R-92-1712 - 4/23/1992WHEREAS, the City of Round Rock has duly advertised for bids for certain renovations to the new Police Facility located on Palm Valley Boulevard (HWY 79), and WHEREAS, International Industrial Consultants, Inc. has submitted the lowest and best bid, and WHEREAS, the City Council wishes to accept the bid of International Industrial Consultants, Inc., Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the bid of International Industrial Consultants, Inc., is hereby accepted as the lowest and best bid, and the Mayor is hereby authorized and directed to execute on behalf of the City a contract with International Industrial Consultants, Inc., a copy of said contract being attached hereto and incorporated herein for all purposes. RESOLVED this 23rd day of April, 1992. ATTEST: NE LAND, Secretary RSO4232A RESOLUTION NO. /7/127e MIKE ROBINSON, Mayor City of Round Rock, Texas T 11 E' A M E R, I..C•A N AGREEMENT The Project is: (Name and locaron) The Architect is: (Name and address) I N S T I T U T E O F A R, C,.H I T E C T S s AIA Document A101 Standard Form of Agreement Between Owner and Contractor where the basis of payment is a STIPULATED SUM 1987 EDITION THIS DOCUMENT HAS IMPORTANT LEGAL CONSEQUENCES; CONSULTATION WITH AN ATTORNEY IS ENCOURAGED WITH RESPECT TO ITS COMPLETION OR MODIFICATION. The 1987 Edition of AIA Document A20I, General Conditions of the Contract for Construction, is adopted in this document by reference. Do not use with other general conditions unless this document is modified This document has been approved and endorsed by The Associated General Contractors of America. made as of the Nineth day of Apri in the year of " - Nineteen Hundred and Ninety - two BETWEEN the Owner: City df Round Rock (Name and address) 221 E. Main St. , Round Rock, Tx 78664 and the Contractor: International Industrial Consultants, Inc. (Name and address) 4425 South Mopac, Suite 209 Austin, Texas 78735 Police Department Relocation 605 Palm Valley Blvd. Round Rock, Tx. 78664 R. Gill & Associates P.O. Box 217 Round Rock, Tx. 78680 The Owner and Contractor agree as set forth below. 1 WARNING: Unlicensed photocopying violates U.S. copyright laws and Is subject to legal prosecution. Copyright 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 01987 by The American Institute of Archi- tects, 1735 New York Avenue, N.W., Washington, D C 20006 Reproduction of the material herein or substantial quotation of Its provisions without written permission of the AIA violates the copyright lass of the United States and will be subject to legal prosecution. , AIA DOCUMENT A101 • OWNER. CONTRACTOR AGREEMENT • TWELFTH EDITION • AIA. • ©1987 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N W , WASHINGTON, D C 20006 Ai 01 -1987 1 ARTICLE 1 THE CONTRACT DOCUMENTS The Contract Documents consist of this Agreement, Conditions of the Contract (General, Supplementary and other Conditions), Drawings, Specifications, addenda issued prior to execution of this Agreement, other documents listed in this Agreement and Modifications issued after execution of this Agreement; these form the Contract, and are as fully a part of the Contract as if attached to this Agreement or repeated herein The Contract represents the entire and integrated agreement between the parties hereto and supersedes prior negotiat ions, representations or agreements, either written or oral An enumeration of the Contract Documents, other than Modifications, appears in Article 9. ARTICLE 2 THE WORK OF THIS CONTRACT The Contractor shall execute the entire Work described in the Contract Documents, except to the extent specifically indicated in the Contract Documents to be the responsibility of others, or as follows: Only those items as noted in the contract documents. ARTICLE 3 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION 3.1 The date of commencement is the date from which the Contract Time of Paragraph 3.2 is measured, and shall be the date of this Agreement, as first written above, unless a different date is stated below or provision is made for the date to be fixed in a notice to proceed issued by the Owner. (Insert the date of commencement, If it differs from the date of Ibis Agreement or, if applicable, state that the date will bettered to a nonce to proceed ) The date will be fixed in a notice to proceed. Unless the date of commencement is established by a notice to proceed issued by the Owner, the Contractor shall notify the Owner in writing not less than five days before commencing the Work to permit the timely filing of mortgages, mechanic's liens and other security interests. 