R-93-06-24-9B - 6/24/1993'r 11/19/93 CHANGE ORDER Fisher Hatoed, Inc, ENGINEER 30 Hestera r- 1os +ine. Suite 110 Address Round Rock Teas. TO (Contractor): BOUND ROCK CONSTRUCTION, INC. P.O. Box 1179 Round Rock, Texas 78680 16:39 ROUND ROCK PUBLIC WORKS • 512 255 6676 Distribution to: OWNER ■ ENGINEER • CONTRACTOR ■ FIELD 0 OTHER O B D //-//-33 Date /l'—l� NO. 166 P13 PROJECT: CREEKBEND BOULEVARD EXTENSION CHANGE ORDER NUMBER: 1 INITIATION DATE: November 11, 1993 ENGINEER'S PROJECT NO: 92114-04 CONTRACT FOR: Creeltbend Blvd Extension Impe. DATE: July 2, 1993 You are directed to make the following changes in this Contract: Item 15 - Add 5,355 SF Sidewalk including joints & broom finish, complete In place @ $2.10 /SF 511,245.50 Item 30 • Install parallel pipe safety runners at 3-18' RCP's at FM3406 per Texas Department of Transportation requirement to approve driveway permit, @ 51,100 Lump Sum 51,100.00 Not valid until signed by both the Owner and Engineer. Signature of the Contractor Indicates his agreement herewith, Including any adjustment in the Contract Sum or Contract Time: The original Contract Sum was S 243 Net change by previously authorized Change Orders S 0.00 The Contract Sum will be Increased by this Change Order S 12,345.50 The new Contract Sum including this change order will be S 256,277.50 The Contract Time will be jorrAmt by (10 ) Days The Date of Substantial Completion u of the date of this Change Order therefore Authorized: ROUND ROCK CONSTRUCTION, INC, CITY OF ROUND ROCK CONTRACTOR OWNER J?.O. Box 1179 E. M Address ound Roc Address f 'Mar gear /LAI Dato )ATE 11/11/93 JOB NO 92114 -04 mow Creekbend Blvd. Extension 1 11/11/92 1 NE, Change Order No. 1 for Creekbend Blvd. Extension COPIES DATE Na OESCePTiON 1 11/11/92 1 Change Order No 1 to Round Rock Construction, Inc. for Creekbend Blvd. Extension 11411/19/93 16:39 ROUND ROCK PUBLIC WORKS -, 512 255 6676 Fisher Ha ood Inc. CIVIL & STRUCTURAL ENGINEERS 301 Neaten Crossin(, Su lte 110 Round Reek. Ines 76661 (512) 214 -1616 TO City of Round Rock Public Works Department ATTENTION: Mr. Al Willie GENTLEMEN: WE ARESENDING YOU DAttached O Under separate cover via ❑ Prints fl Reproducibles ❑ Shop drawings ❑ Submittals 0 Copy of letter ❑ Addenda X$ rhRngP Or.9Pr for distribution. COPY(S) TO SIGNED: TYPE TITLE: NO. 166 P12 LETTER OF TRANSMITTAL THESE ARE TRANSMITTED as checked below: O Returned - review completed 0 Resubmit copies for approval D Returned - make corrections noted ❑ Submit copies for distribution ❑ Return corrected prints XRI For approval 0 For your use O As requested D Returned - rejected D For review and comment 0 Returned - not reviewed 0 0 FOR BIDS DUE 19 OPRINTSRETURNEDAFTERLOANTOUS REMARKS Mr. Willie: Please execute the attached change order and return to our office Thank you very much. Office Manager the following items: ❑ Specifications ' 11/22/93 14:59 ROUND ROCK PUBLIC WORKS • 512 255 6676 NO.169 D03 DATE: November 19, 1993 SUBJECT: City Council Meeting, November 23, 1993 ITEM: 11A. Consider Change Order No. 1 to Round Rock Construction for the Creekbend Boulevard improvements. STAFF RESOURCE PERSON: Jim Nuse STAFF RECOMMENDATION: Staff recommends acceptance. SPECIFICATIONS FOR CONSTRUCTION OF MAY 1993 FIs_1.�, Bagood & Hejl, Ine, z 1 / CIVIL & STRUCTURAL ENGINEERS \ / 331 Ihsters Crossing, Suite 110 v 1 Ramnd Rock, Texas 78681 (512) 244-1546 R- 93- 0(o -a4 - 98 CREE.KBEND BOULEVARD EXTENSI.ON FRO vi SAM BASS ROAD TO FM 3406 FOR CITY OF ROUND ROCK PUBLIC WORKS DEPARTMENT COUNCILMEMSERS: CHARLES W. CULPEPPER MAYOR JIMMY JOSEPH MAYOR PRO -TEM ROBERT STLUKA ROD MORGAN RICK STEWART EARL PALMER MARTHA CHAVEZ CITY MANAGER: ROBERT L. 3ENNET, JR. PUBLIC WORKS DEPARTMENT DIRCTOR: JAMES 'USE, P.E. 9 Section 1.0 Notice to Bidders NB -1 2.0 Bid Documents BD -1 3.0 Post Bid Documents PBD -1 4.0 General Conditions GC -1 5.0 Special Conditions SC -1 6.0 Technical Specifications TS -1 table.mst/spec TABLE OF CONTENTS Description Page 1.0 NOTICE TO BIDDERS NOTICE TO BIDDERS Sealed bids addressed to the Purchasing Agent, City of Round Rock, 221 East Main Street, Round Rock, Texas 78664, for furnishing all labor, material and equipment and performing all work required for the project titled Creekbend Boulevard Extension (project includes approximately 7,300 SY of new HMAC, base, and subgrade prep., 16,150 SF of combined concrete and landscaped median, curb and gutter, drainage structures and piping, as well as pavement marking and temporary and permanent erosion and sedimentation controls) will be received until 2:00 PM, June 08, 1993 then publicly opened and read aloud at City Hall Council Chambers at the same address. Bid envelopes should state date and time of bid and "Creekbend Boulevard Extension ". No bids may be withdrawn after the scheduled opening time. Any bids received after scheduled bid opening time will be returned unopened. Bids must be submitted on City of Round Rock bid forms and must be accompanied by an acceptable bid security as outlined in the Instructions to Bidders, payable to the City of Round Rock, Texas equal to five percent (5 %) of the total bid amount. Plans, Bid Forms, Specifications, and Instructions to Bidders may be obtained from the office of the engineer, Fisher, Hagood, & Hejl, Inc., 301 Hesters Crossing, Round Rock, Texas beginning May 25, 1993 non - refundable charge of $25.00 per set. In case of ambiguity, duplication, or obscurity in the bids, the City of Round Rock reserves the right