalent to first class millwork All mold•
ings, panel work and bevel strips shall be straight and true with neatly mitered joints designed so the finish work is
True, sharp and clean cut. All forms shall be constructed to permit their removal without marring or damaging the
concrete. The forms may be given a slight draft to permit ease of removal.
Metal form ties of an approved type or a satisfactory substitute shall be used to hold forms in place and shall be of a
type that permits ease of removal of the metal as hereinafter specified.
All metal appliances used inside of forms for alignment purposes shall be removed to a depth of at least' inch from
the concrete surface. They shall be made so the metal may be removed without undue chipping or spelling and
when removed, shall leave a smooth opening in the concrete surface. Burning oft of rods, bolts or ties will not be
permitted.
Any wire ties used shall be cut back at least '/ inch from the face of the concrete and properly patched.
Devices holding metal ties in place shall be capable of developing the strength of the tie and adjustable to allow for
proper alignment.
Metal and wooden spreaders which are separate from the forms shall be removed entirely as the concrete is being
placed.
Adequate clears out openings shall be provided for narrow walls and other locations where access to the bottom of
the forms is not readily attainable.
Prior to placing concrete, the facing of all forms shall be treated with oil or other bond breaking coating of such
composition that it will not discolor or otherwise injuriously affect the concrete surface. Care shall be exercised to
prevent coating of the reinforcing steel.
(3) Metal Forms
The foregoing requirements for timber forms as regards design, mortar - tightness, filleted corners, beveled protec-
tions. bracing, alignment, removal, reuse and wetting shall also apply to metal forms. except that these will not re-
quire lining, unless specifically indicated.
The thickness of form metal shall be as required to maintain the true shape without warping or bulging All bolt and
rivet heads on the facing sides shall be countersunk. Clamps, pins or other connecting devices shall be designed to
hold the forms rigidly together and to allow removal without injury to the concrete. Metal forms which do not present
a smooth surface or line up properly shall not be used. Metal shall be kept free from rust, grease or other foreign
materials.
(4) Form Supports for Overhang Stabs
Form supports which transmit a horizontal force to a steel girder or beam or to a prestressed concrete beam will be
Page 5 Concrete Structures
410.10 Placing Reinforcement
Reinforcement in concrete structures shall be placed carefully and accurately and rigidly supported as provided in Item No. 406,
"Reinforcing Steel". Reinforcing steel supports shall not be welded to I -beams or girders or stirrups of prestressed concrete
beams.
410.11 Placing Concrete, General
The minimum temperature of all concrete at the time of placement shall not be less than 50 F. The maximum temperature of any
concrete, unless otherwise indicated, shall not exceed 95 F when placed. The maximum temperature of cast•in -place concrete in
bridge superstructures, diaframs. parapets, concrete portions of railing, curbs and sidewalks and direct traffic box culverts shall
not exceed 85 F when placed. Other portions of structures, when indicated, shall require the temperature control specified.
For continuous placement of the deck on continuous steel units, the initial set of the concrete shall be retarded sufficiently to
insure that 1 remains plastic in not less than 3 spans immediately preceding the one being placed. For simple spans, retardation
shall be required only if necessary to complete finishing operations.
The consistency of the concrete as placed should allow the completion of all finishing operations without the addition of water to
the surface. When conditions are such that additional moisture is needed for finishing, the required water shall be applied to the
surface by fog spray only and shall be held to a minimum amount. Fog spray for this purpose may be applied with hand operated
logging equipment.
The height of free fall of concrete shall be limited to 3 — 4 feet to prevent segregation.
The maximum time interval between the addition of cement to the batch and the placing of concrete in the forms shall not exceed
the following:
410 Rev. 09130187
permitted, but shall not be used unless a structural analysis has been made of the affect on the girder or beam and
approval is granted by the Engineer.
When overhang brackets are used on prestressed concrete beams, the following shall apply:
(a) In normal spans or in spans skewed not more than 15 degrees, overhang brackets may be used to
support standard slab overhangs of widths not exceeding 3 feet, 11/2 inches without additional support or
bracing, when Type A, 8, C and Type IV beams are used. When the 15 degree skew angle is exceeded.
additional support shall be provided by welding No. 5 reinforcing bars to the stirrups of the exterior beam
and adjacent interior beam. Such bars shall be approximately 11/2 inches above the bottom of the slab
and spaced not more than 5 feet, center to center.
(b) In normal or skewed spans with standard overhangs not exceeding 3 feet, 11/2 inches, additional support
shall be provided using No. 5 bars as specified above and in addition. braces or struts, equivalent in size
to a 4 inch x 4 inch timber, shall be wedged between the bottom flanges of the exterior and adjacent
interior beam and spaced not more than 15 feet between struts or struts and permanent diaframs, when
SDHPT Size 48 inch through 72 inch beams are used.
(c) Spans in which the overhang width exceeds 3 feet, 11/2 inches will require additional support for the
outside beams to resist torsion. Details of the Contractor's proposed method of providing additional sup-
port shall be included with the slab forming plans submitted to the Engineer for review and approval.
(d) To counteract torsion effects, diatram concrete shall be placed and cured and the diafram bars tightened
prior to slab placing.
Holes in steel members for support of overhang brackets may be punched or drilled full size or may be torch cut to Y.
inch under size and reamed full size. In no case shall the holes be burned full size. The hole shall be lett open unless
indicated to be filled with a button head bolt. They shall never be filled by welding.
Air or Concrete
Temperature
whichever is higher
35 F to 79 F
Over 80 F
90 F or above
75 F to 89 F
35 F to 74 F
Nonagitated Concrete
Agitated Concrete
Maximum lime
30 minutes
15 minutes
45 minutes
60 minutes
90 minutes
Page 6 Concrete Structures
The use of an approved retarding agent in the concrete will permit the extension of each of the above temperature -time maxi
mums by 30 minutes tor bridge decks, top slabs of direct traffic culverts and cased dnlled shahs and 1 hour for all other concrete
except that the maximum time shall not exceed 30 minutes for nonagitated concrete.
From the time of initial stnkeofl until final finish is completed and required interim curing is in place, the unformed surfaces of slab
concrete in bridge decks and top slab of direct traffic culverts and concrete slabs. shall be kept damp, not wet, to offset the ellecls
of rapid evaporation of mixing water from the concrete due to wind, temperature, low humidity or combinations thereof. Fogging
equipment capable of applying water in the form of a fine fog mist, not a spray, will be required. Fogging will be applied at the
times and in the manner directed by the Engineer.
Fogging equipment may be either water pumped under high pressure or a combination of air and water, either system in corn.
bination with a proper atomizing nozzle. The equipment shall be sufficiently portable for use In the direction of any prevailing
winds. The equipment shall be adapted for intermittent use to prevent excessive wetting of the surfaces.
Upon completion of the final finish. interim curing will be required for slab concrete in bridge decks and top slabs of direct traffic
culverts as follows:
(1) Required water curing shall begin as soon as it can be done Without damaging the concrete finish.
(2) Unless otherwise indicated, Type 1 membrane curing compound (Resin Base Only) shall be applied to the slab
surface.
The Contractor shall give the Engineer sufficient advance notice before placing concrete in any unit of the structure to permit the
review of forms, reinforcing steel placement and other preparations. Concrete shall not be placed in any unit pnor to the comple-
tion of form work and placement of reinforcement therein.
Concrete mixing, placing and finishing shall be done in daylight hours. unless adequate provisions are made 10 light the entire
placement site.
Concrete placement will not be permitted when impending weather conditions will impair the quality of the finished work. If rainfall
should occur after placing operations are started, the Contractor shall provide ample covering to protect the work. If conditions of
wind, humidity and temperature are such that concrete cannot be placed without cracking, concrete placement shall be done in
the early morning or at night.
The sequence for placing concrete shall be as indicated or as required herein. The placing shall be regulated so the pressures
caused by the plastic concrete shall not exceed the loads used in the form design.
The method of handling. placing and consolidation of concrete shall minimize segregation and displacement of the reinforce-
ment and produce a uniformly dense and compact mass. Concrete shall not have a free fall of more than 4 feet, except in the
case of thin wall sections. Any hardened concrete spatter ahead of the plastic concrete shall be removed.
The method and equipment used to transport concrete to the forms shall be capable of maintaining the rate of placement. Con-
crete may be transported by buckets, chutes. buggies. belt conveyors. pumps or other acceptable methods.
When belt conveyors or pumps are used, sampling for testing will be done at the discharge end. Concrete transported by con.
veyors shall be protected from sun and wind, it necessary, to prevent loss of slump and workability. Pipes through which concrete
is pumped shall be shaded and/or wrapped with wet burlap. it necessary. to prevent loss of slump and workability. Concrete shall
not be transported through aluminum pipes. tubes or other aluminum equipment. The coarse aggregate content of the concrete
shall be within the limits specified in Item No. 403, "Concrete for Structures ".
Chutes. troughs. conveyors or pipes shall be arranged and used so that the concrete ingredients will not be separated. When
steep slopes are necessary, the chutes shall be equipped with baffle boards or made in short lengths that reverse the direction of
movement or the chute ends shall terminate in vertical down - spouts. Open troughs and chutes shall extend, ff necessary. down
inside the forms or through holes left in them. All transporting equipment shall be kept clean and free from hardened concrete
coatings. Water used for cleaning shall be discharged clear of the concrete.
Each part of the forms shall be filled by depositing concrete as near its final position as possible. The coarse aggregate shall be
worked back from the lace and the concrete forced under and around the reinforcement bars without displacing them. Depositing
large quantities at one point and running or working it along the forms will not be allowed.
Concrete shall be deposited in the forms in layers of suitable depth but not more than 36 inches in thickness. unless otherwise
directed by the Engineer.
The sequence of successive layers or adjacent portions of concrete shall be such that they can be vibrated into a homogeneous
mass with the previously placed concrete without a cold joint. Not more than 1 hour shall elapse between adjacent or successive
placements of concrete. Unauthorized construction joints shall be avoided by placing all concrete between the authorized joints
in one continuous operation.
410 Rev. 09130187 Page 7 Concrete Structures
An approved retarding agent shall be used to control stress cracks and/or authorized cold joints in mass placements where
differential settlement and/or setting time may induce stress cracking, such as on false work, in deep girder stems, etc.
Openings in forms shall be provided. it needed. for the removal ol lailance or foreign matter of any kind.
All forms shall be wetted thoroughly before the concrete Is placed therein.
All concrete shall be well consolidated and the mortar flushed to the form surfaces by continuous working with immersion type
vibrators Vibrators which operate by attachment 10 forms or reinforcement will not be permitted. except on steel forms. At least 1
standby 'vibrator shall be provided for emergency use in addition to the ones required for placement. For lightweight concrete.
vibrators of the high frequency type which produce a minimum of 7000 impulses per minute will be required.
The concrete shall be vibrated immediately after deposition. Prior 10 the beginning 01 work. a systematic spacing of the points of
vibration shall be established to insure complete consolidation and thorough working of the concrete around the reinforcement.
embedded fixtures and into the comers and angles of the forms. Immersion type vibrators shall be inserted vertically, at points 18
to 30 inches apart and slowly withdrawn. The vibrator may be inserted in a sloping or honzontal position in shallow slabs. The
entire depth of each lift shall be vibrated. allowing the vibrator to penetrate several inches into the preceding lilt. Concrete along
construction joints shall be thoroughly consolidated by operating the vibrator along and close to but not against the pint surface.
The vibration shall continue until thorough consolidation and complete embedment of reinforcement and fixtures is produced. but
not long enough 10 cause segregation. Vibration may be supplemented by hand spading or rodding, 11 necessary. to insure the
flushing 01 mortar to the surface of all lorms.
Holes for anchor bolts in piers, abutments. bents or pedestals may be dnited or formed by the insertion of oiled wooden plugs or
metal sleeves in the plastic concrete. Formed holes shall be large enough to permit honzontal adjustments of Ole bolts. The bons
shall be carefully set in mortar. In lieu of the above. anchor bolls may be set to exact locations when the concrete is placed.
Slab concrete shall be mixed in a plant located oft the structure. Carting or wheeling concrete batches over completed slabs will
not be permitted until they have aged at least 4 lull curing days or limber planking. placed on top of the slab for the carts to
traverse along Carts shall be equipped with pneumatic tires. Cunng operations shall not be interrupted for the purpose Of wheel.
ing concrete over finished slabs.'
Exposed concrete surfaces. while still plastic. shall be stamped with an impression having the Contractor's name. the month and
year The stamp shall be of an approved design
Alter concrete has taken its initial set. to prevent damage to the concrete at least 1 curing day shall elapse before placing strain
on projecting reinforcement
The storing of reinforcing or structural steel on completed roadway slabs generally shall be avoided and when permitted. snail be
limited to quantities and distnbuliOn that will not induce excessive stresses.
410.12 Placing Concrete in Cold Weather
(1) General
The Contractor is responsible lor the protection of concrete placed under any and all weather conditions and is
responsible lor producing concrete equal In quality 10 that placed under normal conditions. Should concrete placed
under adverse weather conditions prove unsatisfactory, tl shall be removed and replaced.
(2) Cast•in -Place Concrete
410 Rev. 09130187
Concrete may be placed when Ine atmospheric temperature is not less Than 35 F Concrete shall not be placed in
contact with any material coaled with frost or having a temperature less than 32 F
Aggregates shall be tree from ice. frost and frozen lumps-When required, In order to produce the minimum specified
concrete temperature, the aggregate and/or the water shall be heated uniformly, in accordance with Ine following.
The water temperature shall not exceed 180 F and/or the aggregate temperature shall not exceed 150 F. The
heating apparatus shall heat the mass of aggregate uniformly. The temperature 01 the mixture of aggregates
and water shall be between 50 F and 85 F before introduction of the cement
All concrete shall be eltectively protected as follows:
(a) The temperature 01 slab concrete ol all unformed surfaces shall be maintained at 50 F or above for a
period ol 72 hours from time of placement and above 40 F for an additional 72 hours
(b) The temperature al the surface of all concrete in bents, piers. culvert walls. retaining walls, parapets.
wingwalls. bottom of slabs and other similar forms shall be maintained at 40 For above for a period of 72
hours from time of placement.
Page 8 Concrete.Structures
1
1
1
1
1
1
1
1
1
1
1
1
1
1
i
1
1
1
1
(c) The temperature of all concrete, Including the bottom slabs of culverts placed on or in the ground, shall
be maintained above 32 F for a period of 72 hours from time of placement
Protection shall consist of rovidi in
p ng additional covering, insulated forms or other means and H necessary supple-
menting such covering with artificial heating. Curing shall be provided during this period until all requirements tor
curing have been satisfied.
When Impending weather conditions indicate the possibility of the need for such temperature protection, all neces-
sary heating and covering material shall be on hand ready for use before permission is granted to begin placement.
Sufficient extra test specimens will be made and cured with the placement to ascertain the condition of the concrete
as placed prior to form removal and acceptance.
(3) Precast Concrete
A fabricating plant for precast products which has adequate protection from cold weather in the form of permanent or
portable framework and covering, which protects the concrete when placed in the fors and is equipped with ap-
proved steam curing facilities may place concrete under any low temperature conditions provided:
(a) The framework and covering are placed and heat is provided for the concrete and the forms within 1
hour after the concrete•is placed. This shall not be construed to be 1 hour after the last concrete is
placed, but that no concrete shall remain unprotected longer than 1 hour.
(b) Steam heat shall keep the alr surrounding the concrete between 50 F and 85 F for a minimum of 3 hours
prior to beginning the temperature rise which is required for steam curing.
410.13 Placing Concrete In Hot Weather
When the temperature of the air is above 85 F, an approved retarding agent will be required in all exposed concrete, concrete
used in superstructures. top slabs of direct traffic culverts and all cased drilled shafts regardless of temperatures. The maximum
temperature of all concrete, unless otherwise indicated shall not exceed 95 F.
410.14 Placing Concrete in Water
Concrete shall be deposited in water only when indicated or with written permission of the Engineer. The forms, cofferdams or
caissons shall be sufficiently tight to prevent any water current passing through the space in which the concrete is being depos-
ited. Pumping will not be permitted during the concrete placing nor until it has set for at least 36 hours.
The concrete shall be placed with a tremie, closed bottom -dump bucket or other approved method and shall not be permitted to
fall freely through the water nor shall it be disturbed after it has been placed. Its surface shall be kept approximately level during
placement.
The tremie shall consist of a water -tight tube 14 inches or Less In diameter. It shall be constructed so that the bottom can be
sealed and opened after it is in place and fully charged with concrete. It shall be supported so that it can be easily moved horizon-
tally to cover all the work area and vertically to control the concrete flow.
.$ottom -dump buckets used for underwater placing shall have a capacity of not less than rh cubic yard. it shall be lowered gradu-
ally and carefully until it rests upon the concrete already placed and raised very slowly during the upward travel; the intent being
to maintain still water at the point of discharge and to avoid agitating the mixture.
The placing operations shall be continuous until the work is complete.
Unless otherwise indicated. all concrete placed under water shall be Class E.
410.15 Placing Concrete in Superstructure
Unless otherwise indicated, simple span roadway slabs shall be placed without transverse construction joints by using a longitu-
dinal screed or a self propelled transverse finishing machine. The screed shalt be adequately supported on a header or rail
system sufficiently stable to withstand the longitudinal or lateral thrust of the equipment. Unless otherwise indicated, temporary
intermediate headers will be permitted for placements exceeding 50 feet in length for the longitudinal screed, provided the rate of
placement is rapid enough to prevent a cold joint and these headers are designed for early removal to permit satisfactory consol-
idation and finish of the concrete at their locations.
Unless otherwise indicated, slabs on continuous units shall be placed in one continuous operation without transverse construc-
tion joints using a longitudinal screed or a self propelled transverse finishing machine. Rails for transverse finishing machines
supported from the beams or girders shall be installed so they may be removed without damage to the slab. Bond between
removable supports and the concrete shall be prevented in a manner acceptable to the Engineer. Rail support parts which re-
main embedded in the slab shall not project above the upper mat of reinforcing steel. Rail or screed supports attached to
I -beams or girders shall be subject to "General Requirements" stated above.
410 Rev. 09/30/87
Page 9 Concrete Structures
For continuous placements of slab on steel or prestressed members, continuous slab and girder units or continuous slab spans.
the Contractor shall submit his rate of placement schedule. For simple span units, a minimum rate of placement for a particular
unit may be indicated. If not so Indicated, the Contractor shall satisfy the Engineer that the equipment fumished Is capable of
placing, finishing and curing the slab at an acceptable rate to Insure compliance with the specifications.
The profile gradeline may require adjustment, due to variation in beam camber and other factors, to obtain the required cover
over the slab reinforcement. Beams shall be set in a sufficient number of spans so that when adjustment is necessary the profile
gradeline can be adjusted over suitable Increments so that the revised gradeline will produce a smooth riding surface.
One or more passes shall be made with the screed over the bridge deck segment prior to the placement of concrete thereon to
insure proper operation and maintenance of grades and clearances.
Slab concrete shall be deposited between the exterior beam and the adjacent beam prior to placing concrete in the overhang
portion of the slab.
For transverse slab finishing, concrete shall be placed in transverse strips, proceeding from the lowest end of the placement.
For longitudinal screeding, concrete shall be placed in longitudinal steps starting at a point in the center of the segment adjacent
to one side, except as provided herein and the strip completed by placing uniformly in both directions toward the ends except that
for spans on a grade of 1.5 percent or more, placing shall start at the lowest end. The width of strips shall be such that the
concrete therein will remain plastic until the adjacent strip is placed. Where monolithic curb construction is specified, the con-
crete shall be placed therein in proper sequence to be monolithic with the adjacent longitudinal strips of the slabs.
Forms for the bottom surface of concrete slabs, girders and overhangs shall be maintained true to the required vertical alignment
during concrete placing. An approved system of checking shall be used to detect any vertical movement of the forms or
falsework. Unless otherwise indicated, girders, slab and curbs of deck girder spans shall be placed monolithically.
The girder stems shall be filled first and the slab concrete placed within the time limits specified in "Placing Concrete, General"
above.
Construction joints when permitted for stab placements on steel and prestressed concrete beams shall be as indicated Where
plans permit segmental placing, without specifying a particular order of placement, any logical placing sequence which will not
result in the overstressing of any of the supporting members will be permitted subject to the approval of the Engineer.
Any faisework under steel girder or truss spans shall be released and the spans swung free on their permanent supports before
placing any slab concrete thereon.
When the curb forms are filled, the top of curb and sidewalk section shall be brought to the correct camber and alignment and
finished as descnbed in "Treatment and Finishing of Horizontal Surfaces Except Roadway Slabs" and "Ordinary Surface Finish ",
below.
The slab shall be finished as specified in "Finish of Roadway Slabs ", below. When the slab is to receive an additional wearing
surface or level -up (widening), it shall be given a reasonable smooth float or screed finish.
410.16 Placing Concrete In Concrete Arches
Concrete shall be placed in arch rings so the loading is kept symmetrical on the falsework. The arch rings and nbs shall be
placed in one continuous operation unless otherwise indicated or permitted by the Engineer. The spandrel walls or columns and
the beams shall not be placed until the arch is swung. Floor slab, railing, parapet walls, etc., shall not be placed until all spandrels
are complete. Slab placement shall be symmetrical about the transverse centerline so the loading of the arch is kept approxi-
mately symmetrical.
The placing sequence shall be as indicated.
410.17 Placing Concrete in Box Culverts
In general, construction joints will be permitted only where indicated.
Where the top stab and walls are placed monolithically in culverts more than 4 feet in clear height, an interval of not less than 1
nor more than 2 hours shall elapse before placing the top slab to allow for shrinkage in the concrete wall.
The base slab shall be trowel finished accurately at the proper time to provide a smooth uniform surface. Top slabs which carry
traffic shall be finished as specified for roadway slabs in "Finish of Roadway Slabs," below. Top slabs of fill type culverts shall be
given a reasonably smooth float finish.
410.18 Placing Concrete In Foundations and Substructure
Concrete shall not be placed in footings until the depth and character of the foundation has been inspected by the Engineer and
permission has been given to proceed.
410 Rev 0930187
Page 10 Concrete Structures
Placing oI concrete footings upon seal courses will be permitted after the caissons or cofferdams are free from water and the seal
course cleaned. My necessary pumping or bailing during the concrete placement shall be done from a suitable sump located
outside the forms. -
All temporary wales or braces inside cofferdams or caissons shall be constructed or adjusted as the work proceeds to prevent
unauthorized construction joints in footings or shafts.
When footings can be placed in a dry excavation without the use of cofferdams or caissons forms may be omitted ff desired by
the Contractor and approved by the Engineer and the entire excavation filled with concrete to the elevation of the top of looting in
which case measurement for payment will be based on the footing dimensions indicated.
Concrete in columns shall be placed monolithically unless otherwise indicated. Columns and caps and/or tie beams supported
thereon may be placed in the same operation. To allow for shrinkage of the column concrete, it shall be placed to the lower level
of the cap or tie beam and placement delayed for not less than 1 hour nor more than 2 before proceeding.
410.19 Treatment and Finishing of Horizontal Surfaces Except Roadway Slabs
All unformed upper surfaces shall be struck off to grade and finished. The use of mortar topping for surfaces under this classifica-
tion will not be permitted.
Aker the concrete has been struck off, the surface shall be floated with a suitable float. Bridge sidewalks shall be given a wood
float or broom finish or may be striped with a brush as specified by the Engineer.
The tops of caps and piers between bearing areas shall be sloped slightly from the center toward the edge and the tops of
abutments and transition bents sloped from the backwall to the edge, as directed by the Engineer, so that water will drain from
the surface and shall be given a smooth trowel finish. When indicated, the coaling of caps and piers shall be done using Type x
epoxy material. Unless otherwise indicated. the color shall be concrete gray. Bearing areas for steel units shall be constructed in
such a manner to have a full and even bearing upon the concrete When the concrete is placed below grade, bearing areas may
be raised to grade on beds of Portland Cement mortar consisting of 1 part cement, 2 parts sand and a minimum amount of water.
Bearing seat buildups or pedestals for concrete units may be cast integrally with the cap or with a construction joint as follows
The construction joint area under the bearing shall have the surface roughened thoroughly as soon as practical after initial
set is obtained. The bearing seat buildups shall be placed using a latex based grout or an epoxy grout, mixed in ac-
cordance with the manufacturers recommendation. Pedestals shall be placed using Class C concrete, reinforced as
indicated.
Bearing areas under elastomeric pads shall be given a slightly textured wood float finish.
410.20 Finish of Roadway Slabs
In all roadway slab finishing operations, camber for specified vertical curvature and transverse slopes shall be provided.
For concrete slab or concrete girder spans cast in place on falsework, an additional amount of camber shall be provided to offset
the initial and final deflections of the span. The additional amount of camber shall be determined from the dead load deflection
diagram indicated. When dead bad deflection is not indicated, the additional amount of camber shall be % inch per 10 foot of
span length but not to exceed 1/2 inch. For pan girder spans the additional camber for initial and final deflections shall be approxi-
mately inch for 30 foot spans and V. inch for 40 foot spans.
Roadway slabs supported on prestressed concrete beams. steel beams or girders shall receive no additional camber, except
that for slabs without vertical curvature, the longitudinal camber shall be approximately Y inch.
Work bridges or other suitable facilities shall be provided from which to perform all finishing operations and check measurements
for slab thickness and reinforcement cover.
As soon as the concrete has been placed and vibrated in a section of sufficient width to permit working, the surface shall be
struck off. leveled and screeded, carrying a slight excess of concrete ahead of the screed to insure filling of all low spots. The
screed shall be designed rigid enough to hold true to shape and shall have sufficient adjustments to provide for the required
camber. A vibrating screed shall be used in all slabs more than 20 feet in width. A vibrating screed may be used f1 heavy enough
to prevent undue distortion. The screeds shall be provided with a metal edge.
Longitudinal screeds shalt be moved across the concrete with a sawlike motion while their ends rest on headers or templates set
true to the roadway grade or on the adjacent finished slab.
The surface of the concrete shall be screed a sufficient number of times and at such intervals to produce a uniform surface, true
to grade and tree of voids. If necessary, the screed surface shall be worked 10 a smooth finish with a long handled wood or metal
float of the proper size or hand floated from bridges over the slab.
410 Rev. 09130/87
Page 11 Concrete Structures
The Contractor shall perform sufficient checks with a long handled 10foot straightedge on the plastic concrete to insure that the
final surface will be within the tolerances specified below. The check shall be made with the straightedge parallel to and perpen-
dicular to the centerline. Each pass thereof shall lap half of the preceding pass. All high spots shall be removed and all depres-
sions over %ie inch in depth shall be filled with fresh concrete and floated. The checking and floating shall be continued until the
surface is true to grade and tree of depressions, high spots, voids or rough spots.
•
Rail support holes shall be filled with concrete and finished to match the top of the slab.
A broom finish shall be applied with longitudinal weeding. A broom or burlap drag finish shall be applied with transverse
screeding.
Unless otherwise indicated, the burlap drag shall consist of 4 or more layers of 10 ounce burlap fabric, free of seams, dirt or
hardened concrete; it shall be kept wet when in use and it shall be drawn over the surface in as many passes as required to
produce the desired texture depth. Broom finishes shall be applied with stilt bristled brooms. The Contractor shall have on hand
at all times brooms for the purpose of providing the desired texture depth when surface conditions are such that the burlap drag
will not provide it.
Upon completion of the floating and/or straightedging and before the disappearance of the moisture sheen, the surface shall be
given a broom or burlap drag finish. The grooves of these finishes shall be parallel to the structure centerline. It is the intent that
the average texture depth resulting from the number of tests directed by the Engineer be not less than 0.035 inch with a minimum
texture depth of 0.030 inch for any one test when tested in accordance with SDHPT Test Method Tex - 436 -A. Should the texture
depth fall below that intended, the finishing procedures shall be revised to produce the desired texture.
At the option of the Contractor or when indicated. the surface shall be given its final texture by saw grooving to meet the above
requirements. Saw grooving may be done a minimum of 4 days atter the slab concrete has been placed. If saw grooving is done
prior to the completion of curing, the curing shall be continued after sawing to provide the minimum curing time required.
When the plans require that a concrete overlay be placed on the slab (new construction) or on prestressed concrete box beams,
the slab or top surface of shear key and diafram concrete shall be given a metal tine finish of approximately 0.050 inch.
When the plans indicate an asphaltic tack coat and overlay be placed on the slab (new construction) or on prestressed concrete
box beams, the slab or the top surface of shear key and diafram concrete shall be given a lightly textured broom finish, similar to
a sidewalk finish having an average texture depth of approximately 0.025 inch.
After the concrete has attained its final set. the roadway surface shall be tested with a standard 10 foot straightedge. The
straightedge shall be placed parallel to and perpendicular to the centerline of roadway to bndge any depressions and touch high
spots. Ordinates of irregulanties measured from the face of the straightedge to the surface of the slab shall not exceed Ve inch,
making proper allowances for camber, vertical curvature and surface texture. Occasional variations, not exceeding Vie inch will
be acceptable, if in the opinion of the Engineer it will not affect the riding qualities.
Irregulanties exceeding the above requirements shall be corrected. Areas which are corrected to produce satisfactory nding
qualities shall be provided with an acceptable surface texture in a manner approved by the Engineer.
410.21 Placing Survey Monuments
The Contractor shall obtain City Survey Monuments, for a fee of $10.00, from the Transportation and Public Services Department,
Construction Inspection. Monuments shall be imbedded In freshly poured concrete at locations indicated and accessible to sur-
vey equipment at the completion of the project. The monuments shall be Installed flush with the adjacent concrete in a workman
like manner.
410.22 Curing Concrete
The Contractor shall inform the Engineer fully of the methods and procedures proposed for curing, shall provide the proper
equipment and material in adequate amounts and shall have the proposed method, equipment and material approved prior to
placing concrete.
Inadequate curing and/or facilities therefor shalt be cause for the Engineer to notify the Contractor, in writing, that the work is
unsatisfactory and the concrete will have to be removed and replaced.
All concrete shall be cured for a period of 4 cunng days except as noted herein.
Exceptions to 4 Day Curing
Description Required Curing
410 Rev. 03/30/87
Upper Surfaces of Bridge Slabs and Top Slabs
of Direct Traffic Culverts.
Concrete Piling (nonprestressed) 6 curing days
8 curing days (Type I or III cement)
10 curing days (Type II cement)
Page 12 Concrete Structures
When the air temperature is expected to drop below 35 F, the water curing mats shall be covered with polyethylene sheeting.
burlap- polyethylene blankets or other material to provide the protection required by "Placing Concrete in Cold Weather", below.
A curing day is defined as a calendar day when the temperature, taken in the shade away from artificial heat, is above 50 F for at
least 19 hours (or colder days if satisfactory provisions are made to maintain the temperature at all surfaces of the concrete
above 40 F for the entire 24 hours). The required curing period shall begin when all concrete therein has attained its initial set.
The following methods are permitted for curing concrete subject to the restrictions of Table 1, below and the following require-
ments for each method of curing.
(1) Form Curing
When forms are left in contact with the concrete, other curing methods will not be required except for cold weather
protection.
When forms are stnped before the 4 day minimum curing time has elapsed, curing shall continue by an approved
method.
(2) Water Curing
All exposed surfaces of the concrete shall be kept wet continuously for the required curing time. The water used for
curing shall meet the requirements for concrete mixing water as indicated in Item No. 403, "Concrete for Structures ".
Sea water will not be permitted. Water which stains or leaves an unsightly residue shall not be used. •
(a) Wet Mat
Polyethylene sheeting or burlap - polyethylene blankets placed in direct contact with the slab will be required
when the air temperature is expected to drop below 40 F during the first 72 hours of the curing period. Wet
mats placed in direct contact with the slab will be required when the air temperature is expected to remain
above 40 F for the first 72 hours of the curing period. Damp burlap blankets made from 9 ounce stock may be
placed on the damp concrete surface for temporary protection prior to the application of the cotton mats which
may be placed dry and wetted down atter placement
The mats shall be weighted down adequately to provide continuous contact with all concrete surfaces where
possible. The surfaces of the concrete shall be kept wet for the required curing time. Surfaces which cannot be
cured by contact shall be enclosed with mats, anchored positively to the forms or to the ground, so that outside
air cannot enter the enclosure. Sufficient moisture shall be provided inside the enclosure to keep all surfaces
of the concrete wet.
410 Rev. 09130187
(b) Water Spray
This method shall consist of overlapping sprays or sprinklers that keep all unformed surfaces continuously
wet.
(c) Ponding
This method requires the covering of the surfaces with a minimum of 2 inches of clean granular material, kept
wet at all times or a minimum of 1 inch depth of water. Satisfactory provisions shall be made to provide a dam
to retain the water or saturated sand.
(3) Membrane Curing
Unless otherwise indicated, either Type 1 -D or Type 2 membrane curing compound may be used where permitted
except that Type 1 -D (Resin Base Only) will be permitted for slab concrete in bridge decks and top slabs of direct
traffic culverts.
STRUCTURE UNIT
DESCRIPTION
TABLE 1
1. Upper surfaces of Bridge Roadway, X X
Median and Sidewalk Slabs, Top Slabs of (resin base)
Direct Traffic Culverts.
REQUIRED PERMITTED
Water Membrane Water Membrane
for Complete for Interim for Complete for Complete
Curing Curing Curing Curing
Page 13 Concrete Structures
410 Rev. 09/30187
STRUCTURE UNIT
DESCRIPTION
2. Top Surface of any Concrete Unit upon
which Concrete is to be placed and
bonded at a later interval (Stub Walls,
Risers, etc.). Other Superstructure Con-
crete (Curbs, Wingwalls, Parapet Walls,
etc.).
3. Top Surface of Precast and/or Pre-
stressed Piling.
410.23 Removal of Forms and Falsework
TABLE 1 (continued)
REQUIRED
X
PERMITTED
Water Membrane Water Membrane
for Complete for Interim for Complete for Complete
Curing Curing Curing Curing
*X *X
4. All Substructure Concrete Culverts, *X *X
Box Sewers, Inlets, Manholes, Retaining
Walls, Riprap.
*Polyethylene Sheeting, Burlap- Polyethylene Mats or Laminated Mats in close intimate contact with the
concrete surfaces, will be considered equivalent to water or membrane curing for items under 4.
For substructure concrete, only one Type of curing compound will be permitted on any one structure. Material requirements and
construction methods shall conform to Bern No. 409, "Membrane Curing ", except as changed herein. The membrane shall be
applied in a single, uniform coating at the rate of coverage recommended by the manufacturer and as approved by the Engineer,
but not less than 1 gallon per 180 square feet of area. Tests for acceptance shall be at this specified rate.
Membrane curing shall not be applied to dry surfaces but shall be applied just after free moisture has disappeared. Formed
surfaces and surfaces which have been given a first rub shall be dampened and shall be resist at the time of application of the
membrane.
When membrane is used for complete curing. the film shall remain unbroken for the minimum curing penod specified. Membrane
which is damaged shall be corrected immediately by reapplication of membrane. Unless otherwise indicated, the choice of mem-
brane type shall be at the option of the Contractor, except that the Engineer may require the same cunng method for like portions
of a single structure.
Except as herein provided, forms for vertical surfaces may be removed when the concrete has aged not less than 1 day when
Type I or Type II cement is used and not less than 1 day when Type III cement is used, provided it can be done without damage
to the concrete.
Forms for inside curb faces may be removed in approximately 3 hours provided it can be done without damage to the curb.
Weight supporting forms and falsework for structures, bridge components and culvert slabs shall remain in place a minimum of 4
cunng days after which they may be removed if the concrete has attained a flexural strength of 500 psi as evidenced by strength
tests using specimens made from the same concrete and cured under the same conditions as the portion of the structure in-
volved. Forms for other structural components may be removed as specified by the Engineer.
Inside forms (walls and top slabs) for inlets, box culverts and sewers may be removed after the concrete has aged not less than 3
days and has acquired a flexural strength of not less than 300 psi, provided an overhead support system, approved by the
Engineer, is used to transfer the weight of the top slab to the walls of the box culvert or sewer before the support provided by the
fors is removed.
If all test beams made for the purpose of form removal have been broken without attaining the required strength, fors shall
remain in place for a total of 14 curing days.
Formwork supporting weight of concrete, such as beam soffits, joints and other structural elements. may not be removed in less
than 14 days and until concrete has attained design minimum compressive strength at 28 days. Determine potential com-
pressive strength of in place concrete by testing field cured specimens representative of concrete location of members.
The above provisions relative to for removal shall apply only to tors or parts thereof which are constructed to permit removal
without disturbing forms or falsework required to be left in place for a longer period on other portions of the structure.
Backfilling against walls of Type 1 or Type II cement shall not take place for a minimum of 7 days. Backfilting against walls of Type
III cement shall not take place until the flexural beam strength has reached 500 psi or the wall has cured for 5 days.
Page 14 Concrete Structures
410.24 Defective Work
Any defective work discovered after the tombs have been removed shall be repaired as soon as possible In accordance with
"Finishing Exposed Surfaces." below.
If the surface of the concrete is bulged, uneven or shows excess honeycombing or form marks, which in the opinion of the
Engineer, cannot be repaired satisfactorily, the entire section shall be removed and replaced at the expense of the Contractor
410.25 Finishing Exposed Surfaces
(1) Ordinary Surface Finish
An Ordinary Surface Finish shall be applied to all concrete surfaces either as a final finish or preparatory to a higher
grade or class of finish. Higher grades and classes of finish shall conform to Item No. 411, "Surface Finishes for
Concrete ". Where neither a grade or class of finish is specified, an Ordinary Surface Finish only, will be required.
Ordinary Surface Finish shall be provided as follows:
After form removal. all porous or honeycombed areas and spalled areas shall be corrected by chipping away
all loose or broken material to sound concrete.
410 Rev. 09130/87
Feather edges shall be eliminated by cutting a face perpendicular to the surface. Shallow cavities shall be
repaired using adhesive grout or epoxy grout. If judged repairable by the Engineer, large defective areas shall
be corrected using concrete or other material approved by the Engineer.
Holes and spells caused by removal of metal ties, etc., as required by "Forms ", above, shall be cleaned and
filled with adhesive grout or epoxy grout. Exposed parts of metal chairs on surfaces to be finished by rubbing.
shall be chipped out to a depth of V2 inch and the surface repaired.
All fins, runs, drips or mortar shall be removed from surfaces which remain exposed. Form marks and chamfer
edges shall be smoothed by grinding and/or dry rubbing.