3.2 The Contractor shall achieve Substantial Completion of the entire Work not later than (Insert the calendar date or number of calendar days after the date of commencement Also Insert any requirements forearber Substantial Completion ofcer- tain portions of tb a Rork, If not stated elsewhere tin the Contract Documents ) October 1, 1992 , subject to adjustments of this Contract Time as provided in the Contract Documents. (Insert provisions, if any, for ',outdated damages relating m fadute to complete on time,) No liquidated damages. AIA DOCUMENT A101 • OWNER. CONTRACTOR AGREEMENT • TWELFTH EDITION • AIA. • ©1987 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N W , WASHINGTON, D.C. 20006 WARNING: Unlicensed photocopying violates U.S. copyright laws and Is subject to legal prosecution. A101 -1987 2 ARTICLE 4 CONTRACT SUM 4.1 The Owner shall pay the Contractor in current funds for the Contractor's performance of the Contract the Contract Sum of FOUR HUNDRED SEVENTY —SIX : THOUSAND FIVE HUNDRED EIGHTY —FIVE Dollars ($ $476,585.00 ), subject to additions and deductions as provided in the Con- tract Documents. 4.2 The Contract Sum is based upon the following alternates, if any, which are described in the Contract Documents and are hereby accepted by the Owner. (State the numbers or othertdentipcaLion of accepted alternates If amazons on other alternates are to be made by the Owner subsequent to the exectaton of this Agreement, attach a schedule of sucb otber alternates showing the amount for each and the date mad witch that amount Is cand ) Alternate number two is included in the above price. Deletions to the original bid are as follows: 1. Job shack. $890.00 2. Run ceiling grid continuous. $1,100.00 3. Add color to texture,instead of ,water,,delete primer coat. $982.00 4. Use satin finish on flag pole. $80.00 5. Delete form boards. $420.00 6. Use plain slash birch doors in lieu of plain slash ash. $700.00 Use prefinished doors. $600.00 Total deducted form original bid. ,$4;772.00 The above deductions are refledted in_the.above'conttadt-price. 4.3 Unit prices, if any, are as follows: Drilled piers: 18" in dia. $36.00/ lin. ft. 24" in dia. $52.00/ lin. ft. Casing drilled piers: 18" in dia. $48.00/ lin.ft. 24" in dia. $64.00/ lin.ft. AIA DOCUMENT A101 • OWNER'CONTRACTOR AGREEMENT • TWELFTH EDITION • AIAe • ©1987 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N W , WASHINGTON, D C 20006 A1O1 -1987 3 WARNING: Unlicensed photocopying violates U.S. copyright laws and Is subject to legal prosecution. ARTICLE 5 PROGRESS PAYMENTS 5.1 Based upon Applications for Payment submitted to the Architect by the Contractor and Certificates for Payment issued by the Architect, the Owner shall make progress payments on account of the Contract Sum to the Contractor as provided below and elsewhere in the Contract Documents. 5.2 The period covered by each Application for Payment shall be one calendar month ending on the last day of the month, or as follows: All payment request must be approved by the City Council on the second Thursday of each month. All pay request must be submitted to the Architect for approval no later than the Tuesday of the week prior to the scheduled meeting of the City Council. 5.3 Provi c an Ap heat. n f r Payments rcce:vcd by the Archaca n t later th.... day f a m nth, the wncr shall make paymc.t t the C ett..,... n t later th day f the •.....•.h. If .,„ Apph,,,,,n, 1 , r.. „ .... v.. L 5 do. the 5.4 Each Application for Payment shall be based upon the schedule of values submitted by the Contractor in accordance with the Contract Documents. The schedule of values shall allocate the entire Contract Sum among the various portions of the Work and be prepared in such form and supported by such data to substantiate its accuracy as the Architect may require. This schedule, unless objected to by the Architect, shall be used as a basis for reviewing the Contractor's Applications for Payment. 5.5 Applications for Payment shall indicate the percentage of completion of each portion of the Work as of the end of the period covered by the Application for Payment. 5.6 Subject to the provisions of the Contract Documents, the amount of each progress payment shall be computed as follows: 5.6.1. Take that portion of the Contract Sum properly allocable to completed Work as determined by multiplying the percentage completion of each portion of the Work by the share of the total Contract Sum allocated to that portion of the Work in the schedule of values, less retainage of Ten percent ( --10%) Pending final determination of cost to the Owner of changes in the Work, amounts not in the dispute may be included as provided in Subparagraph 7.3.7 of the General Conditions even though the Contract Sum has not yet been adjusted by Change Order; 5.6.2 Add that portion of the Contract Sum properly allocable to materials and equipment delivered and suitably stored at the site for subsequent incorporation in the completed construction (or, if approved in advance by the Owner, suitably stored off the site at a location agreed upon in writing), less retainage of Ten percent ( - -10 %); 5.6.3 Subtract the aggregate of previous payments made by the Owner; and 5.6.4 Subtract amounts, if any, for which the Archttect has withheld or nullified a Certificate for Payment as provided in Para- graph 9.5 of the General Conditions. 