to construe the meaning thereof. The City of Round Rock further reserves the right to reject any or all bids and waive any informalities and irregularities in the bids received. The successful bidder will be expected to execute the standard contract prepared by the City of Round Rock, and to furnish performance and payment bonds as described in the bid documents. Publish Dates: Austin American Statesman: Round Rock Leader: noticebd.mst/spec NB -1 2.0 BID DOCUMENTS INSTRUCTIONS TO BIDDERS 1. Prior to submitting any bid, bidders should read the plans, specifications, bid form, contract and bond forms carefully; to inform themselves by their independent research, test and investigation of the difficulties to be encountered and judge for themselves of the accessibility of the work and all attending circumstances affecting the cost of doing the work and the time required for its completion and obtain all information required to make an intelligent bid. 2. Should the bidder find discrepancies in, or omissions from the plans, specifications, or other documents, or should he be in doubt as to their meaning, he should notify at once the Engineer and obtain clarification or addendum prior to submitting any bid. 3. It shall be the responsibility of the bidder to see that his bid is received at the place and time named in the Notice to Bidders. Bids received after closing time will be returned unopened. 4. Bids shall be submitted in sealed envelopes , plainly marked "Sealed Bid" and showing the name of the project, the job number if applicable, and the opening date and time. 5. Bids shall be submitted on bid forms furnished by the City of Round Rock. 6. All bids shall be accompanied by a certified cashier's check upon a National or State bank in an amount not less than five percent (5 %) of the total maximum bid price, payable without recourse to the City of Round Rock, or a bid bond in the same amount from a reliable surety company, as a guarantee that the bidder will enter into a contract and execute performance and payment bonds, as stipulated by item 11 below, within ten (10) days after notice of award of contract to him. Bid guarantees must be submitted in the same sealed envelope with the bid. Bids submitted without check or bid bonds will not be considered. biddoc.mst/spec BD -1 7. All bid securities will be returned to the respective bidders within twenty- five (25) days after bids are opened, except those which the owner elects to hold until the successful bidder has executed the contract. Thereafter, all remaining securities, including security of the successful bidder, will be returned within sixty (60) days. 8. Until the award of the contract, the City of Round Rock reserves the right to reject any and all bids and to waive technicalities; to advertise for new bids; or to do the work otherwise when the best interest of the City of Round Rock will be thereby promoted. 9. In case of ambiguity or lack of clarity in the statement of prices in the bids, the City of Round Rock reserves the right to consider the most favorable analysis thereof, or to reject the bid. Unreasonable (or unbalanced) prices submitted in a bid may result in rejection of such bid or other bids. 10. Award of the contract, if awarded, will be made within sixty (60) days after opening of the bids, and no bidder may withdraw his bid within said sixty (60) day period of time unless a prior award is made. 11. Within ten (10) days after written notification of award of the contract, the successful bidder must furnish a performance bond and a payment bond in the amount of one - hundred percent'(100 %) of the total contract price. Provided however, if the contract price is less than $50,000.00, the bidder shall have the option of providing a letter of credit in lieu of a performance bond, said letter of credit in a form acceptable to the City of Round Rock. Said performance bond, or letter of credit, if applicable, and payment bond shall be from an approved surety company holding a permit from the State of Texas to act as surety (and acceptable according to the latest list of companies holding certificates of authority from the Secretary of the Treasury of the United States) or other surety or sureties acceptable to the Owner, with approval prior to bid opening. 12. If the total contract price is less than $25,000.00 the performance and payment bond requirement may be waived by the City of Round Rock. Payment will be made following completion of the work. 13. Failure to execute the construction contract within ten (10) days of biddoc.mst/spec BD-2 written notification of award or failure to furnish the performance bond, or letter of credit if applicable, and payment bond as required by item 11 above, shall be just cause for the annulment of the award. In case of the annulment of the award, the bid guarantee shall become the property of the City of Round Rock, not as a penalty, but as a liquidated damage. 14. No contract shall be binding upon the City of Round Rock until it has been signed by its Mayor after having been duly authorized to do so by the City Council. 15. The Contractor shall not commence work under this contract until he has furnished certification of all insurance required and such has been approved by the City of Round Rock, nor shall the contractor allow any subcontractor to commence work on his subcontract until proof of all similar insurance that is required of the subcontractor has been furnished and approved. 