R-91-1561 - 2/14/1991WHEREAS, the City of Round Rock has previously entered into a contract with Corrosion Eliminators, Inc. for the 1990 Tank Rehabilitation Project, and WHEREAS, it has since been determined that the ground storage tank at the main well site is in need of painting and rehabilitation, and WHEREAS, Corrosion Eliminator, Inc. is willing to paint and rehabilitate the said ground storage tank for the same unit prices as contained in its original bid, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City a Change Order to the contract with Corrosion Eliminator, Inc. for the 1990 Tank Rehabilitation Project to add the ground storage tank at the main well site. RESOLVED this 14th day of February, 1991. ATTEST: RS02141G NE LAND, City Secretary RESOLUTION NO. 15691 1 MIKE ROBINSON, Mayor City of Round Rock, Texas ITEM NO. DESCRIPTION OF CHANGES ADDED DAYS CALENDAR WORKING AMOUNT 1 Add cleaning, painting and disinfection of tank. - $ 46,142.00 lA Add welding, cutting, repairing, patching deteriorated plate and welds $13.60 /L.F. 400 L.F. $ 5,440.00 1B Add shrouding system including erection, maintenance, and dismantling of shroud. $ 10,600.00 TOTAL - DEPT.; Public Work Department DATE: 2/14/91 PROJECT: 1990 Tank Rehabilitation Project CHANGE ORDER NO • 1 JUSTIFICATION: ORIGINAL CONTRACT PRICE $ • 103,984.00 Tank repair of main well site, PREVIOUS CHANGE ORDERS $• 0 500,000 gal Water!Storage Facility. THIS CHANGE ORDER S. 93,436.00 CHANGE ORDERS TO DATE $• 93,436.00 PREPARED BY: Steven D. Miller, P.E. 2/14/91 ENGINEER DATE Corrosion Eliminator, Inc. APPROVED. TITLE: Mayor CONTRACTOR CITY OF ROUND ROCK CONTRUCTION CHANGE ORDER CHANGE DATA Page 1 I'f 2 PERCENT OF ORIGINAL CONTRACT PRICE _ q 61% for tank repaint THIS CHANGE ORDER 28% for tank repair DATE PREVIOUS CHANGE ORDERS. TOTAL % CHANGE. 89% 0 Y ORIGINAL CONTRACT PRICE PLUS CHANGE ORDERS S. 197,420.00 a:coi ITEM NO. DESCRIPTION OF CHANGES ADDED.DAYS CALENDAR WORKING AMOUNT 1C Add concrete pads including forming, batching and placing concrete, finishing, and cleanup @ $18.82 S.Y. - 50 S.Y. $ 941.00 Subtotal for Tank Rehabilitation $63,123.00 2 Add the installation of new 24" 0 overflow, vent and 5' -0" x 9'-0" wier box complete - in- place. $ 1,375.00 3 Add repair of portions of tank shell and roof plate. $28,938.00 • Subtotal for Tank Repair. $30,313.00 Total calendar days 60 Total I $93,436.00 , Note : See also attached Contractor's Proposal • " f TOTAL 60 $ 93,436.00 DEPT • Public Works Department PROJECT: 1990 Tank Rehabilitation Project CITY OF ROUND ROCK CONSTRUCTION CHANGE ORDER CHANGE DATA Page 2 of 2 DATE • 2/14/91 1 CHANGE ORDER NO• a:co2 w„ THE CITY OF ROUND ROCK ,:��: PUBLIC WORKS DEPARTMENT - _ 221 East Main Street j ',� B10 TABULATION �� Round Rock, Texas 78664 - _ \ (512) 255 -3612 - ni7 BIDS = XTENDz�T,w�lf =• BY: Steve Mi � TEXgsaa D CH2C�.(Ep .•''' ERn ¢i DATE: + ;. W J • . SHEET ... ,, -1! g CONTRACT: 1990 Tank Rehabilitation _ °9.. S - BIDDERS -- tt • \ � + j i •Rt� `-.t LOCATION: City Hall Council Chambers Corrosion Eliminator Bid Bond? Yes A-Way Tank Service B Bond? Yes M.R.S. Contracting _ _ Bid Bond? No TravDS ••' rat Painters Bid Bond ?Can,,ars BID DATE: October 16, 1990 TIME: 2 :00 po ITEM UNIT APPROX. QUANTITY UNIT PRICE COST UNIT PRICE COST UNIT PRICE COST UNIT PRICE COST 1.. Barton'dill L.S. $ 48,769.00 $ 43,990.00 $ 44,087.00 $ 55,000.00 1.5. Welding Foot 1100 $ 13.60 $ 14,960.00 $ 10.00 $ 11,000.00 $ 26.17 $ 28,787.00 $10.00 $ 11,000.00 1.B. Shroud L.S. $ 8,000.00 $ 16,500.00 - $ 8,876.00 $ 34,000.00 Subtotal: $ 71,729.00 $ 71,490.00 $ 81,750.00 $ 100,000.00 2. Westinghouse L.S. $ 16,010.00 $ 15,990.00 $ 18,264.00 $ 19,566.00 2.A. Welding Foot 850 $ 13.70 $ 11,645.00 $ 10.00 $ B,SOO.DO $ 22.50 $ 19,125.00 $ 10.00 $ 8,500 2.B. Shroud L.S. $ 3,659.00 $ 2,500.00 $ 4,358.00 $ 18,000.00 Subtotal: $ 31,314.00 $ 26,990.00 $ 41,747.00 $ 46,066.00 3. Concrete Pads S.Y. 50 $ 18.82 $ 941.00 5130.00 $ 6,500.00 $ 24.00 $ 1,200.00 $110.00 $ 5,500.00 BID TOTAL: - - $ 103,984.00 $104,980.00 - $ 124,697.00 _ $ 151,566.00 a: 6'dta DATE: February 12, 1991 SUBJECT: City Council Meeting, February 14, 1991 ITEM: 9G. Consider a resolution authorizing a change order for Corrosion Eliminator, Inc. to paint the main well site tank. STAFF RESOURCE PERSON: Jim Nuse STAFF RECOMMENDATION: Recently a level transducer failed at the main well site ground water tank causing the water to overflow from the tank. In order to assess any possible damage, the tank was drained and inspected internally. The inspection revealed that several locations of the top angle brace and several rafters had rusted in several locations. This tank is scheduled to be the next tank repaired in the on -going tank rehabilitation program. During this program, the tank will be sandblasted, and painted inside and out, new overflows constructed and any other necessary rehabilitation such as rust removal and welding. Since some damage to the tank occurred, which is covered by our insurance, staff recommends painting and modifying the overflows at this time. Corrosion Eliminator currently has a contract with the City of Round Rock for the rehab of two tanks. The contractor has agreed to extend his unit prices for painting related items and the rehab work. The repairs will be negotiated with the insurance company. This change order is recommended for several reasons: 1. The contractor is in town and can paint and repair this tank prior to the heavy summer usage. 2. The unit prices are from a bid that was opened on October 16, 1990, where four contractors bid. This insures that the work will be done competitively. 3. Repair portion is covered by insurance. 4. The longer it takes to paint the tank, the longer the corrosion has to work. If it were bid out, we could not schedule the work prior to next winter.