5.7 The progress payment amount determined in accordance with Paragraph 5.6 shall be further modified under the following circumstances: 5.7.1 Add, upon Substantial Completion of the Work, a sum sufficient to increase the total payments to Ninety —five percent( 95 %)of the Contract Sum, less such amounts as the Architect shall determine for incomplete Work and unsettled claims; and 5.7.2 Add, if final completion of the Work is thereafter materially delayed through no fault of the Contractor, any additional amounts payable m accordance with Subparagraph 9.10.3 of the General Conditions. 5.8 Reduction or limitation of retamage, if any, shall be as follows: NONE (/f I es untended prior to Substantial Completion of the entire Work, to reduce or limit the retainage resulting from the percentages inserted in Subpara- graph. 5.6 1 and 5 6 2 above. and ibis is not explained elsewhere in !be Contract Documents, insert here provisions for such reduction or Imitation.) AIA DOCUMENT A101 • OWNER - CONTRACTOR AGREEMENT • TWELFTH EDITION • AIA° • ©1987 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N W , WASHINGTON, D C 20006 A101 -1987 4 WARNING: Unlicensed photocopying violates U.S. copyright laws and Is subject to legal prosecution. ARTICLE 6 FINAL PAYMENT Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when (1) the Contract has been fully performed by the Contractor except for the Contractor's responsibility to correct nonconforming Work as provided in Subparagraph 12 2 2 of the General Conditions and to satisfy other requirements, if any, which necessarily survive final payment, and (2) a final Certificate for Payment has been issued by the Architect; such final payment shall be made by the Owner not more than 30 days after the issuance of the Architect's final Certificate for Payment, or as follows. ARTICLE 7 MISCELLANEOUS PROVISIONS 7.1 Where reference is made in this Agreement to a provision of the General Conditions or another Contract Document, the ref- erence refers to that provision as amended or supplemented by other provisions of the Contract Documents. 7.2 Payments due and unpaid under the Contract shall bear interest from the date payment is due at the rate stated below, or in the absence thereof, at the legal rate prevailing from time to time at the place where the Project is located, (Insert rate of merest agreed upon, if any) NONE (Usury laws and requirements under the Federal Truth to Loafing Act, stmtlarstate and local cauumer credo taus and other regulations at the Owner's and Contractor's principal places of business, the tocatton f the Protect and elsewhere may affect the oaltdtty of tins provision Legal advice should be obtained with respect to deletions or modtftcaltons, and also regarding requirements such as written disclosures or waivers) 7.3 Other provisions NONE ARTICLE 8 TERMINATION OR SUSPENSION 8.1 The Contract may be terminated by the Owner or the Contractor as provided in Article 14 of the General Conditions. 8.2 The Work may be suspended by the Owner as provided in Article 14 of the General Conditions. AIA DOCUMENT A101 • OWNER - CONTRACTOR AGREEMENT • TWELFTH EDITION • AIA. • ©1987 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N W., WASHINGTON, D.C. 20006 WARNING: Unlicensed photocopying violates U.S. copyright laws and is subject to legal prosecution. A101 -1987 5 ARTICLE 9 ENUMERATION OF CONTRACT DOCUMENTS - 9.1 The Contract Documents, except for Modifications issued after execution of this Agreement, are enumerated as follows: 9.1.1 The Agreement is this executed Standard Form of Agreement Between Owner and Contractor, AIA Document A101, 1987 Edition. 976 9.1.2 The General Conditions are the General Conditions of the Contract for Construction, AIA Document A201 f 98Edition. 