16. Any quantities given in any portion of the contract documents, including the plans, are estimates only, and the actual amount of work required may differ somewhat from the estimates. The basis for the payment shall be the actual amount of work done and/or ,material furnished. 17. No Texas sales tax shall be included in the prices bid for work under this contract. This contract is issued by an organization which is qualified for exemption pursuant to the provisions of Article 10.04 (h) of the Texas Limited Sales, Excise and Use Tax Act. The contractor performing this contract may purchase, rent or lease all materials, supplies, equipment used or consumed in the performance of this contract by issuing to his supplier an exemption certificate complying with State Comptroller's ruling #95 -0.07. Any such exemption certificate issued by the contractor in lieu of the tax shall be subject to the provisions of the State Comptroller's ruling #95 -0.09 as amended to be effective July 1, 1979. 18. No conditional bids will be accepted. biddoc.mst/spec BD -3 MITESTAIDIRMIAMEIMMEMIMARZEUM KNOW ALL MEN BT THESE PRESENTS: OMMERCIAL Lloyd's Insurance Company THAT Round Rock Construction, Inc of Round Roth, Texas , as Principal, and COMMERCIAL LLOYDS INSURANCE COMPANY, as Surety, are held and firmly bound untoC.itY Q.f R.Q.U0SL,RQck as Obligee, in the full and just sum of Five Permit (5%.) of the g a m4411t bid not to exceed ...fifteen...thousand dollars...and...no/11M lawful money of the United States, for the payment of which sum, well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. WHEREAS. the said Principal is herewith submitting its proposal Creekbend Boulevard Extension from Sam Bass Road to FM 3406 THE CONDITION OF THIS OBLIGATION is such that if the aforesaid Principal shall be awarded the contract the said Principal will, within the time required, enter Into a formal contract and give a good and sufficient bond to secure the performance of the terms and conditions of the contract, then this obligation to be void; otherwise the Principal and Surety will pay unto the Obligee the difference in money between the amount of the bid of the said Principal and the amount for which the Obligee legally contracts with another party to perform the work RQuflhJ .c. :>aa.i.Qn......z.n.c.. (SEAL) CO MERCIAL LLOYD'S INS 9IRA NCE COMPANY 1 if the latter amount be in excess of the former, but in no event shall liability hereunder exceed the penal sum hereof. Signed, sealed and delivered June 8, 1993 (Date) BID BOND P ti BOND NUMBER W. Schuler Dollars, (SEAL) ""-- AlliirfferkKleot tGtQdN.n`..xin twY •lli; ih iidh al'ti , !1 , 4404 , st73; /li, 4� 9'. y!d rT • %r.•,ti C 1 Lloyd's Insurance Company 901 S. Lamar T ustin, Texas 78704 KNOW ALL MEN BY THESE PRESENTS: t hat Union Commerci Inc., a Corporation duly organized and existing under the laws of the State of Texas, having its principal office in Austin, Texas, Auorney -In -Fact for the Underwriters at Commercial Lloyd's Insurance Company, pursuant to the following resolution which I s now in full force and effect: Ch That each of the following officers: the President, or any Vice - President, may from time to time appoint Attorneys - in - Fact, and Agents to at for and on behalf of the Company and may give any such appointee such authority as his certificate of authority and other writings obligatory n the nature of a bond, and any of said officers may at any time remove any such appointee and revoke the power and authority given him," d oes hereby make, constitute and appoint: John W. Schul er I ts true and lawful Attomey(s) -in -Fact, with full power and authority hereby conferred in its name, place and stead, to sign, execute, acknowl- edge and deliver in its behalf, and as its act and deed, as follows: ' All bonds not to exceed on any single instrument Fi fteen thousand dollars dti /100 Q W ♦C I N WITNESS WHEREOF, Union Commercial, Inc. has caused these presents to be signed by its President, and its Corporate 01 Deal to be affixed, this 1st day of November, 1991. m C n o , • ' John W. Schuler; - President U I rate of Texas C ounty of Travis a 'Commission Expires 2 -5 -94 COM &RCIAL VOyd$ hS1�ICE �OIIMI�ry BD 12911 POWER OF ATTORNEY L this 1st day of November, in the year 1991, before me Shannon McBride, a notary public, personally appeared John W. Schuler, personally nown to me to be the person who executed the within instrument as President, on behalf of the Corporation therein named and acknowledged o me that the Corporation executed it. Shannon McBride Notary Public C ERTIFICATE the undersigned, Secretary of Commercial Lloyd's Insurance Company, DO HEREBY CERTIFY that the foregoing and attached Power of � ttorney and Certificate of Authority remains in full force and has not been revoked: igned and Sealed at the said Company at Austin, Texas dated this 8 day of June , 19 9_ Secretary COi Lloyd's Insurance Company IMPORTANT NOTICE To obtain information or make a complaint: You may contact John Schuler, President of Operations, whose direct dial number is 512 - 444 -7776. You may also fax us information at 512 - 447 -7222. You may also call Commercial Lloyd's Insurance Company, toll -free telephone number for information or to make a complaint at: 1 -800- 234 -8046 You may also write to Commercial Lloyd's Insurance Company at: P.O. Box 67, Austin, Texas 78767. You may contact the Texas Department of Insurance to obtain information on companies, coverages, rights or complaints at: 1- 800 - 252 -3439 You may also write the Texas Department of Insurance: P.O. Box 149104, Austin, Texas 78714 -9104, Fax# 512 - 475 -1771. ' PREMIUM OR CLAIM DISPUTES: Should you have a dispute concerning your premium or about a claim you should contact the company first. If the dispute is not resolved you may contact the Texas Department of Insurance. ATTACH THIS NOTICE TO YOUR POLICY: This notice is for information only and does not become a part of condition of the attached document. 