Grease, oil, dirt, curing compound, etc., shall be removed from surfaces requiring a higher grade of finish.
Discoloration resulting from spillage or splashing of asphalt, paint or other similar material shall be removed.
Repairs shall be dense, well bonded and properly cured and when made on surfaces which remain exposed
and do not require a higher finish, shall be finished to blend with the surrounding concrete.
Unless otherwise indicated Ordinary Surface Finish shall be the final finish for the following exposed surfaces: inlets,
manholes, sewer appurtenances, inside of culvert barrels, bottom of bridge decks between beams or girders, ver-
tical and bottom surfaces of interior concrete beams or girders.
(2) Rubbed Finish
In general, the following areas shall require a rubbed finish and shall receive a first and second rubbing:
(a) The top, exterior and roadway facia of curbs and parapet walls.
(b) All concrete surfaces of railing.
(c) The exterior vertical facia of slab spans, rigid frames, arches and box girders.
(d) The outside and bottom surfaces of facia beams or girders (except precast concrete beams).
(e) The underside of overhanging slabs to the point of juncture of the supporting beams.
(1) All vertical surfaces of piers, columns, bent caps, abutments, wingwalls and retaining walls which are
exposed to view atter all backfill and embankments is placed.
(g) Exposed formed surfaces of inlet and outlet structures on culverts, transition structures, headwalls and
inlets.
(h) Such other surfaces specified elsewhere to receive a rubbed finish and such additional surfaces re-
quired by the Engineer to receive a rubbed finish.
After removal of forms and as soon as the mortar used in pointing has set sufficiently, surfaces to be rubbed shall be
wet with a brush and given a first surface rubbing with a medium coarse carborundum stone. This rubbing shall be
done before the concrete has cured more than 48 hours.
Page 15 Concrete Structures
410.26 Measurement and Payment .
No direct measurement or payment will be made for the work to be done or the equipment to be fumished under this item, but
shall be considered subsidiary to the particular Items required by the bid.
End
The second rubbing shall present a cleaned uniform appearance free from drip marks and discoloration. It shall be
given with a No.30 carborundum stone or an abrasive of equal quality.
If the Contractor elects to use an epoxy paint in Geo of the second rubbing, he may do so upon approval of the
Engineer.
(3) Special Surface Finishes
Striated, exposed aggregate and other special surface finishes shall conform to Item No. 411, "Surface Finishes for
Concrete" and/or with the requirements indlcated.
Ref: 401, 403, 405, 406, 406, 409, 411
410 Rev. 09130/87
Page 16 Concrete Structures
1
}
}
411.1 Description
This item shall govern for the furnishing of all materials and the application by the methods of construction indicated for the
application of a surface finish to concrete'
411.2 Materials
(1) Masonry Sand
Masonry sand shall conform to ASTM C 144
(2) White Cement
While cement shall conform to ASTM C 150
(3) Portland Cement
All cement unless otherwise indicated shall be Portland Cement conforming to ASTM C 150.
(4) Membrane Curing
Membrane curing shall conform to Item No. 409. "Membrane Cunng"
(5) Adhesive Grout
This subsection sets forth the requirements for three epoxy adhesives with different viscosities designed to bond
fresh Portland Cement concrete to existing Portland Cement concrete. hardened concrete to hardened concrete and
steel to fresh or hardened concrete. These adhesives are as follows.
Type V: Standard (medium viscosity) for applying to honzontal and vertical surfaces. This material is suit-
able for surface sealing of tine cracks in concrete.
Type VI: Low viscosity for application with spray equipment to honzontal surfaces
Type VII. Paste consistency for overhead application and where a high buildup is required. This material is
suitable for surface sealing of cracks in concrete which are veed out prior to sealing and for grouting
of dowel bars where clearance is Vic inch or less.
(a) Mixing Ratio: The ratio of resin and hardener components to be mixed together to form the finished adhesive
shall be either 1 to 1 or 2 to 1 by volume.
Any specific coloring of resin and /or hardener components desired will be stated by the Engineer.
Fillers, pigments, and thixotropic agents All fillers, pigments and /or thixotropic agents in either the epoxy resin or
hardener component must be of sufficiently fine particle size and dispersed so that no appreciable separation or
settling will occur during storage.
Any fillers present in the low viscosity version must be of such a nature that they will not interfere with application by
spray equipment or abrade or damage such equipment.
The concrete adhesive shall contain no volatile solvents.
(b) Consistency: The adhesives shall comply with the following:
Viscosity of mixed adhesive at
77 1 F. Poises
Pot Life at 77 F, minutes,
minimum — 30
Set Time at 77 F. hours,
maximum — 12
(Time required to attain 180 psi)
Type V
400 Maximum
Item No. 411
Surface Finishes for Concrete
Type VI Type VII
150 Maximum must be sufficiently fluid to apply by
trowel or spatula without difficulty
Page 1 04/17,86 411
Thixotropy test shall be performed at both 77 and 120 F. Average thickness of cured adhesive remaining on test
panel, mils minimum.
(7) Synthetic Resin Paint
Type V
30
Type VII
45
Samples of the individual components in sealed containers shall be maintained at 115 - 3 F for 2 weeks. The mixed
adhesive prepared from these samples must still comply with the minimum thixotropy requirements
The viscosity of the Type V and Type VI versions must not show an increase of more than 20 percent compared with
the viscosity pnor to the stability test The Type VII adhesive must still be sufficiently fluid to apply by trowel or spat-
ula without difficulty.
(c) Physical Properties of the Cured Adhesive
Property Requirements
Adhesive Shear Strength. psi. minimum 2200
Water Gain, percent by weight, maximum 0 20
Ability to bond fresh Portland Cement Concrete 400
to cured Portland Cement concrete.
psi. minimum (7 days cure lime)
Type X Epoxy: This is a high solids epoxy coating designed for application by brush or roller. The materials can also
be applied by airless spray by addition of a maximum of 5 percent toluene solvent at the direction of the Engineer.
Raw Materials
The basic raw materials to be incorporated into this coating are listed below. along with the specific requirements for
each material. The final decision as to the quality of matenals shall be made by the Engineer. After the Engineer has
approved the brand names of raw materials proposed by the Contractor, no subsitution will be allowed during the
manufacture without prior approval of the Engineer.
Epoxy Resin
The basic epoxy resin used in the formulation shall be an unmodified liquid resin conforming to the following chemi-
cal and physical requirements:
Viscosity at 25.0 s 0.1 C. cps. 7.000 to 10,000
Weight per epoxy equivalent, gms per gm — mole 175 to 195
Color (Gardner Number), maximum 5
Hydrolyzable chlorine, maximum percent by weight 0.2
Specific gravity, 25/25 degrees 1 14 to 1.18
Test methods to be used in determining these qualities are listed below:
(a) Viscosity — Test for Kinematic Viscosity (ASTM Designation D 445).
(b) Weight per Epoxy Equivalent — Test for Epoxy Content of Epoxy Resins (ASTM Designation* D 1652)
(c) Color — Test for Color of Transparent Liquids (Gardner Color Scale) (ASTM Designation. D 1544)
(d) Hydrolyzable Chlorine — Test for Hydrolyzable Chlorine Content of Liquid Epoxy Resins (ASTM Desig-
nation D 1726)
(e) Specific Gravity — Method 01 Test for Density of Paint, Varnish. Lacquer and Related Products (ASTM
Designation. 0 1475)
411 04/17/86 Page 2
Pigment
Titanium Dioxide
Extender
The titanium dioxide used in this formulation shall be equivalent to DuPont R -900 This shall be a pure. chalk -
resistant, rutile titanium dioxide meeting the requirements of ASTM D 476, Type III
The extender used in this formulation shall be Nyad 400. manufactured by Interpace Pigments Specific require-
- •enis are as follows
Particle size distribution•
Minimum Maximum
Minus 20 microns. percent by weight 95
Minus 10 microns. percent by weight 70 80
Minus 5 microns. percent by weight 40 50
Minus 3 microns. percent by weight 30 40
Minus 1 micron. percent by weight 14 20
Oit Absorption (rub out. Ibs 100 lbs) 25 maximum
Bnghtness (G E) 92.5 minimum
411.3 Grade of Finish
(1) General
The grade and/or class of finish shall be as described herein and as indicated.
' Grade" of finish designates the areas to which a higher finish is to be applied beyond the requirements of an Ordi-
nary Surface Finish Four grades of finish are included herein.
"Class" of finish designates the materials or the process to be used in providing the grade of finish. Three classes of
finish are included herein.
For structures and surfaces not described herein under grade of finish, a class of finish only may be indicated. Where
neither a grade nor class is specified, an Ordinary Surface Finish only will be required as specified in Item No 410,
"Concrete Structure-.
Where the plans specity a grade and class of finish, i.e., Grade 11, Class C. only that type of finish shall be furnished.
Where the plans specity a grade of finish only, i.e.. Grade I Finish, any of the classes of finish may be furnished. Only
one class of finish shall be furnished on any individual structure, twin structures or on structures in close proximity to
each other, except as specified for prestressed concrete members below.
(2) Grade 1
The following areas shall receive a Class A. B or C (two rub) Finish, except that prestressed members shall receive
either a Class A or B Finish only.
All concrete surfaces of railing, including the parapet types: exterior vertical faces of slabs, slab spans, arches and
box girders: the outside and bottom surfaces of fascia beams or girders (including prestressed members): the under-
side of overhanging slabs to the point of juncture of the supporting beam: all exposed vertical surfaces of bents and
piers and bottom surfaces of bent caps, all exposed surfaces of tie beams. abutments. bridge wingwalls, culvert
headwalls and wingwalls and retaining walls exposed to view after all backbit and embankment is placed
Unless otherwise indicated, the underside of the slab of slab spans shall be finished Its entire width.
Unless otherwise indicated, exposed surfaces of pump houses and other miscellaneous concrete surfaces shall
receive a Class A. B or C (one rub) Finish
(3) Grade 11
All concretesudaces of railing, including the parapet types, all exposed surfaces of bridge wingwalls and the exterior
vertical faces of slabs and slab spans shall receive a Class A, B or C (two rub) Finish. All other surfaces described
Page 3 04 1786 411
(4) Grade 111
(5)
under Grade I Finish shall receive a Class A or B finish only The underside of slab spans shall receive an Ordinary
Surface Finish only,
All concrete surfaces of railing, including the parapet types, all exposed surfaces of bridge wingwalls and the exterior
vertical faces of slabs shall receive a Class A, B or C (two rub) Finish. All other surfaces described under Grade I
Finish shall receive an Ordinary Surface Finish
Grade IV
411.4 Class of Finish
The top and roadway faces only of all concrete railing, including the parapet types, and bridge wingwalls shall re-
ceive a Class A, B or C (one rub) Finish. All other surfaces described under Grade I shall receive an Ordinary Sur-
face Finish
The Class of Finish designates either an adhesive grout material, a paint -type material or a rubbing process applied to surfaces
specified in "Grade of Finish ", as required above and/or as indicated.
Unless otherwise indicated, the color shall be concrete gray
(1) ClassA
This finish shall consist of an adhesive grout textured coating with a minimum /w inch thickness. composed of 1 part
white cement, 1 part natural (gray) cement. 2 parts masonry sand. 1 part (latex) emulsion and enough water to form
a viscous slurry of a consistency that may be applied by spray gun. brush or roller without appreciable running or
sagging. The proportions of white and gray cement may be vaned slightly to obtain the desired color
Gradation of the masonry sand shall be as required to produce a texture satisfactory to the Engineer.
Prepackaged materials meeting these requirements and acceptable to the Engineer as to color. texture and appear-
ance will be permitted
(2) Class B
The finish shall be a paint -type material, consisting of a synthetic resin, containing fibrous as well as texturing pig-
ments. which when applied by a 1 coat spray application at the rate of 45 c 5 square feet per gallon will yield an
acceptable textured coating. Certification by the manufacturer of the above materials will be required
(3) Class C
This finish shall consist of a one rub or Iwo rub system, as the case may be. meeting the requirements set forth
below under "Construction Methods ".
411.5 Approval of Surface Finishing Materials
The matenal to be furnished shall meet the requirements of SDHPT Specification D -9 -8110. "Structural Coatings ", latest revision
In addition to the above, the manufacturer shall furnish the following:
(1) At the time of original request for approval of the surface furnishing material, the manufacturer shall supply a 1 gallon
sample of the material to the Engineer /Architect, 0 requested.
(2) Each 6 months atter approval of the material. the manufacturer shall furnish a notanzed certification indicating that
the material originally approved has not been changed or altered in any way. Any change in formulation of a surface
finish shall require retesting prior to use.
The Engineer may request additional information to be submitted such as infrared spectophotometry scan. solids content. etc .
for further identification A change in formula discovered by any of the tests prescribed herein or by other means and not reported
and retested. may be cause to permanently bar the manufacturer from furnishing surface finish materials for City work
The City reserves the right to perform any or all of the tests required by this specification as a check on the tests reported by the
manufacturer In case of any variance the City tests will govern;
411.6 Construction Methods
Pnor to application of any of the finishes required herein. concrete surfaces shall be given an Ordinary Surface Finish. For Class
A and B materials. concrete surfaces shall be clean and free of dirt. grease. curing compound or any other bond breaking sub-
411 04/17/86 Page 4
stance. Class A shall be applied on moistened surfaces but Class B requires a dry surface. The temperature of the atmosphere.
concrete and compound shall be above 50 F for Classes A and B at the time of application. The finished surfaces shall be
protected against rain or freezing for a period of 24 hours after application
Class A materials shall be applied by spraying. by roller or by brush Class B materials shall be applied by spraying only All
applications shall provide an acceptable texture of the proper coverage.
The Class A and B material shall be applied after all preparation work required by Ordinary Surlace Finish has been completed
The Class C Finish shall be performed with a carborundum stone as follows. after all preparatory work required by Ordinary
Surface Finish has been completed
For a two rub system, the first rubbing shall bring the wetted concrete face to a paste and produce a smooth dense surface
without pits, form marks or other irregularities The use of cement or grout to form the paste will not be permitted Striping
with a brush and washing after the first rubbing will not be required. Chamfer lines shall be finished during the second
rubbing
The first rubbing shall be done soon after form removal. Membrane curing, if used, shall be applied after the first rub is
complete. Prior to the second rubbing, any remaining curing membrane shall be removed from the surface by brushing.
buffing or other satisfactory methods
The second rubbing shall be performed when conditioning the structure for final acceptance. The specified surfaces shall
be cleaned of drip marks and discolorations and given a final rubbing. The surface shall be striped neatly with a brush and
the paste allowed to lake a reset, after which the surfaces shall be washed with clean water leaving them with a neat and
uniform appearance and texture.
For a one rub system, the rubbing requirements shall be the same as for the first rub above. except chamfer lines shall be
finished and the paste spread uniformly. striped with a brush and allowed to take a reset atter which the surfaces shall be
washed with clean water leaving them with a neat and uniform appearance and texture.
411.7 Special Surface Finishes
(1) General
When special surface finishes are required for retaining walls, panels. copings or similar construction. the Contractor
shall prepare sample panels for approval of the finish and the method of application Unless otherwise indicated.
panel or pattern arrangement and dimensions may be varied to achieve a more pleasing appearance or to utilize
forming material more efficiently when approved by the Engineer /Architect. Aggregates, materials, variation of panel
or pattern arrangement, dimensions and other features affecting the work shall be approved prior to start of the work
(2) Striated Finish
The striated (grooved) pattern shall be as indicated or as approved by the Engineer /Architect
The finish shall be made by lining the forms with striated sheets of plywood, plastic, fiberglass. metal or other mate-
rial acceptable to the Engineer'Architect The striations on the panels shall be of a smooth, wide pattern. not sharp or
angular.
A chamfer groove shall be used along all edges of each panel All lies, bolts or other forming accessories shall be
located along the chamfer grooves or panel edges
Exposed Aggregate Finish
Exposed aggregate panels may be either raised, recessed or as indicated with the sides of each panel chamfered as
directed by the Engineer /Architect
The aggregate used tor this finish shall be approved by the Engineer Architect Unless otherwise indicated. aggre-
gate shall conform to the grading requirements of Grade 2 aggregate except that a minimum of 50 percent shall be
retained on the 3 /. inch sieve. Gravel of predominately rounded particles shall be used. except that when indicated or
approved by the Engineer/Architect in writing. crushed stone may be used The aggregate shall be large enough to
remain firmly anchored in the face of the final product. The depth shall be ''. inch minimum to '. inch maximum
unless otherwise indicated or directed by the Engineer /Architect.
A surface retarder that penetrates the concrete approximately Y. inch shall be applied to the forms or concrete sur-
face as an aid in achieving the desired finish Wood forms may require 2 or 3 coatings to compensate for absorption
Form Points shall be taped or caulked to prevent escape of the retarder during placing operations.
Treated form surfaces shall be protected from sun and rain while exposed to the atmosphere In case of high humid-
(3)
Page 5 0417 86 411
End
ily or it rain has dampened the forms prior to placing concrete. a reapplication of the surface retarder may be re-
quired to prowdf uniform coverage of the retarder on the forms
Adjacent areas of ties connate not requiring exposed aggregate hnivh shall se protected when the retarder is
applied
The finish shall be oblatneo by sandblasting. bush hammering. water blasting or other methods as approved by the
Engineer Architect Horizontal surf aces may be finished by combination of brushing and washing but only after the
concrete has set sufficiently to prevent loosening of the aggregate
Unless otherwise directed by the Engineer Architect, forms for surface requiring exposed aggregate finish shall be
removed 12 to 15 hours after concrete placement. The exposed aggregate operation shall be accomplished imme-
diately after form removal Except for the time required tor obtaining the exposed aggregate finish. curing of all sur-
faces shall be maintained for the minimum 4 day curing time. All surfaces shall be either water cured or may be
cured with an approved clean membrane compound. If water cunng is used. it shall be followed by a clear membrane
curing compound conforming to Item No. 409. "Membrane Curing"
Care shall be taken to ensure proper vibration at all points of concrete placement to prevent honeycomb or segrega-
tion of the materials Vibration shall be done in such a mariner as to provide adequate penetration of previously
placed concrete lifts Care shall be taken to prevent contact of the vibrator with the face form
411.8 Measurement and Payment
No direct measurement or payment will be made for the work to be done. the equipment or materials to be furnished under this
item, but shall be considered subsidiary to the particular items required by the plans and the contract
411 na 17 0e c
1
1
1
1
1
i
1
1
1 1
1
1
1
1
1
1
1
1
1
414.1 Description
This item to consist of a retaining wall composed of Portland Cement
concrete and reinforcing steel, precast or cast in place constructed in
conformity with the lines, grades and details indicated or as directed by
the Engineer. This item to also consist of any pumping, bailing, drainage
and Item No. 509, "Trench Safety Systems" for trench walls, when indicated.
414.2 Materials
(1) Concrete
(2) Reinforcing Steel
(3) Expansion Joint Materials
414.3 Construction Methods
Item No. 414
Concrete Retaining palls
Cast in place concrete shall conform to Class C Concrete, Item No.
403, "Concrete For Structures ". Precast Concrete shall conform to
Item No. 403, "Concrete for Structures" and shall have a 28 day
strength of 4500 psi.
Reinforcing steel shall conform to Item No. 406, "Reinforcing
Steel ".
Expansion joint materials shall conform to Item No. 408,
"Expansion Joint Materials ".
(4) Membrane Curing Compound
Membrane curing compound shall conform to Item No. 409, "Membrane
Curing ".
(5) Filter Fabric
Filter fabric shall conform to Item No. 620, "Filter Fabric ".
(6) Select Backfill
Select backfill shall conform to Item No. 210, "Flexible Base ".
All excavation shall be done in accordance with Item No. 401, "Structural
Excavation and Backfill".
All forms and forming, placement of reinforcement, placement of concrete,
form removal, finishing and curing shall conform to Item No. 410, "Concrete
Structures ".
414 06/08/88 Page 1 Concrete Retaining Walls
The height of the wall will be determined by grades set or as directed by
the Engineer and shall be such that water will not be trapped on private or
public property.
Reinforcement for the wall shall be as indicated and all expansion joints
shall extend the full height and width of the wall.
The Contractor shall provide dowel bars of the proper size, shape and
spacing, as indicated.
Devices to release the hydrostatic head shall be installed as indicated.
414.4 Measurement
Accepted cast in place work as prescribed by this item will be measured by
the cubic yard for concrete and by the pound for reinforcing steel,
complete place. In case reinforcing steel is not a separate pay item in
the bid, measurement will be per cubic yard for reinforced concrete
retaining wall, complete in place. All concrete quantities will be based
on the dimensions indicated.
Ref: 210, 401, 403, 406, 408, 409, 410, 509, 620
414 06/08/88 Page 2 Concrete Retaining Walls
1
1
1
1
1
1
1
1
414.5 Payment 1
The cast in place Work performed as prescribed by this item Will be paid
for at the unit price bid per cubic yard for "Concrete Retaining Wall ", !
which price shall be full compensation for all excavation, forms, concrete, (`
curing, finishing, backfilling, sloping and for all labor, tools,
materials, equipment and incidentals necessary to complete the work and at
the unit price bid per pound for "Reinforcing Steel ", complete in place or
as included in _the - proposal and contract. -- • - • - --
Payment will be made under one of the following: 1
Pay Item No. 414-A: Concrete Retaining Walls - Per Cubic Yard.
Pay Item No. 414 -B: Concrete Retaining Wall, Including Reinforcement -
Per Cubic Yard.
Pay Item No. 414-C: Precast Concrete Retaining Wall - Per Cubic Yard.
End
1
1
1
1
1
1
Item No. 430
Concrete Curb and Gutter
430.1 Description
This Item shall consist of Portland Cement concrete curb or curb and gutter with reinforcing steel as required, constructed on an
approved subgrade and base in accordance with this specification and in conformity with the lines, grades, section and details
Indicated or as established the Engineer
430.2 Materials
(1) Concrete
Concrete shall conform to Class A Concrete as indicated in Item No. 403, "Concrete for Structures" or Item No. 360,
"Concrete Pavement" when the curb and gutter is placed integral with the pavement
(2) Reinforcing Steel
Reinforcing steel shall conform to Item No. 406. "Reinforcing Steel"
(3) Expansion Joint Materials
Expansion joint materials shall conform to Item No. 408, "Expansion Joint Materials"
(4) Membrane Curing Compound
Membrane curing compound shall conform to Item No. 409. "Membrane Curing".
(5) Flexible Base
Aggregate shall conform to Item No. 210, "Flexible Base ".
430.3 Construction Methods
Subgrade for curb and gutter shall be excavated and prepared to required depth and width including a minimum of 12 inches
behind the curb, unless a greater width is indicated, to construct the work to grades and dimensions indicated. A minimum of 4
inches of flexible base shall be spread, wetted and thoroughly compacted under curb and gutter as specified in Item No. 210.
"Flexible Base ". If dry, the base shall be sprinkled with water lightly before concrete is deposited thereon.
Forms shall be of metal or well seasoned wood. The length of the forms shall be not less than 10 feel. Flexible or curved forms
shall be used for curves of 100 foot radius or less. Wood forms for straight sections shall be not less than 2 inches in thickness.
Forms shall be clean, straight, free from warp and oiled with a light form oil. Alt forms shall be securely staked to line and grade
and maintained in a true position during the depositing of concrete.
The reinforcing steel shall be placed in position as shown on the typical section. Care shall be exercised to keep all steel in its
proper location.
Expansion joint material, V. inch in thickness, shall be provided at intervals not to exceed 40 feel and shall extend the full width
and depth of the concrete. Weakened plane joints shall be made 3'. inch deep at 10 foot intervals. All joint headers shall be
braced perpendicular and at right angles to the curb.
Two round smooth dowel bars, ' inch in diameter and 24 inches in length, shall be installed at each expansion joint. Sixteen
inches of one end of each dowel shall be thoroughly coated with hot oil, asphalt or red lead, so that it will not bond to the con-
crete. The dowels shall be installed with a dowel sleeve on the coated end as indicated or equivalent as directed by the Engineer
Concrete shall be placed in the forms, rodded and tamped to exclude all air and honeycomb. Not more than 1 hour after the
concrete has been placed, a thin coating not more than 1 inch nor less than 1/2 inch thick of finish mortar, composed of 1 part
Portland Cement to 2 parts fine aggregate, shall be worked into the exposed faces of the curb and gutter by means of a "mule'
After the concrete has become sufficiently set, the exposed edges shall be rounded by the use of an edging tool to the radii
indicated. The entire exposed surface of the curb and gutter shall be floated to a uniform smooth surface, then finished with a
camel hair brush to a gritty texture. The forms shall remain in place a minimum of 24 hours unless approved otherwise by the
Engineer After removal of the forms, any minor honeycombed surfaces shall be plastered with a mortar mix as described above
Excessively honeycombed curb and gutter, as determined by the Engineer, shall be completely removed and replaced when
directed.
The finished concrete, while still plastic, shall be stamped with an impression having the Contractor's name and the month and
year. The stamp shall be of approved design and impressions shall be made on the face of the curb at or near street intersections
and not exceeding 350 feet apart or as directed by the Engineer.
Page 1 04/17/86 430
Immediately after finishing the curb, concrete shall be protected by a membrane curing conforming to Item No. 409, "Membrane
Curing ".
After a minimum of 3 days curing and before placing the final course base, the curb shall be backfilled 10 the lull height of the
concrete, tamped and sloped as directed by the Engineer. The top 4 inches of backfill shall be of clean topsoil, free of stones and
debns conforming to Item No. 604, "Seeding for Erosion Control" when turf is to be established.
430.4 Measurement
Accepted work as prescribed by this item will be measured by the linear loot of concrete curb and gutter, complete in place.
430.5 Payment
The work performed as prescribed by this item will be paid for at the unit price bid per linear loot for "Concrete Curb and Gutter ",
which price shall be full compensation for all work as set forth and descnbed under payment Method A, 8, C or D.
Method A (Pay Item No. 430 -A)
This payment method includes all the work performed for "Concrete Curb and Gutter', complete, at the unit price bid,
which price shall be full compehsation for excavation, preparing the subgrade, for furnishing and placing all base matenat,
reinforcing steel, dowels, expansion joint matenat, curing material, backfilling and for all other materials, manipulations,
labor, tools, equipment and incidentals necessary to complete the work.
Method 8 (Pay Item No. 430 -8)
This payment method includes all the work performed for "Concrete Curb and Gutter ", complete, at the unit pnce bid,
which pnce shall be full compensation for fine grading, for furnishing and placing reinforcing steel, dowels, expansion joint
material, curing material, backfilling and tor all other materials, manipulations, labor, tools, equipment and incidentals nec-
essary to complete the work.
Method C (Pay Item No. 430 -C)
This payment method includes all the work performed for "Concrete Curb ", complete, at the unit price bid, which price shall
be full compensation for fine grading, for furnishing and placing reinforcing steel, dowels, expansion joint material. curing
matenat, backfilling and for all other materials, manipulations, labor, tools, equipment and incidentals necessary to com-
plete the work.
Method D (Pay Item No. 430-D)
This payment method includes all the work performed for "Concrete Curb ", complete, at the unit price bid, which price shall
be lull compensation for excavation, prepanng the subgrade, for finishing placing all base material. reinforcing steel,
dowels, expansion joint matenat, curing material, backfilling and for other materials, manipulations, labor, tools, equipment
and incidentals necessary to complete the work.
Payment will be made under one of the following:
Pay Item No. 430-A: Concrete Curb and Gutter — Per Linear Foot.
Pay Item No. 430-B: Concrete Curb and Gutter — Per Linear Foot.
Pay Item No. 430-C: Concrete Curb — Per Linear Foot.
Pay Item No. 430-0: Concrete Curb — Per Linear Foot.
End
430 04/17/86 Page 2
436.1 Description
This item shall consist of concrete valley gutters, composed of Portland Cement concrete, constructed as herein specified on an
approved subgrade in conformity to the lines. grades and details indicated or as established by the Engineer.
436.2 Materials
(1) Concrete
Concrete shall be Class A conforming to Item No. 403, "Concrete for Structures"
(2) Reinforcing Steel
Reinforcing steel and welded wire fabric shall conform to Item No. 406, "Reinforcing Steel ".
(3) Expansion Joint Materials
Expansion (oint materials shall conform to Item No. 408. "Expansion Joint Materials"
(4) Membrane Curing Compound
Membrane curing compound shall conform to Item No. 409. "Membrane Curing"
436.3 Construction Methods
All forms and forming, placement of reinforcement. placement of concrete, form removal, finishing and curing shall conform to
Item No 410, "Concrete Structures ".
Where stabilized subbase is not provided, the subgrade shall be excavated as required. all unstable or otherwise objectionable
material removed and all holes, ruts and depressions filled with approved matenal.
Rolling shall be performed when and to the extent directed and the roadbed shall be completed to the plane of the typical sec-
tions indicated and the lines and /or grades established by the Engineer. All work shall conform to Item No. 201. "Subgrade
Preparation ".
Forms shall be of metal or well- seasoned wood not less than 2 inches nominal thickness, of a section satisfactory to the Engi-
neer. clean. straight. free from warp and of a depth equal to the thickness of the finished work. All forms shall be securely staked
to line and grade and maintained in a true position during the depositing of concrete. Before concrete is placed, forms shall be
thoroughly oiled with a light form oil. If the subgrade is dry the area shall be sprinkled lightly immediately before the concrete is
placed
Expansion joint material >/ inch thick shall be provided as indicated or as directed by the Engineer. The expansion joint material
shall be placed vertically and shall extend the lull depth of the concrete. Dummy joints shall be provided on 10 foot centers or as
directed by the Engineer. Normal dimensions of the dummy groove shall be '1. inch wide and 'r inch deep.
Reinforcement for concrete valley gutters shall conform to the details indicated or as directed by the Engineer Care shall be
exercised to keep the reinforcement in its proper position during the depositing of concrete.
Concrete shall be placed in the forms and spaded. tamped or vibrated until thoroughly compacted and until it entirely covers the
surface and has a monolithic finish. The top surface shall be screeded and floated to a uniform smooth surface, then finished
with a wood float to a gritty texture. The outer edges shall be rounded with approved tools to a V. inch radius.
At the proper time after finishing, the surface shall be protected by a membrane - curing compound or by wetting cotton or burlap
mats Either method shall be subject to approval by the Engineer. Traffic shall be securely barricaded from using the concrete
valley gutter for a minimum of 4 days after initial placing and may be opened to traffic only with the approval of the Engineer
Unless otherwise specified. all necessary excavation, filling and grading of the subgrade will be considered incidental work per -
tarnmg to this item, and will not be paid for directly
436.4 Measurement
Bern No. 436
Concrete Valley Gutters
Accepted work performed as prescribed by This item will be measured by the square loot of surface area of concrete placed The
square foot will include the reinforced monolithic curb placed at the ends of the valley gutter.
Page 1 04/17/86 436
436.5 Payment
The work performed as prescribed by this item will be paid for at the unit price bid per square loot for "Concrete Valley Gutters ",
which price shall be full compensation for prepanng the subgrade, for furnishing and placing all materials, including reinforcing
steel and expansion Joint matenals and for any other materials, manipulations, labor, tools, egwpmenl, barricading and inciden-
tals necessary to complete the work
Payment will be made under
Pay Item No. 436: Concrete Valley Gutters — Per Square Foot.
End
436 04/17/86 Page 2
508.1 Description
508.2 Types
508.3 Materials
(1) Concrete
Item No. 508
Miscellaneous Structures and Appurtenances
This item to consist of the construction of miscellaneous structures and
appurtenances complete in place or to the stage detailed indicated and the
materials used herein, including the excavation, installation, backfilling,
placement of the concrete and when required, the furnishing and
installation of frames, grates, rings, covers, safety end treatment and any
concrete curb and gutter indicated.
The various types of structures and appurtenances such as inlets,
headwalls, energy dissipators, etc., are designated on the plans by letter
or by number for the particular design of structure to be constructed in
accordance with the details indicated. Unless otherwise indicated, the
Contractor may have the option of furnishing cast in place or precast
structures.
Concrete shall conform to Item No. 403, "Concrete for Structures ",
with the following classes:
Cast in Place Concrete
Precast Concrete
(2) Mortar
Class A
Class N
Mortar shall be composed of 1 part Portland Cement and 2 parts
clean, sharp mortar sand suitably graded for the purpose by
conforming in other respects to the provisions of Item No. 403,
"Concrete for Structures" for fine aggregate. Hydrated lime or
lime putty may be
added to the mix, but in no case shall it exceed 10 percent by
weight of the total dry mix.
(3) Reinforcement and Steel
Reinforcing Steel shall conform to Item No. 406, "Reinforcing
Steel ".
Structural Steel shall conform to Item No. 720, "Metal for
Structures ".
(4) Frames, Grates, Rings and Covers
Frames, grates, rings and covers shall conform to Item No. 503,
Miscellaneous Structures
508 06/08/88 Page 1 and Appurtenances
"frames, Grates, Rings and Covers ".
(5) Safety End Treatment for Structures
(a) Bolts and Nuts
All bolts, nuts and associated hardware shall meet the
specifications of ASTH A 307.
(b) Plates and Angles
All plates and similar angles and brackets shall meet the
specifications of ASTM A 36.
(c) Pipe Runners
Pipe Runners shall conform to the requirements of ASTM A53,
Grade B.
(d) Galvanizing
All hardware including nuts, bolts and plates.listed.above .
shall be galvanized conforming to ASTM A 123 or A 153.
(6) Miscellaneous Items '
Cast iron for supports, steps and inlet units shall conform
the shape and dimensions indicated. The casting shall be clean
and perfect, free from sand or blow holes or other defects. Cast
iron castings shall meet the requirements of ASTM A 48, Class 30.
Steel for temporary covers when used with Stage Construction shall
be adequate for the loads imposed.
508.4 Construction Methods
All concrete work shall be performed in accordance with Item No. 410,
"Concrete Structures ". Forms will be required for all cast in place
concrete walls, except where the nature of the surrounding material is such
that it can be trimmed to a smooth vertical face (the outside form for
concrete bases). Where cast in place concrete is used in wall construction
of storm sewers, the steps shall be cast into the wall when the concrete is
placed.
The construction inlets shall be done as soon as is practicable after sewer
lines into the inlet are complete. All severs shall be cut neatly at the
inside face of the walls of the inlet and pointed up with mortar.
Bases for cast in place inlets may be placed prior to or at the
Contractor's option after the sewer is constructed.
Bases for box sewers shall be cast as an integral part of the sewer. The
manholes may be constructed prior to backfilling or if the Contractor so
elects, the manhole opening may be covered temporarily with a steel plate
to facilitate the compaction of backfill for the sewer as a whole.
Miscellaneous Structures
508 06/08/88 Page 2 and Appurtenances
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1 )
1
Thereafter, required excavation for the inlet shall be made and the inlet
constructed and backfilled.
The inverts passing out or through an inlet shall be shaped and grouted
across the floor of the inlet as indicated. This shaping may be
accomplished by adding shaping mortar or concrete after the base is cast or
by placing the required additional material with the base.
All miscellaneous structures shall be completed in accordance with the
details indicated. Backfilling to original ground elevation shall be in
accordance with the provisions of the appropriate items and as directed by
the Engineer. •
508.5 Measurement
All miscellaneous structures and safety end treatments satisfactorily
completed as indicated vill'be measured as completed units per each. - ,
Concrete removed, excavation and backfill, riprap, pipe, headwalls,
wingwalls, collars and apron slabs will not be measured under this item but
will be considered subsidiary to the other items.
Frames, grates,_ rings, covers,.safety end treatment and any-concrete curb -
and gutter indicated will not be measured and paid for but shall be
considered subsidiary to one of the pay items set in the bid.
508.6 Payment
(1) Inlets
Payment for Inlets of the type indicated in place in accordance
with these specifications and measured as prescribed above will be
made at the unit price bid for each Inlet, of the type specified.
(2) Energy Dissipators and Headwalls
Payment for special complete structures will be made at the unit
price bid per each.
(3) Safety End Treatment
Payment for Safety End Treatment, complete in place, will be made
at the unit price bid for each unit of the type indicated.
Payment will be made under one of the following:
Pay Item No. 508 -E: Energy Dissipators, _ In. Dia. - Per Each.
Pay Item No. 508 - Headwalls, Type B , 11 =36 In. Dia. Pipe - Per Each.
Pay Item No. 508-i: Headwalls, Type B , 2- 3.36In. Dia. Pipe . -Per Each.
Pay Item No. 508 - IA: Inlet, Area - Per Each
Pay Item No. 508 -IG: Inlet, Grated - Per Each.
Pay Item No. 508 -SET Safety End Treatment, Type _ Size
- Per Each
Pay Item No. 508 -I5R: Inlet, Recessed - Per Each.
Miscellaneous Structures
508 06/08/88 Page 3 and Appurtenances
End
Pay Item No. 508 -I10R: Inlet, Recessed - Per Each.
Pay Item No. 508 -I15R: Inlet, Recessed - Per Each.
Pay Item No. 508 -I20R: Inlet, Recessed - Per Each.
Pay Item No. 508 -I5S: Inlet, Recessed - Per Each.
Pay Item No. 508 -I10S: Inlet, Standard - Per Each.
Pay Item No. 508 -I15S: Inlet, Standard - Per Each.
Pay Item No. 508 -I20S: Inlet, Standard - Per Each.
Ref: 403, 406, 410, 503, 720
Miscellaneous Structures
508 06/08/88 Page 4 and Appurtenances
510.1 Description
Item No. 510
Pipe
This item shall consist of furnishing all pipe and /or materials'for
constructing pipe_mains, severs, laterals, stubs, inlet leads, service
connections and culverts, including all applicable work such as excavating,
bedding, jointing, backfilling materials, tests, concrete trench cap,
concrete cap and encasement, etc., prescribed under this item in accordance
with the provisions of the Edvards Aquifer Protection Ordinance, when
applicable and Specification "Cuts in Public Right of Way" for existing
streets. The pipe shall be of the sizes, types, class and dimensions
indicated or as designated by the Engineer and shall include all joints or
connections to nev or existing mains, pipes, severs, manholes, inlets,
structures, etc., as may.be required to complete the vork in accordance
vith specifications and published standard practices of the trade
associations for the material specified and to the lines and grades
indicated. This item shall consist of any pumping, bailing, drainage and
Item No. 509, "Trench Safety Systems" for trench walls, when indicated.