9.1.3 The Supplementary and other Conditions of the Contract are those contained in the Project Manual dated February 13, 1992 , and are as follows. Document See Article 9.1.4 -- Title Pages 9.1.4 The Specifications are those contained in the Project Manual dated as in Subparagraph 9.1.3, and are as follows. (Either list the Specifications here or refer to an exhibit attached to this Agreement) Section Title Pages See attached Table of Contents to the specification manual. AIA DOCUMENT A101 • OWNERCONTRACTOR AGREEMENT • TWELFTH EDITION • AIA. • ©1987 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W, WASHINGTON, D C 20006 WARNING: Unlicensed photocopying violates U.S. copyright laws and is subject to legal prosecution. A101 -1987 6 9.1.5 The Drawings are as follows, and are dated (Faber 1bt the Drawings! ere or reler to an exhibit attached b, tors Agreement ) Number T1tte See attached Index to the drawings. unless a different date is shown below: Date 9.1.6 The addenda, if any, are as follows, Number Date Pages Addendum No. 1 Feb. 20, 1992 • 1 Addendun No. 2 Mar. .2. 1992 - 4 Portions of addenda relating to bidding requirements are not part of the Contract Documents unless the bidding requirements are also enumerated in this Article 9 AIA DOCUMENT A101 • OWNER CONTRACTOR AGREEMENT • TWELFlH EDITION • AIA® • ©1007 TIIE AMERICAN INSTITUTE OFARCHITEC I'S, 1735 NEW ORK AVEN UE, N W WASHINGTON, D C 2(00)6 A101 -1987 7 WARNING: Unlicensed photocopying violates U.S. copyright laws and Is subject to legal prosecution. 9.1.7 Other documents, if any, forming part of the Contract Documents are as follows. (List here anyaddinonal documents which are intended toformpart of tbe Contract Documents TM General Conditions provide tbatbldd"fg requirements such as advertisement or "fellation to bid, Instructions to &dders, sample forms and the Contractor's bid are not part of the Contract Documents unless enumerated in this Agreement They should be listed bere only if :mended to be part of the Contract Documents) OWNER (Signature) ! /LJ''/ / /!•� /� (Printed name and title) AIA NONE Mike Robinson, Mayor w This Agreement is entered into as of the day and year first wntten above and is executed in at least three original copies of which . one is to be delivered to the Contractor, one to the Architect for use in the administration of the Contract, and the remainder to the Owner. CONTRACTOR (Signature) mfrrr 1-oc,�w (Printed name and title) CAUTION: You should sign an original AIA document which has this caution printed in red. An original assures that changes will not be obscured as may occur when documents are reproduced. AIA DOCUMENT A101 • OWNER - CONTRACTOR AGREEMENT • TWELFTH EDITION • AIA • ©1987 THE AMERICAN INSTITUTE OFARCHITECTS, 1735 NEW YORK AVENUE, N.W., WASHINGTON, D C. 20006 WARNING: Unlicensed photocopying violates U.S. copyright laws and Is subject to legal prosecution. (f A101 -1987 8 6/91 1 Section Pages 00020 - INVITATION TO BIDDERS 2 00100 - INSTRUCTIONS TO BIDDERS 3 BID CONTRACT 3 GENERAL CONDITIONS 1 -19 SUPPLEMENTARY CONDITIONS 1 -6 FORMS OF AGREEMENT AND BONDS G INDEX of DRAWINGS TECHNICAL SPECIFICATIONS DIVISION 1 - GENERAL REQUIREMENTS 01000 - GENERAL REQUIREMENTS 2 01020 - ALLOWANCES 1 01100 - ALTERNATES 1 01150 - UNIT PRICES 1 01160 - CONTRACTOR REQUIREMENTS 2 01300 - SUBMITTALS 3 01410 - TESTING LABORATORY SERVICES 2 01500 - TEMPORARY FACILITIES and CONTROLS 2 01580 - PROJECT IDENTIFICATION and SIGNS 2 01700 - CONTRACT CLOSEOUT 3 01710 - CLEANING 2 01720 - RECORD DOCUMENTS 3 01740 - WARRANTIES 1 DIVISION 2 - SITEWORK PROJECT MANUAL CITY of ROUND ROCK POLICE DEPARTMENT RELOCATION TABLE of CONTENTS 02011 - SUBSURFACE INVESTIGATION 15 02070 - SELECTIVE DEMOLITION 1 02200 - EXCAVATION and GRADING 4 02441 - LANDSCAPE IRRIGATION 5 02446 - WOOD FENCES and GATES 2 02452 - SITE SIGNAGE 1 02485 - LAWNS & GRASS 2 02513 - ASPHALTIC CONCRETE PAVING 4 02528 - CONCRETE CURBS 2 02585 - CONCRETE WALKS, BROOM FINISH 2 02722 - SANITARY and STORM SEWERS 2 02900 - SOIL TREATMENT, TERMITES 2 Section DIVISION 3 - CONCRETE 03100 - CONCRETE FORMWORK 03200 - CONCRETE REINFORCEMENT 03251 - EXPANSION and CONTRACTOR JOINTS 03300 - CAST - IN -PLACE CONCRETE 03346 - CONCRETE FLOOR FINISHING 03415 - PRECAST CONCRETE HOLLOW CORE PLANKS DIVISION 4 - MASONRY 04100 - MORTAR 04340 - REINFORCED UNIT MASONRY SYSTEM DIVISION 5 - METALS 05500 - METAL FABRICATIONS DIVISION 6 - WOODS & PLASTICS 06111 - LIGHT WOODEN STRUCTURES FRAMING 06112 - FRAMING & SHEATHING 06114 - WOOD BLOCKING & CURBING 06181 - GLUE LAMINATED STRUCTURAL UNITS 06200 - FINISH CARPENTRY 4 06410 - CABINET WORK 3 DIVISION 7 - THERMAL MOISTURE PROTECTION 07210 - BUILDING INSULATION 2 07412 - PRE - FORMED METAL ROOFING 2 07420 - COMPOSITE BUILDING PANELS 3 07620 - SHEET METAL FLASHING AND TRIM 2 07631 - GUTTERS and DOWNSPOUTS 2 07920 - SEALANTS and CAULKINGS 3 DIVISION 8 - DOORS and WINDOWS 08110 - STANDARD STEEL DOORS 4 08111 - STANDARD STEEL FRAMES 3 08115 - PACKAGED METAL FRAMES 2 08211 - FLUSH WOOD DOORS 2 