3901 Soulh Lamar • Suite 350 • Auslin, Texas 78704 P 0 Box 67 • Auslm, Texas 78767 0067 Tel 512 444 7776 • Fax. 512 4477222 BIDDING SHEET JOB NAME: Creekbend Boulevard Extension JOB LOCATION: Round Rock, Williamson County, Texas OWNER: City of Round Rock, Texas DATE: Gentlemen: Pursuant to the foregoing Notice to Bidders and Instructions to Bidders, the undersigned bidder hereby bids to do all the work, to furnish all necessary superintendence, labor, machinery, equipment, tools, materials, insurance and miscellaneous items, to complete all the work on which he bids as provided by the attached supplemental specifications, and as shown on the plans for the construction of Creekbend Boulevard Extension and binds himself on acceptance of this bid to execute a contract and bond for completing said project within the time stated, for the following prices, to wit: biddoc.mst/spec BD-6 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Creekbend Boulevard E>dension Oty of Round Rock item Estimated No. Quantity STREET IMPROVEMENTS Description and Unit Price of item In Words 1,800 IF Silt Fence, complete and In place, per lineal foot, FOR ONE AND F/Fr y 2 40 IF Rock Berm, complete and in place, per lineal foot, FOR FIFTEEN DOLLARS AND NO CENTS DOLLARS CENTS 3 1 EA Stabilized Construction Entrance, complete and In place, per each, F1oE 1-kudogi> FOR FiFry DOLLARS AND No CENTS 4 1,200 LF Bearing, Grubbing of R.O.W. per Special Conditions and Disposal, complete and In place, per lineal foot. FoR Foul; DouARs AND MO CENTS 5 9,650 SY Street Excavation and Disposal, to include any excavation within R.O.W. to grade for construction of sidewalk, complete and In place, per square yard, FOR TNREE DOLLARS AND hi O CENTS 6 9,650 SY Subgrade Preparation, complete and In place, per square yard, FOR N O DOLLARS AND N I N F TAI CENTS 7 7,480 SY 16' Base, complete and in place, per square yard, FOR I EVF tJ Do ARS AND E t.IT y CENTS 8 7,410 SY 2' Asphak, complet e In place, per square yard, FOR Po uR AND TE: 4 DOLLARS CENTS 9 1,200 IF Saw Cut Pavement, complete and in place, per lineal foot, FOR ON DOLLARS AND N O CENTS Unit Price Total In Figures Price 1.56 /5.00 550.00 '-f . oo 3;00 1.00 2,7oo.0o 6oa.00 550.00 '4 B00.00 28,950.0o 8, 685.00 5 30, 381.00 1 f 2,00 . O O Creekbend Boulevard &tension Gty of Round Rock hem Estimated No. Quantity X10 2,900 SF bdsting Pavement Removal, complete and In place, per square foot, { 11 1,200 LF Description and Unit Price of h.m In Words FOR N O DOLLARS AND Ft Fry CENTS Curb and Gutter Installed In adding pavement *salon, complete and In place, per lineal foot, FOR .S F II C N D0UARS AND Mn CENTS 12 6,100 IF Curb and Gutter, including base beneath and behind bark of curb, complete and M place, per lineal foot, FOR Fo r_R DOLLARS 75 Z8 �I S. 00 ANOSEVENTs Fixer-CENTS ) 13 1,200 IF Asphalt repair along new curb & gutter, complete and In place, per lineal foot FOR TWl cs DOLLARS E. o o E, y o o. o 0 AND NO CENTS s 14 1,150 SF Concrete Median, complete and in place, per square fool FOR ONE DOLLARS f. 8 2, 0 70.00 AND L76/.-/Ty CENTS 15 8,550 SF Sidewalk Including joints d broom finish, complete and In place, per square foot /� FOR I Gt.) O DOLLARS , , / o / 7, c 6 00 AND TEA! aNTS 16 2 EA Barricade (60 Lined Feet), complete and in place, per each, ONE THouS 1? FOR T1)15 ' DOLLARS AND Nn CENTS 17 4,300 SY Permanent Erosion Control, Complete and In place, per square yard FOR NO DOLLARS AND Fl6Hry CENTS 18 650 IF Pavement Marking (Reflective Paint) Solid 8' White, complete and In place, per lineal Foot FOR A/ DOLLARS AND s/ xr y CENTS Unit Price Total In Figures Price . 6o I, Lj SO.O o 1.6D 8,i-too. 4, ZOO.00 .80 4 15/0.00 2,''100.Oo Creekbend Boulevard Extension City of Round Rock Item Estimatd No. Quantity Description and Unit Prim of Rem Unit Pries Total In Words In Figures Prim 19 3,400 LF Pavement Marking (Reflective Point) Solid 4' While, 10' Long e 40' O.C. complete and In place, per lineal foot, FOR /JO DOLLARS AND 7LL/,4 Ty CENTS 20 115 EA Pavement Marking, Traffic Bunon - Type 1A complete and in place, per each, FOR 51 K DOIL\RS AND N D CENTS 21 5 EA Obled Marken al end of median with pointed median nose, complete and In place, per each, FOR E161-in/ DOLLARS AND MO aNTS 22 5 EA Stop Signs, complete and In place, per each, Tub O FOR 140 tJDRE.D DOLLARS AND tJ o CENTS TOTAL STREET IMPROVEMENTS DRAINAGE IMPROVEMENTS 23 5 EA 10' Curb Inlet, complete and In place, per each, ON E rI IO USA w9D IJI NE 1- 1-Uc+DRE FOR DOLLARS AND h.11) CENTS 24 1 EA 20' Curb Inlet, (double 10') complete and in place, per each, Two TNousAIND FO Mt1NDREDDOLLARS 5t AND kin CENTS 25 200 IF 18' RCP, Class IN Storm Sewer, complete and In place, per lineal foot, - 1 - 141 AT FOR FI U� DOLLARS AND t•lt CENTS 26 3 EA Valley Gutters, complete and in place, per O tJ E 71{-6 uSAND roW ,IGAr DOLLARS AND 1.10 CENTS e.3o 4ozo. oo 6.0D 690.00 80.00 goo . o o 1,000.00 Zoz, 31Z. o0 1,q oo. 00 9,500.0o 2,400.o0 z, 1 1 . 