Unless otherwise provided, this item.shall consist of the removal and
disposition of trees, stumps and other obstructions, old structures or
portions thereof such as house foundations, old severs, masonry or concrete
walls, the plugging of the ends of abandoned piped utilities cut and left
in place and the restoration of existing utilities damaged in the process
of excavation, cutting and restoration of pavement and base courses,•the
furnishing and placing of select bedding, backfilling and cement or lime
stabilized backfill, the hauling and disposition of surplus materials,
bridging of trenches and other provisions for maintenance of traffic or
access as indicated.
510.2 Materials
The Contractor shall submit descriptive information and evidence that the
materials and equipment the Contractor proposes for incorporation into the
work is of the kind and quality that satisfies the specified functions and
quality. Water and Wastewater Standard Products Lists form a part of the
Specifications. Should the Contractor elect to use any materials from
these lists, they should be completely and clearly identified when
submitted.
(1) Concrete
Concrete shall conform to Item No. 403, "Concrete for Structures ".
(2) Coarse Aggregate
Coarse aggregate shall conform to Item No. 403, "Concrete for
Structures" or one of the following:
510 06/09/88 Page 1 Pipe
(a) Pipe Bedding Stone
Pipe bedding stone shall be clean gravel, crushed gravel or
crushed limestone, free.of mud, clay, vegetation or other
debris, conforming to ASTH C 33 for stone quality. Size
gradation shall conform to'ASTH C -33 No. 57 or No. 67 or the
following Table:
SIEVE SIZE PERCENT RETAINED BY VEIGBT
1 1/2" - 0
1" • ;-1.: 0-10
:Y :_1/2 ".
•
#4 azresf;•�y n X90=100 ....
18 • • . , r - P•95-1.00
u_• -, mac._ ,:•
(b) Foundation Rock -
Foundation rock shall be well graded coarse aggregate ranging
in size from 2 to 8 inches.
(c) Flexible Base
Flexible base shall conform to Item No. 210, "flexible Base ".
(3) Fine Aggregate
(a) Concrete and Mortar Sand
Fine aggregate shall be Grade 1 and shall conform to Item No.
403, "Concrete for Structures ".
(b) Bedding Sand
Sand for use as pipe bedding shall be clean, granular and
homogeneous material composed mainly of mineral matter, free
of mud, silt, clay lumps or clods, vegetation or debris. The
material removed by decantation SDHPT Test Method Tex - 406 -A,
plus the weight of any clay lumps, shall not exceed 4.5
percent by veight.
The average electrical resistance when eater- saturated shall
be at least 1,800 ohm /cm by the single probe method, vith no
single test reading lover than 1,500 ohm /cm. Size gradation
of sand for bedding shall be as follows:
510 06/09/88 Page 2 Pipe
(4) Soil Cement
GRADATION TABLE
SIEVE SIZE PERCENT RETAINED BT WEIGHT
1/4" 0
' #60 - - 75 - 100 :
#100 95 -100
Soil cement bedding shall consist of a mixture of approved soil,
cement, vater and approved admixtures. The soil cement mixture
shall have a minimum 14 day compressive strength of 120 psi and a
maximum shrinkage of 5 percent. The mix design and the results of
mix testing, both done by an independent testing laboratory
acceptable to the Ovner, shall be submitted to the Engineer for
approval prior to construction.
The eater content shall not exceed that required to provide a mix
that will flow, can be pumped and will maintain the soil in
suspension while being placed. The soil cement bedding shall be
placed such that all voids are filled. Soil for the soil cement
bedding shall meet the folloving requirements:
a. A minimum of 80 percent by dry weight shall pass a #4
sieve.
b. Between 5 percent and 30 percent shall pass a #200
sieve.
c. The soil material shall have a plasticity index of 3 or
less.
d. The maximum size of any clay balls in the soil shall be
1/2 inch.
Class C or Class P fly ash may be used as an admixture. The fly
ash shall meet the requirements of ASTH C 595, C 618 and the
supplier's certificate as to the analysis and composition shall
be furnished.
Hatching equipment shall be provided to obtain the proper weights
of soil, cement, water and admixture. All measuring devices shall
be sensitive to a 2 percent variation above or below the actual
weights required.
The mixers used for mixing the soil cement bedding shall be
designed and operated so that the soil cement discharged from the
mixer is uniform in compaction and consistency throughout each
batch.
.510 06/09/88 Page 3 Pipe
4
1
(5) Pea Gravel -
Pea gravel bedding shall be clean vashed material, hard and
insoluble in eater, free of mud, clay, silt, vegetation or other
debris. Stone quality shall meet ASTH C 33. Size gradation shall
be as follovs:
•
. SIEVE SIZE • PERCENT RETAINED BY =cat
ir (7) Cement Stabilized Backfill
(8) Pipe
General
3/4" . . 0
1/2" - 0 -25
1/4" 90 -100
(6) Select Backfill or Borrov
This material•shall consist of borrov or suitable material
excavated from the trench vhich has a plasticity index of less
than 20, a moisture content vhich does not exceed 2 percent from
optimum as determined in accordance vith SDHPT Test Method
Tex -114 -E and free bf stones or rocks over 8 inches.
All suitable materials from excavation operations not required for
backfilling the trench shall be placed in embankments, if
applicable. All unsuitable materials should be dried or modified
to make them suitable for use, as required.
Vhen indicated or directed by the Engineer, all backfill shall be
with cement- stabilized backfill rather than the usual materials.
Unless othervise indicated, cement stabilized backfill material
shall consist of a mixture of the dry constituents described for
Class J Concrete. The cement and aggregates shall be thoroughly
dry mixed vith no eater added to the mixture except as may be
directed by the Engineer.
Fire line leads and fire hydrant leads shall be ductile iron.
Domestic vater services shall not be supplied from fire service
leads, unless the domestic and fire connections are on separately
valved branches vith an approved backflov prevention device in the
fire service branch. All vastewater force mains shall be
constructed of ductile iron pipe of the class indicated, Thickness
Class 50 minimum.
Water pipe in or near structures and in vehicular traffic areas
within utility easements on private property shall be Ductile Iron
Pipe, Thickness Class 52 wrapped as indicated, except for sizes
over 24 inches, Concrete Pressure Pipe, steel cylinder type,
conforming to the requirements of AVVA C -301 vill be acceptable.
510 06/09/88 Page 4 Pipe
There may be no service connections to Concrete Pressure Pipe
installed in these areas. All service tubing (3/4 inch thru 2
i __• f ._. T inches).installed in any such private•property shall be 150 psi
,...annealed seamless Type K copper tubing vith no sweat or soldered
__ joints.
The quality of materials, the process of manufacture and the
finished:pipe shall•be subject to inspection•and approval by the
Engineer at the pipe manufacturing plant and at the project site
prior to and during installation.
510
(a) Reserved
(b) Iron Pipe
Iron pipe shall be ductile iron pipe conforming to the
specifications below: ' • •
AWA C -151
AWA C -115
AVVA C -104
For push - on or mechanical joint piple..
For flanged pipe, flanges must be ductile iron
(gray iron is not acceptable) Class 125 ANSI
B16.1 and must be fabricated and attached to
the pipe barrels by the original pipe
manufacturer. • .
•
All pipe interiors shall be cement - mortar
lined and seal coated accordingly; pipe
exteriors shall be coated as required by the
applicable pipe specification.
Except as described for easements, and where not
.othervise indicated, ductile iron pipe shall meet the
following minimum physical requirements:
Thickness Class 50
Tensile Strength
Yield Strength
06/09/88 Page 5
60,000 psi
42,000 psi
1. Ductile Iron and Gray Iron Fittings
Fittings shall be push - on, flanged or mechanical joint
as indicated or approved and shall conform to the
following specifications:
Sizes 4 inch through 12 inch: AMA C -110 or
AMA C -153
Sizes larger than 12 inch: AVVA C - 110
Pipe
is r,.,,••a... �:u r�:.. ?: 2. - .Joint Materials
510
06/09/88
AVVA C -104:
The interior of all fittings shall
be cement - mortar lined and coated as
per C -104; exterior coating shall be
as required by the applicable
fitting specification.
, :Gaskets for mechanical joints shall conform to ANSI /IOVA
A21.11 /C -111.
Joining of slipjoint iron pipe shall, vithout exception,
be accomplished with the natural or synthetic rubber
gaskets of the manufacturer of that particular pipe
being used. A joint lubricant shall be used and
applicable recommendations of the manufacturer shall be
folloved.
Gaskets for flanged joints shall be bonded continuous
full face gaskets, of 1/8 inch minimum thickness of
natural or synthetic rubber, cloth - reinforced rubber,
neoprene or asbestos composition material, preferably of
deformed cross section design and shall meet all
applicable requirements of ANSI /AVVA A21.11/C -111 for
gaskets. They shall be manufactured by, or satisfy all
recommendations of, the manufacturer of the
pipe /fittings being used and be fabricated for use with
Class 125 ANSI B16.1 flanges.
Tee -head bolts, nuts and washers for mechanical joints
shall be high strength, low alloy, corrosion resistant
steel stock equal to "COR -TEN A" or alloyed ductile iron
conforming to ASTH A 536, fabricated in accordance with
the ANSI /AVVA A21.11 /C -111.
Hex head bolts and nuts shall satisfy the chemical and
mechanical requirements of ASTH A 307 Grade B and shall
be fabricated in accordance vith ASTH B 18.2 vith UNC
Class 2 rolled threads.
Hex bolts, nuts and vashers shall be stainless steel or
hot -dip zinc or hot -dip aluminum coated. Either hex or
tee head bolts, nuts and washers with bonded
fluoropolymer corrosion resistant coating may be used
vhere specifically approved.
All threaded fasteners shall be marked with a readily
visible symbol cast, forged or stamped on each nut and
bolt, which vill identify the fastener grade /material
and the producer and the supplier shall provide adequate
literature to facilitate such identification. Painted
markings are not acceptable.
Page 6 Pipe
3. Polyethylene Film Wrap
4. Harking
(c) Concrete
. 1. General
All iron pipe, fittings and accessories shall be vrapped
vith 8 mil (minimum) polyethylene film conforming to
AWWA C -105, with all edges overlapped and taped securely
vith duct tape to provide a continuous vrap to prevent
contact between the piping and the surrounding backfili.
Repair all punctures of the polyethylene vith duct tape
to restore the continuous protective wrap before
backfilling.
Each pipe joint shall be marked vith the pipe class,
manufacturer's identification, year manufactured and
"Ductile" or "DI ".
Pipe shall conform to ASTH C 76 for Circular Pipe.
Concrete pipe smaller than 12 inches in diameter shall
conform to ASTH C 14, Extra Strength. All pipe shall be
machine made or cast by a process vhich vill provide
uniform placement of the concrete in the form and
compaction by mechanical devices vhich vill assure a
dense concrete. Concrete shall be mixed in a central
batch plant or other approved batching facility from
which the quality and uniformity of the concrete can be
assured. Transit mixed concrete will not be acceptable
tor use in precast pipe. The pipe shilFbe' III or _
the class indicated. Storm sewer pipe shall be of the
tongue and groove or 0 -ring joint design. Wastewater
pipe shall be of the 0 -ring joint design.
2. Harking
Each joint of pipe shall be marked with the pipe class,
the date of manufacture, the manufacturer's name or
trade mark, diameter of pipe and orientation, if
required.
Pipe marking shall be vaterproof and conform to ASTH C
76. Harking of Life Design shall be included on
wastewater pipe.
3. Minimum Age for Shipment
Pipe shall be considered ready for shipment when it
conforms to the tests specified in ASTH C 76.
510 06/09/88 Page 7 Pipe
4. Joint Materials --
When constructing storm sewers, the Contractor shall
have the option of making joints with either of the
folloving materials:
— Composition
Bitumen (petroleum
plastic content)
(Z by veight)
a. Mortar
Mortar for joints shall meet the requirements '
set forth below in "Mortar ".
b. Cold Applied Preformed Plastic Gaskets
Cold Applied Plastic Gaskets shall be suitable
for sealing joints of tongue and groove II
pipe. The gasket sealing the joint
shall be produced from blends of refined
hydrocarbon resins and plasticizing compounds
reinforced vith inert mineral filler and shall '
contain no solvents, irritating fumes or
obnoxious odors. The gasket joint sealer
shall not depend on oxidizing, evaporating or '
chemical action for its adhesive or cohesive
strength and shall be supplied in extruded
rope form of suitable cross section. The size
of the plastic gasket joint sealer shall be in '
accordance vith the manufacturer's
recommendations and sufficient to obtain II
around the joint. The gasket
joint sealer shall be protected by a suitable
removable vrapper that may be removed
longitudinally without disturbing the joint 1
sealer to facilitate application.
The chemical composition of the gasket joint '
sealing compound as shipped shall meet the
folloving requirements:
Test Method Typical Analysis
ASTM D 4
Ash -inert Mineral Water Tex -526 -C 30 -50
(Z by veight)
Volatile Hatter (at 325 F) Tex -506 -C
(Z by weight)
2.0 Maximum
1
1
1
1
50 -70
1
1
1
The gasket joint sealing compound when immersed
30 days at ambient room temperature separately
percent solution of caustic potash, a mixture oil
percent hydrochloric acid, a 5 percent solution
510 06/09/88 Page 8 Pipe '
1
• tea, •
510
Property
5. Bends
06/09/88 Page 9
sulfuric acid and a saturated H2S solution shal3
shoe no visible deterioration.
The physical properties of the gasket joint sealir
compound as shipped shall meet the following
requirements:
Test Typical Analysis
Method Minimum Maximum
Specific Gravity at 77 F ASTH D 71 1.20 1.35
Ductility at 77P (cm) Minimum Tex -503 -C 5.0
Softening point Penetration: Tex -505 -C 275 F
32 F (300 g) 60 sec Tex -502 -C 75
, 77 F (150 g) 5 sec Tex -502 -C 50 120
115 F (150 g) 5 sec Tex -502 -C 150
Flashpoint C.O.C. F Tex -504 -C 600 F
Fire C.O.C. F Tex -504 -C 625 P
When constructing wastewater lines, the contractor shall use
0 -ring gasket joints conforming to ASTH C 443. Just before
making a joint, the ends of the pipe shall be clean, dry,
free of any foreign matter, lumps, blisters, excessive
coal -tar coating and grease or oil and shall be vire brushed.
The gasket and the inside surface of the bell shall be
lubricated vith a light film of soft vegetable soap compound
to facilitate assembly of the joint. Rubber 0 -ring gaskets
shall be stretched uniformly in the joint. No horizontal or
vertical angles in the alignment of vaste eater pipes shall
be permitted unless indicated. The spigot shall be centered
in the bell, the pipe pushed uniformly home_ and brought into __
— '"-" - -- - - -""" —' true alignment: `Bedding materiar shall be placed'and tamped ��
against pipe to secure the joint. •
When horizontal or vertical angles in the alignment of
storm severs are indicated, the bend or angle shall be
constructed by cutting on a bias one or both pipes as
may be required for the alignment indicated.
The pipe cut shall be sufficiently long to alloy
exposing the reinforcement, which shall be bent, velded
and incorporated into the pipe bend and reinforced
concrete collar to maintain the structural integrity.
The collar shall be 6 inches minimum, reinforced vith #4
bars on a 1 foot center both directions. Builder's
hardware cloth may be used on the outside of the joint
to aid in holding cementing materials in place.
Plyvood, fiberboard or other materials placed on the
inside of the pipe as formwork shall be removed as soon
as the joint materials have obtained initial set, after
which the inside surface of the pipe joint shall be
finished smooth and true to the line and grade
Pipe
510
established. The Contractor may use prefabricated bends
meeting the specification requirements in lieu of field -
fabricated bends. All bends shall be watertight, have a
smooth floe line and be equal or greater - in strength to
the adjacent. pipe.
- Horizontal or bends in vastevater lines shall
• be accomplished by use of With the Engineer's
approval, bends may be constructed using beveled radius
pipe joints or deflected straight pipe meeting the
manufacturer's recommended minimum radius of curvature.
6. Sulfide and Corrosion Control
•
All concrete pipe used for vastevater installations"
shall•be protected from sulfide and corrosion damage by
using limestone aggregate or vall thickness pipe vhich
meets the 100 year life design.
(d) Concrete Steel Cylinder (CSC) Pipe
1. General Requirements
The Contractor shall submit to the Engineer for approval
along with other required data a tabulated layout
schedule with reference to the stationing and grade
lines to be used.
The manufacturer shall furnish all fittings and special
pieces required for closures, bends, branches, manholes,
air valves, blovoffs and connections to main line valves
and other fittings as indicated.
Each pipe length, fitting and special joint shall have
plainly marked on the bell end of the pipe, the head
condition for vhich it is designed. In addition,
marking vill be required to indicate the location of
each pipe length or special joint in the line and such
markings vill be referenced to the layout schedules and
dravings and submitted for approval.
Hydrostatic testing of concrete steel cylinder fittings
during fabrication will not be required.
2. Design and Inspection
Where not othervise indicated, concrete steel cylinder
pipe shall be Class 150, designed to vithstand a vacuum
of not less than 28 feet of eater in addition to other
loads. Valve reducers, tees and outlets from a pipe run
shall be designed and fabricated so that all stresses
are carried by the steel forming the fitting or outlet.
06/09/88 Page 10
Pipe
Concrete steel cylinder pipe shall meet one of the
following specifications:.
AWA C -301 - Any Size
AWA C - 303 - 24 inch maximum size
All pipe flanges shall conform to AWA C -207,
requirements for standard steel flanges of pressure
classes corresponding to the pipe class.
Pipe to be installed in a tunnel or encasement shall be
manufactured vith 1 inch thick by 24 inch vide skid
bands of mechanically impacted mortar in addition to the
normal coating.
All concrete steel cylinder fittings shall be
constructed of steel plate of adequate strength to
withstand both internal pressure and external loading.
Rod reinforcing shall not be used to figure the required
steel area. The fittings shall have a concrete lining
and 1 inch minimum coating of cement mortar, except that
centrifugally spun lining need not be reinforced.
Minimum lining thickness shall be 1/2 inch for 16 inch
pipe and 3/4 inch for sizes larger than 16 inch pipe.
Where it is impractical to place such concrete
protection on interior surfaces of small outlets, 2
coats of "Bitumastic Tank Solution" shall be applied.
No fitting shall be made by cutting of standard pipe,
except that outlets of less than 75 percenLof_the
diameter may be placed in a standard pipe. Beveled
spigots may be placed on standard pipe.
Joint Materials
510
Joints shall be of the rubber gasket type conforming to
the applicable standards. The inside and outside
recesses betveen the bell and spigot shall be completely
filled vith Cement Grout in accordance vith the pipe
manufacturer's recommendations. Grout materials for
jointing such pipe, unless othervise indicated, shall be
as described herein.
(e) In Place Pipe Rehabilitation
1. In Place Sliplining With or Without Pipe
Destruction /Replacement
This item shall consist of installing a high density
polyethylene pipe by use of a pipe insertion machine,
such as Expand -A -Line or approved equal, into an
existing line.
06/09/88
Page 11 Pipe
r
a. Material Requirements
The polyethylene pipe shall meet the following
specifications:
ASTM F 714
Plastic Pipe Institute PE3408
Unless otherwise specified, the Contractor shall
furnish the polyethylene pipe in accordance with
the following table:
Depth of Cover
Expressed in Peet SDR of Pipe
0 — 16 17
._16.1 — . 11
b. Functional Requirements
The polyethylene pipe shall be assembled and
joined at the site using the thermal butt fusion
method. All equipment and procedures shall be in
strict compliance with the manufacturer's
recommendations. Fusing shall be accomplished by
personnel certified as fusion technicians by a
manufacturer of polyethylene pipe and /or fusing
equipment.
The complete joint shall be in true alignment and
have a uniform double roll back bead resulting from
the use of proper temperature and pressure. The
joint shall be alloyed adequate cooling time before
removal of pressure. Joints shall be smooth on the
inside vith a maximum projection of the veld bead
of approximately 3/16 inch. The fused joint shall
be watertight and shall have a tensile strength
equal to that of the pipe. All joints shall be
subject to acceptance by the Engineer or his /her
representative prior to placement. All defective
joints shall be cut out and replaced.
Any section of the pipe with a gash, abrasion, nick
or scar greater in depth than 10 percent of the
wall thickness, or containing concentrated ridges,
discolorization, excessive spot roughness, pitting,
variable wall thickness, or any other defect of
manufacturing or handling as determined by the
Engineer or his /her representative, shall be
discarded and removed from the site.
Terminal sections of pipe that are joined within
the insertion pit shall be connected with a full
circle pipe repair clamp with a minimum length of
510 06/09/88 Page 12 Pipe
one and one half times the nominal inside pipe
diameter, in accordance vith Water and Wastewater
OPL No. 271. The butt gap be.tveen pipe ends shall
not exceed 1 /10'of the nominal inside diameter of
the pipe.
c. Installation Procedure
The Contractor shall carry out his operations in
strict accordance with all OSHA and manufacturer's
safety requirements. Particular attention is drawn
to those safety requirements involving entering
confined spaces and trench safety.
The Contractor, when required, shall provide for
the floe of eater around the section or sections of
pipe designated for rehabilitation including active
services in the rehabilitation section. The bypass
shall be made by plugging the line at an existing
upstream manhole or adjacent system. The pump and
bypass lines.shall be of adequate capacity and size
to handle the flow. The Contractor shall take all
necessary steps to prevent flooding of any private
property and shall be liable for damage's incurred
by the flooding.
Nev polyethylene pipe shall be inserted immediately
behind the boring equipment in accordance with the
manufacturer's procedures. The boring machine
shall be specifically designed and: manufactured by
Expand -A -Line or approved equal. The boring
machine shall be equipped with all controls
necessary to place the pipe on proper line and
grade according to the plans.
The Contractor shall install all pulleys, rollers,
bumpers, alignment control devices and other
equipment required to protect existing manholes and
to protect the pipe from damage during .
installation.
Lubrication may be used as recommended by the pipe
manufacturer. Under no circumstances shall the
pipe be stressed beyond its elastic limit.
All active service connections shall be identified
by video inspection or other means and connected to
the new main in accordance with the plan details.
Upon commencement, insertion, from manhole to
manhole, shall be continuous without interruption
except as approved by the Engineer.
510 06/09/88 Page 13 Pipe
The installed pipe shall be allowed the
manufacturer's recommended amount of time, but not
less than 12 hours, to provide for complete
shrinkage or relaxation of the pipe prior to any
connection of service lines, sealing of the annular
space where the pipe enters the manhole; or
- =backfilling of the insertion pit. Sufficient
-excess length of pipe shall be alloyed to provide
for this shrinkage.
The pipe bedding in the insertion pit shall be
either pea gravel or pipe bedding stone. Bedding
and backfill shall conform to the specifications
contained herein. All street repairs and pavement
replacement shall conform to Item No. 500, "Cuts in
Public Right of Way ".
The relaxed pipe shall be cut so that it projects 4
inches inside of the manhole and any annular space
shall be sealed. Sealing shall be with material
approved by the Engineer. The sealant shall
completely fill the void betveen the pipe and the
manhole vall and shall extend 3 inches beyond the
annulus on the inside vall of the manhole. The
sealant shall form a smooth transition from the
pipe onto the manhole. The complete joint shall be
uniform and vatertight. A concrete invert shall be
poured in place and shaped to form a smooth floe
channel through the manhole.
2. Cured Resin Pipe Lining
This item shall consist of installing a resin
impregnated flexible felt tube by an inversion
reconstruction method, such as Insituform or equal, into
an existing pipe. Curing shall be accomplished by
circulating hot vater or other approved method to cure
the resin into a hard impermeable pipe lining.
Insituform is a patented process installed by licensed
installers.
a. Material Requirements
The fiber felt tube shall be fabricated to a size
that when installed vill neatly fit the internal
circumference of the conduit specified by the
Engineer.
The minimum length shall be that deemed necessary
by the Contractor to effectively span the distance
from the inlet to the outlet of the respective
manholes unless othervise specified. The
Contractor shall verify the lengths in the field
before impregnation. Individual inversion runs can
510 06/09/88 Page 14 Pipe
be made over one_or more manhole sections as
determined in the field by the Contractor, subject
to approval by the Engineer.
Unless otherwise specified, the Contractor shall
furnish a general purpose unsaturated polyester
resin and catalyst system that meets the finished
cured physical strengths listed belov:
Flexural Stress (ASTM D 790) 4,500 psi
Tensile Stress (ASTM D 368) 2,500 psi
Modulus of Elasticity (ASTM D 790) 250,000 psi
If so directed, the Contractor shall furnish, prior
to use of the materials, satisfactory vritten
certification of his compliance vith the above
standards.
b. Installation Procedure
The Contractor shall carry out his operations in -
strict accordance vith all OSHA and manufacturer's
safety requirements.. Particular attention is drawn
to those safety requirements involving working vith
scaffolding and entering confined spaces.
When required, cleaning and repair of the pipe line
shall be performed by City of Austin Water and
Wastevater Utility.. Inspection of pipe line by the
Contractor shall be performed by experienced
personnel trained in locating breaks, obstacles
and service connections by closed - circuit
television. The interior of the pipe shall be
carefully inspected to determine the location of
— any conditions vhich may prevent proper
installation into the pipe and these conditions
shall be corrected. A video tape and log shall be
made by the Contractor and kept for later reference
by the Ovner.
The Contractor, when required, shall provide for
the floe of vater around the section or sections of
pipe designated for rehabilitation including active
services in the rehabilitation section. The bypass
shall be made by plugging the line at an existing
upstream manhole and pumping the floe into a
downstream manhole or adjacent system. The pump
and bypass lines shall be of adequate capacity and
size to handle the flow. The Contractor shall take
all necessary steps to prevent flooding of any
private property and shall be liable for any
damages incurred by the flooding.
510 06/09/88 Page 15 Pipe
It shall be the responsibility of the City of
Austin to clear the lines of obstructions such as
solids, dropped joints, protruding service
connections or collapsed pipe that vill prevent the
insertion of Insituform.
•- The Contractor shall designate a location where the
uncured resin in the original' containers and the
unimpregnated fiber -felt tube shall be vacuum
impregnated prior to installation. The Contractor
shall alloy the Engineer to inspect the materials
and "vet out" procedure. The quantities of the
liquid thermosetting materials shall be per
manufacturer's standards to provide the wall
thickness specified.
Water for the work shall be furnished by the City.
Contractor shall use a double -check valve assembly
to prevent backflov in the event of pressure
failure. The wet out fiber -felt tube shall be
inserted through an existing manhole or other
approved access by means of an inversion process
and the application of a hydrostatic bead
sufficient to fully extend it to the next
designated manhole.
The impregnated tube material shall be inserted
into the vertical inversion standpipe vith the
impermeable plastic membrane side out. At the
lover end of the inversion standpipe, the felt tube
shall be turned inside out and attached to the
standpipe so that a leakproof seal is created. The
inversion head will be adjusted to be of sufficient
height to cause the impregnated tube to invert from
manhole to manhole and hold the tube tight to the
pipe vall, produce dimples at side connections and
flared ends at manholes. The use of a lubricant is
recommended and, if used, such lubricant shall be
as approved by manufacturer's standards. The
manufacturer's standards shall be closely followed
during the elevated curing temperature so as not to
over stress the felt -fiber and cause damage or
failure prior to cure. (If prior approval is
obtained from the owner, the Contractor may elect
to use a Top Inversion. In this method the
fiber -felt tube is preinverted to a distance that
corresponds to the minimum inversion head and
instead of attaching to an elbow at the base of the
vertical inversion standpipe, it is attached to a
top ring and the standpipe is formed from the felt
tube itself.)
After inversion is completed the Contractor shall
supply a suitable heat source and water
510 06/09/88 Page 16
Pipe
1
1
recirculation equipment. The equipment shall be
capable of delivering hot eater throughout the
section by means of a prestrung hose, vhich has
been perforated per manufacturer's recommendations,
to uniformly raise the vater temperature above the
temperature required to effect a cure of the resin.
This temperature shall be determined by the
resin /catalyst system'employed.
The heat source shall be fitted vith suitable
monitors to gauge the temperature of the incoming
and outgoing eater supply. Another such gauge
shall be placed betveen the impregnated felt tube
and the pipe invert at the remote manhole to
determine the temperature during cure. Vater
temperature in the line during the cure period
shall not be less than 150 F or more than 200 F as
measured at the heat source return line.
Initial cure shall be deemed to be completed when
inspection of the exposed portions of pipe liner
appear to be hard and sound and the remote
temperature sensor indicated that an exotherm had
occurred. The cure period shall be of a duration
recommended by the resin manufacturer, as modified
for the manufacturer's process during which time
the recirculation of the eater and cycling of the
head exchanger to maintain the temperature
continues.
The Contractor shall cool the hardened_pipe_liner______
to a temperature below 100 F before relieving the
static head in the inversion standpipe. Cool -down
may be accomplished by the introduction of cool
vater into the inversion standpipe to replace
eater being drained from a small hole made in the
downstream end.
Care shall be taken in the release of the static
head so that a vacuum vill not be developed that
could damage the nevly installed pipe liner.
The finished pipe liner shall be continuous over
the entire length of an inversion run betveen tvo
manholes and be free from visual defects such as
foreign inclusions, dry spots or voids.
Any defect which vill affect, in the foreseeable
future, or warranty period, the integrity or
strength of the pipe liner shall be repaired at the
Contractor's expense, in a manner specified by the
Engineer.
510 06/09/88 Page 17 Pipe
0
510
(f) Polyethylene Tubing
1. General-
If, due to broken or misaligned pipe at a manhole 11
vall, the pipe liner failed to make a tight seal,
the Contractor shall apply a seal at that point.
The seal shall be of a resin mixture compatible
vith pipe liner.
After the pipe liner has been cured in place, the
Contractor shall connect new services or reconnect I
existing service connections as designated and
identified by the proposal. This shall generally
be done vithout excavation, from the interior of
the pipeline by means of a television camera and a
cutting tool. The eater- tightness of the pipe
liner shall be gauged while curing and under a
positive head. To ascertain that there is no
leakage, the water pressure inside the pipe should
hold at 6 pounds per square inch for a duration of
at least 4 hours testing time. After the work is
completed the Contractor will provide the Engineer
with a video tape shoving both the before and after
conditions including the restored connections.
All polyethylene (PE) plastic tubing shall be high
density, high molecular weight plastic tubing, pressure
rated at 200 psi vorking pressure and must bear the
National Sanitation Foundation seal of approval for
potable eater service.
When tested for Environmental Stress Cracking, the PE
tubing shall not show any loss of pressure in the 6
specimens tested for 3 hours in accordance vith the
requirements of ASTM D 2737 using the test pressure of
400 psi at 73.4 F.
The minimum burst pressure shall be 630 psi at 73.4 F
determined in accordance vith ASTH D 1599, latest
revision. The time of testing of each specimen shall be
between 60 and 70 seconds.
06/09/88
The tubing shall not fail, balloon, burst or veep as
defined in ASTM D 1598, latest revision, when tested in '
accordance with the Sustained Pressure Test Method of
ASTM D 2737 but under the folloving test conditions:
Temperature
73.4 F
100 F
•
Time
1,000 hours
1,000 hours
Page 18
Pressure
400 psi
330 psi
1
1
1
1
1
1
1
1
1
Pipe
1
...o;.R1u:•:? z, +- s, :2.. Markings . . - -_
. 3 .
-,;Is.� ^_ra :•� - Permanent marking on the tubing shall include the'
- following at intervals of not more than 5 feet:
3. Tube Size •
PE tubing shall be standard copper tube size outside
diameter, with Standard Dimension Ratio (SDR) of 9.
Standard sizes, dimensions and tolerances shall be as
follows:
Nominal Outside Diameter ' pall Thickness
Tube Size Average Tolerance Minimum Tolerance
(inches) (inches) (inches) (inches) (inches)
3/4 0.875 t0.004 __.�__ 0.097 ._ +0.010
1 1.125 ±0.005 0.125 +0.012
1 1/4 1.375 ±0.005 0.153 +0.015
1 1/2 1.625 ±0.006 0.181 +0.018
2 2.125 10.006 0.236 +0.024
(g) Copper Tubing
Nominal tubing size.
The type of plastic material, i.e., PE 3408.
The Standard Dimension Ratio (SDR) and the pressure
rating in psi for vater at 73.4 F (e.g., SDR -9, 200
psi).
ASTH D 2737 designation.
The manufacturer's »ame or trademark, code and seal
of approval (NSF-mark) of the National Sanitation
Foundation.
All copper service tubing shall be annealed seamless Type K
vater•tube rated at 150 psi working pressure. The tubing
shall be homogenous throughout and free from cracks, holes,
crimping, foreign inclusions or other defects. It shall be
uniform in density and other physical properties.
Nominal
Tube Size Outside Diameter pall Thickness
(inches) (inches) (inches)
1/2 0.625 +0.0025
3/4 0.875 +0.003
1 1.125 +0.0035
1 1/4 1.375 +0.004
1 1/2 1.625 +0.0045
2 2.125 .0.005
0.049 .0.004
0.065 .0.0045
0.065 .0.0045
0.065 +0.0045
0.072 .0.005
0.083 .0.007
510 06/09/88 Page 19 Pipe
510
Exposed threads shall be covered with plastic caps or
sheeting to protect the threads.
Brass goods of each type and class shall be compatible with
other fittings in common usage for similar purposes. where
not otherwise indicated, all such materials shall meet the
following requirements:
All fittings shall be suitable for use at hydrostatic
working pressures up to 150 psi.
06/09/88 Page 20
1
(h) Service Connection Fittings
All fittings used in customer service connection - tapping '
mains, connecting meters, etc. - must be currently listed on
the Vater and Wastewater Standard Products List or called for
in the Standard Installation Details in the Service
Connection Guide section of the City of Austin Standards. II
(1) Brass Goods
All brass stops, couplings, bends, connections, nipples and 1
miscellaneous brass pipe fittings and accessories used in
meter connections, copper service lines, air release piping '
assemblies and wherever needed in the eater distribution
system, shall conform to the Standards, Vater and Wastewater
Standards product list and AWVA C -800, except as herein
modified or supplemented. _
Unless otherwise noted, the goods described herein shall be
fabricated of standard.Red Brass (Waterworks Brass)
consisting of 85 percent copper and 5 percent each of tin,
lead and zinc.
1
1
1
1
Corporation stop thread (where used) shall conform to
Table 1, Figure 1, AWVA C -800, commonly called the
Nueller.Thread. Corporation stops with iron pipe
threads are also permitted. Iron pipe threads shall
conform to ANSI B2, 1 -1969 and Table 9, Figure 9 of AWVA
C -800. '
Copper fittings threads shall conform to Table 2 and 3,
Figure 2 and 3 of At7VA C -800 and ANSI B1.1960 with
approximate tolerance of Class 2.
1
1
Flanges shall conform to ANSI B16.1, Class 125 (or Class
250 where so noted), as to dimensions; drillings, etc. 1
Brass pipe shall conform to the weight and dimensions of
Table 2 in the Appendix for AWVA C -800. 1
1
Pipe
1
1
1
r
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
510
(j) PVC - Plumbing Pipe
1. General
• Polyvinyl chloride pipe and fittings shall be Type I,
,Grade 1, schedule 40, 200 psi_ conforming to the City of
,Austin plumbing code, CS 270 and PS 21.
" naa 2. Physical Requirements
06/09/88
Pipe shall be extruded from 100 percent virgin
unplasticized Type 1, Normal Impact Polyvinyl Chloride
(PVC) to conform to the folloving minimum physical
properties:
Specific Gravity
Tensile Strength at 78
(PSI)
Compression Strength
(PSI)
Modulus of Elasticity
Coefficient of
Linear Expansion
Izod Impact at 78 F
(ft. lbs. /in. notch)
Burning Rate
Heat Distortion at
264 PSI '
3. Visual Inspection
1.36 -1.40
F
7,500
9,400
410,000 •
- 6 5
0.7 -1.5
Self
Extinguishing
160 F
Pipe shall be homogenous throughout and free from
visible cracks, holes or foreign materials. Pipe shall
be free from blisters, vrinkles and dents. This
inspection shall be made on each length of pipe.
4. Dimensions and Tolerance
Dimensional measurements of plastic pipe vill be made on
the outside diameter, wall thickness and
out -of- roundness. Pipe not meeting these requirements
shall be rejected. Dimensions and tolerances shall be
in accordance vith Commercial Standard CS 256 -63.
5. Harking and Identification
All PVC pipe shall be continuously and permanently
marked with the folloving information: manufacturer's
name, pipe size, class or schedule, type of pipe and
material. When used for potable water line, the pipe
shall bear the seal of the National Sanitation
Foundation for potable eater pipe.
Page 21 Pipe
510
6. PVC Pipe Fittings
All fittings shall be of schedule 40 or heavier
plasticized polyvinyl chloride.
7. Inspection and Testing of Materials
Test certificates from a testing laboratory and /or
guarantee by the manufacturer satisfactory to the
Engineer shall be furnished for the pipe and fittings to
be incorporated in the work. As required by the
Engineer, certificates shall be submitted for other
materials to be incorporated in the work. These
certificates, stating that the materials meet the
requirements of the specifications, vill be required
before permission is given to incorporate such materials
in the vork.
The cost of this inspection and testing will be paid for
by the Contractor and shall be included in his price bid
for such materials complete in place.
Any material brought on the ground for use in the work
and deemed by the Engineer as unsuitable or not in
conformity with the specifications shall be removed from
the site of the work by the Contractor upon receipt of
written notice from the Engineer to that effect.
8. Handling of PVC Pipe and Fittings
The Contractor is cautioned to exercise care in
handling, loading, unloading and storing PVC pipe and
fittings. All PVC pipe and fittings will be stored
under cover before using and vill be transported in a
vehicle with a bed long enough to alloy the length of
pipe to lay flat so as not to be subject to undue
bending or concentrated external load at any point. Any
section of pipe that has been dented or damaged vill be
discarded until said section of pipe is cut out and
rejoined vith a coupling.
9. Threaded Connections
On PVC to metal connections, the Contractor shall work
the metal connections first. A nonhardening pipe dope
such as Permatex #2 or equal shall be used on all
threaded PVC to metal joints and light wrench pressure
is all that should be used.
Vhere threaded PVC connections are required, use
threaded PVC adapters into which the pipe may be welded.
06/09/88 Page 22
Pipe
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
i7 t 'i T= ..
-(k) Polyvinyl Chloride Water Pipe
.1. General . • • •
All polyvinyl chloride (PVC) eater pipe shall be of the
rigid (UNPLASTICIZED) type and must bear the National
..Sanitation Foundation seal for potable water
.. joint of pipe consist of single
continuous extrusion; bells or other components attached
�•:by solvent welding are not acceptable. Pipe shall be
pressure rated at 200 psi (SDR -14) or 150 psi (SDR -18)
as indicated.