08221 - WOOD DOORS & FRAMES 2 08410 - ALUMINUM ENTRANCES and STOREFRONTS 2 08710 - FINISH HARDWARE 2 08730 - WEATHERSTRIPPING and SEALS 1 08740 - THRESHOLDS 1 08800B- GLAZING 3 Section Pages DIVISION 9 - FINISHES 09110 - NONLOAD BEARING WALL FRAMING SYSTEMS 09220 - PORTLAND CEMENT PLASTER 09260 - GYPSUM WALBOARD SYSTEMS 09510 - ACOUSTICAL CEILINGS 09660 - RESILIENT TILE FLOORING 09682 - CARPETING 09910 - EXTERIOR PAINTING 09920 - INTERIOR PAINTING 09950 - VINYL WALLCOVERING DIVISION 10 - SPECIALTIES DIVISION 11 - EQUIPMENT DIVISION 12 - FURNISHINGS DIVISION 15 - MECHANICAL WORK DIVISION 16 - ELECTRICAL WORK 2 3 3 3 4 3 4 5 3 10260 - CORNER GUARDS 2 10440 - SIGNAGE 1 10800 - TOILET and BATH ACCESSORIES 3 (NOT USED) (NOT USED) DIVISION 13 - SPECIAL CONSTRUCTION (NOT USED) DIVISION 14 - CONVEYING SYSTEMS 14212 - HYDRAULIC PASSENGER ELEVATORS 3 15000 - GENERAL PROVISIONS FOR MECHANICAL CONSTRUCTION 7 15400 - PLUMBING SYSTEMS 6 15700 - HEATING, VENTILATING, AIR CONDITIONING 5 15800 - AIR DISTRIBUTION 6 16200 - DESCRIPTION OF THE WORK 2 16202 - INTERIOR COMPONENTS 2 16203 - RACEWAYS, FITTINGS BOXES 2 16204 - TRIM -OUT MATERIALS 3 16720 - FIRE ALARM SYSTEM 10 INDEX of DRAWINGS D1 SITE DEMOLITION PLAN D2 BUILDING 'C' DEMOLITION PLAN D3 BUILDING 'B' DEMOLITION PLAN Al - SITE IMPROVEMENT PLAN /LANDSCAPE A2 1st FLOOR PLAN BUILDING 'C' A3 2nd FLOOR PLAN BUILDING 'C' A4 ADDITION to BUILDING 'C'/ HOLDING CELLS A5 1st FLOOR PLAN BUILDING 'B' A6 EXTERIOR ELEVATIONS A7 BUILDING SECTIONS A8 DOOR SCHEDULE /DETAILS A9 CABINET ELEVATIONS /DETAILS A10 REFLECTED CEILING PLANS BUILDING 'C' All REFLECTED CEILING PLAN BUILDING 'C' HOLDING CELLS BLDG. S1 FOUNDATION PLAN BUILDING 'B' S2 FOUNDATION PLAN BUILDING 'C' S3 CEILING, 2nd FLOOR and LOW ROOF FRAMING PLAN S4 HIGH ROOF FRAMING PLAN S5 FOUNDATION DETAILS and SECTIONS S6 FRAMING DETAILS and SECTIONS M1 MECHANICAL FLOOR PLAN /HOLDING CELLS M2 MECHANICAL FLOOR PLAN 1st FLOOR BUILDING 'B' M3 MECHANICAL FLOOR PLAN 1st FLOOR BUILDING 'C' M4 MECHANICAL FLOOR PLAN 2nd FLOOR BUILDING 'C' P1 1st FLOOR PLUMBING BUILDING 'C' P2 2nd FLOOR BUILDING 'C'/ 1st FLOOR PLUMBING BUILDING El 1st FLOOR PLAN BUILDING 'C' ELECTRICAL POWER PLAN E2 2nd FLOOR PLAN BUILDING 'C' ELECTRICAL POWER PLAN E3 POWER and LIGHTING PLANS /HOLDING CELLS E4 1st FLOOR PLAN BUILDING 'B' ELECTRICAL POWER PLAN E5 1st FLOOR PLAN BUILDING 'C' LIGHTING PLAN E6 2nd FLOOR PLAN BUILDING 'C' LIGHTING PLAN E7 ELECTRICAL LIGHTING PLAN 1st FLOOR BUILDING 'B' 'B' 'B' NAME OF BIDDER BID BOND ADDENDA RECEIVED BASE BID NUMBER OF DAYS AII' ;I•:RNA'I'I: PI PAINT A & 1 AI ;I'RRNA'Il•: 11/ INSULATION • • 1 2 Brath, Inc. • Reed Properties Construction Company SCS, Inc. 5Ic �/ ! y J sw,,3 r �L' .6; e�L) . `J 2, r7') G- Z R & R Construction RGD Builder �%d Set Point Builders, Inc. .510 Y y V / j S6�i f � _ /S � / `J _ �4%7 � ` l n/ / d, C.P. Snider Construction Company International Industrial Consultants, Inc. p v 1 / y �� ��7 44/ s / � ,-z) OZ �, �r 2, ?74 '� ii... — • Rizzo Construction, Inc. 2 s y 1g 7 5/7 El // 7. .fiv Landmark Organization, Inc. C & M Enterprises 1 R. GILL & ASSOCIATES BOX 217 ROUND ROCK, TEXAS 78680 CITY OF ROUND ROCK POLICE DEPARTMENT RELOCATION BID TABULATION DATE March 5, 1992 ADDENDA 2 (TWO) NAME OF BIDDER BID BOND ADDENDA RECEIVED BASE BIU NUMBER OF DAYS ALTERNATE 111 PAINT A & H ALTERNATE : 2 # INSULATION • • . 1 2 Austin Canyon Corporation o l y ;7 / g1C t a i — � 5 , 5 /G /, �t // ��/� �-r s , 76'6 — 6� f` . I'� �/ ,_ / PIZ., ! 9,60 ,% / �i ? ' M. W. Morgan Construction, Inc, l- / Y y '/ William Ardis & Associates 6 �C I/ c � `= / � � / �� i v 7 ,, j y Wayne Barnes Company rsA, \I Y ' cDz, C y _ D & I Associates, Inc. Braun & Butler Construction / V ' �- ewe '`z Zv B. Construction 4.3 ,l „t z L y Miscoe Construction, Inc. .5; y J / y x .5 - 7/ ". /?� /d / � 1 � /� D � / f 1 lL 4 / /3 HB Travis, Inc. /` re ,,r r 2 R. GILL & ASSOCIATES BOX 217 SOUND ROCK, TEXAS 78680 CITY OF ROUND ROCK POLICE DEPARTMENT RELOCATION BID TABULATION DATE March 5, 1992 ADDENDA 2 (TWO) April 23, 1992 R. Gill Architect Ray Gill P.O. Sox 217 Round Rock, Texas 78664 Sincerely, gat A Matt Logan President INC Re: Round Rock Police Station Dear Ray: As per our phone conversation on April 23, 1992, we are giving written notice that the electrical plans, as drawn, will not pass city codes. We would like co propose that we make all necessary changes required to meet code and obtain necessary permits. IIC, Inc. would be able co make the necessary changes and complete the project without an increase in cost to the owners. If we can be of sny further assistance, please feel free to contact us at (512) 892 -1690. 