Loading...
R-92-1690 - 1/9/1992Mayor Mike Robinson Mayor Pro-tem Charles Culpepper Council Members Robert Slake Tish Oatnmo Rick Stewart Earl Palmer Jimmy Joseph City Manager Robert L. Bennett, Jr. City Attorney Stephan L. Sheets January 20, 1992 A. William Waeltz, P.E. 9510 Ranch Roack 620 Austin, Texas 78726 Dear : Sincerely, Joanne Land, Assistant City Manager/ City Secretary JL:RS Enclosure THE CITY OF ROUND ROCK 221 East Main Street Round Rock, Texas 78664 512-255-3612 Fax 512- 255 -6676 Resolution No. 1690R was approved by the Round Rock City Council on January 9, 1992. The enclosed copy of the resolution and proposal are for your files. If you have any questions, please give us a call. WHEREAS, the City of Round Rock desires engineering services for the construction of the US 79 Waterline Improvements project, and WHEREAS, Rio Tech, Inc. has submitted a proposal to provide the needed engineering services, and WHEREAS, the City Council desires to accept the proposal and to enter into an agreement with Rio Tech, Inc., Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City an agreement for engineering services with Rio Tech, Inc. regarding the construction of the US 79 Waterline Improvements project. RESOLVED this 9th day of January, 1992. ATTEST: RS01092D E LAND, City Secretary RESOLUTION NO. /6290/C ®/C /A4WAL_ MIKE ROBINSON, Mayor City of Round Rock, Texas It! rio tech, inc. (512) 250 8373 environmental engineers transportation engineers industrial site development engineers land development engineers construction managers planners consulting engineers November 18, 1991 Mr. James R.. Nuse, P.E. Director of Public Works City of Round Rock 300 Blair Street Round Rock, Texas 78664 Re: Highway 79 Water Line Dear Jim, 9510 ranch road 620 austin, texas 78726 We are pleased to provide this proposal for the preparation of Construction Plans and Specifications for the Highway 79, 12" Water Line. It is our understanding the Project consists of construction of approximately 1550 L.F. of 12 " water line, plus appurtenances, from the Creek Apartments to the existing 16" water line along F.M. 1460. The estimated construction cost of the Project, as prepared by your staff, is $67,000.00. The total Project cost, including Engineering and contingencies, is estimated to be $80,400.00. Our proposed scope of work is as follows: 1. Prepare Construction Plans and Specifications. 2. Assist Owner in solicitation of bids and award of contract for construction. 3. Provide Construction Administration Services during construction of the Project. It is our understanding that design surveys as necessary to establish existing topography and location of existing utilities will be supplied by the City of Round Rock. We would propose to provide the above services with compensation based upon the T.S.P.E. Curve "A" as shown in Attachment "A ". Since the estimated construction cost of this Project is under $100,000.00, the fee percentage will be capped @ 11.7% of the construction costs. Further, since design survey information will be supplied in an "ink on mylar" condition we propose to deduct $2375.00 from the total Curve "A" fee. Mr. James R. Nuse, P.E. Re: Highway 79 Water Line Page 2 Easement preparation, if required, and construction staking will be supplied with compensation based upon the hourly rates as shown in Attachment "B ". If this proposal is acceptable to the City of Round Rock, please indicate by signature below. Please execute both copies of this letter and return one to our office. The other copy is for your files. If you have any questions or comments regarding this matter, please advise. Very truly yours, RIO TECH, INC. A. William Waeltz, . Vice President AWW /slw Attachments Accepted by the City of Round Rock: by: /Pe /' date: /- Q- 9z. a:h79wIloa,pp7 NOTES: 14 13 12 1 (1) When Construction Cost is under $100,000, use reim- bursable basis of compensation. (2) Construction cost below is the work authorized at one time. However, where the work is to be accomplished in a number of separate construction contracts, then each such project element should be evaluated on an individual basis, with additional compensation to the Engineer. (3) The Basic Charge presented below represents median com- pensation. The appropriate compensation for any given assign. CONSTRUCTION COST MILLIONS OF DOLLARS ment may vary above or below the curve, depending upon com- plexity. (4) Compensation for alteration work should be increased by at least one-third above the median compensation illustrated. (5) Curve A and Curve B are consistent with Curve A and Curve B • in Manual 45, published by the American Society of Civil Engi- neers. New curves will be issued as subsequent revisions are published by ASCE. 0.5 1 ■ ■ ■■ ■ ■ ■ ■■■ ■II ∎■ ■■ ■1111 ■MINIM t ■■■■ ■■■■1111■ ■■■1111_ ■ ■■ ■1111 11111111 ■■1111 ■ ■■111111 ■ ■■1 ■1I Iu ■:,�■■■■ ■iiii ...