00•0 0 35.00 7,00o.0o 1,800.00 5, I/00.00 CreeU, nd Boulevard 6dension Oty of Round Rock Item Estimated No. Quantity Description and Unit Pricer of ham In Words 27 200 IF Trench Safety, complete and In place, par linaal foot, FOR Tug O DOLlAR5 AND /Jf1 CENTS 28 390 IF 18' RCP, Class RI Storm Sewer, 0.130'1en8Ih+) with 6 to 1 end Ireatmen! complete and In place, per lineal foot, 7L ENT y FOR F./6,—/r" DOLLARS AND N o CENTS 29 2,000 SF 6' Concrete Riprop for cared end Irealment, complete and In place, per square foot, FOR TOTAL DRAINAGE IMPROVEMENTS DOLLARS AND NO CENTS TOTAL PRICE BID FOR STREET AND DRAINAGE IMPROVEMENTS BIDDER ROt.I_NC ROC—Fe. l.()IV STT?LL.r' rfnN BY TITLE PRE S I DEKIT MAILING ADDRESS P.O. Box I fl Prw.ND Roc.K, TX. 78(080 Unh Price Total M Figures Prim 28.o0 /0 9Z0.00 oo 000. oo 4 Y/41, 6 zo . oo 'f2413, 1 1 1 If this bid is accepted, the undersigned agrees to execute the contract and provide necessary bonds and insurance certification as per the Instructions to Bidders and commence work within ten (10) days after written Notice to Proceed. The undersigned further agrees to complete the work in full within ninety (90) calendar days after the date of the written Notice -to- Proceed. The undersigned certifies that the bid prices contained in the bid have been carefully checked and are submitted as correct and final. The Owner reserves the right to reject any or all bids and may waive any informalities. 1 Respectfully Submitted, c itil rLli E� 1 PRES /.E Title for ' ou iv4 & CoNsreu - L uc , Name of Firm 7 -ZZ -93 Date 1 1 1 1 1 blddoc.mst/apec BD -7 P.o, Box I I' RD unLn Address Secreta , 15(- 78GSo (512)_Z.S -6 eliho - i „ if /111Ellilliiiim1616.4:_ -a- on ctor is a Corporation 3.0 POST BID DOCUMENTS THE STATE OF TEXAS AGREEMENT COUNTY OF WILLIAMSON THIS AGREEMENT, made and entered into this 2nd day of July A.D. 1993, by and between the CITY OF ROUND ROCK. TEXAS acting through it's Mayor, Party of the First Part, hereinafter termed the OWNER, and Round Rock Construction. Inc. of the City of Round Rock, County of Williamson, State of Texas, Party of the Second Part, hereinafter termed Contractor. WITNESSETH: That for and in consideration of the payments and agreements hereinafter mentioned, to be made and performed by said First Party (Owner), the said Second Party (Contractor), hereby agrees with the first Party to commence and complete the construction of certain improvements at the prices set forth in the Contractor's Bid dated June 08. 1993 for certain improvements described as follows: The Contractor shall perform all work shown on the Plans and described in the Contract and shall meet all requirements of ,this Agreement, the General and Special Conditions of the Contract; and such Orders and Agreements for Extra Work as may subsequently be entered by the above named parties to this Agreement. The Contractor hereby agrees to commence work under this contract within 10 consecutive calendar days after that date of the Notice to Proceed and shall cause work to progress in a manner satisfactory to the Owner. Such work shall be completed in full within 90 calendar days after the date of the written Notice to Proceed. Time is of the essence to this contract. The Owner agrees to pay the Contractor in current funds, and to make payments on account, for the performance of the work in accordance with the Contract, at the prices set forth in the Contractor's Bid, subject to additions and deductions, all as provided in the General Conditions of the Agreement. postbid.mst/spec CREEKBEND BOULEVARD EXTENSION PBD -1 AGREEMENT - continued The following documents together with this Agreement, comprise the Contract, and they are fully a part thereof as if herein repeated in full: The Notice to Bidders The Instruction to Bidders The Bidding Sheets The Performance & Payment Bonds The General Conditions of Agreement The Special Conditions of Agreement The Technical Specifications .Addenda Change Orders The Certificate of Insurance The Plans IN WITNESS WHEREOF the Parties to these presents have executed this Agreement in multiple originals in the year and day first above written. ATTEST: Bv: i 111110g.d/A, u /. //_/ poslbid.mst/spec Secretary, if on r: ctor is a Corporation or otherwise registered with the Secretary of the State PBD -2 Bv: Party of th¢F t Part (Owner) Mayor - City of Round Rock Party of the econd Part (Contractor) Ili • COMMERCIAL STATE OF TEXAS COUNTY OF Travis KNOW ALL MEN BY THESE PRESENTS: That Round Rock Construction, Inc. Lloyd's Insurance Company TEXAS STATUTORY PAYMENT BOND (Penalty of this bond must be 100% of Contract amount) P.O. Box 1179, Round Rock, Texas 78680 -1179 (hereinafter called the Principal), as Principal, and COMMERCIAL LLOYD'S INSURANCE COMPANY (hereinafter called the Surety), as Surety, are held and firmly bound unto City of Round Rock (hereinafter called the Obligee), in the penal sum of..Two..Hundred.Roxtx. Thrae..Thousand Nine Hundred Thirty Two Dollars and no /100 ($.243,932..00 ) for the payment of which sum well and truly to be made, we bind ourselves, our heirs, administrators, executors, successors and assigns, jointly and severally, firmly by these presents. WHEREAS, the Principal has entered into a certain written contract with the Obligee, dated the 22nd. day of July - , 19..93 , a copy of which is hereto attached and made a part hereof, for Street and Drainage Improvements NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the said Principal shall pay all claimants supplying labor and material to him or a subcontractor in the prosecution of the work provided for in said contract, then, this obligation shall be void; otherwise to remain in full force and effect. PROVIDED HOWEVER, that this bond is executed pursuant to the provisions of Article 5160, Revised Civil Statutes of Texas and all liabilities on this bond to all such claimants shall be determined in accordance with the provisions thereof to the same extent as if it were copied at length herein. IN WITNESS WHEREOF, the said Principal and Surety have signed and sealed this instrument this 22nd day of JuJ,y 19..93 n W. Schuler BOND NUMBER....t Dollars Round Rock Construction Co. .