4425 South MuPat. Suit: 299 ern DATE: April 21, 1992 SUBJECT: City Council Meeting, April 23, 1992 ITEM: 9A. Consider a resolution authorizing the Mayor to enter into a contract for the renovation of the new Police Facility located on Palm Valley Blvd. (Hwy 79). STAFF RESOURCE PERSON: Jim Nuse STAFF RECOMMENDATION: On March 5, 1992, 13 bids were opened for the construction of the Police Station Improvements at Heritage Woods. International Industrial Consultants Inc. submitted the lowest and best bid of $479,087 plus add alternates totaling $8,759. The alternates are for sound proofing offices and painting the exterior remaining two buildings. The negotiated project cost including add alternates is $476,585. Ray Gill has verified the references and recommends award to International Industrial Consultants Inc. The budget has been approved for this work. Staff recommends acceptance of the proposal. KI -515 CONTRACTOR (Name and Address): INTERNATIONAL INDUSTRIAL CONSULTANTS 19229 TOMBALL PARKWAY HOUSTON, TEXAS 77070 OWNER (Name and Address): CITY OF ROUND ROCK P.O. BOX 217 ROUND ROCK, TEXAS 78680 THE AMERICAN INSTITUTE OF ARCHITECTS A/A Document A312 Payment Bond Any singular reference to Contractor, Surety, Owner or other party shall be considered plural where applicable. CONSTRUCTION CONTRACT Date: • APRIL 28, 1992 Amount: $476,585.00 Description (Name and Location): ROUND ROCK POLICE DEPARTMENT RELOCATION BOND Date (Not earlier than Construction Contract Date): APRIL 28, 1992 Amount: $476,585.00 Modifications to this Bond: E None CONTRACTOR AS PRINCIPAL SURETY Company: (Corporate Seal) Company: INTERNATIONAL INDUSTRIAL CONSUL EAGLE IN Mme) Signature: !r'4UN Name and Title: (Any additional signatures appear on page 6) CE COMP SURETY (Name and Principal Place of Business): EAGLE INSURANCE COMPANY 41607 SAN PEDRO SAN ANTONIO, TEXAS 78232 _R1:1See Page 6 i (Corporate Seal) Signature • 1 l g&un� 1 � 1'P / A / Name and Title: WAYMOND LIr r el T ATTO' Y -1 –FACT (FOR INFORMATION ONLY —Name, Address and Telephone) AGENT or BROKER: OWNER'S REPRESENTATIVE (Architect, Engineer or other party): AIA DOCUMENT A312 • PERFORMANCE BOND AND PAYMENT BOND • DECEMBER 1984 ED. • AIA THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., N.W., WASHINGTON, D.0 20006 THIRD PRINTING • MARCH 1987 WARNING: Unlicensed photocopying violates U.S. trademark laws and Is subject to legal prosecution. A312 -1984 4 4 The Surety shall have no obligation to Claimants under this Bond until. 4.1 Claimants who are employed by or have a direct contract with the Contractor have given notice to the Surety (at the address described in Paragraph 12) and sent a copy, or notice thereof, to the Owner, stating that a claim is being made under this Bond and, with substantial accuracy, the amount of the claim. 4.2 Claimants who do not have a direct contract with the Contractor. 1 The Contractor and the Surety, jointly and severally, bind themselves, their heirs, executors, administrators, successors and assigns to the Owner to pay for labor, materials and equipment furnished for use in the perfor- mance of the Construction Contract, which is incorpo- rated herein by reference. 2 With respect to the Owner, this obligation shall be null and void if the Contractor. 2.1 Promptly makes payment, directly or indirectly, for all sums due Claimants, and 2.2 Defends, indemnifies and holds harmless the Owner from claims, demands, liens or suits by any person or entity whose claim, demand, lien or suit is for the payment for labor, materials or equipment fur- nished for use in the performance of the Construction Contract, provided the Owner has promptly notified the Contractor and the Surety (at the address described in Paragraph 12) of any claims, demands, liens or suits and tendered defense of such claims, demands, liens or suits to the Contractor and the Surety, and provided there is no Owner Default. 3 With respect to Claimants, this obligation shall be null and void if the Contractor promptly makes pay- ment, directly or indirectly, for all sums due. Have furnished written notice to the Con- tractor' and sent a copy, or notice thereof, to the Owner, within 90 days after having last performed labor or last furnished materials or equipment included in the claim stating, with substantial accuracy, the amount of the claim and the name of the party to whom the materials were furnished or supplied or for whom the labor was done or performed, and .2 Have either received a rejection in whole or in part from the Contractor, or not received within 30 days of furnishing the above no- tice any communication from the Contractor by which the Contractor has indicated the claim will be paid directly or indirectly; and .3 Not having been paid within the above 30 days, have sent a written notice to the Surety (at the address described in Paragraph 12) and sent a copy, or notice thereof, to the Owner, stating that a claim is being made under this Bond and enclosing a copy of the previous written notice furnished to the Contractor. 