Pipe shall have push -on, rubber gasket joints of the
bell and spigot type with thickened integral bells or of
the double spigot type vith thickened coupling sleeves
with rubber gasket joints. The wall thickness of each
pipe bell and joint coupling must be greater than the
standard pipe barrel thickness. Clearance must be
provided in every gasket joint for both lateral pipe
deflection and for linear expansion and contraction.
Concrete thrust blocking shall be placed behind bends
and tees. Unless the granular bedding envelope
material is pipe bedding stone, concrete support
blocking shall also be placed betveen the bottom of the
fitting and the undisturbed trench bottom.
2. Applicable Specifications
Except as modified or supplemented herein, PVC pipe
shall meet the following standards:
AVVA C -900, SDR 18 or SDR 14 for PVC Pressure Pipe,
in 4, 6, 8 and 12 inch nominal sizes, having Cast
Iron Pipe size outside diameters.
Fittings used with PVC Pressure pipe shall be AVVA
C -110 or AVVA C -153 cast iron fittings.
Standard sizes, dimensions and tolerances shall be
as follovs:
SDR -18 SDR - 14
Nominal Outside Diameter Wall Thickness Wall Thickness
Size Avg. Tolerance Min. Tolerance Min. Tolerance
(inches) (inches) (inches) (inches) (inches) (inches) (inches)
4 4.800 +0.009 0.267 +0.032 0.343 +0.041
6 6.900 +0.011 0.383 +0.046 0.493 +0.059
8 9.050 +0.015 0.503 + 0.060 0.646 + 0.078
12 13.200 +0.015 0.733 +0.088 0.943 +0.113
510 06/09/88 Page 23 Pipe
3. Material Requirements
All pipe 4 inches and larger must be approved
Undervriter's Laboratories for use in buried vater
supply and fire protection systems.
• ' ''"
� All pipe and fittings shall be made from clean, virgin,
, tils�r•6:•r .. i =:' 'NSF approved, Class 12454B PVC. Clean revorked g r
materials generated from the manufacturer's ovn
production may be used vithin the current limits of the
referenced AVVA C - 900.
510
4. Harking
Permanent marking on each joint of pipe shall include
. the folloving at intervals of not more than 5 feet:
Nominal pipe size and OD base (e.g., 4 CIPS).
The type of plastic material (e.g., PVC 12454 - B).
The standard Dimension Ratio and the pressure
rating in psi'f" r eater at 73 F (e.g., SDR 18, 150 II psi).
The AVVA or ASTM designation with which the pipe
complies (e.g., AVVA C 900).
The manufacturer's name or code and the National
Sanitation Foundation (NSF)_mark._.___
(1) Polyvinyl Chloride (PVC) Pipe (Nonpressure) and Fittings
1. General .
Where PVC sever or vastevater pipe is indicated, it
shall conform to ASTH D 3034, Type PSH or ASTH F 679
Type T -1 Vall Polyvinyl Chloride (PVC) sever pipe and
fittings. Minimum vall shall be SDR 35. Minimum cell
classification shall be 12454 -B.
2. Joint Material
PVC pipe and fitting shall have elastomeric gasket
joints conforming to ASTH D 3212; gaskets to ASTM F 477.
3. Pipe Markings
06/09/88
Permanent marking on the pipe shall include the
following at intervals of not more than 5 feet:
Manufacturer's name and /or trademark.
Page 24 Pipe
1
1
1
1
r
1
1
1
1
1
1
1
1
r
Nominal pipe size:
Minimum cell classification (12454 -B).
The legend "Type PSH SDR 35 PVC Sewer Pipe."
..Designation AST1 D 3034 or ASTM F 679 Pipe.
4. .Fitting Markings
Fittings shall be clearly marked as follows:
Manufacturer's name or trademark,
Nominal size,
The material designation "PVC ",
PSH, and
This designation, "Specification D3034 ".
(m) Steel Pipe
. 1. Standard Weight
ASTM A 53, Schedule 40.
2. Extra Heavy Weight
Seamless ASTM A 53, Schedule B0.
3. Encasement Pipe
Welded or Seamless pipepiles ASTM A -252,
Grade 2
4. Fittings
Nipples and fillings extra strong Federal Specification
WW -N 351 or WW -P 521.
5. Coatings
Black or galvanized as indicated.
(n) Welded Steel Pipe and Fittings for Water -Pipe
1. General Reference Standards Specification.
a. Specifications of the American Water Works
Association (AWWA) listed below shall apply to this
Section.
510 06/09/88 Page 25 Pipe
C -200 Steel Water Pipe 6 inches and larger. 11
•C-205 Cement - Mortar Protective Lining and Coating la
for Steel Water Pipe, 4 inches and larger, Shop
Applied.
C -206 Field Welding of Steel Water Pipe.
C -207 Steel Pipe Flanges for Watervorks Services,
S izes 4 inches through 144 inches.
C -208 Dimensions for Steel Water Pipe Fittings.
C -602 Cement - Mortar Lining of Water Pipelines, 4
inches and larger in Place.
2. Submittals
a. Furnish shop dravings, product data, design
calculations and test reports as described below:
(1) Certified copies of mill tests confirming the
type of materials used in steel plates, mill
pipe flanges and bolts and nuts to shov
compliance vith the requirements of the
applicable standards.
(2) Complete and dimensional vorking drawings of
all pipe layouts. Shop drawings shall include
the grade of material, size, wall thickness of 11 the_pipe_and fittings, type and - location -of
fittings and the type and limits of the lining
and coating systems of the pipe and fittings.
(3) Product data to shoe compliance of all
couplings, supports, fittings, coatings and
related items.
- 3. Job Conditions
a. The internal design pressure of all steel pipe and
fittings shall be as indicated.
b. The interior of all steel pipe for potable eater, 4
inches and larger, shall be cement- mortar lined.
4. Manufacturing
a. Description
Pipe shall comply with AWVA C - 200.
510 06/09/88 Page 26 Pipe
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
I
1
1
1
1
1
1
1
1
1
1
r
.J•vDre6i :b. •
510
06/09/88
5.- Fittings
(1) Circumferential deflection of all pipe
in -place shall not exceed 2.0 percent of pipe
.diameter.
(2) Diameter
Nominal pipe diameter shall be the inside
diameter of lining or pipe barrel, unless
otherwise designated in Job Conditions.
b. Wall Thickness
(1) Steel pipe vall thickness shall be designed
for the internal and external loads specified
in this section. The cylinder thickness
needed to resist internal pressure shall be
based on-an allowable stress in the steel
- equal to 1/2 the minimum yield stress of the
material used.
a. Welded
Fabricated steel fittings shall be of the same
material as pipe and shall comply vith AWWA C -208.
6. Flanges
a. Flanges shall comply vith the requirements of AWWA
C -207, Class D or Class E. The class shall be
based on operating conditions and mating flanges of
valves and equipment.
b. Gaskets shall be cloth - inserted rubber, 1/8 inch
thick.
c. Flanges shall be flat faced With a serrated finish.
7. Pipe Joints
a. Lap Joints for Field Welding
(1) Lap joints for field velding shall conform to
AWWA C -206. This item applies only to pipes
72 inches in diameter and larger.
(2) The bell ends shall be formed by pressing on a
hydraulic expander or a plug die. After
forming, the minimum radius of curvature of
the bell end at any point shall not be less
than 15 times the thickness of the steel
shell. Bell ends shall be formed in a manner
to avoid impairment of the physical properties
Page 27 Pipe
•
. obic,:t ..ir•sd 11:•1. • -
Bell and Spigot Joints with 0 -Ring Gasket
(
(2)
' of the steel shell. Joints shall permit a lap
at least 1 1/2 inches when assembled. The
longitudinal or spiral veld on the inside of
the bell end and the outside of the spigot end
on each section of pipe shall be ground flush
with the plate surface. The inside edge of
.the bell and the outside edge of the spigot
shall be scarfed or lightly ground to remove
-the sharp edges or burrs.
a. Exterior Surface to be mortar coated shall conform
to AVVA C - 205 for shop application and AVVA C -602
for-field application. Pipe materials shall be the
product of an organization which has had not less
than 5 years successful experience manufacturing
pipe materials and the design and manufacture of
the pipe, including all materials, shall be the
product of one company.
b. All surfaces except as noted in c and d below shall
receive shop application of mortar lining and
coating.
c. Field Velded Joints. After installation, clean,
line and coat unlined or uncoated ends adjacent to
welded field joints, including the weld proper, as
specified for pipe adjacent to the veld.
d. Machined Surfaces. Shop coat machined surfaces
with a rust preventative compound. After jointing
surfaces, remaining exposed surfaces shall be
coated per a and b above.
510 06/09/88 Page 28 Pipe
P
1
1
1
1
1
Bell and spigot joints with rubber gasket
shall conform to AVVA C -200.
The bell and spigot ends shall be so designed
that when the joint is assembled, it will be
self- centered and the gasket vill be confined
to an annuler space in such manner that
movement of the pipe or hydrostatic pressure
cannot displace it. Compression of the gasket
when the joint is completed shall not be
dependent upon eater pressure in the pipe'and
shall be adequate to ensure a watertight seal
when subjected to the specified conditions of
service. Bell and spigot ends shall be welded
on preformed shapes. The bell and spigot ends
shall conform to the reviewed shop drawings.
8. Interior and Exterior Protective Surface Coatings__ _ _. .11
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
(o). Corrugated Metal Pipe
1. General
Pipe shall be corrugated continuous loci. or welded seam
- 'helically corrugated pipe. Corrugated metal pipe may be
galvanized steel, aluminized steel or aluminum
conforming to the folloving:
Galvanized Steel AASHTO H 218
Aluminized Steel AASHTO H 274
Aluminum AASHTO M 197
Where reference is made herein to gage of metal, the
reference is to.U.S. Standard Gage for uncoated sheets.
Tables in AASHTO M 218 and AASHTO H 274 list thicknesses
for coated sheets in inches. The Tables in AASHTO H 197
list thicknesses in inches for clad aluminum sheets.
Sampling and testing of metal sheets and coils used for
corrugated metal pipe shall be in accordance vith SDHPT
Test Hethod Tex 708 - I.
Damaged spelter coating shall be repaired by thoroughly
wire brushing the damaged area and removing all loose,
cracked or weld- burned spelter coating. The cleaned
area shall be painted vith a zinc dust -zinc oxide paint
conforming to Federal Specifications TT -P 641b. Damaged
pipe shall be rejected and removed from the project.
Damaged aluminized coating shall be repaired in
accordance vith the manufacturer's recommendations.
The following information shall be clearly marked on
each section of pipe:
Thickness and corrugations
Trade Hark of the manufacturer
Specification compliance
2. Fabrication
a. Steel Pipe
Galvanized or aluminized steel pipe shall be full
circle or arch pipe conforming to AASHTO H 36, Type
I or Type II as indicated.
It may be fabricated with circumferential
corrugations, lap joint construction with riveted
or spot welded seams or it may be fabricated with
helical corrugations with continuous helical lock
' 510 06/09/88 Page 29 Pipe
P
seam or ultra high frequency resistance butt - velded II
seams. ; _r.::- y ,% A-%
b. Aluminum Pipe
510 06/09/88 Page 30
Portions of aluminum pipe that are to be in contact
with high chloride concrete or metal other than
_ aluminum, shall be insulated from these materials
by a coating of bituminous material. The coating
applied to the pipe or pipe arch to provide an
insulation between the aluminum and other material
shall extend a minimum distance of 1 foot beyond
the area of contact.
•
P ipe
1
1
Pipe shall conform to.AASHTO H 196, Type I,
circular pipe or Type_II, pipe arch as indicated.
It may be fabricated with circumferential
corrugations, lap joint construction vith riveted
or spot velded seams or it'may be fabricated with
helical corrugations with a continuous helical lock II
seam. _
1
1
1
3. Selection of Gages
The pipe diameter, permissible corrugations and required I
gauges shall be as indicated.
1
1
1
1
1
1
1
1
1
• -
• , :i5: 7 ;1: • Corrugaled'tteel
' '2'2/3 inches by 1/2 inch Corrugations
Pull Circle Pipe
: 6! 1 r - , •
,,Minimum ...i%.1:...:: - - , os_..
.:p v 17 Thickness
Pipe to
Pipe .. .Top of 0.064 In. 0.079 In. 0:109 In. 0.138 In. 0.168 In.
Diameter Subgrade 16 Gage 14 Gage 12 Gage 10 Gage 8 Gage
Inches ":7 *r Above Top of Pipe in Feet *
12 ::"" ...-s1.■-.;::.-; :7..!,...2,::; • "i: it74. ..: - -.L.. ....
12 ' 112 122 157
, . 164 171
97 125 131 137
.., ,
18 12 75 81 104 109 ' 114
21 12 64 70 82 94 98
24 12 56 60 69 78 86
27 12 50 54 60 67 73
30 12 49 51 55 59 65
33 12 41 44 52 55 59
36 12 37 41 49 52 55
42 12 41 45(57) 46(90) 49(94) 50(98)
48 12 - 43(50) 44(78) 46(82) 47(86)
54 12 43 43(70) 44(73) 45(76)
- 60 12 - - 43(63) 43(66) 44(69)
66 12 - - - 43(60) 43(62)
72 12 - 43(55) 43(57)
78 12 - 42(53)
84 12 - 42(49)
* Fill heights in ( ) apply when pipe is 5 percent vertically
elongated prior to installation.
Note: Thickness in inches, as shown above, refers to the coated
metal after galvanizing.
510
a:.
06/09/88 Page 11
Pipe
510
The line-;in the gage columns is drawn below the maximum
diameter alloved.for that gage.
- rya; , , .._.. ^•3
Table II
Corrugated Steel
3 inches x 1 inch or inches x 1 inch
Full Circle-Pipe
Minimum
Cover, • ' Thickness
Top of _
Pipe to
Pipe Top of 0.064 In. 0.079 In. 0.109 In. 0.138 In. 0.168 In.
Diameter Subgrade 16 Gage 14 Gage 12 Gage 10 Gage 8 Gage
Inches Maximum Fill Height Above Top of Pipe in Peet *
48 12 48 52(60) 56(89) 61(107) 60(118)
54 12 43 48(53) 52(79) 55(95) 58(105)
60 12 38 46(48) 49(71) 51(85) 53(95)
66 12 35 43 47(65) 48(78) 50(86)
72 12 32 40 45(59) 47(71) 48(79)
78 12 29 36 44(54) 45(66) 46(73)
84 12 34 43(51) 44(61) 45(68)
-- ---
- -' 90 12 32 ._. 43 44(57) 44(63)
96 12 - 30 43 43(53) 44(59)
102 24 • - 28 42 43(50) 43(56)
108 24 - 39 42 43(53)
114 24 - - 37 42 42(50)
120 24 35 42 42
* Fill heights in ( ) apply when pipe is 5 percent vertically
elongated prior to installation.
Note: Thickness in inches, as shown above, refers to the coated
metal after galvanizing.
The line in the gage columns is drawn belov the maximum
diameter allowed for that gage.
06/09/88 Page 32
Pipe
510
Table.III
• .. . • Corrugated Aluminum
: , 1 „., : - , . ^ -.2 2 /3 x 1 /2 Corrugations
• -. • . . • • Pull Circle Pipe
Minimum
"Cover, "_Thickness
Top of
Pipe to
Pipe . Top of 0.060 In. 0.075 In. 0.105 In. 0.135 In. 0.164 In.
Diameter Subgrade 16 Gage ' 14 Gage 12 Gage 10 Gage 8 Gage
Inches
_ Maximum Pill Height Above Top of Pipe in Peet *
12 12 45 45 77 -
15 12 " 36 .- • 37 56 - -
18 12 28 30 36 43 49
24 12 22 23 25 28 31
27 12 20 21 23 25 27
30 12 18 18 21 23 24
33 12 16 17 20 21 22
36 12 - 15 19 20 21
42 12 - - 19 19 20
48 15 - - 18 18 19
54 16 - 17 18 18
60 16 - - 16 18
66 18 - - - 12 15
72 20 _
78 20
84 20
18 11
9
7
* Fill heights in ( ) apply when pipe is 5 percent vertically
elongated prior to installation.
Note: Thickness in inches, as shown above, refers to the clad
sheet.
The line in the gage columns is drawn below the maximum
diameter alloyed for that gage.
06/09/88 Page 33
Pipe
510
r=; :, _, Table IV
,,,. ....Corrugated Aluminum •
. 3 i nch e s z 1 i n c h.or 6 inches x 1 inch Corrugations
. , Full Circle Pipe
Minimum ..
Cover, ^- : Thickness
Top of
Pipe to
Pipe Top of 0.060 In. 0.075 In. 0.105 In. 0.135 In. 0.164 In.
Diameter Subgrade 16 Gage 14 Gage 12 Gage 10 Gage 8 Gage
Inches Maximum Pi11 Height Above Top of Pipe in Feet *
30 12 27 30 '35 41 46
36 12 23 24 28 30 34
42 14 21 22 24 26 28
48 16 20 20 22 23 24
54 18 19 19 20 21 22
60 20 18 19 20 20 21
66 22 - 18 19 19 20
72 24 17 19 19 19
78 26 - 18 18 19
84 26 15 18 18
90 24 - - 16 18
96 24 - - - 14 16
102 30 - - 14
108 30 _
- 12
114 30
10
120 30 - - 8
* Fill heights in ( ) apply when pipe is 5 percent vertically
elongated prior to installation.
Note: Thickness in inches, as shown above, refers to the clad
sheet.
The line in the gage columns is drawn below the maximum
diameter allowed for that gage.
06/09/88 Page 34 Pipe
P
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
For pipe arch, te'design size , and permissible
.corrugations only Will be indicated, since the shape .
and minimum gage for pipe arch shall be as designated
7 ., f .; b ,, ; • in Tables A, B, C D for the'specified design size
and corrugation for metal pipe.
; , : ut -- . , 1-1 ., !sr.se, :tat_...... Lo-e _
•
510
Table "A'
Steel Pipe Arch
2 2/3 Inch by 1/2 Inch Corrugations
- : "8 -20 Loading
Equivalent
Min. Min. Coated Diameter
Design *Span *Rise Cover Gage Thickness Full Cir.
Size
1 Inches Inches Inches Required Inches Pipe Inches
17 13 12 1 6 0.064 15
• 2 • . 21 , 15 12 16 0.064 18
3 • 28- • 20 12 16 0.064 24
4 35 Z4 12 1 6 — 0.064 30
5 42 2 9 12 14 0.079 36
6 49 33 12 14 0.079 42
7
8 57 38 12 12 0.109 48
64 43 12 12 0:109 54
9 71 47 12 10 0.138 60
* The fill heights for all sizes of pipe arch are limited to a
maximum of 7 feet.
A tolerance of plus or minus 1 inch or 2 percent of equivalent
circular diameter, whichever is greater, '. will be permissible in
span and rise, with all dimensions measured from the inside crests
of the corrugations.
Table 8
Steel Pipe Arch
3 Inch by 1 Inch Corrugations
8 -20 Loading
Min. Min. Coated Diameter
D Siz en _ Inches *Rise
Inches Inches Required Thickness Pipe Inches
7 53 41 12 1 2 0.109 48
8 60 46 12 12 0.109 54
9 66 51 12 12 0.109 60
10 73 55 12 12 0.109 66
11 81 59 12 12 0.109 72
12 87 63 12 12 0.109 78
13 95 67 12 12 0.109 84
14 103 71 18 12 0.109 90
15 112 75 18 12 0.109 96
16 117 79 18 12 0.109 102
17 128 83 24 12 0.109 108
18 137 87 24 10 0.138 114
19 142 91 24 10 0.138 210
06/09/88 Page 35 Pipe
P
•
QCrgq:ao
* The fill heights, for all sizes of pipe arch are limited to a
maximum of310.fe9t. : -_; r
A tolerance of plus or minus 1 inch or 2 percent of equivalent
circular diameter, whichever is greater, will be permissible in
span and rise, vith all dimensions measured from the 'inside crests
of the corrugations.
„ Table C
- Steel Pipe Arch
5 Inch by 1 Inch Corrugations
H -20 Loading
Equivalent
Min. Min. Design *Span *Rise Cover Gage Thickness Diameter
ss PullCir.
Size Inches Inches Inches Required Inches Pipe Inches
11 81 59 12 12 0.109 72
12 87 63 12 12 0.109 78
13 95 67 12 12 0.109 84
14 103 71 18 12 0.109 90
15 112 75 18 12 0.109 96
16 117 79 18 12 0.109 102
17 128 83 24 10 0.138 108
18 137 87 24 10 0.138 114
19 142 91 24 10 0.138 120
* The fill heights for all sizes of pipe arch are limited to a
maximum of 10 feet.
A tolerance of plus or minus 1 inch or 2 percent of equivalent
circular diameter, whichever is greater, will be permissible in
span and rise, with all dimensions measured from the inside crests
of the corrugations.
Table D
Aluminum Pipe Arch.
2 2/3 Inch by 1/2 Inch Corrugations
H -20 Loading
Equivalent
Min. Min. Coated Diameter
Design *Span *Rise Cover Gage Thickness Full Cir.
Size Inches Inches Inches Required Inches Pipe Inches
1 17 13 12 16 0.060 15
2 21 15 12 16 0.060 18
3 28 20 12 14 0.075 24
4 35 24 12 14 0.075 30
5 42 29 18 12 0.105 36
6 49 33 18 12 0.105 42
7 S 38 18 10 0.135 48
8 6 43 18 10 0.135 54
9 71 47 18 8 0.164 60
510 06/09/88 Page 36. Pipe
P
•
510
* All dimensions are measured from the inside crests of the
- A tolerance of plus or minus 1 inch or 2 percent of
the equivalent circular diameter, whichever is greater vill be
permissible in span and rise.
The fill heights for all sizes of pipe arch are limited to a
maximum of 7 feet.
4. Joint Haterial
Except as otherwise indicated, coupling bands and other
hardware for galvanized or aluminized steel pipe shall
conform to AASHTO M 36 for steel pipe and AASHTO H 196
for aluminum pipe. Field joints for each type of
corrugated metal pipe shall maintain pipe alignment
during construction and prevent infiltration of soil
material during the life of the installation.
Coupling bands shall be not more than 3 nominal sheet
thicknesses lighter than the thickness of the pipe to be
connected and in no case lighter than 0.052 inch for
steel or 0.048 inch for aluminum.
Coupling bands shall be made of the same base metal and
coating (metallic or othervise) as the pipe.
Coupling bands shall lap equally on each of the pipes
being connected to form a tightly closed joint after
installation.
Pipes furnished with circumferential corrugations shall
be field jointed vith corrugated locking bands. This
includes pipe vith helical corrugations which has
reformed circumferential corrugations on the ends. The
locking bands shall securely fit into at least one full
circumferential corrugation on each of the pipe ends
being coupled. The minimum vidth of the corrugated
locking bands shall be as shovn belov for the
corrugation which corresponds to the end circumferential
corrugations on the pipes being joined:
10 1/2 inches vide for 2 2/3 inches x 1/2 inch
corrugations.
12 inches vide for 3 inches x 1 inch or 5 inches •
x 1 inch corrugations.
Helical pipe vithout circumferential end corrugations
vill be permitted only when it is necessary to join a
new pipe to an existing pipe which vas installed vith no
circumferential end corrugations. In this event pipe
furnished with helical corrugations at the ends shall be
field jointed vith either helically corrugated bands or
06/09/88 Page 37
Pipe
with bands vith projections or dimples. The minimum
width of helically corrugated bands shall conform to the
following:
12 inches vide for pipe diameters up to and
including 72
•
14 inches wide for 1 inch deep helical end
corrugations.
Bands with projections shall have circumferential rovs
of projections vith one projection for each corrugation.
The vidth of bands vith projections shall be not less
than the folioving:
12 inches vide for pipe diameters up to and
including 72 inches.
The bands shall have 2 circumferential rows of
projections.
•
16 1/4 inches wide for pipe diameters of 78 inches
and greater. The bands shall have 4
circumferential rows of projections.
Unless othervise indicated, all bolts for coupling bands
shall be 1/2 inch diameter. Bands 12 inches wide or
less will have a minimum of 2 bolts and bands greater
than 12 inches wide shall have a minimum of 3 bolts.
Galvanized bolts may be dip galvaniied conforming to
AASBTO H 232, mechanically galvanized to provide the
same requirements as AASHTO H 232 or electrogalvanized
per ASTH A 164 Type RS.
5. Additional Coatings or Linings
a. Bituminous Coated
Bituminous Coated pipe or pipe arch shall be as
indicated both as to base metal.and fabrication and
in addition shall be coated inside and out vith a
bituminous coating vhich shall meet the performance
requirements set forth herein. The bituminous
coating shall be 99.5 percent soluble in carbon
bisulphide. The pipe shall be uniformly coated
inside and out to a minimum thickness of 0.05 inch,
measured on the crests of the corrugations.
The bituminous coating shall adhere to the metal
tenaciously, shall not chip off in handling and
shall protect the pipe from deterioration as
evidenced by samples prepared from the coating
510 06/09/88
Page 38 Pipe
510
material successfully meeting the Shock Test and
Plow Test in accordance with Test Method Tex - 522 -C.
b. Paved Invert
Where a Paved Invert is indicated, the pipe or pipe
arch, in addition to the fully coated treatment
described above, shall receive additional
bituminous material of the same specification as
above, applied to the bottom quarter of the
circumference to form a smooth pavement with a
minimum thickness of 1/8 inch above the crests of
the corrugations.
c. Cement Lined
.(1) General
Except as modified herein, pipe shall conform
to AASHTO M 36 for lock seam or welded
helically corrugated steel pipe. Pipe shall
be of full circle and shall be fabricated with
two annular corrugations for purposes of
joining pipes together with band couplers.
Lock seams shall develop the seam strength as
required in Table 3 of AASHTO M 36. Concrete
lining shall conform to the following:
Composition
Concrete for the lining shall be composed
of cement, fine aggregate and eater that
are well mixed and of such consistency as
to produce a dense, homogenous,
nonsegregated lining.
Cement
Portland Cement shall conform to AASHTO M
85.
Aggregates shall conform to AASHTO M 6
except that the requirements for
gradation and uniformity of gradation
shall not apply.
Mixture
The aggregates shall be sized, graded,
proportioned and thoroughly mixed with
such proportions of cement and water as
will produce a homogenous concrete
mixture of such quality that the pipe
will conform to the design requirements
06/09/88 Page 39 Pipe
.. �o ,Cb ,:i: .amt! : ibai s .�• ;7
= itii.g ;� i :..;.
510
06/09/88
indicated. In no case, however, shall
the proportions of Portland Cement,
blended cement or Portland Cement plus
pozzolanic admixture be less than 470
lb /cu. yd of concrete.
The lining shall have a minimum thickness '
of 1/8 inch above the crest of the
corrugations.
Lining Procedures
The lining shall be plant applied by a
machine traveling through a stationary
pipe. The rate of travel of the machine
and the rate of concrete placement shall
be mechanically regulated so as to
produce a homogenous nonsegregated lining
throughout.
Surface Finish
The lining machine shall also
mechanically travel the concrete lining
as the unit moves through the pipe.
Certification
When 0) -ring gaskets are indicated they
shall be placed in the first corrugation
of each pipe and shall be compressed by
Page 40 Pipe
1
1
1
1
1
1
1
1
1
- - - - - - Furnish manufacturer's stan -- —
certification of compliance upon request 11 of the purchaser.
Joints
Pipe shall be joined together with ,
coupling bands made from steel sheets to
an indicated thickness of 0.064 inch (12
ga.). Coupling bands shall be formed
with two corrugations that are spaced to
provide seating in the third corrugation
of each pipe end without creating more
than 1/2 inch ± annular space between
pipe ends when joined together.
Bands shall be drawn together by two 1/2
inch galvanized bolts through the use of
a bar and strap suitably welded to the
band.
1
1
510
•
tightening the coupling hand. Rubber
0 -ring gaskets shall conform to Section
'5.9, ASTH C 361.
•
. (2) Causes for Rejection
Pipe shall be subject to rejection on account
'of failure to conform to any of the
indications. Individual sections of pipe may
be rejected because of any of the following:
Damaged ends, where such damage would
prevent making satisfactory joint.
Defects that indicate poor workmanship
and could not be easily repaired in the
field.
Severe dents or bends in he metal
itself.
If concrete lining is broken out, pipe
may be rejected or at the discretion of
the Engineer, repaired in the field in
accordance with the manufacturer's
recommendation. Hairline cracks or
contraction cracks in the concrete lining
is to be expected and does not constitute
cause for rejection.
d. Fiber Bonded
'Where fiber bonded pipe is indicated, the pipe or
pipe arch shall be formed from sheets whose base
metal shall be as indicated. In addition, the
sheets shall have been coated with a layer of
fibers, applied in sheet form by pressing them into
a molten metallic bonding. If a paved invert is
indicated it shall be in accordance with the
procedure outlined above. The test for spelter
coating above is waived for fiber bonded pipe.
6. Slotted Drain Storm Severs
The pipes for the slotted drain and slotted drain
outfall shall be helically corrugated, lock seam or
welded seam pipe. Materials and fabrication shall be in
accordance with the above. The metal thickness shall be
a minimum 16 gage.
The chimney assemblies shall be constructed of 3/16 inch
welded plate or machine formed 14 gage galvanized steel
sheets. The height of the chimney required will be as
indicated. Metal for the welded plate slot shall meet
06/09/88 Page 41
Pipe
•1
the requirements of - ASTH A 36 and the completed plate
slot shall be galvanized after fabrication in accordance
with ASTH A 123. ,
Veld areas and the heat affected zones where the slot is
welded to the corrugated pipe shall be thoroughly ,
cleaned and painted vith a good quality asphalt base
"•� '
• aluminum paint.
7. Mortar ,
Hortar shall be composed of 1 part Type I Portland
Cement and 2 parts clean, sharp mortar sand suitably
graded for the purpose and conforming in other respects
to the provisions for fine aggregate of Item No. 403,
"concrete
Structures".
butB in r no e case m shall l it e exceed
10 percent by veight of the total dry mix.
(p) Vitrified Clay Pipe ,
Vitrified Clay Pipe shall conform to ASTH C 700, extra
strength clay pipe. The joint material for vitrified clay
pipe shall conform to ASTH C 425 compression joints for
vitrified clay bell and spigot pipe.
• 510.3 Construction Methods
(1) General
Prior to commencing this vork, all erosion control and tree
protection measures required_shall.be -in place- and - ell— vttlittes--- -'
• 'located • and • protected as set forth in "General Conditions of
Agreement ". Clearing the site shall conform to Item No. 102,
"Clearing and Grubbing ". Maintenance of environmental quality
protection shall comply with all requirements of "General
Conditions of Agreement" and Item No. 601, "Salvaging and Placing ,
Topsoil ".
The shall conduct his vork such that a reasonable
minimum of disturbance to existing utilities vill result.
Particular care shall be exercised to avoid the cutting or
breakage of all existing utilities. If at any time the Contractor
Contractor the
utilities in place
immediately notify his operations,
theovneroftheutility to
make the necessary repairs. When active wastewater sever lines
are cut in the trenching operations, temporary flumes shall be
across the trench while open and the lines
restored when thebackfillinghasprogressedtothe original
bedding lines of the sewer so cut.
The Contractor shall inform utility owners sufficiently in advance
of the Contractor's operations to enable such utility owners to
reroute, provide temporary detours or to make other adjustments to
utility lines in order that the Contractor may proceed with his
510 06/09/88
Page 42 Pipe '
work with a minimum of delay and expense. The Contractor shall
cooperate vith all utility owners concerned in effecting any
utility adjustments necessary and shall not hold the City liable
for any expense due to delay or additional work because of
conflicts arising from existing utilities.
ace at The Contractor shall do ail trenching in accordance vith the
3t '''' and the directions of the Engineer as to the amount of
trench left unfilled at any time. All excavation and backfilling
shall be accomplished as indicated and in compliance with State
Statutes.
•
•
Where excavation for a pipe line is required in an existing City
street, a street cut permit is required and control of traffic
shall be as indicated in accordance vith the Texas Manual on
Uniform Traffic Control Devices.
Wherever existing utility branch connections, sewers, drains,
conduits, ducts, pipes or structures present obstructions to the
grade and alignment of the pipe, they shall be permanently
supported, removed, relocated or reconstructed by the Contractor
through cooperation with the owner of the utility, structure or
obstruction involved. In those instances where their relocation
or reconstruction is impractical, a deviation from line and grade
will be ordered by the Engineer and the change shall be made in
the manner directed.
Adequate temporary support, protection and maintenance of all
underground and surface utility structures, drains, sewers and
other obstructions encountered in the progress of the work shall
be furnished by the Contractor, at his expense and as approved by
the Engineer.
•
Where traffic must cross open trenches, the Contractor shall
provide suitable bridges. For trenches less than 2 feet in width,
sheet steel plates having a minimum thickness of 1/2 inch shall be
used. For trenches up to 4 feet in width, sheet steel plates
having a minimum thickness of 3/4 inches shall be used.. In all
cases, the plates shall overlay the top of the trench a minimum of
18 inches on both sides and secured by asphalt. Adequate
provisions shall be made for the floe of severs, drains and
watercourses encountered during construction and any structures
which may have been disturbed shall be satisfactorily restored
upon completion of work.
When rainfall or runoff is occurring or is forecast by the U.S.
Weather Service, the Contractor shall not perform or attempt any
excavation - or other earth moving work in or near the flood plain
of any stream or watercourse or on slopes subject to erosion or
Brunoff, unless given specific approval by the Engineer. when
such conditions delay the work, an extension of time for working
day contracts will be allowed in accordance with "General
Conditions of Agreement ".
510 06/09/88 Page 43 Pipe
P
(2) Eater Line/Nev Vastevater Line Separation
Installation of new vater or vastevater lines shall conform to the ,
following:
Vhere feasible, eater and vastevater lines shall be no closer, '
to each other than 9 feet betveen outside diameters in all
directions and shall be in separate trenches.
If the 9 foot separation cannot be achieved, any portion of a II
nev gravity vastevater line vithin 9 feet in any direction
(between OD's) of a potable vater line, shall be in a II
trench and constructed of ductile iron or AVVA C -900
150 psi (minimum) pressure pipe.
If the lines are parallel, they shall not be closer than 4 '
feet horizontally or 2 feet vertically betveen OD's with the
vastevater lover than the eater line. If the lines cross, bn OD's II
they may be no with the sever belov vaternline and foot
length of D.I. or C -900 150 psi pipe shall be centered at the
point of crossing the eater line
510
(3)
Unless vastevater manholes and the connection to the sever
can be made completely watertight and tested for no leakage,
they must be installed so as to provide a minimum of 9 feet II
horizontal clearance from an existing or proposed vater
line.
All force mains shall be ductile iron pipe, of the class
in dicated.Thickness- Class -5e- minimum.
Utility and Stormlever Crossings
When the Contractor installs a pipe that crosses under a utility
structure or storm sever and the top of the pipe is vithin 18
inches of the bottom of the utility structure, the pipe shall be
encased as specified in Item No. 505, "Concrete Encasement and
Encasement Pipe ", for a distance of at least 1 foot on either side
of the ditch line of the utility structure or the storm sever.
Unless otherwise specified by the Engineer, concrete encasement
will not be required for Ductile Iron or AVVA C -900 PVC pipe.
When the Contractor installs a pipe that crosses over a•utility
structure or storm sever and the top of the utility structure or
storm sewer is vithin 18 inches of the bottom of the pipe, the
pipe shall be either Ductile Iron or AVVA C - 900 PVC, unless
othervise specified by the Engineer.
Vhere trenches eider than 12 inches cross under existing
vastevater lines, the sever lines shall be replaced with one 20
foot joint of Class 50 ductile iron or C -900 SDR -18 PVC pipe
centered over the trench.
06/09/88
1
1
1
1
1
1
1
1
1
Page 44 Pipe '
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
•,•
510
(4) Trench Excavation -
Underground piped utilities to be constructed in an open cut in
accordance with Federal regulations, applicable State Statutes
conforming to Item No. 509, "Trench Safety Systems" and with a
trench width and depth described below. When pipe is to be
constructed in fill above the natural'groutid, Contractor to
construct embankment to an elevation not less than one foot above
tope of pipe, after vhich trench is excavated. Required vertical
sides shall be sheeted and braced as indicated to maintain the
sides of the required vertical excavation throughout the
construction period. _ Adequacy of the design of sheeting and
bracing shall be the responsibility of design professional.
Contractor shall be responsible for installation as indicated.
After the pipe has been laid and the backfill placed and compacted
to 12 inches above the top of the pipe, any sheeting, shoring and
bracing required may be removed with special care to insure that
the pipe is not disturbed. As each piece of sheeting is removed,
the space left by its removal must be thoroughly filled and
compacted vith suitable material and provisions made to prevent
the sides of the trench from caving until the backfill has been
completed. Any sheeting left in place vill not be paid for and
shall be considered subsidiary to the pipe item bid.
(5) Trench Width
Trenches for eater and wastewater lines shall have a minimum width
of 6 inches and a maximum width of 1 foot on each side beyond the
outside surfaces of the pipe bell or coupling.
Trenches for Storm Sewers up to 42- inches shall have a width of 1
foot on each side beyond the outside surfaces of the pipe. Pipes
more than 42 inches shall have a trench vidth not to exceed 18
inches on each side beyond the outside surfaces of the pipe.
If trench width within the pipe zone exceeds this maximum, the
entire pipe zone shall be refilled with approved backfill
material, thoroughly compacted to a minimum of 95 percent of
maximum density as determined by SDHPT Test Method Tex - 114 - and
then re- excavated to the proper grade and dimensions. Excavation
along curves and bends shall be so oriented that the trench and
pipe are approximately centered on the centerline of the curve,
using short lengths of pipe and /or bend fittings if necessary.
For all utilities to be constructed in fill above natural ground,
the embankment shall first be constructed to an elevation • not less
than 1 foot above the top of the utility after which excavation
for the utility shall be made.
(6) Trench Depth and Depth of Cover
All pipe and in -line appurtenances shall be laid to the grades
indicated. The depth of cover shall be measured from the
established finish grade, natural ground surface, subgrade for
06/09/88 Page 45 Pipe
510
staged construction, street or other permanent surface to the top
or uppermost projection of the pipe.
