Loading...
R-91-1593 - 3/28/1991 RESOLUTION N0. 15 93Gi 4 WHEREAS, the City of Round Rock has duly advertised for and received proposals for the installation of asphalt for the hike and bike trail in Old Settlers Park at Palm Valley, and WHEREAS, Halliburton Excavation, Inc. has submitted the most favorable proposal, and WHEREAS, the City Council wishes to accept the proposal of Halliburton Excavation, Inc., Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the proposal of Halliburton Excavation, Inc. is hereby accepted as the most favorable proposal, and the Mayor is hereby authorized and directed to execute on behalf of the City a contract with Halliburton Excavation, Inc. for the installation of asphalt for the hike and bike trail in Old Settlers Park at Palm Valley, a copy of said contract is attached hereto and incorporated herein for all purposes. RESOLVED this 28th day of March, 1991. -�/1"', /-t/'I— - M ROBINSON, Mayor City of Round Rock, Texas ATTEST: "—J JOffNE LAND, City Secretary RS03281L T11E CITY OP ROUND ROCK 221 East Main Street Round Rock,Texas 78664 512-255-3612 March 15, 1991 Sherl Halliburto n President Halliburton Excavation, Inc. P.O. Box 63 Cedar Park, TX 78613 Dear Mr. Halliburton: The City of Round Rock, Parks and Recreation Department is accepting price quotes for 2650' of hike and bike trail construction, to be done at the old Settlers Park at Palm Valley. Quotes will be accepted until 12:00 Noon, March 25, 1991, Parks and Recreation Department, 214 E. Main Street, Round,Rock, TX 78664. Please quote on the following alternates for 2650' of trail. Alternate 1 4' Width 6' Width 1. Compact and roll $ �� $ base material r� 2. Apply 1" of Asphalt hot mix Total $5!LTO $ /16,c0 Mayor Afihe Rohrnson Mayor Pro•lem Charles Culpepper Alternate 11 4' Width 6' Width Council Members Dom_ Robert 1m.n 1. Install 1" of $!f,S�SnZ.e� $ P'ZOatmaru asphalt hot mix Jr3Qon Pr(c Cnrrca City Manager J Robert G Bennett,Jr. City Attorney Stephan L.Sheels , Page Two The Parks and Recreation Department shall be responsible for the following items: 1. Trail excavation to 4-6" depth. 2. Removing excess dirt. 3. Hauling base material to the trail site. The contractor cannot start before April 8, 1991 and must complete the project by April 19, 1991. I , the undersigned contractor, understand that I cannot begin before April 8, 1991 and must be completed with the project by-April 19, 1991. —�Name Date Randy Gord Parks Superintendent Parks and Recreation Dept. RG/rr / (�'o-s+/�.�eTi o•✓ ,oe fe�OS JPati wE,¢�`j-El^ r Z CITY OF ROUND ROCK PARRS AND RE.CRE_STION DEPART.%ENT QUOTE TABULATION QUOTES PROJECT: Trail ,...rs«..,,.«i o„ nsv 2 ry 12.00 Noon 8alliburton Safi 6 Associates, Travis Paving QUOTE DATE• j rch 25.1991T�0 Excavation Inc. Inc. LOCATION: PARR Office INSURANCE I YES YES I YES 1 ITr UNIT DESCRIPTION PRICE I PRICE I PRICE Not' ' compac t Alternate I I 4ft wide base and apply $ 5,960.00 $ 7,288.00 I $ 7,420.00 Trail 1" asphalt 6ft wide I has. aadcapptyt I $ 8,911.00 $ 9,836.00 .$11,130.00 Trail 1" asphalt Alternate II 4ft wide Apply 1" asphalt $ 5,112.00 $ 6,112.00 I $ 5,300.00 Trail to prepared surface Eft wide Apply 1" asphalt) $ 7,639.00 $ 8,248.00 $ 7,950.00 t0 prepared Trail surface I DATE: March 26, 1991 SUBJECT: City Council Meeting, March 28, 1991 ITEM: 9.L. Consider a resolution authorizing the Mayor to accept quotes to install asphalt for the hike and bike trail in Old Settlers Park at Palm Valley. STAFF RESOURCE PERSON: Sharon Prete STAFF RECOMMENDATION: Staff recommends that the quote from Halliburton Excavation Inc. be accepted for alternate I , 6 ft. wide trail in the amount of $ 8,911.00. ECONOMIC IMPACT: The price is within budget.