5 If a notice required by Paragraph 4 is given by the Owner to the Contractor or to the Surety, that is suffi- cient compliance. 6 When the Claimant has satisfied the conditions of Paragraph 4, the Surety shall promptly and at the Surety's expense take the following actions: 6.1 Send an answer to the Claimant, with a copy to the Owner, within 45 days after receipt of the claim, stating the amounts that are undisputed and the basis for challenging any amounts that are disputed. 6.2 Pay or arrange for payment of any undisputed amounts. 7 The Surety's total obligation shall not exceed the amount of this Bond, and the amount of this Bond shall be credited for any payments made in good faith by the Surety. 8 Amounts owed by the Owner to the Contractor under the Construction Contract shall be used for the perfor- mance of the Construction Contract and to satisfy claims, if any, under any Construction Performance Bond. By the Contractor furnishing and the Owner accepting this Bond, they agree that all funds earned by the Contractor in the performance of the Construction Contract are dedicated to satisfy obligations of the Contractor and the Surety under this Bond, subject to the Owner's prior- ity to use the funds for the completion of the work 9 The Surety shall not be liable to the Owner, Claimants or others for obligations of the Contractor that are unrelat- ed to the Construction Contract. The Owner shall not be liable for payment of any costs or expenses of any Claim- ant under this Bond, and shall have under this Bond no obli- gations to make payments to, give notices on behalf of, or otherwise have obligations to Claimants under this Bond. 10The Surety hereby waives notice of any change, including changes of time, to the Construction Contract or to related subcontracts, purchase orders and other obligations. 11 No suit or action shall be commenced by a Claimant under this Bond other than in a court of competent juris- diction in the location in which the work or part of the work Is located or after the expiration of one year from the date (1) on which the Claimant gave the notice required by Subparagraph 4.1 or Clause 4 2 3, or (2) on which the last labor or service was performed by anyone or the last mate- rials or equipment were furnished by anyone under the Con- struction Contract, whichever of (1) or (2) first occurs If the provisions of this Paragraph are void or prohibited by law, the minimum period of limitation available to sureties as a defense in the jurisdiction of the suit shall be applicable. 12 Notice to the Surety, the Owner or the Contractor shall be mailed or delivered to the address shown on the signature page Actual receipt of notice by Surety, the Owner or the Contractor, however accomplished, shall be sufficient compliance as of the date received at the address shown on the signature page. 13 When this Bond has been furnished to comply with a statutory or other legal requirement in the location where the construction was to be performed, any provision in this Bond conflicting with said statutory or legal requirement shall be deemed deleted herefrom and provisions con- forming to such statutory or other legal requirement shall be deemed incorporated herein. The intent is that this AIA DOCUMENT A312 • PERFORMANCE BOND AND PAYMENT BOND • DECEMBER 1984 ED • AIA® THE AMERICAN INSTITUTE OF ARCHITECTS, 1739 NEW YORK AVE. N W, WASHINGTON, DC 2W06 THIRD PRINTING • MARCH 1987 WARNING: Unlicensed photocopying violates U.S. trademark laws and Is subject to legal prosecution. A312 -1984 5 Bond shall be construed as a statutory bond and not as a common law bond. 14 Upon request by any person or entity appearing tobea potential beneficiary of this Bond, the Contractor shall promptly furnish a copy of this Bond or shall permit a copy to be made. 15 DEFINITIONS 15.1 Claimant: An individual or entity having a direct contract with the Contractor or with a subcontractor of the Contractor to furnish labor, materials or equip- ment for use in the performance of the Contract. The intent of this Bond shall be to include without limita- tion in the terms "labor, materials or equipment" that part of water, gas, power, light, heat, oil, gasoline, telephone service or rental equipment used in the MODIFICATIONS TO THIS BOND ARE AS FOLLOWS: t (Space is provided below for additional signatures of added parties, other than those appearing on the cover page.) CONTRACTOR AS PRINCIPAL Company: Signature: Name and Title: Address: AIA SURETY (Corporate Seal) Company: Construction Contract, architectural and engineering services required for performance of the work of the Contractor and the Contractor's subcontractors, and all other items for which a mechanic's lien may be asserted in the jurisdiction where the labor, materials or equipment were furnished. 