(a) Where not otherwise indicated, all eater piping shall be laid
to the following minimum depths:.
Water piping installed in undisturbed ground in
easements of undeveloped areas which are not within
existing or planned streets, roads -or other traffic
areas shall be laid with at least 36 inches of cover.
2. Water piping installed in existing streets, roads or
other traffic areas shall be laid with at least 48
inches of cover below finish grade.
3. Unless approved by the Engineer, installation of water
piping in proposed new streets•vill not be permitted
until paving and drainage plans have been approved and
the roadway traffic areas excavated to the.specified or '
standard paving subgrade, with all parkways and sidewalk
areas graded according to any applicable provisions of
the drainage plans or sloped uniformly from the curb
line to the right of vay line. Piping and appurtenances
installed in such proposed streets shall be laid with at
least 36 inches of cover below the subgrade.
(b) Where not otherwise indicated, all wastewater piping shall be
laid to the following minimum depths:
1. Wastewater piping installed in natural ground in
easements_or.other- undeveloped areas which not _ -
within existing or planned streets, roads or other
traffic areas shall be laid with at least 42 inches of
cover.
2. Wastewater piping installed in existing streets, roads
or other traffic areas shall be laid with at least 66
inches of cover.
3. Wastewater piping installed in such proposed streets
shall be laid with at least 48 inches of cover below the
actual subgrade.
(7) Classification of Excavation
Excavation will not be considered or paid for as a separate item
of work, so excavated material will not be classified as to type
or measured as to quantity. Full payment for all excavation
required for the construction shall be included in the various
unit or lump sum contract prices for the various items of work
installed, complete in place. No extra compensation, special
treatment or other consideration will be allowed due to rock,
pavement, caving, sheeting and bracing, falling or rising eater, '
06/09/88 Page 46
Pipe '
working under and in the proximity of trees or any other handicaps
to excavation.
ma
(8) Devatering Excavation
Underground piped utilities shall not be constructed or thP pipe
laid in the presence.of vater. All water shall be removed from
"the excavation prior to the pipe placing operation to insure a dry
firm granular bed on which to place the underground piped
utilities and shall be maintained in such unvatered condition
until all concrete and mortar is set. Removal of eater may be
accomplished by bailing, pumping or by a yell -point installation
as conditions varrant. .
In the event that the excavation cannot be dewatered to the point
where the pipe bedding is free of mud, a seal shall be used in the
bottom of the excavation. Such'seal shall consist of Class B
concrete, conforming to Item No. 403, "Concrete Structures ",
with a minimum depth of 3 inches.
Trench Conditions
510
(9)
Before attempting to lay pipe, all vater, slush, debris, loose
material, etc., encountered in the trench must be pumped or bailed
out and the trench must be kept clean and dry while the pipe is
laid and backfilled. Where needed, sump pits shall be dug
adjoining the trench and pumped as necessary to keep the
excavation dewatered.
Backfilling shall closely follow pipe laying so that no pipe is
left exposed and unattended after initial assembly. All open
ends, outlets or other openings in the pipe shall be protected
from damage and shall be properly plugged and blocked watertight
to prevent the entrance of trench water, dirt, etc. The interior
of the pipeline shall at all times be kept clean, dry and
unobstructed.
Where the soil encountered at established footing grade is a
quicksand, saturated or unstable material, the folloving procedure
shall be used unless other methods are indicated:
All unstable soils shall be removed to a depth of a minimum 2
feet below bottom of piped utility or as required to
stabilize the trench foundation. Such excavation shall be
carried out for the entire trench width.
All unstable soil so removed shall be replaced with a
concrete seal, foundation rock or coarse aggregate materials
placed across the entire trench width in uniform layers not
to exceed 6 inches, loose measure and compacted by mechanical
tamping or other means which will provide a stable foundation
for the utility.
06/09/88 Page 47
Pipe
Forms, sheathing and bracing, pumping, additional excavation
and backfill required in unstable trench - conditions shall be
subsidiary to pipe bid.
(10) Blasting
. _ . {; u v
- All blasting shall conform to the provisions of "General
- Conditions of Agreement ".
(11) Removing Old Structures
When out of service masonry structures or foundations are
encountered in the excavation, such obstructions shall be removed
for the full width of the trench and to a depth of 1 foot below
the bottom of the trench. When abandoned inlets or manholes are
encountered and no plan provision is made for adjustment or
connection to the nev sewers, such manholes and inlets vithin the
construction limits shall be removed completely to a depth 1 foot
belov the bottom of the trench. In each instance, the bottom of
the trench shall be restored to grade by backfilling and
compacting by the methods provided above. Where the trench cuts
through storm or wastewater severs which are known to be
abandoned, these severs shall be cut flush vith the sides of the
trench and blocked with a concrete plug in a manner satisfactory
to the Engineer. When old structures are encountered, which are
not visible from the existing surface and are still in service,
they shall be protected and adjusted as required to the finished
grade.
(12) Lines and Grades
--------- — — Grades, lines and levels shall conform to Section No. 00341,
"Grades, Lines and Levels ". Any damage to the above by the
Contractor shall be re- established at the Contractor's expense.
The location of the lines and grades indicated may be changed only
by direction of the Engineer and it is understood that the
Contractor will be paid on the basis of his unit contract prices
bid for such work actually performed and will make no claim for
damages or loss of anticipated profits due to the change of
location or grade.
The Contractor shall furnish, at his expense, all necessary batter
boards or electronic devices for controlling the work. Batter
boards shall be of adequate size material and shall be supported
substantially. The boards and all location stakes must be
protected from possible damage or change of location. The
Contractor shall furnish good, sound twilled lines for use in
achieving lines and grades and the necessary plummets and
graduated poles.
The Contractor shall submit to the Engineer at least 6 copies of
any layout plans from the pipe manufacturer for review and
approval. The Contractor shall submit the layout plans at least
510 06/09/88 Page 48
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Pipe
� 30 days in advance of any actual construction of the project. The
?��i• ' Engineer will forward all comments of the review to the Contractor
''""`'for revision. Revisions shall be made and forwarded to the
Engineer for his acceptance. Prior to commencement of the
Project, reviewed layout plans will be sent to the Contractor
marked for construction. _ •
"Should the Contractor's procedures not produce a finished pipe
placed to grade and alignment, the pipe shall be removed and
relayed and the Contractors procedures modified to the
satisfaction of the Engineer. No additional compensation shall be
paid for the removal and relaying of pipe required above.
(13) Surplus Excavated Materials
Excess material or material which cannot be made suitable for use -
_ ' in embankments will be declared surplus by the Engineer and shall
become the property of the Contractor to dispose of off site at a
permitted fill site, without injury to the City or any individual.
Such surplus material shall be removed from the work site promptly
following the completion of.the portion of the utility involved.
(14) Pipe Bedding
Pipe shall be installed in a continuous bedding envelope as
required to meet the existing soil and flooding conditions,
consisting of sand, pea gravel, soil cement, cement stabilized
backfill or pipe bedding stone.
The plans and specifications will set forth the pipe bedding
requirements for the project. In the absence of plan details or
specification provisions, the following bedding shall be used:
(a) Welded steel eater pipe. Cement stabilized backfill
or crushed limestone
bedding.
(b) Water pipe except (a) and May be bedded in sand, pea
(b) above. gravel or pipe bedding
stone, except that in
trenches excavated by
blasting, pipe must be
bedded in pea gravel or
pipe bedding stone,
subject to limitation
below on use of crushed
stone.
510
(c) Wastewater pipe up to 15
inches ID.
06/09/88
May be bedded in either
sand, pea gravel or pipe
bedding stone except that
in trenches excavated by
blasting, pipe must be
bedded in peas gravel or
Page 49 Pipe
:■•
pipe bedding stone subject
to limitation belov on use
- of crushed stone.
(d) Vastevater pipe larger Must be laid -in pipe
than 15 inches ID. bedding stone, regardless
of excavation method,
subject to limitation
below on use of crushed
stone.
(e) Storm severs.
Crushed stone bedding shall - not be used for polyethylene tubing.
Sand bedding shall not be used in trenches vhere eater is present
or where rock has been blasted.
Bedding material shall extend for the full width of the trench
excavation and from 6 inches below the pipe to the folloving:
Water and Vastevater Pipe
All storm severs shall be
laid in sand bedding,
except within the 25 year
flood plain and subject to
the limitations belov.
12 inches above the outer
parts of the pipe,
fillings and accessories.
1
1
1
1
1
1
1
1
1
Storm Severs • Minimum of 15 percent of__ '
the oveiall pipe height.
All bracing, struts, etc., installed by the pipe manufacturer (or ,
temporary replacements by the Contractor) shall be kept in place
in the pipe, undisturbed, until the trench has been backfilled at
least to the top of the pipe. When installing mortar lined and
mortar coated steel pipe, all bracing, struts, etc., installed by
the pipe manufacturer shall be kept in the pipe, undisturbed until
the bedding has been placed and the trench backfill placed.
(15) Laying Pipe
No pipe shall be installed in the trench until excavation has been
completed, the bottom of the trench graded and the trench
completed as indicated.
Laying of corrugated metal pipes on the prepared foundation shall
be started at the outlet end with the separate sections firmly
joined together, with outside laps of circumferential joints
pointing upstream and with longitudinal laps on the sides. Any
metal in joints which is not protected by galvanizing shall be
coated with a suitable asphaltum paint. Proper facilities shall
be provided for hoisting and lowering the sections of pipe into
the trench without damaging the pipe or disturbing the prepared
510 06/09/88 Page 50 Pipe
P
1
1
1
1
1
1
510
foundation and the sides of the trench. Any pipe which is not in
alignment or which shovs any undue settlement after laying or is
damaged, shall be taken up and relaid without extra compensation.
Multiple installations of corrugated pipe or arches shall be laid
vith the centerlines of individual barrels parallel. When not
othervise indicated, clear distances of 2 feet between outer
surfaces of adjacent pipes shall be maintained.
No debris shall remain in the drainvays or drainage structures.
All backfill in streets and under structures vill be tested by the
City and must satisfy the specified density requirements
conforming to Section 00344, "Testing Laboratory Services" before
final acceptance of or payment for the work.
All recommendations of the manufacturer shall be carefully
observed during handling and installation of each material.
Unless otherwise indicated, all materials shall be delivered to
the project by the manufacturer or agent and unloaded as directed
by the Contractor. Each piece shall be placed facing the proper
direction near to where it vill be installed.
The interior of all pipe, fittings and other accessories shall be
kept free from dirt and foreign matter at all times and stored in
a manner that will protect them from damage. Stockpiled materials
shall be stacked so as to minimize entrance of foreign matter.
The interior of all pipeline components shall be clean, dry and
unobstructed when installed.
Piping materials shall not be skidded or rolled against other
pipe, etc. and under no circumstances shall pipe, fittings or
other accessories be dropped or jolted.
During handling and placement, materials shall be carefully
observed and inspected and any damaged, defective or unsound
materials shall be marked, rejected and removed from the job site.
Minor damage shall be marked and repaired in a manner satisfactory
to the Engineer. Joints which have been placed but not joined,
backfilled, etc., shall be protected in a manner satisfactory to
the Engineer.
(16) Assembling of Pipe
Angular spacing of all joints shall meet the manufacturer's
recommendations for the pipe and accessories being used. Side
outlets shall be rotated so that the operating stems of valves
will be vertical when the valves are installed. Pressure pipe
shall be laid with bell ends facing the direction of pipe
installation. Pipe end bells shall be placed upgrade for all
wastewater lines.
06/09/88 Page 51
Pipe
510
Orientation marks, vhen applicable, shall be in their proper
position before pipe is seated.-
Before joining any pipe, all foreign matter, lumps, blisters,
excess coal tar coating, oil or grease shall be removed from the
ends of each pipe and the pipe ends shall then be vire brushed and
wiped clean and dry. Pipe ends shall be-kept clean until joints
are made.
Every precaution shall be taken to prevent foreign material from
entering the pipe during installation. No debris, tools, clothing
or other materials shall be placed in the pipe.
(17) Joints
(a) Mortar
Pipe ends shall be clean, free of asphalt or other
contaminants which will inhibit the bond of the mortar to the
pipe. The pipe ends shall be moistened immediately prior to
placing the mortar in the joint.
(b) Cold Applied Preformed Plastic Gaskets
The pipe ends shall be clean and the joint material applied
to. the dry pipe. In cold weather, the joint material shall
be heated to facilitate the seal of the joint.
(c) 0 -Ring
1
1
1
1
1
1
1
1
1
Just before making a,joint..the ends of the pipe shall be -- '
clean, dry, free of any foreign matter, lump blisters,
excessive coal tar coating and grease or oil and shall be
wire brushed. The gasket and the inside surface of the bell
shall be lubricated with a light film of soft vegetable soap
compound to facilitate assembly of the joint. The rubber
gasket shall be stretched uniformly as it is placed in the
spigot groove to insure a uniform volume of rubber around the
circumference of the groove. The spigot shall be centered in
the bell, the pipe pushed home uniformly and brought into
against pipe to secure the joint.
true alignment. Bedding material shall be placed and tamped
(d) Push -on Joints
Just before making a joint, the bell and spigot rings shall
be clean and dry. The gasket and the inside surface of the
bell shall be lubricated with a light film of soft vegetable
soap compound (Flax Soap) to facilitate telescoping the
joints. The rubber gasket if not factory installed shall be
stretched uniformly as it is placed in the spigot groove to
insure a uniform volume of rubber around the circumference
of the groove. The spigot shall be centered in the bell, the
pipe pushed home and brought into true alignment. It shall be
06/09/88 Page 52 Pipe
1
1
1
1
1
All flanged, mechanical or other bolted joints shall be
joined with nuts and bolts of high strength, low alloy,
corrosion resistant steel, stainless steel or be coated as
indicated above in Iron Pipe.
(f) Solvent Veld - For plumbing pipe.
(18) Pressure Pipe Laying
(a) Grout for Concrete Steel Cylinder Pipe.(CSC) and Velded Steel
Pipe
secured there with bedding material which is carefully tamped
under and on each side of the pipe. Care should be taken to
prevent dirt or foreign matter from entering the joint space.
•
(e) Bolted Joints
Aggregate, cement, etc., shall be as indicated in "Mortar"
herein. .
Grout shall be poured into the recess between the bell and
spigot on the outside of the pipe and contained by a joint
wrapper ( "diaper ") recommended by the pipe manufacturer. The
wrapper shall have a minimum width of 7 inches for 30 inch
and smaller and 9 inches for larger pipe, secured
to the pipe by "Band Iron" steel straps. The grout shall be
poured in one continuous operation in such manner that after
shrinkage and curing the joint recess will be completely
filled.
Mortar for the inside recess shall be of the consistency of
plaster. The inside recess between the bell and spigot shall
be filled with mortar after the pipe joint on either side of
the recess has been backfilled and yell tamped with no less
than one pipe joint installed ahead of the pipe forming the
recess. The mortar shall completely fill the recess and
shall be trowelled and packed into place and finished off
- smooth vith the inside of the pipe. .
The Contractor shall inspect the joint after the mortar has
set and make repairs of any pockets, cracks or other defects
caused by shrinkage to the satisfaction of the Engineer. The
inside surface shall be cleared of any mortar droppings,
cement, eater, slurry, etc., before they have become set and
shall be cleared of any other foreign matter. The inside
surface of the pipe shall be left clean and smooth.
Pipe shall be handled at all times with vide nonabrassive
slings, belts or other equipment designed to prevent damage
to the coating and all such equipment shall be kept in such
repair that its continued use is not injurious to the
coating. The use of tongs, bare pinch -bars, chain slings,
rope slings without canvas covers, canvas or composition belt
510 06/09/88 Page 53 Pipe
510
slings vith protruding rivets, pipe hooks without proper
padding or any other handling equipment which the Engineer
deems to be injurious to the coating shall not be permitted.
The spacing of pipe supports required to handle the
pipe shall be adequate to prevent cracking or damage to the
cement mortar lining.
(19) Placing Pipe in Tunnels
Piping installed as a carrier pipe in a tunnel, encasement pipe,
etc., shall have uniform alignment, grade, bearing and conform to
the reviewed shop dravings. All necessary skid blocks, rails,
bedding material, grout cradle or paving, bracing, blocking, etc.,
as stipulated by the Contract or as may be required to provide and
maintain the required pipe alignment and grade, shall be provided
by the Contractor at no cost except as provided by the Bid Items.
This shall include at least 1 screv -type hold down jack per joint
of pipe to prevent flotation of the pipe, unless othervise
indicated. Such carrier piping shall have flexible bolted or
gasketed push -on joints or Concrete Steel Cylinder pipe installed
as follows:
(a) 21 Inch Pipe and Smaller
Prior to placing the pipe in the tunnel, the inside
joint recess at the bell shall be buttered with cement
mortar.
After the joint is engaged, the excess mortar shall be
smoothed by pulling a tight fitting swab through the
joint.. The pipe joints shall then be velded rigid by
placing 3 segments of veld, having a minimum length of 9
inches each and equally spaced around the joint. Cement
mortar protection shall then be placed in the normal
manner to the exterior of the joint and alloyed to
harden sufficiently to avoid dislodgement during
installation. If time is of the essence, a quick
setting compound may be used. -
(b) 24 Inch Pipe and Larger
Each length of pipe shall be pushed into the tunnel as
single units. A flexible mastic sealer shall be applied
to the exterior of the joint prior to joint engagement.
The surfaces receiving the mastic sealer shall be
cleaned and primed in accordance with the manufacturer's
recommendation. Sufficient quantities of the mastic
sealer shall be applied to assure complete protection of
all steel in the joint area. The interior of the joint
shall be filled vith cement mortar in the normal manner
after the pipe is in its final position within the
tunnel.
06/09/88 Page 54
Pipe
1
1
1
1
1
1
1
1
1 -
1
1
1
1
1
1
1
I
1
(20) Temporary Pipe Plugs, Caps, Bulkheads and Trench Caps
r.`j'I'n "„ " " - "'Temporary 'plugs, caps or plywood bulkheads shall be installed to
close all openings of the pipe and fittings when pipeline
construction is not in progress.
: • ,; ; Standard plugs shall be.inserted the bells of all dead ends
of pipes, _tees or crosses and spigot ends shall be capped. All
end plugs or caps shall be secured to the pipe as provided under
Item No. 507, "Bulkheads ".
510
Trench caps shall be reinforced Class D concrete as indicated.
(21) Corrosion Control .
(a) Protective Covering
Unless otherwise indicated, all flanges, nuts, bolts,
threaded outlets and all other iron or steel components
buried and in contact with earth or backfill shall be wrapped
with 8 -mil (minimum) polyethylene film meeting ANSI /AWA
C to provide a continuous vrap.
(b) Corrosion Monitoring System
1. If indicated the corrosion monitoring system shall be
furnished and installed to meet the folloving
requirements:
•
a. Bonds shall be provided betveen steel cylinders of
adjacent pipe sections and all noninsulating joints
as necessary to assure electrical continuity except
where electrical isolation is required. The joint
bonds shall be designed:
(1) With sufficient slack to allow for a total
joint displacement of 1/2 inch.
(2) Using insulated copper cable metallurgically
bonded to adjacent cylinders. All bare copper
and steel at the connection shall be insulated
by an approved means.
b. Intermediate bonds for the prestress vire of
embedded cylinder prestressed concrete pipe shall
also be provided as required to minimize
attenuation. The intermediate bonds shall be in
the form of steel straps embedded in the outer
surface of the concrete core directly upon which
the prestress vire is tightly wound. The size and
number of straps shall be designed to provide
uniform current distribution to all embedded
metallic surfaces of the pipe.
06/09/88
Page 55 Pipe
510
c. Electrical isolarion in the o 'e flexible
or rigid insulating fittings as specified herein
.shall be provided as required to obtain electrical
discontinuity.
d. Flexible insulating fittings required shall be
t: ,style 39 insulating couplings as manufactured by
. Dresser Industries, 41 Fisher Avenue, Bradford, PA
16701 or equal.
e. Rigid insulating fittings required shall be
insulated with fullface gaskets and combination
bolt sleeves and washers for flanges as
manufactured by Central Plastics Co., P.O. Box 762,
Shawnee, OK 74801 or equal.
f. Corrosion test stations shall be installed on the
pipeline at:
(1) All buried line crossings.
(2) The beginning and end of the portions of the
pipeline to be monitored.
a. Both sides of insulating fittings.
b. Intermediate locations along the line,
such that the test stations are no more
than 1,000 feet apart.
For the embedded cylinder prestressed
concrete pipe alternative, test stations,
with wires originating at the prestress
vire at the midpoint of the pipelaying
length at the above locations, shall also
be provided.
g. Test stations shall be of the tvo-vire type vith
one of the vire being sized (No. 6 AVG or larger)
such that it can be used for bonding. The other
vire, for determining pipe -to -soil potentials,
shall be No. 12 AVG or larger. Both leads shall be
continuous (without splices) and laid with
sufficient slack to prevent stress. The leads
shall be insulated vith 600 -volt rated insulation
suitable for direct burial. Prior to backfilling,
the insulation shall be inspected for defects. All
defects shall be repaired by approved methods.
h. Test stations shall be of the flush type (terminal
below grade) or the above- surface type, protected
as required for permanency. The flush type shall
be installed in developed, urban areas (streets,
alleys, sideways, etc.) and the- above- surface type
06/09/88 Page 56 Pipe
P
(mounted-on a post) shall installed in
cross- country areas (rangeland, farmland, etc.).
Where practicable, -test stations shall be located
at or closely adjacent to clearly identifiable
topographical features (fence line, road
intersection pipeline
. - r , ; section line,'.etc.) of the
:,
t .t ..... .vi right of. way. ..
I. The Contractor shall perform tests as required to
determine the following and correct the
corrosion - monitoring system to comply with these
specifications:
j.
1. . Pipeline electrical continuity.
2. Effectiveness of insulating joints.
3. Test station integrity.
4. Static pipe -to -soil potentials at each
test station.
5. Soil resistivity at each test station.
All design, installation and testing shall be
consistent vith sound corrosion engineering
practice.
(22) Pipe Anchorage, Support and Protection
Pressure pipeline tees, plugs, caps and bends exceeding 22 1/2
degrees; other bends as directed shall be securely anchored by
suitable concrete thrust blocking or by approved metal harness.
Unless otherwise indicated, on 24 inch or larger piping, all bends
greater than 11 1/4 degrees shall be anchored as described herein.
Storm severs on steep grades shall be lugged as indicated.
(a) Concrete Thrust Blocking
' Concrete for use as reaction or thrust blocking shall be
Class B conforming to Item No. 403, "Concrete for
Structures ".
Concrete blocking shall be placed between solid ground and
the fitting to be anchored. The area of bearing on the pipe
and on the ground shall be as indicated or directed by the
Engineer. The blocking shall, unless otherwise indicated, be
so placed that the pipe, fittings and joints will be
accessible for repair.
The trench shall be excavated at least 6 inches outside the
outermost projections of the pipe or appurtenance and the
trench walls shaped or undercut according to the detail
510 06/09/88 Page 57 Pipe
P
1
drawings or as required to provide adequate space and bearing
area for the concrete.
The pipe and fittings shall be adequately weighted and
laterally braced to prevent floating, shifting or straining
of the pipeline while the concrete is being placed and taking ,
initial set. The Contractor shall be solely responsible for
the sufficiency of such restraints.
(b) Metal Thrust Restraint
1
Fabricated thrust restraint systems such as those described
below may be approved for use instead of concrete blocking.
To obtain approval, the project plans must include sufficient
drawings, notes, schedules, etc., to assure that the proposed
restraints as installed will be adequate to prevent '
undesirable movement of the piping components. Such
restraint systems may only be used where and as specifically
detailed and scheduled on approved project plans. 1
1. Thrust Harness •
A metal thrust harness of tie rods, pipe clamps or lugs,
turnbuckles, etc., may be approved. All carbon steel
components of such systems, including nuts and washers,
shall be hot -dip galvanized; all other members shall be
cast ductile iron. After installation, the entire
assembly shall be wrapped with 8 mil polyethylene film,
overlapped and taped in place with duct tape to form a
continuous protective wrap.
— - The number, size and arrangement of rods, lugs, etc.,
shall be specifically detailed on the approved plans.
2. Restrained Joints
Piping or fitting systems utilizing integral ,
mechanically restrained joints may be approved. All
components of such systems shall be standard
manufactured products fabricated from cast ductile iron,
hot -dip galvanized steel, brass or other corrosion
resistant materials and the entire assembly shall be
protected with a continuous film wrap as described for
1. above.
Location, configuration and description of such products
shall be specifically detailed on the plans. (Add -on
attachments such as retainer glands, all- thread rods,
etc., are not acceptable.)
(c) Concrete Encasement, Cradles, Caps and Seals
When trench foundation is excessively vet or unstable or
installation of water or wastewater pipe will result in less
510 06/09/88 Page 58 Pipe
1
•
than 30 inches of.cover,`Contractor shall notify Engineer.
Engineer may require Contractor to install a concrete seal,
cradle,_cap, or . other'appropriate action.
All concrete cap, etc., shall be continuous and begin and end
within 6 inches of pipe joints. Concrete cap, cradle and
encasement shall;conform to City of Austin Standards No.
510 -1, 510-9 and 510-7 respectively. The pipe shall be well
secured to prevent shifting or flotation while the concrete
is being placed. _
(d) Anchorage Bulkheads
Concrete bulkheads keyed into the undisturbed earth shall be
placed as indicated to support and anchor the pipe and /or
backfill_against end thrust, slippage on slopes, etc.
Concrete material and placement shall be Class A, Item No.
403, "Concrete for Structures ".
(e) Trench Caps, Concrete Rip -Rap and Shaped Retards
Where called for by the Contract or as directed by the
Engineer, concrete trench caps, concrete rip -rap and /or
shaped retards shall be placed as detailed by the standard
dravings as protection against erosion. Concrete material
and placement shall be Class B, Item No. 403, "Concrete for
Structures ".
(23) Wastewater Connections
(a)
Connections to Mains
12 Inches and Smaller
All branch connections of new main lines shall be made by use
of manholes.
Service stubs shall be installed as indicated. minimum grade
shall be 1 percent and minimum cover shall be 4 1/2 feet at
the curb. Standard plugs shall be installed in the dead end
before backfilling.
Where a service connection to a main 12 inches or smaller is
indicated, a wye, tee or double wye shall be installed.
Vhere a service connection to a main 15 inches or larger is
indicated, a field tap may be made with the pipes installed
croon to crown. The tap should be made conforming to the
pipe manufacturer's recommendations with the Engineer's
approval.
Vhere not otherwise indicated, service connections to mains
shall be installed at an angle approximately 45 degrees above
the horizontal.
510 06/09/88 Page 59 Pipe
P
(b) Connections to the Existing System
Unless otherwise specified by•the'Engineer, all connections
made to existing mains shall be made at manholes with the
croon of the inlet pipe installed at the same elevation as
the crovn of the existing pipe.• Service stubs installed on
the existing system shall be installed by use of tapping
saddles unless otherwise approved by the Engineer. Extreme
care shall be exercised to prevent material from depositing
in the existing pipe as the taps are being made.
When connections to existing mains are made, a temporary plug
approved by the Engineer must be installed downstream in the
manhole to prevent vater and debris from entering the
existing system before final acceptance. These plugs shall
be removed after the castings are adjusted to finish grade or
when final acceptance is given.
•
(24) Vater System Connections
The Contractor shall, at his expense, make all necessary
connections of new piping or accessories to the existing eater
system. To minimize any inconvenience from outages, the
Contractor shall schedule all such connections in advance and such
schedule must be approved by the Engineer before beginning any
work.
(a) Shutoffs
The City vill make all shutoffs on existing vater mains where
more than one valve is involved. The Contractor -will be - - - -- --
required to notify the Engineer's field representative on the
job at least 24 hours prior to the desired time for any
shutoff. Where only one valve will be operated, the
Contractor may operate the valve under the immediate
supervision of the Engineer's field representative.
(b) Vet Connections to Existing Water System
The Contractor shall make all vet connections called for by
the Contract or required to complete the vork. A vet
connection shall include draining and cutting into existing
piping and connecting a new pipeline other extension into
the existing pressure piping, forming an addition to the
vater transmission and distribution network.
The contract price for vet connections shall be full payment
for all necessary shutoffs, excavation, removing plugs and
fittings, pumping water to drain the lines, cutting in new
fittings, blocking and anchoring piping, bedding and
backfilling, placing the lines and service and all site
cleanup.
510 06/09/88 Page 60 Pipe
1
1
1
1
1
1
1
1
1
1
_1
1
1
1
1
1
1
1
1
No eater containing detectable amounts of chlorine may be
drained, released or discharged until.specific planning and
appropriate preparations to handle, dilute and dispose of
such chlorinated water are approved in advance by the City
and the disposal operations shall be witnessed by an
authorized representative from the City.
Pressure Taps,to'Existing Vater System
The Contractor shall,make all pressure taps called for by the
Contract Documents or required to complete the work. A
pressure tap shall consist of connecting new piping to the
existing water system by drilling into the existing pipe
while it is carrying water under normal pressure without
taking the existing piping out of service.
Unless otherwise provided by the Contract, the Contractor
shall, at his expense, perform all necessary excavation,
furnish and install the tapping sleeve, valve and
accessories, provide the tapping machine, drill the tap
(unless otherwise indicated) and shall block, anchor and
backfill the piping, valve and all accessories, place the new
piping in service and perform all site cleanup. Where that
the City will make the tap, City forces are not obligated or
expected to perform any vork except to provide tapping
machine and drill the actual hole. If City crews are to make
the tap, fiscal arrangements must be made in advance at the
Taps 0fficeo 309 West 2nd Street.
(c)
If a private contractor makes the tap, a V -VV inspector must
be present. "Size on size" taps will not be permitted, unless
made by use of an approved full circle gasket tapping sleeve.
Concrete blocking shall be placed behind and under all tap
sleeves 24 hours prior to making the vet tap.
(d) Service Connections
Tapping of PVC or AC pipe for service connections may be made
using either a service clamp or saddle or a tapping sleeve
recommended by the manufacturer and approved as satisfactory
by the Engineer. Direct tapping will not be permitted.
All service connections shall be installed so that the outlet
is at an angle of approximately 45 degrees above horizontal
at the main line.
Precautions should be taken to ensure that the tapping saddle
or sleeve is placed on the pipe straight to prevent any
binding or deformation of the PVC pipe. The mounting chain
or U -bolt strap must be tight.
Tapping shall be performed with a sharp shell type cutter so
designed that it will smoothly penetrate heavy walled PVC
DR14 and 200 psi AC and will retain and extract the coupon
from the pipe.
510 06/09/88 Page 61 Pipe
(25) Backfilling
• (a) General '
6 inch bedding under pipe shall be brought to or near optimum
moisture content and densified to provide adequate support
for pipe. Remainder of bedding shall be brought to or near
optimum moisture content and densified immediately after pipe
placement as indicated, except when mortar joints are used
for jointing storm severs, no backfill above bedding shall be
placed until mortar has cured for at least 6 hours.
Special emphasis is placed upon the need for obtaining
uniform backfill material anduniformcompacted density
throughout the bedding and backfill. Extreme care is to be
taken to insure proper backfill over the pipe. The maximum
lift of backfill shall be determined by the compaction
equipment selected and in no case shall it exceed 18 inches,
loose measurement.
No heavy equipment, which might damage pipe, vill be alloyed
over the pipe until sufficient cover has been placed and
compacted. Testing of the completed bedding and backfill in
streets and under and around structures shall meet the
specified density requirements to be accepted. All initial
testing will be at no expense to the Contractor and shall
conform to Section 00344, "Testing Laboratory Services ".
(b) General Corrugated Metal Pipe
After the corrugated metal pipe structure has been completely
assembled on the proper line and grade and headvalls
constructed where indicated; selected material free from
rocks over 8,inches in size from excavation or borrow, as
approved by the Engineer, shall be placed along both sides of
the completed structures equally, in uniform layers not
exceeding 6 inches in depth (loose measurement), sprinkled if
— required and thoroughly compacted between adjacent structures
and between the structures and the sides of the trench or for
a distance each side of the structures equal to the diameter
of the pipe if pipe is laid above the existing ground.
Backfill material shall be compacted to the same density
requirements as indicated for the adjoining sections of
embankment in accordance with the governing specifications
thereof. Above the 3/4 point of the structure, the fill
shall be placed uniformly on each side of the pipe in layers
not to exceed 12 inches, loose measure.
Prior to adding each new layer of loose backfill material,
until a minimum of 12 inches of cover is obtained over the
croon of the pipe, an inspection will be made of the inside
periphery of the corrugated metal structure to determine if
510 06/09/88 Page 62
Pipe
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
any result o of i im p ro p er l construction dmethodsion has occurred as a
(c) Backfill Materials
o- ion9D.. u; .. _.
;t: ....
.The Engineer.may approve any of the following well graded
materials: t.
1. Select trench material
2. Sand
3. Crushed rock cuttings
4. Rock cuttings • "'"
5. Foundation Rock
6. Blasted material with fines and rock
7. Cement stabilized material
8. Borrow
Within the 100 year flood plain, sand will not be permitted
for backfilling. The Engineer shall approve the topsoil for
areas to be seeded or sodded.
(d) Backfill in Street Right of Way
Placement of backfill under pavement structures and within 2
feet of any structures shall be compacted to the required
density using any method, type and size of equipment which
will give the required compaction without damaging the pipe
or bedding. Placement of backfill greater than 2 feet beyond
structures in Right of Way shall be conform to (g) belov.
The depth of layers, prior to compaction, shall depend upon
the type of sprinkling and compacting equipment used and the
- test results thereby obtained. Prior to and in conjunction
vith the compaction operation, each layer shall be brought to
the moisture content necessary to obtain the required density
and shall be kept level to insure uniform compaction over the
entire layer. Testing for density will be in accordance with
Test Method Tex - 114 - E and Test Method Tex - 115 -
Each layer of backfill must provide the density as required
herein. Swelling soils (soils vith plasticity index of 20 or
more) shall be sprinkled as required to provide not less than
optimum moisture nor more than 2 percent over optimum
moisture content and compacted to the extent necessary to
provide not less than 95 percent nor more than 102 percent of
the density as determined in accordance vith Test Method
Tex - 114 -E. Nonsvelling soils (soils with plasticity index
less than 20) shall be sprinkled as required and compacted to
510 06/09/88 Page 63
Pipe
P
the extent necessary to provide not less than 95 percent of
the density as determined in accordance with Test Method
Tex - 114 -E.
After each layer of backfill is complete, tests may be made
by the Engineer. If the material fails to meet the density
indicated, the course shall be reworked as necessary to
obtain the indicated compaction and the compaction method
shall be altered on subsequent vork•to obtain indicated
density and conform to Section 00344, "Testing Laboratory
Services ".
At any time, the Engineer may order proof rolling to test the
uniformity of compaction of the backfill layers. All
irregularities, depressions, weak or soft spots which develop
shall be corrected immediately by the Contractor.
•
Should the backfill, due to any reason, lose the required
stability, density or finish before the pavement structure is
placed, it shall be recompacted and refinished at the sole
expense of the Contractor. Excessive loss of moisture. in the
subgrade shall be'prevented by sprinkling, sealing or
covering with a subsequent backfill layer or granular
material. Excessive loss of moisture shall be construed to
exist vhen the subgrade soil moisture content is more than 4
percent below the optimum of compaction ratio density.
Backfill shall be placed from the top of the bedding material
to the existing grade, base course, subgrade or as indicated.
The remainder of the street backfill shall be Flexible Base,
Concrete or Hot Nix Asphalt Concrete as indicated or to
replace in kind the surface removed to construct the pipe.
(e) Backfill in County Street or State Highway Right of Vay
All work within the right of way must meet the requirements
of (d) above, as a minimum and shall meet the requirements of
the permit issued by the County vhen their requirements are
more stringent. Prior to the start of construction, the
Contractor will be responsible for contacting the appropriate
SDHPT office or County Commissioner's Precinct Office and for
coordinating his activities with the operating procedures in
effect for utility cut permits and pavement repair under
their jurisdiction. Approval for all completed work in the
State or County right of way must be obtained from the
appropriate Official prior to final payment by the Owner.
(f) Backfill in Railroad Right of Way
All work within the railroad right of way must meet the
requirements of (d) above, as a minimum and shall meet the
requirements of the permit issued by the Railroad Owner when
their requirements are more stringent. Approval for all
completed work in the railroad right of way must be obtained
from the Railroad prior to final acceptance.
510 06/09/88 Page 64 Pipe
P
(g) Backfill in Easements
Where not otherwise indicated, Contractor may select whatever
methods and procedures may be necessary to restore entire
work area to a safe, useful and geologically stable condition
with a minimum density of 85 percent or a density superior to
that prior to construction: '
In and near flood plain of all streams and watercourses,
under or adjacent to utilities, structures, etc., all
backfill shall be compacted to a density of not less than 95
percent conforming to SDHPT Test Method Tex - 114 -E, unless
otherwise directed by Engineer.
All soil areas disturbed by construction shall be covered
with top soil and seeded conforming to Item No. 604, "Seeding
for Erosion Control ". All turf, drainvays and drainage
structures shall be constructed or replaced to their original
condition or better. No debris shall remain in the drainvays
or drainage structures.
(26) Quality Testing for Installed Pipe
(a) Wastewater Pipe Acceptance Testing
After construction is complete, Engineer shall determine
whether the pipeline is to be tested for infiltration,
exfiltration or by the low pressure air test method.
Wastewater pipe installed in the City of Austin and its ETJ
areas shall be tested for exfiltration or infiltration as
described below in "Exfiltration Test" and "Infiltration
Test" or by acceptable low pressure air test, as described
below. At the conclusion of either test series, the work
shall be further tested for pipeline settlement as described
below. The Contractor shall be solely responsible for making
proper repairs to those elements which do not pass these test
requirements.
(b) Exfiltration Test
The pipeline shall be completely filled with eater for its
complete length or by sections as determined by the Engineer.
If tested for its complete length, the maximum head at any
point shall not exceed 25 feet unless otherwise indicated.
If tested in sections, the manholes in the test section shall
be completely filled with water. After the pipeline has been
filled and allowed to stand for 24 hours, the amount of
exfiltration shall be calculated. Any amount in excess of
200 gallons per inch of inside pipe diameter per mile per day
shall be cause for rejection.
