Loading...
R-91-1562 - 2/14/1991WHEREAS, the City of Round Rock has duly advertized for bids for the 1991 Water Plant Modifications, and WHEREAS, the Council has determined that all bids received were unacceptable, Now Therefore, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That all bids received for the 1991 Water Plant Modifications are deemed to be unacceptable and are hereby rejected. RESOLVED this 14th day of February, 1991. ATTEST: JO E LAND, City Secretary RS02141H RESOLUTION NO. /5R f MIKE ROBINSON, Mayor City of Round Rock, Texas DATE: January 31, 1991 TO: Al Wille, P.E. Asst. Director Public Works FROM: ' Steven Miller, P.E. Staff Engineer RE: DISCUSSION THE CITY OF ROUND ROCK 221 East Main Street Round Rock, Texas 78664 512- 255.3612 MEMORANDUM 1991 Water Plant Modifications The City received only one (1) bid for the project mentioned above. A local Round Rock firm, Jezek Construction Co., submitted a proposal in the amount of $37,752.00. The estimate for this project was $25,306.00.. • There were six (6) possible bidders for this project. I contacted several contractors who purchased plans /specifications to find out why they had not submitted a proposal. The responses ranged from acquiring the plans too late, the value of the project was not large enough, and the project was too diversed. - Several plans and specifications were released during the last week of the bid opening. The few contractors that purchased the documents late cited busy work schedules and their late notice of the advertisement. Several contractors did not submit a proposal due to the total value of the project. It appears the project estimate possibly did not adequately address some labor intensive activities such as the dismantling of the existing pump station. Also, some material cost may have been undervalued creating a lower overall project cost. One interesting aspect of the responses was the comments concerning the paint removal activity. There was a general consensus that this work activity could possibly be broken out into a distinct separate project. Nearly half of the Mayor bidders were interested in either the mechanical aspect of this project or the painting but Mike Robusson not both together. Mayor Pro.tem Charles Culpepper Council Members CONCLUSION Robert Stluka Tub Oahnmi I believe the best option at this point would be to reject the single bid received and re -W, Pete Correa Earl Painter advertise the project as two (2) separate contracts with a revised estimate. Jimmy,Joseph City Manager wts9lim Robert L. Bennett, Jr. - } City Attorney Stephan L. Sheets - e: "`�b� - THE CITY OF ROUND ROCK /:•/-"'\;,, PUBLIC WORKS DEPARTMENT �R 221 East Main Street BID TABULATION . .I' Round Rock, Texas 78664 // (512) 255 -3612 BIDS EXTENDED AND CHECKED BY: Steve Miller DATE: 1/L SHEET I OF 1 CONTRACT: 1991 Water Plant Frgli.fi - l-innc - -- BIDDERS Jezek Constriction - CcnPa Inc. Bid Bond? YES - _ -- - Bid Bond? - Bid Bond? . - Bid Bond? LOCATION: CitY Hall Council ambers BID DATE: January 25, 1991 TIME: 2:00 P.M. ITEM UNIT APPROX. QUANTITY UNIT PRICE COST UNIT PRICE COST UNIT PRICE COST UNIT PRICE COST Paint Ra(oval and Paintitx( L.S. 1 91560. $1560. ' 8" Backwash Return Line L.F. • 254 640/Lif. 910,160, Saw Cut Concrete L.F. 87 $34.48/Lif $3,000. _ ._ Put, Remval/Installation L.S. 1 618,032. $18,032. Slide Gate Installation L.S. 1' $5,000. $5,000. - �"°' DF \ �y " - - - P5 s �— - TOTAL BIM $37,752.00 ti ' 64524 441 t .4 ��i. GISTEQ .er r ' . a:0'd tab DATE: February 12, 1991 SUBJECT: City Council Meeting, February 14, 1991 ITEM: 9H. Consider a resolution rejecting all bids for the 1991 Water Plant Modifications. STAFF RESOURCE PERSON: Jim Nuse STAFF RECOMMENDATION: Please see the attached memorandum. Staff requests rejection of the bid.