•e"° "'•-(Baal) ii X4_ �.��' . '(Seal) OMMERCIA LOYD' INS ANC &COMPANY Attorney -in -fact B CL 507 (3 -91) P 4t,r11t: ?pAV AII4( 40lis(Pyiv;tn/!V1r;St1,yx'1 N7.1 \111'9/f4lq" pl AWI NlL%a1113YUiF.• OMNana _ 5 , COMMERCIAL Lloyd's Insurance Company l TEXAS STATUTORY PERFORMANCE BOND (Penalty of this bond must be 100% of Contract amount) STATE OF TEXAS COUNTY OF Travis BOND NUMBER BD 13154 KNOW ALL MEN BY THESE PRESENTS: That. Round. Rock. Const.ruc.t:i.on., . Sac. P.O. Box 1179, Round Rock, Texas 78680 - 1179 (hereinafter called the Principal), as Principal, and COMMERCIAL LLOYD'S INSURANCE COMPANY (hereinafter called the Surety), as Surety, are held and firmly bound unto City of Round Rock z- (hereinafter called the Obligee), in the penal sum of Two Hundred Forty Three Thousand -, Nine Hundred Thirty Two Dollars & 00 /100 Dollars ($....2.43,932..00 ) for the payment of which sum well and truly to be made, we bind ourselves, our heirs, administrators, executors, successors and assigns, jointly and severally, firmly by these presents. WHEREAS, the Principal has entered into a certain written contract with the Obligee, dated the ...7.th day of....lu.ly 19... 93.., a copy of which is hereto attached and made a part hereof, for Street and Drainage Improvements NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the said Principal shall faithfully perform the work in accordance with the plans, specifications and contract documents, then this obligation shall be void; otherwise to remain in full force and effect. 3 PROVIDED HOWEVER, that this bond is executed pursuant to the provisions of Article 5160, Revised Civil Statutes of Texas and all liabilities on this bond shall be determined in accordance with the provisions thereof to the same extent as If it were copied at length herein. IN WITNESS WHEREOF, the said Principal and Surety have signed and sealed this instrument this ...22nd day of July 19...9.3 Round Roc Construction "... +• (Seal)" MERCIALL YD'SINSUAA CEC6MPANY ^2. - 3 = �'" - ( .. By. ,/ ' ...... (Seal) 'T W. Schuler . - Anomey -in -lace y1/1 MMlllLtAIflARKPREMMIMMI IIMHt1{ ll".; 71RRItlOSIft1lJAAMAAt16 ✓ARtalICf IUMARLIkll` 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 CL 506 (3 -91) Commercial Lloyd's Insurance Company 1 3901 S. Lamar Austin, Texas 78704 COMMERCIAL Wes borate CognilanY BD 13154 POWER OF ATTORNEY KNOW ALL MEN BY THESE PRESENTS: That Union Commercial, Inc., a Corporation duly organized and existing under the laws of the State of Texas, having its principal office in Austin, Texas, Attorney - In - Fact for the Underwriters at Commercial Lloyd's Insurance Company, pursuant to the following resolution which now in full fore and effect: "That each of the following officers: the President, or any Vice - President, may from time to time appoint Attorneys -in -Fact, and Agents to 'act for and on behalf of the Company and may give any such appointee such authority as his certificate of authority and other writings obligatory in the nature of a bond, and any of said officers may at any time remove any such appointee and revoke the power and authority given him," 'does hereby make, constitute and appoint: John W. Schuler II ts true and lawful Attomey(s) -in -Fact, with full power and authority hereby conferred in its name, place and stead, to sign, execute, acknowl- edge and deliver in its behalf, and as its act and deed, as follows: 'All bonds not to exceed on any single instrument Two Hundred Forty Three Thousand Nine Hundred Thirty Two Q Dollars and no /100 -- W 'IN WITNESS WHEREOF, Union Commercial, Inc. has caused these presents to be signed by its President, and its Corporate Seal to be affixed, this 1st day of November, 1991. 1 1 ' C State of Texas ounty of Travis John W. Schuler President 'On this 1st day of November, in the year 1991, before me Shannon McBride, a notary public, personally appeared John W. Schuler, personally known to me to be the person who executed the within instrument as President, on behalf of the Corporation therein named and acknowledged 'to me that the Corporation executed it. 