15.2 Construction Contract: The agreement between the Owner and the Contractor identified on the sig- nature page, including all Contract Documents and changes thereto. 15.3 Owner Default: Failure of the Owner, which has neither been remedied nor waived, to pay the Con- tractor as required by the Construction Contract or to perform and complete or comply with the other terms thereof. (Corporate Seal) Signature• Name and Title: Address: CAUTION: You should sign an original AIA document which has this caution printed In red. An original assures that changes will not be obscured as may occur when documents are reproduced. AIA DOCUMENT A312 • PERFORMANCE BOND AND PAYMENT BOND • DECEMBER 1984 ED. • AIA THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE:, N.W., WASHINGTON, D.C. 20006 THIRD PRINTING • MARCH 1987 WARNING, Unlicensed photocopying violates U.S. trademark laws end Is subject to legal prosecution. A312 -1984 6 EAGLE INSURANCE COMPANY 14607 San Pedro, San Antonio, Texas 78232 GENERAL POWER OF ATTORNEY Know All Men By These Presents, That EAGLE INSURANCE COMPANY has made, constituted and appointed. and by these presents does make, constitute and appoint WAYMOND LIGHTFOOT its true and lawful attorney, for it and Its name. place. and stead to execute on behalf of the said Company, as surety, bonds, undertakings and contracts of suretyship to be given to ALL OBLIGEES provided that no bond or undertaking or contract of suretyship executed under this authority shall exceed in amount the sum of $500,000.00 This Power of Attorney is granted and is signed and sealed by facsimile under and by the authority of the following Resolution adopted by the Board of Directors of the Company on the 20th day of lune. 1991 "RESOLVED. that the Chairman of the Board. the Vice Chairman of the Board, the President, an Executive Vice President or a Senior Vice President or a Vice President of the Company, be. and that each or any of them hereby Is. authorized to execute Powers of Attomey qualifying the attomey named in the given Power of Attorney to execute in behalf of the Company. bonds. undertakings and all contracts of suretyship: and that an Assistant Vice President. a Secretary or an Assistant Secretary be. and that each or any of them hereby is. authorized to attest the execution of any such Power of Attomey and to attach thereto the seal of the Company. FURTHER RESOLVED, that the signatures of such officers and the seal of the Company may be affixed to any such Power of Attomey or to any certificate relating thereto by facsimile. and any such Power of Attorney or certificate bearing such facsimile signatures or facsimile seal shall be valid and binding upon the Company when so affixed and in the future with respect to any bond. undertaking or contract of suretyship to which k is attached." in Witness Whereof, EAGLE INSURANCE COMPANY has caused its official seal to be hereunto affixed. and these presents to be signed by the President and attested by its Vice Presidents this 5th day of July. 1991. Attest By: STATE OF TEXAS COUNTY OF BEXAR 1,aJt_ x'11 yw M. Fourquet. Vice &resident SS.: JOYCE ROBBINS Notary Punk, State of Tang My Commission aspires 01.1694 EAGLE INSURANCE COMPANY Stephen C. Dahlbo(President On this 5th day of July, 1990, before me personally came Stephen C. Dahlbo, to me known, who being by duly sworn. did depose and say that he is President of the EAGLE INSURANCE COMPANY. the corporation described in and which executed the above instrument: that he knows the seal of the said corporation; that the seal affixed to the said instrument is such corporate seal; that is was so affixed by order of the Board of Directors of said corporation and that he signed his name hereto by like order. 10 CE ROBBINS NOTARY PUBLIC. State of Texas Bexar County - Commission expires January 16. 1994 CERTIFICATE 1, the undersigned, Secretary of the EAGLE INSURANCE COMPANY. a Texas corporation. DO HEREBY CERTIFY that the foregoing and attached Power of Attorney remains in hill force and has not been revoked; and furthermore that the Resolution of the Board of Directors. set forth in the said Power of Attorney, is now in force. Signed and sealed at the City of San Antonio. in the State of Texas. Dated the 28th day,pf APRIL PATcIA 1. HOWARD. Secretary KI - 515 ,19 92