510 06/09/88 Page 65 Pipe
(c) Infiltration Test -
When the pipe placed in easements is completed, the upper
• portion of the ditch backfill shall be removed to a depth of '
not less than 18 inches below the finished surface and width
equal to the original trench width. The trench shall then be
- flooded with eater until it is completely saturated and eater
stands in the ditch a minimum of 12 inches deep. In cases of
steep terrain, earthen dikes shall be used to assure that
eater will stand over the trench. After it is apparent that . ,
the trench is completely saturated, the main shall then be
inspected with closed- circuit television for infiltration.
Any section of the main or any service stub that indicates
excessive infiltration shall be cause for rejection. '
This procedure shall not be used for pipes installed in areas
where the P.I. of the surrounding material is 20 or higher or II where the backfill material has a P.Z. of 20 or more.
(d) Pipeline Settlement Test
(e) Low Pressure Air Test of Gravity Flow Vastewater Lines
(1) General _..
During the infiltration test or after the exfiltration test,
the pipe vial be TV inspected for possible settlement. When
air testing has been used, eater shall be flowed into the
pipe to permit meaningful observations. Any pipe settlement
vhich causes excessive ponding of eater in the pipe shall be
cause for rejection. 1
Wastewater lines in sizes for which the City has testing
equipment may at the discretion of the Engineer, be air
tested between 'manholes. Backfilling to grade shall be
completed before the test and all laterals and stubs
shall be capped or plugged by the Contractor so as not
to allow air losses which could cause an erroneous test II
result. Manholes are to be plugged so they are isolated
from the pipe and cannot be included in the test.
All plugs used to close the sever for the air test must
be capable of resisting the internal pressures and must II
be securely braced. Place all air testing equipment
above ground and alloy no one to enter a manhole or II
where a plugged sewer is under pressure. Release
all pressure before the plugs are removed. The testing
equipment used must include a pressure relief device
designed to relieve pressure in the sever under test at ,
10 psi or less and must alloy continuous monitoring of
the test pressures in order to avoid excessive pressure.
Use care to avoid the flooding of the air inlet by
infiltrated ground water. (Inject the air at the upper
plug if possible.) Use only qualified personnel to
conduct the test.
510 06/09/88 Page 66 Pipe
P
1
1
1
1
(2) Ground Water
F•�! - •" ' ••• Since the presence of ground eater will affect the test
results, test holes shall be dug to the pipe zone at
L,, usp =• - .. • •• Intervals of not more than 100 feet and the average
}m •. * height of ground eater above the pipe (if any) shall be
;.ri;9s -•:' •• - - determined before starting the test.
3i.� i• ,., _ i . , -, _
(3) Test Procedure
The Engineer may, at any time, require a calibration
check of the instrumentation used. Use a pressure gauge
having minimum divisions of 0.10 psi and an accuracy of
0.0625 psi. (One ounce per square inch.) All air used
shall pass through a single control panel. Clean the
sever to be tested and remove all debris vhere
indicated. Vet the sewer prior to testing. The average
back pressure of any groundwater shall be determined
(0.433 psi) for each foot of average eater depth (if -
any) above the sewer.
Add air slowly to the section of sever being tested
until the internal air pressure is raised to 4.0 psig
greater than the average back pressure of any ground
water that may submerge the pipe.
After the internal test pressure is reached, allow at
least 2 minutes for the air temperature to stabilize,
adding only the amount of air required to maintain
pressure. ,After the temperature stabilization period,
disconnect the air supply.
Determine and record the time in seconds that is
required .for the internal air pressure to drop from 3.5
psig to 2.5 psig greater than the average back pressure
of any ground eater that may submerge the pipe.
Compare the time recorded with the time required as
follows:
Pipe Size (Inches)6 8 10 12 15 18 21 24
Time (Minutes) 3 4 5 6 7.5 9 10.5 12
Any drop in pressure, from 3.5 psig to 2.5 psig, in a
time less than that required by the above table shall,be
cause for rejection. when the line tested includes more
than one size pipe, the minimum time shall be that given
for the largest size pipe included.
When lines are air tested, manholes are to be tested
separately by exfiltration or infiltration.
510 06/09/88 Page 67 Pipe
P
(27) Pressure Pipe Hydrostatic Testing
After the pipe has been installed and backfilled and all service
laterals, fire hydrants and other appurtenances installed and
connected, a pressure test, followed by a leakage test, will be
conducted by the City. The City vill furnish the pump and gauges
'for the tests. The Contractor will be present and shall furnish
• all necessary assistance for conducting the tests. The specified
test pressures will be based on the elevation of the lowest point
of the line or section under test. Before applying the specified
test pressure, all air shall be expelled from the pipe. If
permanent air vents are not located at all high points, the
Contractor shall install corporation cocks at such points.
All service laterals and fire hydrant leads, with the hydrant
valves closed and nozzle caps open, shall be included in the
tests.
(a) Pressure Test
The entire project or each valved section shall be tested, at
a pressure of 200 psi for a sufficient period (approximately
10 minutes) to discover all leaking or defective materials.
Repairs shall be made by the Contractor to correct any
leaking or defective materials.
(b) Pressure Pipe Leakage Test
A leakage test will follow the pressure test and be conducted
on the entire project or each valved section. The leakage
test shall be at 150 psi for at least 1 hour.
(1) Allowable Leakage
Leakage shall be defined as the quantity of vater that
must be supplied into any test section of pipe to
maintain the specified leakage test pressure (see above,
"Pressure Pipe Leakage Test ") after the air in the
pipeline has been expelled and the pipe has been filled
with eater.
No pipe installation will be accepted if the leakage
exceeds 25 gallons /24 hours /mile of pipe /inch nominal
pipe diameter.
( 25 gpd )
(in. - mi.)
(28) Service Charges for Testing
No charge will be made to the Contractor for the City's test
equipment, inspection, etc.; when the test results shoe that
leakage is within the indicated allowable limits.
510 06/09/88 Page 68
Pipe
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
C
. Sterilization of Potable Water Lines •
- The Contractor shall protect all piping materials from
.contamination during storage, handling and installation. Prior to
disinfection, the pipeline interior shall be clean, dry and
unobstructed. All dirt, debris, gasket lubricant, etc., shall be
washed from the line by swabbing with hypochlorite solution and /or
flushing with clean water.
510
For each test, either for leakage or for pressure, which fails to
meet the indicated requirements, the City's flat charge of $50.00
for such tests will be charged to the Contractor and vill be
deducted from any funds due the Contractor.'
The City, at its expense, vill supply the test gauges and the
concentrated disinfecting material and City personnel vill
supervise and direct the overall sterilization procedure. The
Contractor, at his expense, shall provide all other equipment,
supplies and the necessary labor to perform the sterilization
under general supervision of the City.
(a) Procedure and Dosage
All valves shall be arranged to prevent the strong
.disinfecting dosage from flowing back into the existing water
supply piping. The new pipeline shall then be completely
filled with disinfecting solution by feeding the concentrated
chlorine and approved water from the existing system
uniformly into the new piping in such proportions that every
part of the line has minimum concentration of 50 parts per
million (50 ppm or 50 mg /liter) available chlorine.
Unless otherwise indicated, all quantities called for herein
refer to measurements by the testing procedures in the
current edition of "Standard Methods ". The chlorine
concentration of each step in the sterilization procedure
shall be verified by chlorine residual determinations. This
disinfecting solution shall be retained in the piping for at
— least 24 hours and all valves, hydrants, etc., shall be
operated to disinfect all their parts. After this retention
period, the water shall contain no less than 25 parts per
million chlorine throughout the treated section of the
pipeline.
This heavily chlorinated vater shall then be carefully
flushed from the line until the chlorine concentration is no
higher than the residual generally prevailing in the existing
distribution system or approximately one part per million.
Proper planning and appropriate preparations to handle,
dilute and dispose of this strong chlorine solution without
causing injury or damage to the public, the water system or
the environment must be approved by the City before flushing
of the line may begin and the flushing shall be witnessed by
an authorized representative of the City.
06/09/88
Page 69 Pipe
(b) Bacteriological Testing
After final flushing of the strong disinfecting solution,
eater samples from the line shall be tested for
bacteriological quality by the City and must be found free of
coliform_organisms before the pipeline may be placed in
service. One test sample'shall be dravn from the end of the
main and additional samples collected at intervals of not
more than 1000 feet along the pipeline.
The Contractor, at his expense, shall install sufficient
sampling taps at proper locations along the pipeline. Each
sampling tap shall consist of a standard corporation cock
installed in the line and extended with a copper tubing
gooseneck assembly. After samples have been collected, the
gooseneck assembly may be removed and retained for future
use.
Samples for bacteriological analysis shall be collected only
from suitable sampling.taps in sterile bottles treated with
sodium thiosulfate. Samples shall not be drawn from hoses,
fire hydrants, etc. The City, at its expense, will furnish
the sterile sample bottles and may, at its discretion, .
"collect the test samples with City personnel. .
If the initial disinfection fails to produce acceptable
sample tests, the disinfection procedure shall be repeated
(without extra compensation) until satisfactory test results
have been obtained before the piping may be placed in
service.
(30) Cleanup and Restoration
It shall be the Contractor's responsibility to keep the
construction site neat, clean and orderly at all times.
Cleanup shall be vigorous and continuous to minimize traffic
hazards or obstructions along the streets and to driveways.
Trenching, backfill and cleanup shall be coordinated as directed
by the City. The Engineer shall regulate the amount of open ditch
and may halt additional trenching if cleanup is not adequate to
alloy for orderly traffic flov and access.
Materials at the site shall be stored in a neat and orderly manner
so as not to obstruct pedestrian or vehicular traffic. All damaged
material shall be removed from the construction site immediately
and disposed of in a proper manner. All surplus excavated
materials become the property of the Contractor for disposal at
his expense. After trenching, the Contractor shall immediately
remove all excavated materials unsuitable for or in excess of,
backfill requirements. Immediately following the pipe laying work
as it progresses, the Contractor shall backfill, grade and compact
all excavations as provided elsewhere and shall immediately clean
510 06/09/88 Page 70 Pipe
1
510.4 Measurement
510.5 Payment
up and remove all unused soil,-vaete and debris and restore all-
surfaces and improvements to.a condition equal.or , to•that
before construction began and to an appearance which•:complements •
the surroundings. The Contractor shall grade and dress the top 6
inches of earth surfaces with soil or other material similar and
equal to the surrounding,.fill and smooth any visible tracks or
ruts, replace and.re- establish all damaged or disturbed turf or
other vegetation and otherwise make every effort to encourage the
return of the entire surface and all improvements to a pleasant
appearance and useful condition appropriate and complementary to
the surroundings and equal or similar to that before construction
began.
Pipe vill be measured by the linear foot along the centerline of the pipe
for the various sizes and classes of pipe in place, in accordance with
these specifications, complete and accepted by the Engineer, including
excavation and backfill, unless they are included in the bid as a pay item.
Where wyes, branches or connections to existing pipe lines are involved,
measurement of the new connecting pipe will be made from the intersection
of its central axis with the outside surfaces of the pipe into which it
connects. Where inlets, headwalls, catch basins, manholes, junction boxes
or other structures are included in lines of pipe, that length of pipe
tying into the structure wall vill be included for measurement but no other
portion of the structure length or width will be so included.
For multiple pipes, the measured length will be sum of the lengths of the
barrels measured as prescribed above.
Any concrete seal or mat required shall be measured by the cubic yard of
material placed, calculated by the minimum trench width specified times the
depth of foundation or mat placed below the pipe bedding.
Payment for pipe, measured as prescribed above, will be made at the unit
price bid per linear foot for the various sizes of pipe, of the materials
and class indicated, unless unstable material is encountered or trench
excavation and backfill is bid as a separate item.
The concrete seal, foundation rock or coarse aggregate shall be paid for at
the unit price bid per cubic yard, which shall be full payment for all
excavation and removal of unsuitable material and furnishing, placing and
compacting the foundation rock, coarse aggregate or other approved material
all complete in place.
Excavation and backfill, when included as a separate pay item, will be
measured by Pay Item No. 510 -E or F.
Excavation and backfill, when included as pipe installation will not be
measured as such but shall be included in the unit price bid for
constructing pipe and measured as pipe complete in place including
510 06 /09/88 Page 71 Pipe
r.. excavation and backfill. As established - in the bid, pipe including
excavation and backfill may be either (1) payment for any and all depths or
- , L-(2) payment in 2 foot incremental depth.
...-Payment for pipe excavation vill be included in the Bid to be measured and
, paid by any of the methods of measurement and payment methods indicated
'above or may be measured as "Structural Excavation and Backfill" as
... a .J indicated.
Payment shall be full compensation, in accordance with the pay items set in 1
the bid, for excavation, furnishing, hauling and placing pipe including
lugs and all incidental and subsidiary materials and work; preparing,
shaping, dewatering and shoring of trenches; hauling, placing and preparing 1
bedding; for connecting to nev or existing systems or structures; for
hauling, moving, placing and compacting backfill materials and for all
other incidentals necessary to complete the pipe installation as indicated.
510
(2) Concrete Cradles and Seals
When called for in the Bid, concrete seals or cradles shall be
paid for at the unit contract price bid per linear foot for the
size of pipe specified, complete in place.
(3) Concrete' Retards
When called for in the Bid, Concrete Retards shall be paid under
Item No. 593, "Concrete Retards ".
06/09/88 Page 72
1
1
1
(1) Pipe 1
When called for in the Bid, pipe shall be paid for at the unit
contract price bid per linear foot for the size and type of pipe
spe¢Sdig, at the depth specified, complete in place. The bid
price per linear foot shall include all clearing, excavation, 1
bedding material, temporary plugs, pumping, caps or bulkheads, to
keep the pipe clean and dry, all necessary lugs or braces, pipe
coatings, connection to the existing system, disposal of surplus
materials, laying of pipe, backfilling and cleanup. Measurement
for depth shall be from the existing ground surface or proposed
street subgrade, whichever is less, over the centerline of the
pipe. Measurement for length shall be the horizontal distance
..along the centerline of the pipe as surveyed by the Engineer.
Payment will also represent compensation for removal and
replacement of pavement, curb, drainage structures, driveways and 1
any other improvements damaged during construction. Concrete
blocking for supporting and reinforcing bends and thrust blocks
shall be included in the cost for pipe.
No separate payment vill be made for welded joints or harnessed
joints required for thrust restraint which are scheduled or
indicated.
1
1
1
1
1
Pipe
1
(4)
Boring, Jacking and Tunneling -
• When called for in the Bid, boring, jacking and tunneling shall be
paid under Item No. 501, "Jacking or Boring" or Item No. 502,
"Tunneling ". _
(5) Vet connections to Vater Mains
Vet connections shall be paid for at the unit price bid per each,
complete in place, according to the size of the main that is in
service and shall be full compensation for all work required to
make the connection and place the pipe in service. Cast iron
fittings shall be paid for as a separate item.
(6) Fittings
•
Cast iron and ductile iron fittings of the class indicated,
furnished in accordance with these specifications will be paid for
at the unit price bid per ton, complete in place, according to
scheduled weights for mechanical joint fittings furnished,
including glands, bolts and.gaskets, as published in the following
standards:
AVWA C -153 for all fittings in 4 inch through 12 inch sizes,
regardless of whether AVVA C -110 or AWVA C -153 fittings are
furnished or the type of end connections supplied.
AWVA C -110 for all fittings larger than 12 inch size.
Steel cylinder concrete pipe fittings and welded steel pipe
fittings will not be paid for separately. The Contractor shall
include these in his bid for pipe.
(7) Concrete Trench Cap and Encasement
Where the distance between the top of the concrete encasement and
the top of the trench cap is less than 36 inches, the concrete cap
and encasement will be poured as one unit and paid for under this
bid item at the contract price bid per linear foot. When the
distance above is greater than 36 inches or when the trench cap is
placed separately, the trench cap shall be paid for as a separate
item, per linear foot, complete in place.
(8) Cement - Stabilized Backfill
Cement - stabilized backfill shall be paid for at the unit price bid
per linear foot and shall be full payment to the Contractor for
furnishing and installing the required material, mixed, placed and
cured complete in place.
Concrete Encasement
(9)
When called for in the Bid, Concrete Pipe Encasement shall be paid
under Item No. 505, "Concrete Encasement and Encasement Pipe ".
510 06/09/88 .Page 73 Pipe
P
(10), Pressure Taps —
xis. Pressure taps will be paid for at the unit price bid, complete in
place, according to the size tap made and the size main tapped and
shall be full payment for furnishing all necessary materials,
making the tap, testing and placing the connection in service.
(11) Trench Safety Systems
When called for in Bid, Trench Safety Systems will conform to Item
No. 509, "Trench Safety Systems ".
(12) In -Place Sliplining with or without In -Place Pipe
Destruction /Replacement
As called for in the corresponding bid items, pipe sliplining vith
or without in -place pipe destruction /replacement shall be paid for
at the contract price per linear foot for the specified liner and
pipe size and type pipe, at all depths, complete in place.
Installation of new services, or reconnection of existing
services, to the liner will be paid for at the contract price per
each for the specified size and type of service, at all depths,
complete in place.
(13) Cured Resin Pipe Lining
When called for in the bid, cured resin pipe lining will be paid
for per linear foot, for the size and type of pipe lined, at all
depths, complete in place including all equipment set -ups, video
inspection and cleaning of existing pipe. Installation of nev
services or reconnection of existing services to the relined pipe
will be paid for per each, for the specified size and type of
service, at all depths, complete in place.
Payment, when included as a contract pay item, will be made under one of
the following:
Pay Item No. 510 -A: . Pipe, 12" -Dia. (all
12" RCP. Excavation and Backfill
Pay Item No. 510 -A:
18" RCP
Pay Item No. 510 -A:
24" RCP
Pipe, 18" -Dia. (all
Excavation and Backfill
Pipe, 24" -Dia. (all
Excavation and Backfill
Pay Item No. 510 -A: Pipe, 30" -Dia. (all
30" RCP Excavation and Backfill
depths), including
- per Linear Foot.
depths), including
- per Linear Foot.
depths), including
- per Linear Foot.
depths), including
- per Linear Foot.
510 06/09/88 Page 74 Pipe
1
( 1
1
1
1
1
1
1
1
1
c1
1
1
1
1
1
1
1
1
End
Pay Item No. 510 -A: Pipe, 13" x 22 " -Dia. (all depths), including
13 "x22" RCAP Excavation and Backfill - per Linear Foot.
Pay Item No. 510 -D: Adjust 10" Water Line to clear 30" Storm
Sewer - per Lump Sum.
Pay Item No. 510 -S: Trench Safety Systems - per Linear Foot.
A "W" after the pay item indicates the use for water.
A "WW" after the pay item indicates the use for wastewater.
Ref: 102, 210, 403, 501, 502, 505, 507, 593, 60114 604
510 06/09/88 Page 75 Pipe
559.1 Description
This item to govern the materials used and the constructing, furnishing and
placing of concrete box culverts and wing walls on a prepared grade at the
location shown and in accordance with the details indicated. Unless
otherwise indicated, the Contractor shall have the option of furnishing
cast -in- place, precast (formed) or precast (machine made) box culverts.
When cast -in -place box culverts are used, they shall conform to the details
indicated and the requirements for Item No. 403, "Concrete for Structures"
and Item No. 410, "Concrete Structures ". When precast box culverts are
used under traffic, the design loads shall consist of the impact load, dead
load and live load (HS 20- per AASHTO Standard Specifications for Highway
Bridges; design wheel load, 16 Kips) and to the requirements of ASTM C 789
and /or ASTM C 850.
This item to also consist of any pumping, bailing, drainage and Item No.
509, "Trench Safety Systems" for trench walls, when indicated.
559.2 Materials
(1) Concrete
Class A Concrete shall be used for cast -in -place and precast
(formed) box culverts conforming to the requirements of Item No.
403, "Concrete Structures" and Item No. 410, "Concrete for
Structures ", except that Class M Concrete will be required for
direct traffic boxes.
Concrete for precast (machine made) boxes shall conform to ASTM C
789 or C 850 and shall have a minimum 28 day compressive strength
of 5,000 psi.
(2) Reinforcement
Item No. 559
Concrete Box Culverts
Reinforcing steel shall conform to Item No. 406, "Reinforcing
Steel ".
(3) Jointing Material
Materials for jointing precast box culverts shall conform to Item
No. 510, "Pipe ".
(4) Membrane Curing
Materials for membrane curing shall conform to Item No. 409,
"Membrane Curing ".
(5) Admixtures
Admixtures shall conform to Item No. 405, "Concrete Admixtures ".
559 06/08/88 Page 1 Concrete Box Culverts
Air entraining admixtures shall be added to the mixture to produce
concrete vith not less than 4 nor more than 7 percent air content
by volume.
(6) Granular Backfill
Materials for Granular Backfill shall conform to Item No. 210,
"Flexible Base ".
(7) Foundation Rock
Foundation Rock shall be well graded, course aggregate ranging in
size from 2 to 8 inches and capped with 5/8 inch rock.
559.3 Fabrication
Forms for precast (machine made) boxes shall be made of steel. Forms for
precast (formed) boxes may be either wood or steel. Forms shall be
mortar -tight and of sufficient strength to prevent bulging or misalignment
of adjacent boxes. They shall be constructed to permit their removal
without damage to the concrete. Offsets at form joints shall not exceed
1/8 inch. Forms shall be clean and free of extraneous matter when concrete
is placed.
Positive means of supporting steel cages in place throughout forming and
concrete placement will be required and subject to the approval of the
Engineer. Welding of reinforcing steel will be permitted only where shown
on the plans. Welding shall be done by a qualified welder.
Precast (machine made) boxes shall be cast by a process which will provide
for uniform placement of the concrete in the forms and compaction by
mechanical devices which will assure dense concrete. Concrete shall be
mixed in a central batch plant or other approved batching facility from
which the quality and uniformity of the concrete can be assured.
Transit -mixed concrete will not be acceptable for use in precast (machine
made) boxes.
Curing of precast boxes made in a commercial plant shall be by any one or
by a combination of the following methods which are compatible with the
joint materials selected or as directed by the Engineer:
(1) Steam Curing
Boxes will be placed in a curing chamber, free from outside drafts
and cured in a moist atmosphere maintained by the injection of
steam for such time and temperature as necessary for proper
curing. The curing chamber shall be constructed to allow full
circulation of steam around the entire box. Steam outlets shall
be positioned so that live steam is not applied directly to the
concrete.
(2) Water Curing
Boxes may be water cured by covering with water saturated cotton
559 06/08/88 Page 2 Concrete Box Culverts
(3)
mats, polyethylene sheeting or polyethylene burlap blankets, by a
system of perforated pipe or mechanical sprinklers, by porous hose
or by other methods that will keep the boxes moist during the
curing period. Water for curing shall conform to Item No. 403,
"Concrete for Structures ".
Hembiane Curing
Type 1 membrane curing compound may be used for interim curing or
for complete curing. All surfaces shall be kept moist prior to
the application of the curing compound and shall be damp when the
compound is applied.
When used for interim curing, the curing compound shall be applied
to the outside surface of the box upon removal of forms. It shall
also be applied to the inside surface or a suitable covering may
be placed over the box opening to protect the inside of the box
against rapid drying.
When used for complete curing, curing compound shall be applied to
the inside surface of the box when interim curing is applied or
when handling strength has been attained, but not later than 24
hours after casting.
Curing shall not be delayed longer than 1 hour after the concrete
has been placed in the forms or more than 1/2 hour after removal
of forms, unless interim curing is applied.
Precast boxes made in a commercial plant shall be continuously
cured for a period of 3 days after reaching handling strength or
until the design strength has been attained. Curing may be
interrupted for no more than 30 minutes for form removal and no
more than 4 hours for removal to a storage area and resumption of
curing. All precast boxes shall be protected from freezing during
the curing period.
A curing day is a calendar day when the air temperature, taken in
the shade away from artificial heat, is above 50 F for at least 19
hours or for colder days if satisfactory provisions are made to
maintain the temperature at all surfaces of the concrete above 50
F for the entire 24 hours.
Test cylinders shall be cured at the same time and in the same
manner as the boxes.
Not more than 4 lifting holes may be provided in each box to
facilitate handling. They may be cast -in, cut into the fresh
concrete after form removal or drilled and shall not be more than
2 inches in diameter or 2 inches square. Cutting or displacement
of reinforcement will not be permitted. Spalled areas around the
holes shall be repaired. Concrete boxes shall be given an
ordinary finish conforming to Item No. 410, "Concrete
Structures ".
559 06/08/88 Page 3 Concrete Box Culverts
559.4 Testing
Precast boxes of either type, made in a plant, shall bear the
following marking:
The name or trademark of the manufacturer;
The date of manufacture;
When required, elsewhere herein, a match mark for proper
installation; and if lifting holes are not provided, one end
of each box section shall be clearly marked on the inside and
outside walls to indicate the top and /or bottom as it Will be
installed.
Marking shall be indented into the box or may be painted thereon
with waterproof paint.
Precast box culverts made in a commercial plant, shall have a minimum of 4
test cylinders for design strength made for each day's production run of
each size and class of box culverts. Strength tests for each production
run will be based on the average strength of 2 cylinders which may be
tested anytime after completion of the specified curing period. When
design strength is attained on the initial test, further tests on that run
will not be required. Should the initial test fail to meet the design
strength, a subsequent test shall be made at 28 days unless additional test
cylinders were made during production of that run. Failure to attain
design strength by the 28 day test will result in rejection of the run
represented by the test. Tests for handling strength will be based on the
average of 2 cylinders. These test cylinders are in addition to those
required for design strength. Cylinders for compressive strength tests
shall be made in accordance with SDHPT Test Method Tex - 707 -1. Testing of
precast (formed) culvert sections or cast -in -place culverts shall conform
to Item No. 403, "Concrete for Structures ".
559.5 Fabricating Tolerances
Tolerances for precast boxes of either type shall conform to the following:
The inside vertical and horizontal dimensions shall not vary from plan
requirements more than + 1/2 inch.
The horizontal or vertical plane at each end cha11 not vary from being
perpendicular to the top and bottom by more than 1/2 inch when measured
diagonally between opposite interior corners of the end section.
The sides of a section at each end shall not vary from being
perpendicular to the top and bottom by more than 1/2 inch when measured
diagonally between opposite interior corners of the end section.
The thickness of walls and slabs shall not be less than that required
by the plans, except that an occasional deficiency not greater than 1/4
inch will be acceptable. If proper jointing is not affected,
thicknesses in excess of plan requirements are acceptable.
559 06/08/88 Page 4 Concrete Box Culverts
The straightness of the tongue and groove at the mating surface shall
not vary by more than 1/4 inch.
Deviations from the above tolerances will be acceptable if the box sections
can be fitted at the plant or job site and it is determined that an
acceptable joint can be made. For this condition, an acceptable joint is:
when 2 box sections are fitted together on a flat surface in proper
alignment and in the position they will be installed, the longitudinal
opening at any point shall not exceed 1 inch. Box sections accepted in
this manner shall be match - marked for installation.
559.6 Defects and Repair
Fine cracks or checks on the surface of the member which do not extend to
the plane of the nearest reinforcement will not be cause for rejection
unless they are numerous and extensive. Cracks which extend into the plane
of the reinforcing steel, but are acceptable otherwise, shall be repaired
in an approved manner.
Small damaged or honeycombed areas which are purely surface in nature may
be repaired. Excessive damage, honeycbmb or cracking will be subject to
structural review. Repairs shall be sound, properly finished and cured in
conformance with the pertinent specifications. When fine cracks or
hairchecks on the surface indicate poor curing practices, further
production of precast boxes shall be discontinued until corrections are
made and proper curing provided.
559.7 Storage and Shipment
Precast boxes shall be stored on level blocking in a manner acceptable to
the Engineer. No load shall be placed upon them until design strength is
reached and curing completed. Shipment of boxes may be made when the
design strength and curing requirements have been met.
559.8 Construction Methods
Excavation and backfill shall conform to Item No. 401, "Structural
Excavation and Backfill" and Item No. 510, "Pipe ", except where tunneling
or jacking methods are required or indicated.
Precast concrete boxes shall be bedded on a foundation of firm stable
material accurately shaped to conform to their base. When indicated,
special bedding materials shall be provided.
Unless otherwise indicated, the Contractor may use any of the jointing
materials, except rubber gaskets and shall conform to the jointing
requirements in Item No. 510, "Pipe ".
when precast boxes are used to form multiple barrel structures, they shall
be placed in conformance with the details indicated. Materials to be used
between barrels shall be as indicated.
559 06/08/88 Page 5 Concrete Box Culverts
Connections of precast boxes to cast -in -place boxes or to any required
headwalls, vingvalls, riprap or other structures shall conform to the
details indicated.
Lifting holes shall be filled with mortar or concrete and cured to the
satisfaction of the Engineer.
559.9 Measurement
End
(1) Cast in Place Box Culverts
The quantities of concrete of the various classifications which
will constitute the completed and accepted "Box Culverts" in place
will be measured by the cubic yard, based on the dimensions
indicated.
(2) Precast
559.10 Payment
Concrete box culverts of each size and type shall be measured by
the linear foot. The measurement will be made between the ends of
the box along the central axis. For concrete boxes used in
multiple barrel structures, the measured length will be the sum of
the lengths of all barrels measured as described above.
The unit price bid, per linear foot for the various sizes and types of
precast "Concrete Box Culverts" or the unit price bid, per cubic yard for
the various sizes and types of cast in place "Concrete Box Culverts" shall
be full compensation for constructing, furnishing and transporting boxes;
the preparation and shaping of bed; jointing of boxes; for connections to
existing structures; concrete, reinforcing steel and all other items of
material, labor, equipment, tools and incidentals necessary to complete the
work in accordance with the plans and specifications, except excavation and
backfill, which shall be in accordance with Item No. 401, "Structural
Excavation and Backfill". When precast boxes are laid on a skew, full
compensation for cutting the ends when required by the plans, shall be
included in the unit bid price per linear foot, measured in accordance with
"Measurement" above.
Payment will be made under one of the following:
Item No. 559: Concrete Box Culverts, 7 Ft. x 3 Ft. - Per
Linear Foot.
Ref: 210, 401, 403, 405, 406, 409, 410, 509, 510
559 06/08/88 Page 6 Concrete Box Culverts
Item No. 601
Salvaging and Placing Topsoil
601.1 Description
This stern shall consist of removing and salvaging clean, triable topsoil consisting of loam sandy loam or clay loam Tree of roots
and rocks larger than 2 inches and debris and placing where indicated
601.2 Construction Methods
The existing topsoil shall be removed from the area indicated. stockpiled in a windrow along the right of way or al designated
locations or spread over an area that is ready for topsoil application in accordance with the plans or as directed by the Engineer
Trash. wood brush, stumps. rocks over 2 inches in size and other objectionable material encountered shall be removed and.
disposed of as directed by the Engineer poor to beginning of work required by this item Grass and other herbaceous plant
materials may remain Large clumps shall be broken up
After the grading has been completed 10 the required alignment. grades and cross-sections and prior to the spreading of the
salvaged topsoil. any clay or tight sal surfaces shall be scarified by plowing furrows approximately 4 inches deep along horizon-
tal slope lines al 2 loot vertical intervals The spreading of the salvaged topsoil shall be undertaken as soon as the grading has
been completed The topsoil shall be spread so as to form a cover of uniform thickness indicated After the Topsoil has been
placed and shaped, it shall be sprinkled and rolled to provide a suitable seed bed
601.3 Measurement and Payment
Salvaging and or placing topsoil shall not be measured for payment, but shall be subsidiary to other items of work
End
Page 1 04 36 601
1
1
1
1
1
a
a
1
1
1
1
1
1
1
1
1
1
1
Bern No. 604
Seeding for Erosion Control
604.1 Description
This item shall consist of preparing a seed bed to the lines and grades indicated, sowing of seeds, fertilizing, mulching with straw,
asphalt, cellulose fiber, wood fiber and other management practices along and across such areas as are indicated or as directed
by the Engineer /Architect /Landscape Architect
604.2 Materials
(1) Seeds
All seed must meet the requirements of the Texas Seed Law including the labeling requirements for showing pure
live seed (PLS), name and type of seed. Seed furnished shall be o1 the previous season's crop and the date of
analysis shown on each bag shall be within nine months of the time of delivery to the project. Each variety of seed
shall be furnished and delivered in separate bags or containers A sample of each variety of seed shall be furnished
for analysis and testing when directed by the Engineer /Architect. The amount of seed planted per acre shall be of the
type specified below.
(2) Water
Water shall be clean and free of industnal wastes and other substances harmful to the growth of grass or the area
irrigated
(3) Top Soil
Top soil shall conform to Item No. 130, "Borrow ".
(4) Fertilizer
Fertilizer shall conform to Item No. 606, "Fertilizer' The fertilizer used shall have an analysis of 15-15-15, homoge-
neous 13 -13 -13 or the analysis indicated.
Straw Mulch
Straw Mulch shall be oat, wheat or rice straw, Prairie Grass, Bermuda Grass, other straw or hay approved by the
Engineer /Architect The straw or hay shall be free of Johnson Grass or other noxious weeds and foreign materials. It
shall be kept in a dry condition and shall not be molded or rotted.
(6) Asphalt Emulsion
Asphalt Emulsion shall be SS -1 or CSS -1 asphalt emulsion or as indicated and shall conform to Item No. 301, "As-
phalt, Oils and Emulsions ".
(7) Cellulose Fiber Mulch (Natural Wood)
Cellulose Fiber Mulch shall be natural cellulose fiber mulch produced from grinding clean whole wood chips. The
mulch shall be designed for use in conventional mechanical planting, hydraulic planting of seed or hydraulic mulch-
ing of grass seed, either alone or with fertilizers and other additives. The mulch shall be such that when applied. the
material shall form a strong, moisture - retaining mat without the need of an asphalt binder.
Wood Fiber Mulch (Newsprint)
Wood Fiber Mulch shall be produced from ground newsprint with a labeled ash content not to exceed 7 percent.
The mulch shall be designed for use in conventional mechanical planting, hydraulic planting of seed or hydraulic
mulching of grass seed, either alone or with fertilizers and other additives. The mulch shall be such, that when ap-
plied, the material shall form a strong, moisture - retaining mat without the need of an asphalt binder.
604.3 Construction Methods
(1) Preparing Seed Bed
After the designated areas have been rough graded to the lines, grades and typical sections indicated or as provided
for in other items of this contract and any other soil area disturbed by the construction. a suitable seed bed shall be
prepared. The seed bed shall consist of either 4 inches of approved topsoil or 4 inches of approved salvaged topsoil
cultivated and rolled sufficiently to a state of good tilth which could prevent the seed from being covered too deep for
optimum germination The optimum depth for seeding shall be V. inch Water shall be applied as required to prepare
the seed bed Seeding shall be performed in accordance with the requirements hereinafter described
(5)
(8)
(2) Watering
All watering shall comply with City Ordinances.
Broadcast and asphalt mulch seeded areas shall immediately be watered with a minimum of 5 gallons of water per
square yard or as needed and in the manner and quantity as directed by the Engineer /Architect.
604 Rev. 09/30/57
Page 1 Seeding for Erosion Control
Watering applications shall constantly maintain the seed bed in a wet condition favorable for the growth of grass.
Watering can be postponed immediately after a rainfall on the site of 1 inch or greater, but shall be resumed before
the soil dries out. Watering shall continue until the grass is uniformly 11/2 inches in height and accepted by the Owner
Hydraulic seeded areas shall be watered commencing after the tackifier has dried with a minimum of 5 gallons of
water per square yard or as needed to keep the seed bed in a wet condition favorable for the growth of grass. Watering
can be postponed immediately after a rainfall on the site 01 1/2 inch or greater, but shall be resumed before the soil
dries out Watering shall continue until the grass is uniformly 11/2 inches in height and accepted by Owner
Native grass seeded areas shall be watered commencing after the tackifier has dried with a minimum of 5 gallons
of water per square yard or as needed to keep the seed bed in a wet condition favorable for the growth of grass.
Watering can be postponed immediately after a rainfall on the site of i/, inch or greater, but shall be resumed before
the soil dries out. Watering shall continue until the grass is uniformly 11/2 inches in height and accepted by Owner
604.4 Nonnative Seeding
(1) Method A — Broadcast Seeding
The seed or seed mixture In the quantity specified shall be uniformly distnbuted over the prepared seed bed areas
indicated or where directed If the sowing of seed is by hand. rather than by mechanical methods, the seed shall be
sown in two directions at right angles to each other. 11 mechanical equipment is used. all varieties of seed. as well as
fertilizer, may be distributed at the same time. provided that each component is uniformly applied al the specified
rate After planting, the planted area shall be rolled with a corrugated roller of the 'Cultipacker" type. All rolling of the
slope areas shall be on the contour
604.5 Mulch
604 Rev. 09130187
Seed Mixture and Rate of Application for Broadcast Seeding: From September 15 to March 1, seeding shall be with
a combination of unhulled Bermuda Grass at a rate of 2 pounds per 1000 square feet and winter rye at a rate of 7
pounds per 1000 square feet that has a PLS = 0.83. From March 1 to September 15. seeding shall be with hulled
Bermuda Grass at a rate of 2 pounds per 1000 square feet with a PLS = 0.83. Fertilizer shall be applied and shall
conform to Item No 606. "Fertilizer"
(2) Method B — Hydraulic Planting
The seed bed shall be prepared as specified above and hydraulic planting equipment. which is capable of placing all
materials in a single operation. shall be used.
March 1 to September 15
Hydraulic planting mixture and minimum rate of application per 1000 square feet:
Hulled Bermuda Water Soluble Fiber Mulch Soil
Seed (PLS = 0.83) Fertilizer Cellulose Wood Tackifier
1 1b
September 15 to March 1
(1) Mulch — Asphalt Mulch
15 lbs. 45.9 lbs.
14 lbs.
574lbs. 15lbs
Add 7 pounds per 1000 square feet of winter rye with a PLS = 083 to above mixture Fertilizer shall
conform to Item No 606. Fertilizer ".