'Commission Expires 2 -5 -94 Shannon McBride Notary Public ' CERTIFICATE I, the undersigned, Secretary of Commercial Lloyd's Insurance Company, DO HEREBY CERTIFY that the forsgUraiand attached Power of :�`� Lam• Attorney and Certificate of Authority remains in full force and has not been revoked: 'Signed and Sealed at the said Company at Austin, Texas dated this 22nd (161/ 11 FAT. Secretary day of ' "T,il y ti` r , 19 9'i COiMERCIAL Lloyd's Insurance Company IMPORTANT NOTICE To obtain information or make a complaint: You may contact John Schuler, President of Operations, whose direct dial number is 512 -444 -7776. You may also fax us information at 512 - 447 -7222. You may also call Commercial Lloyd's Insurance Company, toll -free telephone number for information or to make a complaint at: 1- 800- 234 -8046 You may also write to Commercial Lloyd's Insurance Company at: P.O. Box 67, Austin, Texas 78767. You may contact the Texas Department of Insurance to obtain information on companies, coverages, rights or complaints at: 1- 800 -252 -3439 You may also write the Texas Department of Insurance: P.O. Box 149104, Austin, Texas 78714 -9104, Fax# 512 - 475 -1771. PREMIUM OR CLAIM DISPUTES: Should you have a dispute concerning your premium or about a claim you should contact the company first. If the dispute is not resolved you may contact the Texas Department of Insurance. ATTACH THIS NOTICE TO YOUR POLICY: This notice is for information only and does not become a part of condition of the attached document. 3901 South Lamar • Suite 350 • Austin, Texas 78704 P 0 Box 67 • Austin, Texas 78767.0067 Tel 4447776 • Fax 512447.7222 ACO11111 ®- CERTIFICATE OF INSURANCE PRODUCER WHORTON INSURANCE SERVICES 11044 RESEARCH BLVD #B-110 AUSTIN TX 78159-5246 INSURED Round Rock Construction PO Box 1179 Round Rock TX 78680 GENERAL LLABBITY X COMMERCIAL GENERAL LV.BLLITY • CLAWS MADE :OCCUR . OWNERS & COMPACTORS PROT. A AUTOMOB&E UABaT' - ANY AUTO ,.. .. ALL OWNED AUTOS . SCHEDULED AUTOS 1( HIRED AUTOS X . NON -OWNED AUTOS GARAGE LIABILITY EXCESS UABITY ..... UMBRELLA FORA OTHER THAN UMBRELLA FORA WORKERS COMPENSATION AND EMPLOYERS LIABanY 07HER D OWNERS CONTRACTORS . A22208278 DESCRIPTOR OF OPERAIWNSLOCAIION SIVENCLEWSPECIAL REL9 HOLDER City of Round Rock Public Works Dept 221 E Main Round Rock ACOfiDD 254 t7N0) ........:.. . • • • • • BUA1159541688 TX 78664 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND • CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POUCIES BELOW. COMPANIES AFFORDING COVERAGE COMPANY A LETTER rt • COMPANY Lei let COMPANY C METIER COMPANY D LETIFR • COMPANY LETTER COVERAGES THIS IS TO CERTFY THAT THE POIJCIES OF INSURANCE USTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY P6900 INDICATED, NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POUCIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCWSIONS AND CONDITIONS OF SUCH POUCIES. UMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. CO TYPE OF INSURANCE POUOY NUMBER Y L D re( EXPIRATION ' MITTS LTR . GENERAL AGGREGATE '9 2080080 A 115954154A 08/16/92 08/16/93 PRODUCTS COW/OP AGO. :s PERSONAL & AOV. mum, ' WC115968975B 09/15/92 Re:Creekbend Drive street Improvements Waiver of Subrogation Is hereby gran ted to City of Round Rock and they are named u add9 Insured CNA Insurance Companies 04/29/93 04/23194 EACH OCCURRENCE ISSOE DATE (MMODAY) FIRE DAMAGE (Any one fire) ;8 MED. EIPFNSE (Any One peman) 08/16/92 08/16/93 COMBINED STOLE LIMB BODLY INJURY Per person) BOOLY NARY (Per axtonp PROPERTY DAMAGE :EACH OCCURRENCE AGGREGATE • STATUTORY LIMITS 08/16/93 EACH ACCIDENT .s 100000 Dl FASF - PO.ICY LIMIT i5 500000 o,cc °c - EACH EMPLOYEE . 5 100000 CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POUCIES BE CANCELLED BEFORE THE • E%PIRATION DATE THEREOF, THE ISSUING COMPANY WILL EMWJIGXYDC SO MAIL DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT. ALMFa11.19RD(TO<LN SOHIDOOLOSIL WOOS YLW19h(E(d(ffi EVON4X • NAM= =WOK X870(%IPDN(THEXMLINVXCL%XOENTF OFX HBPR05140119M. 1000000 1000000 50000 5000 500000 500000 500000 J • 8/ADORD CORPORATION • l99U V' j ii j . CERTIFICATE OF INSURANCE ` ISBUE D 22- IDD /YY) ri 7 -22 - Al: 93 PRODUCER - THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND - - CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE WHORTON INS. SERVICES DOES NOT AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE 11044 RESEARCH BLVD #B110 — POLICIES BELOW. AUSTIN, TX 78759 COMPANIES AFFORDING COVERAGE LETTER A TRANSCONTINENTAL INS. CO. COMPANY B VALLEY FORGE INS. CO. LETTER INSURED - - ROUND ROCK CONSTRUCTION INC. - COMPANY C TRANSPORTATION INS. CO. - MIKE STEPHENS INDIVIDUAL P. O. BOX 1179 . LETTER D CDNTINENTAL CASUALTY Co. ROUND ROCK, TX 78680 COMPANY ` - E LETTER - COVERAGES .. THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED, NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS j r - I co - LTR' TYPE OF INSURANCE POLICY NUMBER , POLICY EFFECTIVE DATE (MM /DDNY) POLICY EXPIRATION DATE (MM /DDNY) I _ LIMITS 1 GENERAL LIABILITY - !GENERAL AGGREGATE $_ 2,000,000_ A x COMMERCIAL GENERAL LIABILITY 115954154 8 -16 -92 8 -16 -93 PR ODUCTS COMP /OP AGG $ 1,00 1 CLAIMS MAD __._ OCCUR - - - PERSONAL 8 ADV. INJURY $ 1,000,000_ OWNER'S & CONTRACTOR'S PROT, EACH OCCURRENCE $ 1,000,000 - M FIRE DAMAGE (Any one fire) $ - 50,000 i MED EXPENSE (An one person) $ 5, nno I AUTOMOBILE LIABILITY COMBINED SINGLE B ANY AUTO BUA 115954 168 8 -16 -92 8 -16 -93 LIMIT $ 500,000 _ X ALL OWNED AUTOS BODILY INJURY $ 1 SCHEDULED AUTOS g HIRED AUTOS lc f NON.OWNED AUTOS - (Per person) - BODILY INJURY (Per accident) $ - GARAGE LIABILITY 1 PROPERTY DAMAGE $ EXCESS LIABILITY EACH OCCURRENCE $ ! UMBRELLA FORM - - -. AGGREGATE $ OTHER THAN UMBRELLA FORM - C WORKER'S COMPENSATION WC115968975 8 -16 -92 8-16-9) 1 STATUTORY LIMITS EACH ACCIDENT —_ v_ $ _ 100,000 _ AND DISEASE — POLICY LIMIT $ 500,000 EMPLOYERS' LIABILITY _ DISEASE —EACH EMPLOYEE $ 1 0Q_ nno OTHER GENERADAGGREGATE $500,6 Owners & Contractors TBD 4 -23 -93 4 -23 -94 EACH OCCURRENCE 500,000 D lProtective ' DESCRIPTION OF OPERATIONS /LOCATIONSNEHICLES /SPECIAL ITEMS Creekbend