■■ 1 11� ■■■■111 ■..11111 - ■ ■11II__ See USE OF CURVES; page 14 ■■■11111 ■ ■■ ■II---■ ■.n And TYPICAL EXAMPLES; page 16 ■ EM ■■■11111_SI ■■1111 ■ ■■■111 OHM ■■■■111I� 'PL 1■1 ■ ■■1111 ■■1111 mor nmunonl •►9 11 ■■■ ■1111 ■■■1111 ■11111∎ 0,, • nf1 ■ ■■■■1III� ■.■n11 ■ ■ ■ ■111 bF e ■ O 111■■■11111111111■■■ ■u1 ■ ■■■u 1■1■■■n1111M1.111111111111 � ■■ ■1111 IMImP II VIAM ■IIII NIMM■■1I 5 ■ ■■ ISIMMIIMM■ ■1111 ■■■ 11111 111111p11111■\■■■IIII ■■ ■1111 noU■U1■ ___ warn wi�■1111 ■■■11111��m■�11n mEn■1111 ∎ #!!i_u_. ■ ■■ ■.iII- ■ ■■ u■u 0.01 0.05 0 1 10 50 100 0 c CJ to P. g co 0 Y" 0 ATTACHMENT " B " HOURLY RATE SCHEDULE CLASSIFICATION HOURLY RATE 1. Corporate Officer $ 75. 2. Registered Professional Engineer $ 75 3. Registered Public Surveyor $ 60 4. Project Manager /Hydrologist $ 55 5. Engineer —in— Training (E.I.T.) $ 45 6. Land Planner $ 50 7. Survey Crew Coordinator $ 40 8. Project Representative (includes Vehicle and Equipment) $ 40 9. Design Technician $ 35 10. Drafter $ 30 11. Survey Calculation Technician $ 40 12. Technical Support Personnel $ 30 13. Secretarial Personnel $ 25 14. Four Man Survey Crew (includes Vehicle and Equipment) $ 80 15. Three Man Survey Crew (includes Vehicle and Equipment) $ 75 16. Two Man Survey Crew (includes Vehicle and Equipment) $ 65 17. Reimbursement for Direct Non —Labor Expenses and Sub — Contract Expenses — Cost Plus 20% .March.15,1990 PROYESSIONAL LIABILITY ARCHITECTS /ENGINEERS - yei All (1., ('nn•••1..id. 1. n Mrs•" DECLARATIONS AC;r;NCY kxANCH PREFIX POLICY NUMUFR CONTINENTAL S CASUALTY D COMPANY, - — - CNA PLAZA, CHICAGO, TL 60665, 056)24 970 AAE 11- 375 -16 -69 HEREIN K CALLED A WE, US, OA OUR. j NAMED 1i SURFD : - - -- - -- NOTICE. RIO TECH INC. THIS IS A CLAIMS - MADE POLICY. PLEASE READ THIS POLICY CARE - ruLLY AND DISCUSS THE COVER- AGE WITH YOUR INSURANCE AGENT, �. YOLICY�'ERM: " --•- 11/0£ TOi ]l/OB/92 at 12101 Ab! J — Standard Time at your address shown below. 95) 0 Ranch Road WO Austin, Texas 78726 4. EF'F'ECTIVE DA7'F:: ' 11/0B/91 is the effeotive date of the first policy issued end continuously renewed by us. ARDUCTfl I,P. - - $ 10,000 Purchased Deductible $ 0 Deductible Credit $ 10,000 is Deductible per claim (including claim expenses) OF I,IARII • 100,000 is the mAxJmum we will pay fox ell claim and claim expenses during this policy term. 7 , CANCgtLA I ON: 46 with policy Condition i M Q appea r ' i n i gon page d 12. b. Insurcd's liabi],ity arising out of joint ventures is covered $n AGbor.danUO with tho terms of Endorsement No. 5 DATE: January 7, 1992 SUBJECT: City Council Meeting, January 9, 1992 ITEM: 10D. Consider a resolution authorizing the Mayor to enter into a contract with Rio Tech for the US 79 Waterline Improvements. STAFF RESOURCE PERSON: Jim Nuse STAFF RECOMMENDATION: Last year staff recommended that Rio Tech Engineering be hired to design a water line between the Creek Apartments and 1460 along highway 79. Council rejected the recommendation. Since that time, proposals were received for the surveying portion of the project and Baker- Aicklen was authorized to do the work. Round Rock had a lot of rainfall this past summer and functioned well without this line, however, it would be invaluable if the weather were hot and dry. Since there are many utilities located in the right of way, I believe it is important to have the design done by a firm familiar with that ROW. Bill Waeltz, now with Rio Tech, designed and administered the construction of the force main in this stretch of ROW. Therefore, I recommend this project be awarded to Rio Tech. ECONOMIC IMPACT: The estimated construction cost of this project is $67,000. The engineering and surveying portion is equal to 11.7% of the construction cost or $7,839 (the surveying portion is $2,375 and the engineering is $5,464).