The cultivated area or seed bed shall have a relatively smooth surface without ruts or tracks Water shall be applied
to the seed bed until a minimum depth of 4 inches Is uniformly moistened, The water shall be applied in such a
manner as not 10 erode the smooth surface
Atter the watering. when the surface of the seed bed has become sufficiently dry to permit planting. the seed mixture.
and fertilizer application specified above shall then be planted at the rate required and the application shall he uni
form II the sowing of seed is by hand rather than mechanical methods the seed shall be sown in Iwo directions at
right angles to each other Seed and lertilizer may be distributed al the same time provided the specified uniform r,iir•
of application for both is obtained When seed and lertilizer are to be distributed as a water slurry_ the mixture'•h,ill
be applied to the area to be seeded within 30 minuses after all components are placed in the equipment Upon the
completion 01 the sowing of the seed the application ol the asphalt emulsion shall follow ds rapidly as possible
Immediately prior to the application 01 the asphalt emulsion the planted area shall be watered sufficiently to n',tiure
umlaut moisture from the surface to a minimum ol 4 inches in depth
Application of the asphalt emulsion shall bu at the rate 01 approximately 0 3 gallon per square yard It shall Du ap
plied to the area in such a manner that a complete film is obtained and the finished surface shall be comparatively
smooth
Page 2 Seeding for Erosion Control
1
1
1
1 1-
1
r
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
a
1
1
1
1
1
1
1
1
1
1
1
1
(2) Asphalt Coated Straw Mulch
Straw mulch shall be spread uniformly over the area indicated or as designated by the Engineer/Architect at the rate
of 2 l0 2'. tons of straw per acre The actual rate of application will be designated by the Engineer /Architect. A
mulching machine approved by the Engineer Architect. shall be equipped to inject asphalt emulsion material Into
the straw uniformly as it leaves the equipment at a rate 01 0.05 to 0.10 gallons of asphalt per square yard of mulched
area If the straw and asphalt emulsion are placed by hand, the rate of application for asphalt emulsion shall be
approximately 0 15 gallons per square yard
(3) Shredded Brush Mulch
Small brush or tree limbs. except Juniper. which have been shredded may be used for mulching Native Grass
seeding
(4) Straw Mulch
Straw mulch shall be spread uniformly over the area indicated or as designated by the EngineeriArchitect at the rate
of 2 to 2''? Ions of straw per acre The actual rate of application will be designated by the EngtneerArchitect. Straw
may be hand or machine placed and adequately secured
(5) Fiber Mulch
604.7 Measurement
Cellulose and wood fiber mulch shall be spread uniformly over the area indicated or as designated by the En-
gineer/Architect at the rate of 45 to 80 lbs. per 1000 square feet
604.6 Native Grass Seeding
The seed bed shall be prepared as specified above. The seed mixture and the rate of application shall be as follows
End
Ref: 130. 606
604 Rev. 09130187
Alamo Switchgrass
Lometa Indiangrass
Premier Sldeoats grama
Green spangletop
Buffalo Grass
Bermuda Grass
Total Seeding Rate
Species substitution as necessary due to availability shall be approved by the Engineer/Architect. Watering and fertilizer applica-
Ilon shall follow procedures outlined above or as otherwise specified
Seed shall be applied by broadcast or drill method and shall be distributed evenly over the topsoiled areas. Mulching shall imme.
diately follow seed application
Work and acceptable material for 'Seeding for Erosion Control•' will be measured by the square yard or by the acre, complete in
place. with a minimum of 95 percent coverage with no bare areas exceeding 16 square feet and a 1' inch stand of grass. Bare
areas shall be tempered and reseeded as required to develop an acceptable stand of grass
604.8 Payment
The work performed and materials furnished and measured will be paid tor at the unit price bid for "Seeding for Erosion Control"
of the method specified, "Asphalt Mulch ". "Asphalt Coated Straw Mulch or "Shredded Brush Mulch ". as the case may be, which
price shall be full compensation for furnishing all materials, Including all topsoil. water, seed. tackifler, fertilizer or mulch and
for performing all operations necessary to complete the work
All fertilizer will be measured and paid lor conforming to Item No 606. 'Fertilizer'
Payment will be made under one of the lollowing
Pay Item No 604 -A: Seeding for Erosion Control — Method
Pay Item No 604 -B: Seeding for Erosion Control — Method
Pay Item No. 604 -M: Mulch .
Pay Item No. 604 -N• Native Grass Seeding — Per Square Yard
0.1 lbs/1000 sq ft
0.1 Ibsn000 sq It
0 2 lbs/1000 sq. ft
0.1 lbs/1000 sq. fl.
0 2 lbs/1000 sq ft
0 2 lbs/1000 sq 11
1 0 lbs/1000 sq h.
B St raw_ Mulch — Per Square Yard
Mulch — Per Acre.
— Per Square Yard
Page 3 Seeding for Erosion Control
1
a
1
1
1
1
1
1
1
1
a
1
1
1
1
1
1
1
1
606.1 Description
This item shall consist of providing and distributing fertilizer over such areas as Indicated and in accordance with these
specifications.
606.2 Materials
All fertilizer used shall be delivered in bags or containers clearly labeled showing the analysis The fertilizer is subject to testing
by the State Chemist in accordance with the Texas Fertilizer Law. A pelleted or granulated fertilizer shall be used with an analysis
indicated below The figures in the analysis represent the percent of nitrogen. phosphoric acid and potash nutrients. respectively.
as determined by the methods of the Association of Official Agricultural Chemists Fifty percent or greater of the Nitrogen re-
quired shall be in the form of Nitrate Nitrogen (NO,) The remaining Nitrogen required may be in the form of Urea Nitrogen
(CO(NH,),).
In the event it is necessary to substitute a fertilizer of a different analysis, it shall be a pelleted or granulated fertilizer with a lower
concentration The total amount of nutrients furnished and applied per acre shall equal or exceed that specified for each nutrient.
606.3 Construction Methods
Pelleted or granulated fertilizer shall be applied uniformly over the area specified to be fertilized and in the manner directed for
the particular item of work The fertilizer shall be dry and in good physical condition Fertilizer that is powdered or caked will be
rejected. Distribution of fertilizer for the particular item of work shall meet the approval of the Engineer.
Unless otherwise indicated. fertilizer shall be applied uniformly at the following rate:
FERTILIZER APPLICATION
NEW CONSTRUCTION FERTILIZER ANALYSIS
USE TYPE POUND PER ACRE NEW PLANTING MAINTENANCE
Broadcast Seeding Any 400 15 - - 15 - -
Hydraulic Planting Water Soluble 653 15 - - 15
Sodding Any 300 15 -15 -15 15-10-5
Trees Any — 16.8.0 15-15-15
Damaged Trees Any — 16-8-0 15-15-15
Shrubs and Plants Any — 16 -8 -0 15-15-15
Maintenance fertilizing shall be applied every 6 months after the new sod or grass is placed or until the work is accepted by the
City
606.4 Measurement
Work and acceptable material for "Fertilizer" will be measured by the ton of 2,000 pounds or by the 100 pounds as determined by
approved scales or guaranteed weight of sacks shown by the manufacturer.
606.5 Payment
The work performed and materials furnished and measured as provided under "Measurement" will be considered subsidiary to
other items in the contract unless shown in the Bid as a Pay Item, in which case it will be paid for at the unit pnce bid for "Fertil-
izer" of the analysis specified, which price shall be full compensation for furnishing all materials and performing all operations
necessary to complete the work
Payment, when specified, will be made under one of the following'
Pay Item No. 606 - A: Fertilizer — Per Ton
Pay Item No. 606 - B: Fertilizer — Per 100 Pounds
No separate payment will be made. Should be subsidiary to Item 604.
. End
Item No. 606
Fertilizer
Page 1 0417.86 606
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Payment will be made under
Pay Item No. 639: Rock Berm — Per Linear Foot
End
Item No. 639
Rock Berm
639.1 Description
This item shall .ionsist of a temporary berm constructed of open graded rock installed at the toe of a slope on the perimeter of a
developing area The purpose of a rock berm is to intercept sediment laden water from unprotected areas. retain the sediment
and release the water in sheet flow This Item shall include removal of the "Rock Berm' and revegetation ol the area
639.2 Design Criteria
A roc
ock berm is constructed near the perimeter of a disturbed site within the developing area
A detailed design is not required for the installation of a rock berm: however. the following criteria shall be observed
Drainage area — less than 5 acres
Height — 18 inches minimum height, measured vertically from the top ol the existing ground at the upslope toe to
the top of the berm.
Top width — 2 feet minimum
Side scopes — 2.1 or flatter
Grade — Berms will be built along a contour at 0 percent grade or as near possible.
639.3 Materials
Surplus rock excavated from utility trenches or from other excavations may be used for construction of these berms. In general,
stones shall be sound with a minimum of 3 inches in smallest dimension and shall weigh between 10 and 30 pounds each.
Seeding for revegetation shall conform to Item No. 604. "Seeding for Erosion Control ".
Use only open•graded rock, with most of the fines removed.
639.4 Construction Methods
All trees, brush, stumps, objectional material shall be removed and disposed of so as not to interfere with the construction of the
berm
A trench shall be excavated to place the rock as indicated The rocks shall be placed in layers with close joints starting at the
base. Open joints shall be filled with spatls as required to stabilize the berm.
The rock berm shall be inspected after each ram and the stone shall be replaced when the structure ceases to function as
intended due to silt accumulation among the rocks, washout, construction traffic damage, etc.
When the site is completely stabilized. the berm will be removed and disposed of in an approved manner.
The area will be revegetated as required by Item No 604, "Seeding for Erosion Control".
The area upstream from the rock berm shall be maintained in a condition which will allow sediment to be removed following the
runoff of a rainfall event. Inspection, after each rainfall of 1 inch or more, will be made by the Contractor, and when the silt
reaches a depth equal to ih the height.of the berm or 1 foot, whichever is less, the Contractor will remove the accumulated silt
and dispose of it at an approved site in a manner that will not contribute to additional siltation. The berm will be reshaped as
needed during construction. The rock berm shall be left in place until all upstream areas are stabilized and then removed and the
area revegetated.
639.5 Measurement
Acceptable work performed and prescribed in this Item will be measured by the linear foot along the centerline of top of berm.
639.6 Payment
Work performed and material furnished to construct this item will be paid for at the unit price bid per linear foot. This work shall
also Include seeding, inspection, silt removal, rock replacement, removal of rock berm and reseeding.
Page 1 04/17/86 639
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Item No. 704
Metal Beam Guard Railing
704.1 Description
This item shall consist of furnishing metal beam guard railing consisting of 1 line of metal beam rail element supported on timber
or steel posts. Metal beam guard railing shall be constructed of materials and workmanship as indicated or as approved by the
Engineer
704.2 Materials
(1) Rail Elements
The rail elements, end shoes or terminal anchors shall be of the deep beam type fabricated to develop continuous
beam strength and shall consist of a metal plate or sheet formed into a beam not less than 12 inches wide and 3
inches deep as indicated. The beam shall be free from warp. When tested with a straight edge or string along either
edge of a 121/2 foot sectional length of beam, the maximum deviation of the beam edges from the straight edge shall
not exceed Y inch at any point. The steel for the rail elements shall conform to AASHTO M 180. The rail shall be 12
gauge (0.1046 ± 0.008 inch) or as indicated.
The rail element may be galvanized before or after fabrication in accordance with the requirements of ASTM A 123
or A 525, whichever is applicable, except that the galvanized coating shall not be less than 1.8 ounces per square
foot of double exposed surface (single spot test).
Rail elements shall contain not more than 0.04 percent phosphorous nor more than 0.05 percent sulfur.
(2) Posts
The posts shall be either timber or steel as indicated and shall meet one of the following requirements:
Timber posts and spacers, where required, shall be Southern Yellow Pine. All posts shall be round. Posts shall
not be less than 7 inches in diameter. The diameter shall be determined by means of a circumference -
diameter tape. The average diameter at the base of the dome shall not exceed the specified diameter by more
than 1 inch. The diameter at the butt of any post shall not exceed the diameter at the base of the dome of that
post by more than 2 inches. The supplier shall stencil on the butt of each post the nominal diameter of the top 7
inches. The stenciled numeral shall be 1 inch high. The length of the posts shall not vary more than 1 inch from
the specified length. They shall be of the length indicated; the bottom and the top shall be fabricated as
indicated.
All posts shall be domed at the top. The dome shall be approximately hemispherical in shape and the radius of
the dome of each post shall be 'h the diameter of the posts at the base of the domed portion. The dome shall
be smooth and the distance from the top of the dome to the base of the dome shall not vary more than 1 inch at
any location. The posts shall be machine peeled and trimmed of all knots and knobs and shall be free from
defects such as injurious ring shakes, unsound or loose knots or other defects which might impair their
strength and durability. Sound knots will be permitted provided they are not to clusters and they do not exceed
1 of the small diameter or least dimension. Any defect or combination of defects which would be more inju-
rious than the maximum allowable knot will not be permitted. A line drawn from the center of each end of the
post shall not fall outside the center of the post at any point more than 11/4 inches.
All timber posts and spacers, where required, shall be bored and cut to dimensions indicated before being
treated. They shall be treated with 0.4 pounds /cubic foot dry pentachlorophenol treatment. Posts and spacers.
where required, shall be painted with two coats of good quality aluminum paint after the guard rail is erected
unless otherwise indicated.
Steel posts and spacers, where required, shall be of the rolled sections as indicated. The posts and spacers.
where required, shall be structural steel conforming to ASTM A 36. The top of all posts shall be beveled or
square as required by detail and drilled or punched for bolts for rail attachments.
Steel posts and spacers, where required, shall be galvanized and shall conform to ASTM A 123
Fittings shall consist of bolts, nuts and washers and shall conform to the details indicated and shall comply with
the requirements as specified herein.
All bolts and nuts used with galvanized steel rail shall be made by either the open hearth or electric furnace
process and shall conform to ASTM A 307. They shall be hot -dip galvanized to conform to ASTM A 153. Class
C or D.
Unless otherwise indicated, the concrete for terminal anchor posts or for embedment or other posts in con-
crete, where required, shall meet the requirements for Class A Concrete, as specified in Item No 403, "Con-
Page 1 04,17186 704
704.3 Sampling and Testing
A sample of the rail and terminal section may be taken for each project or for each shipment to a project. Samples of bolts and
nuts may also be required. All samples shall be furnished to the City tree of charge. The plate or sheet shall be sampled and
tested in accordance with the requirements of ASTM E 8. For galvanized articles, the weight of the zinc coating shall be deter-
mined by stripping in accordance with ASTM A90.
The uniformity of the zinc coating shall be determined by visual inspection. If, in the opinion of the Engineer, visual examination is
not conclusive, the uniformity of the coating may be determined by magnetic thickness gauge measurement in accordance with
ASTM Designation: E 376 or by the Preece Test as described in ASTM Designation: A 239. When the Preece Test is used, all
items designated in ASTM A 153 as Class B -2, B -3, C and D shall withstand a minimum of 4 one minute dips; all other items shall
withstand a minimum of 6 one minute dips.
The cleaned area shall be coated with 2 coats of zinc dust compound meeting Federal Specification 0 -G -98 (stick only), applied
in accordance with the manufacturer's recommendations.
704.4 Construction Methods
The posts shall be set plumb and firm to the line and grade indicated. Unless the plans call for setting in concrete, the posts shall
be backfilled by thoroughly tamping the material in 4 inch layers. The rail elements shall be erected to produce a smooth, continu-
ous rail paralleling the line and grade of the roadway surface or as indicated. The rail elements shall be joined end to end by bolts
and lapped in the direction of traffic in the lane adjoining the guard fence. When indicated, the rail elements shall be curved
before erection. Holes for special details may be field drilled or punched, when approved by the Engineer.
After erection, all parts of galvanized steel posts, spacers where required, bolts and rail elements on which the galvanizing has
become scratched, chipped or otherwise damaged shall be thoroughly cleaned by wire brushing the damaged area to remove all
loose, cracked or bruised spelter coating. The cleaned area shall be painted with 2 coats of zinc dust -zinc oxide compound
conforming to the requirements of Federal Specification TT- P -641b in accordance with the manufacturer's recommendations.
When fabrication is done after galvanizing and where indicated, the cut edges and bolt holes shall be cleaned by brushing and
the cleaned area shall be painted with 2 coats of zinc dust -zinc oxide compound conforming to the requirements of the Federal
Specification TT- P -641b or shall be repaired by application of galvanizing repair compounds in accordance with the manufac-
turer's recommendations.
No painting of galvanized steel rail members will be required.
704.5 Measurement
End
704 04.17/86 Page 2
crete for Structures" and subsequent Special Provisions thereto. The rail element for the terminal anchor sec-
tion shall be of the same materials as the rail element used throughout the project.
This item will be measured by the linear foot of rail, complete in place, measurement being made upon the face of the rail in
place, from center to center of end posts, from terminal anchor sections or, in the case of structure railing connection, from the
points indicated except as follows: Where bids are requested for "Terminal Anchor Sections ", measurement will be made as
each section, complete in place, each section consisting of a terminal anchor post and one 25 foot rail element, as indicated.
704.6 Payment
The work performed and material fumished as prescribed by this Item, measured as provided under "Measurement" will be paid
for at the unit pnce bid for "Metal Beam Guard Railing" or "Metal Beam Guard Railing, Terminal Anchor Sections ", which pnce
shall be full compensation for furnishing all materials, including necessary boring for preparation, hauling and erection and gal-
vanizing of same; for setting posts in concrete when specified and spacers where required and for all labor, tools, equipment and
incidentals necessary to complete the work, including driving posts, excavating, backfilling and disposing of surplus materials
Payment will be made under one of the following:
Pay Item No. 704: Metal Beam Guard Railing — Per Linear Foot.
Pay Item No. 704 -T: Metal Beam Guard Railing, Terminal Anchor Sections — Per Each.
1
1
1
1
1
1
1
r
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
(2) Pavement Marking Paint
860 Rev. 09130/87
Tex -822 -B
Tex -826 -B
Tex -830 -B
Tex -831 -B
Tex -832 -B
Tex -833 -B
ASTM Designation: D 476, Type II
Federal Spec. TT- P -463A, Type I (March 3, 1961)
National Bureau of Standards — Chromatic Standard No. Sch. -30
Federal Spec TT- P -403a
Federal MIL C - 429C, Type I (March 6, 1969)
ASTM D 362
Item No. 860
Pavement Marking Paint
860.1 Description
This item shall consist of the installation of reflectorized paint pavement marking. The width of the line shall be 4 inches and the
color as indicated.
860.2 Materials
(1) Traffic Stripe Reflective Glass Spheres
(a) The glass spheres shall not contain more than 30 percent (by weight) irregular shaped particles when tested
by ASTM Designation: D 1155. Spheres shall be essentially free of sharp angular particles and particles show-
ing milkiness or surface scarring or scratching. Spheres shall be water white in color.
(b) The glass spheres shall meet the following gradation requirements when tested:
Openings U.S. Std. Sieves Percent Passing
#20 Sieve 100
#30 Sieve 80 -100
#50 Sieve 18 -35
#100 Sieve 0
(c) The spheres, when tested by the liquid immersion method at 25 C,shall show an index of refraction within the
range of 1.50 to 1.98.
(d) The spheres shall be capable of being readily wet with water when tested according to SDHPT Test Method
Tex - 826 -B.
(e) The spheres shall show no tendency toward decomposition, surface etching, change in retroreflective charac-
teristics or change in color after 24 hours exposure (according to SDHPT Test Method Tex - 833 -B) to weak
acids, weak alkali or 100 hours of weather -o -meter exposure.
(1) Spheres shall contain less than 1/2 of 1 percent moisture by weight.
(g) Spheres shall be manufactured from glass.
(h) Spheres shall be free of trash, dirt, etc
(i) Spheres shall show no evidence of objectionable static electricity when flowing through a regular traffic bead
dispenser.
(j) The recommended application rate shall be 6 pounds per gallon of paint.
(k) Sampling and Testing shall be in accordance with the latest applicable SDHPT Manual on Testing Procedures.
Applicable test methods are, but are not limited to the following:
(a) Functional Requirements
1 All materials required to meet Federal, ASTM or SDHPT specifications must meet the specification as
shown
Page 1 Pavement Marking Paint
860 Rev. 09/30/87
ASTM D 740 (Reapproved 1974)
ASTM D 600
SDHPT Test Method Tex -806 -B
SDHPT Test Method Tex -811 -B
SDHPT Test Method Tex -814 -B
2 The paint shall be homogenous, well ground to a uniform and smooth consistency and shall not skin nor
settle badly nor cake, liver, thicken, curdle or gel in the container
3 The paint, when applied to a bituminous pavement surface under normal field conditions at the required
rate of .015 inch wet film thickness, shall have a maximum "no pickup" drying time of 15 minutes to
prevent displacement or discoloration under traffic.
4 In preparation of the paint, the pigments shall be dispersed in the vehicle by appropriate methods so that
a fineness reading of not less than 4 is obtained with a Hegman grind gauge.
5. Consistency viscosity as determined by the Stromer Viscosimeter at 25 C shall be from 85 to 100 K.U.
6. A thin film of paint spread on a glass plate and allowed to dry thoroughly shall not darken or show any
discoloration when subjected to ultraviolet rays for a period of 5 minutes.
(b) Material Requirements
1 Raw Matenals
a. The exact brands and types of raw matenals used in the wet standards are listed for the purpose
of facilitating the selection of parallel materials equal, not only in quality and composition but also
in physical and chemical behavior atter aging in the finished product.
b It shall be the responsibility of the Contractor to utilize materials that not only meet the individ-
ual raw material specification, but that also produce a coating that meets the specific formula
requirements.
c. Matenals required to meet Federal and ASTM specifications must meet the specification as
indicated.
2. Pigments
a White
(1) Lead free zinc oxide: shall meet Federal specification TT- P -463A, Type I, March 3, 1961.
(2) Pure Titanium Dioxide, Rutile, Nonchalking: shall meet ASTM D 476, Type II.
b. Medium Chrome Yellow
(1)
The luminescent factors of the pigment shall be within the limits listed below when tested
before and after exposure.
nrtal 53
Final 45
Minimum Maximum
59.0
In addition, the allowable change between the initial and final luminescent factors shall be
no more than 9 units
The initial x, y chromaticity color coordinates of the pigments shall be within the rectangle
defined by the sets of coordinates shown below.
x
0 490
0 511
0 514
0 535
y
0 455
0 433
0.480
0 458
The pigments shall be tested according to SDHPT Test Method Tex - 810 - B
Page 2 Pavement Marking Paint
1
1
1
1
1
1
1
1
(1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
860 Rev. 09130/87
The color standard shall conform to the National Bureau of Standards Chromatic Standard
No Sch -30.
The formulation of the test enamel using the pigments to be tested is as follows:
Material Parts by Weight
Medium Chrome Yellow
Long Oil Alkyd Resin (1)
4% Calcium Drier
6% Cobalt Drier
Anti - Livering Agent
Anti - Skinning Agent
Mineral Spirits (2)
54.0
31.5
0.6
0.3
0.1
0.2
13 3 (3)
(2) Alkyd Resin Solution meeting Federal specification TT- R -266D, Type 1, Class A, November
17, 1971.
(3) Mineral Spirits shall conform to ASTM D 235, Type IV.
(4) The amount of mineral spints may be varied slightly to produce the desired grinding
consistency.
Two coats of pigments shall be required.
3. Inert
a. Talc, paint -grade magnesium silicate shall meet ASTM D 605.
b Calcium Carbonate shall conform to the following:
CaCO, Maximum 97.0 percent
H Maximum 0.4 percent
Specific Gravity 2.63 -2.73
Weight retained on #325 Screen Maximum 0.75 percent
Color shall be equal to material listed in standard formula. Substitution in standard formula shall
not result in a viscosity variation greater than 4 K.U.
4. Resins
a. Chlorinated'Paraftin shall conform to Federal Specification MIL- C -429C, Type I, May 6, 1969.
b. Chlorinated Rubber shall have a viscosity C 15 C (20% solution with Toluene)` 4 -6 cps.
' Toluene shall meet ASTM D 362
c Traffic paint alkyd resin solution shall conform to the following:
(1) General
Type' Pure, drying alkyd
Length: Medium
Type oil: Soya, linseed or tall. No mixture of 2 or more oils will be permitted.
Type Solvent: Toluene, ASTM D 362
Compatibility: A solution of 1 part 75 percent traffic alkyd and 5 parts toluene shall be
clear.
A solution containing the equivalent of 150 grams of 5 cps chlonnated rubber, 130 grams of
75% traffic alkyd, 200 grams of methyl ethyl ketone shall be clear, transparent and show no
separation alter 24 hours of storage in a' /. full test tube at 80 degrees x5 F. This rubber -
alkyd- solvent solution shall produce a clear film upon drying
Page 3 Pavement Marking Paint
(2) Solid Resin Basis
Percent Phthatic Andydrides
Percent Oil Acids
Acid number, maximum
Ash residue, maximum
Unsaponitiable, maximum
Iodine number of fatty acids, minimum
Retractive Index of fatty acids, minimum
(Tall oil alkyds), maximum
(3) 45 Percent Solids Basis'
Color: Gardner 1953 Standard -9 maximum
Drying Time: A wet film 3 mils thick shall set to touch in not more than 90 minutes.
(Driers: Based on the resin solids present, add the equivalent of 0.06 percent Cobalt (metal)
and 1.0 percent lead metal)
'Toluene shall be used to reduce the resin solution to 45 percent solids and shall meet ASTM D
362.
(4) In addition to the above requirements, the traffic alkyd resin shall meet the following percent
transmittance requirements when tested according to SDHPT Test Method Tex - 814 -B, uti-
lizing menthyl isobutyl ketone as pnmary solvent and methyl alcohol as precipitating agent.
Percent
Transmittance Minimum Maximum
T,
T
V, = 91X
(2) Treated Bentonite Clay
10%
70%
Calculate volume in milliliters of precipitating agent as follows:
Where: V, = volume of precipitating agent required for T,
X = grams of alkyd resin solids and V = 1.398 V,
Where: V, = additional volume of precipitating agent required for
5. Thinners
a. Methyl Ethyl Ketone shall conform to ASTM D 740
b. Aromatic Naphtha
Appearance clean, free of sediment
Color water, white
Boiling Range 360 F — 415 F
Kauri Butanol Value 88 minimum
Specific Gravity, 25 C 0.884 — 0.894
Flash Point F (TCC) 140 minimum
6. Additives and Chemicals
a. Driers shall conform to ASTM D 600.
b. The additives below must be supplied by the manufacturer, as listed:
(1) Thermotite 813
Available from: M & T Chemicals, Inc.
530 Exchange Bank & Trust Tower
Dallas, Texas 75235
A Bentone 34, N.L Industries
B. Claytone 40, Southern Clay Products
33to37
48to55
80
0.10 percent
2.0 percent
115
1.4660
1.0
860 Rev. 09/30/87 Page 4 Pavement Marking Paint
1
1
1
1
1
1
1
1
1
(1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
860.3 Construction Methods
860 Rev. 09/30/87
Formula: White Traffic Paint
Pounds
Traffic Alkyd, 75 Percent Solids 130
Chlorinated Rubber, 5 cps., Hercules, parion S -5 150
Chlorinated Paraffin, Type I, Hercules, Chlorafin 40 75
Treated Bentonite Clay 5
Titanium Dioxide, Rutile, DuPont, R -900 200
Lead Free Zinc Oxide, ASARCO, A2O -33 50
Talc, Nytal 300 225
Calcium Carbonate, T.W. Snowflake White 250
24% Lead Drier 3
6% Cobalt Drier 2
Thermolite 813, M & T Chemicals, Inc. 0.75
Aromatic Naphtha, SC -150 5
Methyl Ethyl Ketone 245
1,340.75
Grind particles: 4 minimum 8 maximum (SDHPT Test Method Tex 806 -B)
Gallon Weight 0.05 Ibs. of theoretical gallon weight
Consistency: 85 to 100 K.U.
Skinning: No skinning within 48 hours
(SDHPT Test Method Tex - 811 -B)
Formula: Yellow Traffic Paint
Pounds
Traffic Alkyd, 75 Percent Solids 130
Chlorinated Rubber, 5 cps., I.C.I. Alloprene X -5 150
Chlorinated Paraffin, Type I, I.C.I., Cereclor 42 75
Treated Bentonite Clay 5
Titanium Dioxide, Rutile, Du Pont, R -900 25
Lead Free Zinc Oxide, ASARCO, A20 -33 50
Medium Chrome Yellow, Du Pont, Y -469 -D 157
Calcium Carbonate, T.W., Snowflake White 250
Talc, Nytal 300 250
24% Lead Drier 3
6% Cobalt Drier 2
Thermolite 813, M & T Chemicals, Inc. 0.75
Aromatic Naphtha, SC -150 5
Methyl Ethyl Ketone 250
1,370.75
Grind Particles: 4 minimum, 8 maximum (SDHPT Test Method Tex - 806 -B)
Gallon Weight: ± 0.05 lbs. of theoretical gallon weight
Consistency: 80 to 100 K.U.
Skinning: No skinning within 48 hours (SDHPT Test Method Tex - 811 -8)
The Contractor shall use a crew experienced in the work of installing pavement markings and in the necessary traffic control for
such operations on the roadway surface and shall supply all the equipment, personnel, traffic control and materials necessary for
the placement of the pavement markings as indicated or as directed by the Engineer. All work shall conform to the current edition
of the Texas Manual 01 Uniform Traffic Control Devices (MUTCD)
The pavement surface to receive the pavement markings shall be thoroughly cleaned of all dirt, organic growth or other material
that will prevent adhesion of the paint to the roadway surface.
The pavement markings shall be placed in the proper alignment with guides established on the roadway. Deviation from the
alignment established shall not exceed 2 inches and in addition, the deviation in alignment of the markings being placed shall not
exceed 1 inch per 200 feet of roadway nor shall any deviation be abrupt.
When deemed necessary by the Engineer, the Contractor, at his expense, shall place any additional pilot markings required to
facilitate the placement of the permanent markings in the alignment specified Any and all additional markings placed on the
roadway for alignment purposes shall be temporary in nature and shall not establish a permanent marking on the roadway.
Materials used for pilot markings and equipment used to place such markings shall be approved by the Engineer.
Page 5 Pavement Marking Paint
Paint markings on the roadway that are not in alignment or sequence as indicated shall be totally and completely removed by any
effective method approved by the Engineer, except that grinding will not be permitted.
Paint shall be applied at a rate of not less than 15 gallons nor more than 20 gallons per mile of solid 4 inch stripe. Application rate
for solid 8 inch stripe shall be between 30 and 40 gallons per mile. (These rates yield wet film thickness from 15 to 20 mils )
Beads shall be applied to the paint markings at a uniform rate sufficient to achieve the retroreflective characteristics specified
when observed conforming to SDHPT Test Method Tex - 828 -B. All markings placed shall have uniform and distinctive retroreflec-
tive characteristics Under no circumstances shall the bead application rate be less than 6 pounds of beads per gallon of paint
applied to the road surface.
Applied markings shall be protected from traffic until they have dried sufficiently so as not to be damaged or tracked by normal
traffic movements.
860.4 Equipment
Paint striping equipment used to place 4 inch solid or broken lines shall have the capability of placing a minimum of 60,000 linear
feet of marking per working day. Equipment used for placing markings in widths other than 4 inches shall have capabilities similar
to 4 inch marking equipment and shall be capable of placing linear markings up to 8 inches in width in 1 pass.
The equipment shall be maintained in satisfactory operating condition. Four inch marking equipment will be considered as un-
satisfactorily maintained it it fails to have an average hourly placement rate of 7000 linear feet in any 5 consecutive working days
of 7 hours or more.
The equipment shall be equipped so that one 4 inch broken line and either 1 or 2 solid lines can be placed at the same time in
alignment and spacing as indicated
The equipment shall be equipped with an automatic cutoff device (with manual operating capabilities) to provide clean, square
marking ends and to provide a method of applying broken line in a stripe to gap ratio of 15 to 25 The length of the stripe shall not
be less than 15 feet nor longer than 15.5 feet. The total length of the stripe -gap cycle shall not be less than 39.5 feet nor longer
than 40.5 feet in variance from one cycle to the next nor shall the average total length of a cycle for a road mile of broken line
exceed 40 5 feet or be less than 39 5 feet
The equipment shall be capable of placing lines of all widths with clean edges and of uniform cross section. Four inch lines shall
be 4 inches plus or minus Y inch. Eight inch lines shall be 8 inches minimum and 81/4 inches maximum in width.
The equipment shall be equipped with an outrigger or outriggers as required to place edgelines as called for in the plans.
The equipment shall be equipped with bead dispensers, 1 for each paint spray gun, placed on the equipment so that beads are
applied to the paint almost instantly as the marking is being placed on the roadway surface. The bead dispensers shall be de-
signed and aligned so that beads are applied uniformly to the entire surface of the marking The bead dispensers shall be
equipped with automatic cutoff controls, synchronized with the cutoff of the marking equipment. Paint pots or tanks shall be
equipped with an agitator that will keep the paint thoroughly mixed and may be either a pressurized or nonpressurized type.
860.5 Measurement
Work for Pavement Marking Paint lines will be measured by the linear foot of the various widths. Work for pavement marking,
paint letter or figures will be measured by the square foot.
860.6 Payment
Work performed as prescribed by this item, measured as provided under "Measurement ", shall be paid for at the unit price bid for
"Pavement Marking Paint" per linear foot or square foot of the various widths specified This price shall be lull compensation for
furnishing all labor, tools, equipment. materials and incidentals necessary to complete the work specified.
Payment will be made under one of the following
Pay Item Na 860 -A Pavement Marking Paint In. — Per Linear Foot.
Pay Item Na 860-B _: Pavement Marking Paint — Per Square Foot.
Pay Item Na 860.0 _ : Pavement Marking Paint (Reflectorized), In — Per Linear Foot.
Pay Item Na 860-D _ Pavement Marking Paint (Reflectorized) — Fir Square Foot
End
860 Rev 09130187 Page 6 Pavement Marking Paint
1
1
1
1
1
1
1
1
1
( 1
1
1
1
1
1
1
1
1
1
900.1 DESCRIPTION
This item shall consist of the restoration, complete in place, to City
standards of all improvements damaged during construction of this project
which are not included as a separate contract pay item.
900.2 MATERIALS AND CONSTRUCTION METHODS
The applicable items contained within this manual and the City of Austin
Standard Specifications as adopted and amended by the City of Round Rock shall
govern improvements to be restored.
900.3 MEASUREMENT AND PAYMENT
Item No. 900
Restoration
Restoration, complete in place, of improvements, which are not included as a
separate contract pay item, damaged during construction of this project shall
be considered subsidiary to the contract and no measurement for additional
payment shall be made.
End.
SOILS INVESTIGATION
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Series 0 Biddin• and Contract Requirements
Soil Investigation bats Section 00220
Depending on project requirements, Owner may have obtained geotechnical information, which may include subsur-
facedata, logs of soil borings and recommendations from geotechnical consultants. Any information obtained is solely
for use by EngineerlArchitect in design of project and are not part of contract. If soli borings have been prepared, they
will be included in this section or on plans. Any geotechnical information Included Is for information only. Owner does
not guarantee accuracy or validity of soil investigation data, nor does Owner assume any responsibility for Contractor
interpretation or conclusions drawn from data.
Contractor may, at his option, perform additional subsurface investigations at his own expense.
End
00220 Rev. 03124108
Page 1 Soil Investigation Data
® Trinity
Engineering Testing
Corporation
GEOTECHNICAL INVESTIGATION
ROUND ROCK MUNICIPAL GOLF COURSE ENTRANCE ROAD
ROUND ROCK, TEXAS
FOR
THE CITY OF ROUND ROCK
AND
BAKER - AICKLEN & ASSOCIATES
AUSTIN, TEXAS
MARCH 1990
PROJECT NO. AU -2872
CONTACT: LEWIS B. YATES, P.E.
Loral Trinity
Engineering Testing
Corporation
IMPORTANT INFORMATION
ABOUT YOUR
GEOTECHNICAL ENGINEERING REPORT
More construction problems are caused by site subsur-
face conditions than any other factor As troublesome as
subsurface problems can be. their frequency and extent
have been lessened considerably in recent years. due in
large measure to programs and publications of ASFE/
The Association of Engineering Firms Practicing in
the Geosciences
The following suggestions and observations are offered
to help you reduce the geotechnical- related delays.
cost - overruns and other costly headaches that can
occur during a construction proiect
A GEOTECHNICAL ENGINEERING
REPORT IS BASED ON A UNIQUE SET
OF PROJECT FACTORS
A geotechnical engineering report is based on a subsur-
face exploration plan designed to incorporate a unique
set of project- specific factors. These typically include:
the general nature of the structure involved, its size and
configuration: the location of the structure on the site
and its orientation. physical concomitants such as
access roads. parking lots, and underground utilities,
and the level of additional risk which the dient assumed
by virtue of limitations imposed upon the exploratory
program. To help avoid costly problems. consult the
geotechnical engineer to determine how any factors
which change subsequent to the date of the report may
affect its recommendations
Unless your consulting geotechnical engineer indicates
otherwise. your geotechnical engineerrng report should not
be used:
• When the nature of the proposed structure is
changed. for example. if an office building will be
erected instead of a parking garage. or if a refriger-
ated warehouse will be built instead of an unre-
frigerated one.
• when the size or configuration of the proposed
structure is altered:
• when the location or orientation of the proposed
structure is modified,
• when there is a change of ownership, or
• for application to an adjacent site
Geotechnical engineers cannot accept responsibility for problems
which may develop if they are not consulted after factors consid-
ered to their reports development have changed
MOST GEOTECHNICAL "FINDINGS"
ARE PROFESSIONAL ESTIMATES
Site exploration identifies actual subsurface conditions
only at those points where samples are taken, when
they are taken Data derived through sampling and sub-
sequent laboratory testing are extrapolated by geo-
technical engineers who then render an opinion'about
overall subsurface conditions. their likely reaction to
proposed construction activity. and appropriate founda-
tion design. Even under optimal circumstances actual
conditions may differ from those inferred to exist.
because no geotechnical engineer. no matter how
qualified, and no subsurface exploration program, no
matter how comprehensive, can reveal what is hidden by
earth. rock and time. The actual interface between mate-
rials may be far more gradual or abrupt than a report
indicates Actual conditions in areas not sampled may
differ from predictions. Nothing can be done to prevent the
unanticipated. but steps can be taken to help minimize their
impact For this reason, most experienced owners retain their
geotechnical consultants through the construction stage. to iden-
tify variances, conduct additional tests which may be
needed. and to recommend solutions to problems
encountered on site.
SUBSURFACE CONDITIONS
CAN CHANGE
Subsurface conditions may be modified by constantly -
changing natural forces. Because a geotechnical engi-
neering report is based on conditions which existed at
the time of subsurface exploration. construction deustons
should not be based on a geotechnical engineering report whose
adequacy may have been affected by time Speak with the geo-
technical consultant to learn if additional tests are
advisable before construction starts.
Construction operations at or adjacent to the site and
natural events such as floods. earthquakes or ground-
water fluctuations may also affect subsurface conditions
and. thus. the continuing adequacy of a geotechnical
report The geotechnical engineer should be kept
apprised of any such events. and should be consulted to
determine if additional tests are necessary
GEOTECHNICAL SERVICES ARE
PERFORMED FOR SPECIFIC PURPOSES
AND PERSONS
Geotechnical engineers reports are prepared to meet
the specific needs of specific individuals A report pre-
pared for a consulting civil engineer may not be ade-
quate for a construction contractor, or even some other
consulting civil engineer Unless indicated otherwise.
this report was prepared expressly for the dient involved
and expressly for purposes indicated by the client Use
by any other persons for any purpose, or by the dient
for a different purpose. may result in problems No ,ndi-
vidual other than the client should apply this report for its
intended purpose without first conferring with the geotechnical
engineer No person should apply this report for any purpose
other than that originally contemplated without first conferring
with the aeotechntcal engineer
A GEOTECHNICAL ENGINEERING
REPORT IS SUBJECT TO
MISINTERPRETATION
Costly problems can occur when other design profes-
sionals develop their plans based on misinterpretations
of a geotechnical engineering report. To help avoid
these problems. the geotechnical engineer should be
retained to work with other appropriate design profes-
sionals to explain relevant geotechnical findings and to
review the adequacy of their plans and specifications
relative to geotechnical issues
BORING LOGS SHOULD NOT BE
SEPARATED FROM THE .
ENGINEERING REPORT
Final boring logs are developed by geotechnical engi-
neers based upon their interpretation of field logs
(assembled by site personnel) and laboratory evaluation
of field samples Only final boring logs customarily are
included in geotechnical engineering reports These logs
should not under any circumstances be redrawn for inclusion in
architectural or other design drawings. because drafters
may commit errors or omissions in the transfer process
Although photographic reproduction eliminates this
problem. it does nothing to minimize the possibility of
contractors misinterpreting the logs during bid prepara-
tion. When this occurs. delays, disputes and unantici-
pated costs are the all -too- frequent result.
To minimize the likelihood of boring log misinterpreta-
tion. give contractors ready access to the complete geotechnical
engineering report prepared or authorized for their use
Those who do not provide such access may proceed un-
der the mtslaken impression that simply disclaiming re-
sponsibility for the accuracy of subsurface information
always insulates them from attendant liability Providing
the best available information to contractors helps pre-
vent costly construction problems and the adversarial
attitudes which aggravate them to disproportionate
scale.
READ RESPONSIBILITY
CLAUSES CLOSELY
Because geotechnical engineering is'based extensively
on judgment and opinion. it is far less exact than other
design disciplines This situation has resulted in wholly
unwarranted claims being lodged against geotechnical
consultants. To help prevent this problem. geotechnical
engineers have developed model clauses for use in writ-
ten transmittals. These are not exculpatory clauses
designed to foist geotechnical engineers' liabilities onto
someone else. Rather. they are definitive clauses which
identify where geotechnical engineers' responsibilities
begin and end. Their use helps all parties involved rec-
ognize their individual responsibilities and take appro-
priate action Some of these definitive clauses are likely
to appear in your geotechnical engineering report. and
you are encouraged to read them closely. Your geo-
technical engineer will be pleased to give full and frank
answers to your questions.
OTHER STEPS YOU CAN TAKE TO
REDUCE RISK
Your consulting geotechnical engineer will be pleased to
discuss other techniques which can be employed to mit-
igate risk In addition. ASFE has developed a variety of
materials which may be beneficial. Contact ASFE for a
complimentary copy of its publications directory
Published by
THE ASSOCIATION
OF ENGINEERING FIRMS
PRACTICING IN THE GEOSCIENCEE5
8811 Colesville Road /Suite G106/Silver Spring. Maryland 20910/13011 565 -2733
1
1
1
1
1
4
1
1
1
t
1
1
1
1 1
I
mum Trinity
Engineering Testing
Corporation
INTRODUCTION
General 1
Subsurface Exploration 1
Laboratory Investigation 2
SUBSURFACE MATERIALS AND CONDITIONS
Local Geology 4
Subsurface Stratigraphy 4
Subsurface Material Characteristics 4
Subsurface Water 5
PAVEMENT DESIGN AND CONSTRUCTION CRITERIA
Design Considerations 6
Subgrade Support Characteristics 6
Traffic Characteristics 7
Flexible Pavement Thickness Design 7
Pavement on Expansive Soils ' 7
Specifications 8
REFERENCES 8
APPENDIX
TABLE OF CONTENTS
PAGE
1
®Trinity
1 Engineering Testing
Corporation 1
1 GEOTECHNICAL INVESTIGATION (PAVEMENT)
ROUND ROCK MUNICIPAL GOLF COURSE ENTRANCE ROAD
' ROUND ROCK, TEXAS
INTRODUCTION
General: This investigation of subsurface materials and conditions for the
1 proposed Entrance Road through the Round Rock Municipal Golf Course
was authorized on February 8, 1990 by Mr. Robert L. Bennett, Jr. of the
' City of Round Rock. The purpose of this investigation has been to:
I - Explore the subsurface materials and conditions present by
core drilling and sampling along the proposed street
alignment;
1 - Perform laboratory tests to classify the soils and evaluate
their pavement support characteristics; and
I - Analyze the results of the field and laboratory tests to
determine the applicable geotechnical design and
construction criteria for the proposed pavement.
I The site under investigation is located east of the City of Round Rock
between U.S. 79 to the north, County Road 168 to the south, and County
I Road 122 to the west (refer to Plate I in the Appendix). Details and
results of this investigation are discussed in the following sections of this
1 report.
I Subsurface Exploration: Subsurface materials at the site were explored by
eighteen core borings advanced to depths ranging from 5.0 to 10.0 feet
I below the existing ground surface. The boring locations, which were
established from the centerline stakes for the proposed roadway, are
shown on Plate I in the Appendix at the end of this report. A
1
truck - mounted rotary drill rig with a three - person crew was used for
drilling and field testing. The field operations were conducted between
March 8 and March 15, 1990.
®Trinity
Engineering Testing
Corporation
The drilling procedures for this investigation consisted of the following:
Cohesive Soils - Continuous sampling using hydraulically
advanced 3 -inch diameter, thin -wall steel tube samplers until
refusal; and
Rock and Rock -Like Materials - Auger sampling and continuous
core sampling using an NX -size double -tube core barrel.
2
All samples of subsurface materials were extruded from the samplers in the
field, classified visually, and labeled as to location and depth.
Undisturbed push -tube samples of soil and 4 inch or longer samples of
rock were carefully sealed in plastic sheeting to minimize moisture changes.
Disturbed samples of soil were placed in plastic bags. All samples were
arranged in core boxes and transported to the laboratory for further
analysis. During the field operations, all of the borings were observed
for subsurface water prior to using drilling fluid to advance the hole.
These observations are noted at the bottom of each boring log and are
discussed in subsequent sections of this report.
Laboratory Investigation: All samples of subsurface materials from the
borings were visually examined and classified in the laboratory by a
geologist. Liquid and plastic limit tests and No. 200 -mesh sieve tests were
performed on selected samples to establish index properties and grain size
characteristics, and to properly classify the soils according to the Unified
Soil Classification System. The results of these tests expressed as liquid
limit, plasticity index, and percent passing the 200 -mesh sieve are
summarized on Plate II and are also shown on the boring logs under the
"Test Results" column as "LL ", "PI ", and "F ".
Strength properties of the cohesive soils were evaluated through the use
of unconfined compression tests on
samples. The results of these tests are
the measured unit weights and moisture
on the boring logs under the "Test
preceded by the letter "q ".
selected, undisturbed push -tube
summarized on Plate II, along with
contents for the soil samples, and
Results" column where they are
®Trinity
I Engineering Testing
Corporation 3
' Pocket penetration tests were conducted on undisturbed soil samples for
estimating the consistency characteristics of the clayey materials. Results
I of these tests, expressed in tons per square foot, are shown on the
boring logs under the "Test Results" column and are preceded by the
I letter "p ". A reading of 4.5+ indicates that the range of the test device
was exceeded.
1
1
1
1
1
1
1
1
1
1
1
1
1
®Trinity
Engineering Testing
Corporation 1
4
SUBSURFACE MATERIALS AND CONDITIONS '
Local Geology: The geologic formation outcropping at this site is the
Austin Chalk formation, a cretaceous age sedimentary limestone formation.
The Austin Chalk is a carbonate limestone varying from chalky limestone to
marly limestone and marl in some locales. In its unweathered condition,
the Austin Chalk is light gray or gray in coloration and then weathers due
to leaching to a tan, sometimes almost white coloration. It is generally 1
considered to be a "soft limestone" as compared to the hard limestones of
the Edwards and Georgetown formations west of Round Rock. The ,
limestone near the surface at this site is weathered to severely weathered,
with the surficial clayey soils being residuum formed from extreme
weathering of this rock.
Subsurface Stratigraphy: Specific types and depths of subsurface 1
materials encountered at the boring locations are shown on the attached
Logs of Borings. The degree of weathering, erosion, and topsoil
development is quite varied across this property. At three locations
(B -15, 16, and 17) only a very thin topsoil (12" or less) exists followed
by either severely weathered limestone, a soil -like weathered material, or
weathered limestone within several feet of the surface. At the remaining
locations the soil development is somewhat thicker reaching 2.5 to 5.0 feet
in thickness before transitioning to weathered limestone and limestone.
The tan weathered limestones vary with depth to a light gray -or gray
limestone which represents a more massive less weathered section of the
Austin Chalk. This type of stratigraphy is typical of the Austin Chalk ,
formation.
Subsurface Material Characteristics: The surficial clayey soils have a stiff
to hard consistency and can be expected to have moderate to high
shrink /swell potential. The severely weathered limestone, which is
soil -like in texture, is of stiff to hard consistency. The upper weathered
limestone is of very poor to poor quality. This material is very hard
relative to the upper soil, but classifies as a low to medium strength rock
when compared to other rock types.
® Tr i n i ty
Engineering Testing
Corporation
5
Subsurface Water: The borings were advanced to depths ranging from 5.0
to 5.5 feet without the use of drilling fluid, and groundwater was not
encountered above those shallow depths.
This limestone formation is potentially highly permeable to water because of
the weathered and fractured areas. Although a permanent groundwater
table probably does not exist within the boring depths, seepage water from
surface sources will sometimes be present in the permeable zones. The
amount of seepage water will be a function of climate conditions (rainfall)
prior to and during excavation periods.
®Trinity
Engineering Testing
Corporation
Design Considerations: The performance of the pavement for the planned
development depends on several factors, including:
The characteristics of the supporting soil;
The magnitude and frequency of wheel load applications;
The quality of available construction materials; and
The pavement design life.
PAVEMENT DESIGN AND CONSTRUCTION CRITERIA
Subgrade Support Characteristics: It is our understanding that the
vertical alignment of the roadway will require minimal excavation. Based
on this information, the predominant subgrade over the majority of the
road right -of -way will be a highly plastic CLAY soil with colors ranging
from dark brown, gray- brown, to tan. Since the surficial soil development
is relatively non - uniform and is very thin near Boring Nos. 14, 15, 16,
and 17, minor excavations may expose the tan SEVERELY WEATHERED
LIMESTONE as subgrade. Therefore, two pavement thickness designs are
provided. Observation of the road cuts prior to placement of base material
will be required to determine the actual subgrade for each thickness
design. If this is not practical from a design or construction point of
view, then the design for the CLAY subgrade should be used along the
entire length of the road.
The pavement support characteristics of these two materials were estimated
1) from correlations developed by Trinity Engineering Testing Corporation
(TETCO) between soil index properties and Texas triaxial values (Texas
State Department of Highways and Public Transportation test method
Tex - 117 -E) and 2) from correlations presented in the literature between
soil index properties and resilient modulus values. The results are
summarized below.
Clay soils
Severely weathered
limestone
SUBGRADE SUPPORT CHARACTERISTICS
Texas Triaxial Value Resilient Modulus, ksi
5.6 3.0
4.8 6.0
6
®Trinity
Engineering Testing
1 Corporation 7
1 Traffic Characteristics: Based on the Round Rock Pavement Design
Standards and verbal discussions with Mr. Al Willie of the Round Rock
I Public Works Department, the street will be classified as a Collector with
the following traffic design values:
1 1. Total Equivalent 18 -Kip Single
Axle Load Applications 150,000
' 2. Load Frequency Design Factor 0.90
3. Wheel Design Load (ATDH) 8 kips
' Flexible Pavement Thickness Design: Pavement designs have been
I determined for each subgrade condition using a modified version of the
SDHPT long -life pavement design procedure. This modified procedure
I incorporates traffic repetitions, as determined by AASHTO road test
results, as a design parameter. The recommended sections are as follows.
1 HMAC Surface Crushed Limestone
Subgrade Course Base Material
I Dark Brown, Gray -Brown or
Tan CLAY 2.0 inches 14.0 inches
' Tan SEVERELY
WEATHERED LIMESTONE 2.0 inches 10.0 inches
I Pavement on Expansive Soils: Pavement design methods are intended to
provide an adequate thickness of structural materials over a particular
I subgrade, such that wheel loads are reduced to a level the subgrade can
support. The support characteristics of the subgrade for flexible
' pavement design does not account for shrink and swell movements of an
expansive clay subgrade such as the dark brown, gray- brown, or tan clay
soils on this project. Thus, the pavement may be adequate from a
structural standpoint, yet still experience cracking and deformation due to
shrink /swell movement of the subgrade.
1
1
Aran Trinity 1
Engineering Testing
Corporation 8
It is therefore important to minimize moisture changes in the subgrade to
reduce shrink /swell movements. The pavement and adjacent areas should
be_well drained. Proper maintenance should be performed on cracks in the
pavement surface to prevent water passing through to the base or subbase
material. Even with these precautions, some movements and related
cracking may still occur, requiring periodic maintenance.
Specifications: The pavements should be specified, constructed and tested
to meet the following requirements:
1. Hot -Mix Asphaltic Concrete Surface - SDHPT Item 340,
Type D.
2. Crushed Limestone Base Material - SDHPT Item 248, Type 1
A, Grade 2 or better. The material should be compacted in
lifts not to exceed 6 inches compacted thickness at a
1 minimum of 100 percent of TEX -113 -E maximum dry density.
1
1
TRINITY ENGINEE ING TESTING CORPORATION
S !
Lewis B. Yates, Jr. A f,
Manager of Geotechnical Services
Au 2872 rYA ``y
3.
March 30, 1990
Natural Subgrade - The natural subgrade that is disturbed
should be compacted to within a range of 93% to 97% of
TEX -113 -E maximum dry density at a moisture content range
of -1.0% to +2.0% of optimum moisture content.
Respectfully submitted,
REFERENCES
(1) Design Guidelines for Streets and Bridges, Travis County,
Texas, January 14, 1986.
(2) Pavement Design Standards for Subdivisions in Round Rock,
Ordinance No. 641, January 25, 1980.
® Trinity
Engineering Testing
I Corporation
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
APPENDIX
6 -18
B -17
8 -16
®Trinity
Engineering Testing
Corporation
B -II
B -10
COUNTY ROAD /22
GOLF COURSE
BOW/OAR/ES
8 -9
B -8
B-7
NORTH
0 1000
SCALE FEET
10- B -BORING FOR THIS REPORT
P8- PREVIOUS BORING FOR TETCO
REPORT AU -2826, AUG.1989
BORING STATION
6 -1 1+70
B-2 4 +21
6-3 10+00
6 -4 13100
B -5 20.00
B -6 25100
6 -7 30100
B -8 35400
B -9 40.00
8-10 43+00
6 -11 49.50
6 -12 55400
6 -13 60100
6.14 84+71
8 -15 70+00
6-16 74 +80
8 -17 80 +00 ( 30' Right )
6 -18 65.00
ROUND ROCK MUNICIPAL GOLF COURSE ENTRANCE ROAD Page 1 of 2 L'i
ROUND ROCK, TEXAS
•
co V
SUMMARY OF LABORATORY TEST RESULTS co
Sample y a,
Boring Depth LL* PI* -200* MC UDW Qu* Material Description 5A-.rot.
No. (ft.) ( %) ( %) ( %) ($) (pcf) (tsf) (USCS Classification) act
1 0.0 - 2.0 -- -- -- 20.7 95.0 1.42 Gray -Brown CLAY
1 2.0 - 3.5 65 43 84 27.4 -- -- Tan CLAY (CH)
2 0.0 - 2.0 87 53 93 41.3 Gray -Brown CLAY (CH)
3 0.0 - 2.0 21.6 97.0 2.10 Dark Brown CLAY
4 0.0 - 2.0 19.7 101.3 2.80 Tan CLAY
6 3.5 - 5.0 -- 15.5 109.4 6.65 Tan SEVERELY WEATHERED LIMESTONE
8 0.0 - 2.0 19.8 103.0 3.00 Gray -Brown CLAY
9 1.5 - 2.0 50 20 79 18.4 Gray -Brown CLAY (CH)
10 2.0 - 3.5 60 41 96 15.6 -- -- Tan CLAY (CH)
10 3.5 - 4.5 -- -- -- 19.6 101.2 5.12 Tan CLAY
12 2.0 - 3.5 -- -- -- 23.9 100.1 3.19 Tan SILTY CLAY
12 3.5 - 5.0 40 21 85 10.0 -- -- Tan SILTY CLAY (CL)
12 6.0 - 6.5 -- -- -- -- 209.9 Tan WEATHERED LIMESTONE
13 3.5 - 5.0 18.5 107.1 3.69 Tan SILTY CLAY
*Indicates data included on Boring Log (Qu =q; (- )200 =F)
LL = Liquid Limit P1 = Plasticity Index -200 = $ Passing #200 Sieve MC = Moisture Content
UDW = Unit Dry Weight Qu = Unconfined Compressive Strength USCS = Unified Soil Class.
PLATE II
IMIN -- - •- -- I I I NM ME MI - MI =
M --- MI NM — MN MI J - -- I NM
ROUND ROCK MUNICIPAL GOLF COURSE ENTRANCE ROAD
ROUND ROCK, TEXAS
SUMMARY OF LABORATORY TEST RESULTS
Sample
Boring Depth LL* PI* -200* MC UDW Qu*
No. (ft.) ( %) ( %) ( %) ( %) (pcf) (tsf)
15 0.0 - 2.0 37 11 48 18.3
16 0.0 - 2.0 -- 11.8 115.2 3.73
18 0.0 - 2.0 51 27 79 24.0
Material Description
(USCS Classification)
Tan SEVERELY WEATHERED LIMESTONE
(SC /GC)
Tan SEVERELY WEATHERED LIMESTONE
Gray -Brown CLAY (CH)
*Indicates data included on Boring Log (Qu =q; (- )200 =F)
LL = Liquid Limit PI = Plasticity Index -200 = % Passing #200 Sieve MC = Moisture Content
UDW = Unit Dry Weight Qu = Unconfined Compressive Strength USCS = Unified Soil Class.
Page 2 of 2 gi
o y
do4
PLATE II
DEPTH
FEET
SYMBOL
SAMPLE
TEST
RESULTS
MATERIAL DESCRIPTION
FORMATIONS
CORE
DRILLED
CORE
RECOVERED
A 313
DEPTHSCALLI
—
—
5
—
—
—
_
10
_
I —
15
—
—
—
—
_
—
-
LINO/STURBEO PUSH TUBE SAMPLE
spur SPOON SAMPLE
DISTURBED SAMPLE
p3.0
a • F59 7
M N35
$
NO SAMPLE
POCKET PENETROMETER (lsf)
L/OLIID /ry INDEX
PL AST ITY
PERCENT PINES (PASSING No 100 SIEVE)
PENETRATION RESISTANCE
�— STANDARD
h
W
N • g 169
1100
CORE SAMPLE (4.. INCHES LONG)
(/s°
5.0
(30)
4.0
UNCONP/NED COMPRESS/ON
TEXAS
— CONE PENETRATION
ity 1
Engineering Testing
Corporation
TYPICAL SOIL AND ROCK SYMBOLS
a nl Well- Graded Gravel (GW)
nA' Poorly - Graded Gravel (GP)
1 a :•�
I�ni Silty Gravel (GM)
Clayey Gravel (GC)
• Well- Graded Sand (SW)
Poorly- Graded Sand (SP)
EXPLANATION OF SYMBOLS AND TERMS
USED ON LOGS OF BORINGS
Silty Sand (SM)
Clayey Sand (SC)
Silt (ML)
Lean Clay (CL)
® Elastic Silt (MH)
I
11111
Fat Clay (CH)
DEGREE OF WEATHERING
Unweathered .. Rock in its natural state without
visible sign of decomposition or
discoloration
Slightly
Weathered .. Slight discoloration without visible
sign of decomposition
Weathered .. Complete discoloration with zones of
slightly decomposed rock
Severely
Weathered .... Complete discoloration and decom-
position. approaching soil texture
and appearance
* y
w+
n
Shale
Sandy Shale
Weathered Shale
Sandstone
Conglomerate
Caliche
�a PYRITE NODULES
Limestone
Shaley Limestone
Weathered Limestone
Dolomite
Fill Material
Asphaltic Concrete
FRACTURE (APP( ANGLE)
SOIL STRUCTURE
Calcareous .... Containing calcium carbonate
Slickensided ... The presence of planes of weakness
having a slick and glossy appearance
Fissured . ... Breaks along definite planes of fracture
with little resistance to fracturing
Laminated iIternating thin layers or lenses of
varying material or color
Interbedded ... Alternating layers of varying material
The Log of Boring is a representation of the subsurface materials at the specific boring location and within the depth
explored The transition between strata may be gradual and variations in material t } pes and depths between borings
can be expected Water level observations represent those conditions at the time of exploration and may s ary with time
and location on the site,
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
DEPTH
FEET
SYMBOL
SAMPLE
TEST
RESULTS
MATERIAL DESCRIPTION
CORE
DRILLED
CORE
RECOVERED
"A313
!DEPTH SCALE!
—
—
—
/
A
.81.42
'
p3.0
LL65
PI43
F84%
p2.5
p3.0
CLAY; gray - brown with limestone fragments
CLAY; tan with limestone fragments
_
-
—
-
—
`
SEVERELY WEATHERED LIMESTONE; tan
5
—
—
-
-
—
-
---10
Total Depth of Boring = 5.0 ft.
Note: Boring was advanced to 5.0 feet
, below the ground surface without
using drilling fluid and ground
water was not encountered above
that depth.
—
-
-
-
—
—
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Engineering Testing
Corporation
Project:
Location:
ROUND ROCK GOLF COURSE ROAD
Round Rock, Texas
LOG OF BORING
Sta. 1 +70
Date: 3 -8 -90 Type: Push Tube /Auger Boring No:
1
DEPTH
FEET
SYMBOL
SAMPLE
TEST
RESULTS
MATERIAL DESCRIPTION
CORE
DRILLED
CORE
RECOVERED
7013
DEPTH SCALE
_
/
..1,I53
F3%
F93%
2.2
p4.0
p4.5+
CLAY; dark brown
-
—
—
SEVERELY WEATHERED LIMESTONE; tan
—
'`H
WEATHERED LIMESTONE; tan
ice.
—
—
—
-
—
l0
Total Depth of Boring = 5.0 ft.
Note: Boring was advanced to 5.0 feet
below the ground surface without
using drilling fluid and ground
water was not encountered above
that depth.
—
—
-
—
—
Anmarini
ty 1
Engineering Testing
Corporation
Project:
Location:
ROUND ROCK GOLF COURSE ROAD
Round Rock, Texas
LOG OF BORING
Sta. 4 +21
Date: 3 -8 +90 Type: Push Tube /Auger Boring No: 2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
DEPTH
FEET
SYMBOL
SAMPLE
TEST
RESULTS
MATERIAL DESCRIPTION
CORE
DRILLED
CORE
RECOVERED
"A313
'DEPTH SCALE'
—
—
/
/
•
g2.10
p4.5+
CLAY; dark brown
_
_
—
SEVERELY WEATHERED LIMESTONE; tan
IIMMI
_
5
WEATHERED LIMESTONE; tan
—
—
-
-
-
—
—10
—
Total Depth of Boring = 5.0 ft.
Note: Boring was advanced to 5.0 feet
below the ground surface without
using drilling fluid and ground
water was not encountered above
that depth.
—
-
-
-
—
—
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
cam 'runty
g Testing
Corporation
Project: ROUND ROCK GOLF COURSE ROAD
Location: Round Rock, Texas
LOG OF BORING
Sta. 10+00
Date: 3 -8 -90 Type: Push Tube /Auger Boring No: 3
a w
LL
Q
J
CO
W
cL
Cl)
SAMPLE
TEST
RESULTS
ATERIAL DESCRIPTION
0311140
3HO0
CORE
RECOVERED
'A313
(DEPTH SCALE'
—
.p4.0
g2.80
CLAY; gray -brown with limestone fragments
CLAY; tan, orange -tan, and gray -brown with
limestone fragments
5
SEVERELY WEATHERED LIMESTONE; tan
—
—
—
—
—10
—
Total Depth of Boring = 5.0 ft.
Note: Boring was advanced to 5.0 feet
below the ground surface without
using drilling fluid and ground
water was not encountered above
that depth.
•
_
_
—
i
1
® Trinity
Engineering Testing
Corporation
Project:
ROUND ROCK GOLF COURSE ROAD
Location: Round Rock, Texas
LOG OF BORING
Sta. 15+00
Date: 3 -8 -90 Type: Push Tube /Auger Boring No: 4
1
1
1
1
1
1
1
1
1
1
'_
1
1
1
1
1
1
I- w
wa. OLL
J
co
>.
W
<
TEST
RESULTS
MATERIAL DESCRIPTION
CORE
DRILLED
CORE
RECOVERED
'ABU
'DEPTH SCALE'
-
--
—
/
p4.5+
CLAY; dark brown
-
-
_
CLAY; tan, light orange, and gray -brown
with limestone fragments
SEVERELY WEATHERED LIMESTONE; tan
.4,4
5
_—
—10
-
Total Depth of Boring = 5.0 ft.
Note; Boring was advanced to 5.0 feet
below the ground surface without
using drilling fluid and ground
water was not encountered above
that depth.
_
_
_
-
-
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
AL
AnanTrinity
Engineering Testing
Corporation
Project: ROUND ROCK GOLF COURSE ROAD
Location:Round Rock, Texas
Date: 3 -8 -90
LOG OF Bwtii
Sta. 20+00
Type: Push Tube /Auger Boring No: 5
DEPTH
FEET
SYMBOL 1
SAMPLE
TEST
RESULTS
MATERIAL DESCRIPTION
CORE
DRILLED
CORE
RECOVERED
7013
(DEPTH SCALE(
__
/
p1.7
CLAY; dark brow wi limestone fragments
—
ry
p4.5+
—
_
SEVERELY WEATHERED LIMESTONE; tan
_
—
p4.5+
—
—
.q6.65
—
5
p4.5+
•
...
Total Depth of Boring = 5.0 ft.
—
_
Note: Boring was advanced to 5.0 feet
_
below the ground surface without
_
using drilling fluid and ground
—
_
_
water was not encountered above
that depth.
_
—
—10
t
i Testing
Corporation
Project: ROUND ROCK GOLF COURSE ROAD
Location: Round Rock, Texas
LOG OF BORING
G
Date: 3 -8 -90 Type: Push Tube
Sta. 25 +00
Boring No: 6
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
a W
ELI O LL
J
>
W
eL
SAMPLE
TEST
RESULTS
MATERIAL DESCRIPTION
CORE
DRILLED
CORE
RECOVERED
. A313
(DEPTH SCALE(
__
p4.5+
p4.5+
CLAY; gray - brown with limestone fragments
and calcium pockets
_
_
_
_
—
SEVERELY WEATHERED LIMESTONE; tan
__
--
_
—10
Total Depth of Boring = 5.0 ft.
Note: Boring was advanced to 5.0 feet
below the ground surface without
using drilling fluid and ground
water was not encountered above
that depth.
_
_
_
_
—
1
'
Engineering Testing
Corporation N LOG OF BORING
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Project: ROUND ROCK GOLF COURSE ROAD
Location: Round Rock, Texas
Sta. 30+00
Date: 3 -8 -90 Type: Push Tube /Auger Boring No: 7
133A
H1d30
SYMBOL
SAMPLE
TEST
RESULTS
MATERIAL DESCRIPTION
CORE
DRILLED
CORE
RECOVERED
'A313
'DEPTH SCALE'
=
/
•
g3.00
p4.5+
CLAY; gray -brown with limestone fragments
—
—
—
_
CLAY; tan
_
—
(/ p
SEVERELY WEATHERED LIMESTONE; tan
74,«\
r,
5
_
_
__
_
_
—10
Total Depth of Boring = 5.0 ft.
Note: Boring was advanced to 5.0 feet
below the ground surface without
using drilling fluid and ground
water was not encountered above
that depth.
—
—
—
—
—
—
AmulTrinity
Engineering Testing
Corporation
Project: ROUND ROCK GOLF COURSE ROAD
Location: Round Rock, Texas
Date: 3 -8 -90
LOG OF BORING
Type:
Push.Tube /Auger
Sta. 35+00
Boring No:
8
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
a w
p LL
J
CO
co
W
a-
co
SAMPLE
TEST
RESULTS
MATERIAL DESCRIPTION
CORE
DRILLED
CORE
RECOVERED
*A3'13
!DEPTH SCALE'
_
-
LL50
PI20
F79%
p4.5+
CLAY; gray -brown with limestone fragments
_
-
—
—
CLAY; tan with limestone fragments
—
\
SEVERELY WEATHERED LIMESTONE; tan
—
—
—
-
-
Total Depth of Boring = 5.0 ft.
Note: Boring was advanced to 5.0 feet
below the ground surface without
using drilling fluid and ground
water was not encountered above
that depth.
-
-
_
—
___10
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
AnuaaTrinity
Engineering Testing
Corporation
•
Project: ROUND ROCK GOLF COURSE ROAD
Location:
Round Rock, Texas
Date: 3 -8 -'90
LOG OF BVtui'
Type: Push Tube /Auger
Sta. 40+00
Boring No:
9
tutu
LL
J
CO
(J)
W
0)
SAMPLE
TEST
RESULTS
MATERIAL DESCRIPTION
CORE
DRILLED
CORE
RECOVERED
'A313
IDEPTH SCALE'
_
9
p 4.5+
CLAY; tan, light orange, and gray -brown
with limestone fragments
—
LL60
PI41
' F96Y,
—
_ p4.5 +
_
q5.12
—
_
,
' p4.5+
— 5
Total Depth of Boring = 4.5 ft.
_
—
Note: Boring was advanced to 5.0 feet
-
-
below the ground surface without
-
-
using drilling fluid and ground
-
-
water was not encountered above
—
that depth.
—
— 10
—
AttalTrinity
Engineering Testing
Corporation
Project: ROUND ROCK GOLF COURSE ROAD
Location: Round Rock, Texas
LOG OF BORING
u
Date: 3 -13 -90 Type: Push Tube
Sta. 45 +00
Boring No: 10
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
DEPTH
FEET
SYMBOL
SAMPLE
TEST
RESULTS
MATERIAL DESCRIPTION
CORE
DRILLED
CORE
RECOVERED
'A313
(DEPTH SCALE(
--
—
—
5
/
0/
CLAY; gray -brown with limestone fragments
—
CLAY; tan, orange, and gray -brown with
limestone fragments
—
—
—
-
—
—
—10
Total Depth of Boring = 5.0 ft.
Note: Boring was advanced to 5.0 feet
below the ground surface without
using drilling fluid and ground
water was not encountered above
that depth.
—
—
-
—
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Project: ROUND ROCK GOLF COURSE ROAD
Location:
Engineering Testing
Corporation
Round Rock, Texas
Date: 3 -13 -90 Type:
LOG OF BORING
Sta. 49 +50
Push Tube /Auger Boring No: 11
DEPTH
FEET
SYMBOL
SAMPLE
TEST
RESULTS
MATERIAL DESCRIPTION
vo CORE
d DRILLED
CORE
RECOVERED
A313
(DEPTH SCALE(
—
CLAY; dark brown
p3.7
_
g3.19
p4.5+
LL40
SILTY CLAY; gray -tan and orange with
limestone fragments
=
__
—
�PI21
—
--- 5
F85%
p4.5+
__
—
.
WEATHERED LIMESTONE; tan
OM
__
'
8210
5.0
5.0
-
NM
(80)
MN
MI
—10
LIMESTONE; gray
--
Total Depth of Boring = 11.0 ft.
—
Note: Boring was advanced to 5.5 feet
__
below the ground surface prior to
—
using drilling fluid and ground
—
water was not encountered above
__
that depth.
_
—
t
ing Testing
Corporation
1
Project: ROUND ROCK GOLF COURSE ROAD
. Location: Round Rock, Texas
Date: 3 -13 -90
LOG OF BORING
Type:
Push Tube /Core
Sta. 55 +00
Boring No:
12
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1-
DEPTH
FEET
SYMBOL
SAMPLE
TEST
RESULTS
MATERIAL DESCRIPTION
CORE
DRILLED
a3d3A003H
3E100
'A313
'DEPTH SCALEI
_
p4.5+
CLAY; dark brown with limestone fragments
—
_
—
—
—
—
/
p4.5+
• g3.69
p4.5+
SILTY CLAY; tan with limestone fragments
and calcium pockets
5
_
_
_
—10
Total Depth of Boring = 5.0 ft.
Note; Boring was advanced to 5.0 feet
below the ground surface without
using drilling fluid and ground
water was not encountered above
that depth.
_
_
_
_
—
ng Testing
Corporation
1
1
1
1
1
1
1
1
1
1
Project:
Location:
LOG OF BVi{.IN
ROUND ROCK GOLF COURSE ROAD
Date: 3 -13 -90 Type: Push Tube
Round Rock, Texas
Sta. 60 +00
Boring No: 13
DEPTH
FEET
SYMBOL
SAMPLE
TEST
RESULTS
MATERIAL DESCRIPTION
CORE
DRILLED
CORE
RECOVERED
'A3'13
'DEPTH SCALEI
I//
p4.5+
CLAY; dark brown
—
_
—
SILTY CLAY; tan with limestone fragments
—
SEVERELY WEATHERED LIMESTONE; tan
a
WEATHERED LIMESTONE; tan
.^
5
—
—
—10
Total Depth of Boring = 5.0 ft.
Note: Boring was advanced to 5.0 feet
below the ground surface without
using drilling fluid and ground
water was not encountered above
that depth.
_
_
_
_
—
imunTrinity
Engineering Testing
1
Corporation
Project:
Location:
ROUND ROCK GOLF COURSE ROAD
Round Rock, Texas
Date: 3 -15 -90
LOG OF BORING
Sta. 64 +71
Type: Push Tube /Auger Boring No: 14
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
DEPTH
FEET
SYMBOL J
SAMPLE
TEST
RESULTS
MATERIAL DESCRIPTION
CORE
DRILLED
CORE
RECOVERED
'A313
DEPTH SCALE'
__
•
LL37
PI11
F48%
p4.5+
p4.5+
CLAY; dark brown
_
_
_
—
__
__
SEVERELY WEATHERED LIMESTONE; tan with
limestone fragments
EMS
--
WEATHERED LIMESTONE; tan
— 5`r
--
---
--
_
_
10
Total Depth of Boring = 5.0 ft.
Note: Boring was advanced to 5.0 feet
below the ground surface without
using drilling fluid and ground
water was not encountered above
that depth.
•
_
_
_
_
_
—
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
.anaTrinity Testing
Corporation
Project: ROUND ROCK GOLF COURSE ROAD
Location: Round Rock, Texas
LOG OF BORING
Sta. 70+00
Date: 3 -15 -90 Type: Push Tube /Auger Boring No: 15
a w
uJ u_
J
m
y
W
0-
Q
SAMPLE
TEST
RESULTS
•
MATERIAL DESCRIPTION
CORE
DRILLED
CORE
RECOVERED
'ATM
(DEPTH SCALE(
—
7
4 ,
g3.73
p4.5+
CLAY; dark brown
—
—
—
_
—
—
—
SEVERELY WEATHERED LIMESTONE; tan
i t r
—
—
5
\
WEATHERED LIMESTONE; tan
1
-
r [4 \
'`r
—
—
-
—
—
-
—10
Total Depth of Boring = 5.0 ft.
Note: Boring was advanced to 5.0 feet
below the ground surface without
using drilling fluid and ground
water was not encountered above
that depth.
—
-
—
-
Aacel&Trinity
Engineering Testing
Corporation
Project: ROUND ROCK GOLF COURSE ROAD
Location: Round Rock, Texas
LOG OF BORING
Sta. 74 +80
Date: 3 -15 -90 Type: Push Tube /Auger Boring No: 16
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
DEPTH
FEET
SYMBOL J
SAMPLE
TEST
RESULTS
MATERIAL DESCRIPTION
CORE
DRILLED
CORE
RECOVERED
'A313
DEPTH SCALE'
p4.5+
CLAY; dark brown
SEVERELY WEATHERED LIMESTONE; tan
r++ �_
_
\
WEATHERED LIMESTONE; tan
\
— 5
—10
Total Depth of Boring = 5.0 ft.
Note: Boring was advanced to 5.0 feet
below the ground surface without
using drilling fluid and ground
water was not encountered above
that depth.
—
—
_
—
—
ana Trinity
g Testing
Corporation
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Project:
Location:
ROUND ROCK GOLF COURSE ROAD
Round Rock, Texas
LOG OF BORING
Sta. 80+00
Date: 3 -15-90 Type: Push Tube /Auger Boring No: 17
DEPTH
FEET
SYMBOL
SAMPLE
TEST
RESULTS
MATERIAL DESCRIPTION
CORE
DRILLED
CORE
RECOVERED
'A313
(DEPTH SCALEI
_
LL51
PI27
F79�
p3.2
p3.2
CLAY; gray - brown with limestone fragments
—
—
—
.7.7
SILTY CLAY; tan and orange with limestone
fragments
—
5
WEATHERED LIMESTONE; tan
—
—
—
-
—
10
Total Depth of Boring = 5.0 ft.
Note; Boring was advanced to 5.0 feet
below the ground surface without
using drilling fluid and ground
water was not encountered above
that depth.
—
—
-
-
--
—
—
Truuty
1
Engineermg Testing
Corporation
Project ROUND ROCK GOLF COURSE ROAD
Location:
Round Rock, Texas
Date:
LOG OF BORING
VI
3 -15 -90 Type:
Sta. 85+00
Push Tube /Auger Boring No: 18
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1