Drive street improvements. Waiver of Subrogation is hereby granted to City of ound Rock and they are named as Additional Insured as well. CERTIFICATE HOLDER �_._. CANCELLATION _ ., SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE City of Round Rock Public Works Dept. EXPIRATION DATE THEREOF, THE ISSUING COMPANY WILL ENDEAVOR TO 221 E. Works - ;„ MAIL _31 DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE Ro und Roc1F, TX 78664 LEFT, BUT FAILURE TO MAIL SUCH NOTICE SHALL IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE COMPANY, ITS AGENTS OR REPRESENTATIVES AUTHORIZED REPRESEN T V 1 JI �9[ � V J V pI I V / •. �l� ACORD 25.5 (7/90) ®ACORD CORPORATION 1990 1 1 1 BOND NUMBER AMOUNT ' KNOW ALL MEN BY THESE PRESENTS, ' That we, (hereinafter called the "Principal") as Principal, and the a Corporation duly ' organized under the laws of the State of and duly licensed to transact business in the State of (hereinafter called the "Surety"), as Surety, are held and firmly bound unto THE CITY OF ROUND ROCK. TEXAS (hereinafter called the "Obligee "), in the sum of dollars ($ ) for the payment of which sum well and truly to be ' made, we, the said Principal and the said Surety, bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly, ' by these presents. 1 1 1 1 1 1 1 1 1 Sealed with our seals and dated this day of , A.D. nineteen hundred and - WHEREAS, the said Principal has heretofore entered into a contract with Dated , 19_, for construction of WHEREAS, the said Principal is required to guarantee the construction of all improvements installed under said contract, against defects in materials or workmanship, which may develop during the period of year(s) from the date of acceptance of the project above described, by Owner: The City of Round Rock, Texas posibid.mst /spec MAINTENANCE BOND PBD -11 MAINTENANCE BOND (continued) NOW, THEREFORE, THE CONDITIONS OF THE OBLIGATIONS IS SUCH, that if said Principal shall faithfully carry out and perform the said guarantee, and shall, on due notice, repair and make good at its own expense any and all defects in materials or workmanship in the said work which may develop during the period of year(s) from the date of acceptance of the project above described, by Owner: The City of Round Rock, Texas OR shall pay over, make good and reimburse to the said Obligee all loss and damage which said Obligee may sustain by reason of failure or default of said Principal so to do, then this obligation shall be null and void; otherwise shall remain in full force and effect. Principal Surety By By • postbid.mst/spec PBD -12 4.0 GENERAL CONDITIONS 1 1 General Conditions of' Agreement 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Contents 1. Definition of Terms 1.01 - Owner, Contractor and Engineer 1.02 - Contract Documents 1.03 - Subcontractor 1.04 - Sub - Subcontractor 1.05 - Written Notice 1.06 - Work 1.07 - Extra Work 1.08 - Working Day 1.09 - Calendar Day 1.10 - Substantially Completed 2. Responsibilities of the Engineer and the Contractor 2.01 - Owner - Engineer Relationship 2.02 - Professional Inspection by Engineer 2.03 - Payments for Work 2.04 - Initial Determinations 2.05 - Objections 2.06 - Lines and Grades 2.07 - Contractor's Duty and Superintendence 2.08 - Contractor's Understanding 2.09 - Character of Workers 2.10 - Contractor's Buildings 2.11 - Sanitation 2.12 - Shop Drawings 2.13 - Preliminary Approval 2.14 - Defects and Their Remedies 2.15 - Changes and Alterations 2.16 - Inspectors gencond.mst/spec GC -1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 3. General Obligations and Responsibilities 3.01 - Keeping of Plans and Specifications Accessible 3.02 - Ownership of Drawings 3.03 - Adequacy of Design 3.04 - Right of Entry 3.05 - Collateral Contracts 3.06 - Discrepancies and Omissions 3.07 - Equipment, Materials and Construction Plant 3.08 - Damages 3.09 - Protection Against Accident to Employees and the Public 3.10 - Performance and Payment Bonds 3.11 - Losses from Natural Causes 3.12 - Protection of Adjoining Property 3.13 - Protection Against Claims of Subcontractors, etc. 3.14 - Protection Against Royalties or Patented Invention 3.15 - Laws and Ordinances 3.16 - Assignment and Subletting 3.17 - Indemnification 3.18 - Insurance 3.19 - Final Clean -Up 3.20 - Guarantee Against Defective Work 3.21 - Testing of Materials 4. Prosecution and Progress 4.01- Time and Order of Completion 4.02 - Extension of Time 4.03 - Hindrances and Delays 5. Measurement and Payment 5.01 - Quantities and Measurements 5.02 - Estimated Quantities 5.03 - Price of Work 5.04 - Partial Payments 5.05 - Use of Completed Portions 5.06 - Final Completion and Acceptance 5.07 - Final Payment 5.08 - Payments Withheld 5.09 - Delayed Payments gencand.mst/spec GC -2 6. Extra Work and Claims 6.01 Change Orders 6.02 Minor Changes 6.03 Extra Work 6.04 Time of Filing Claims 6.05 Continuing Performance 6.06 Arbitration 7. Abandonment of Contract 7.01 Abandonment by Contractor 7.02 Abandonment by Owner 8. Subcontractors 8.01 Award of Subcontracts for Portions of Work 8.02 Subcontractual Relations 8.03 Payments to Subcontractors 9. Separate Contracts 9.01 Owner's Right to Award Separate Contracts 9.02 Mutual Responsibility of Contractors 9.03 Cutting and Patching Under Separate contracts 10. Protection of Persons and Property 10.01 Safety Precautions and Programs 10.02 Safety of Persons and Property 10.03 Location and Protection of Utilities gencond.mst/spe GC -3 1 General Conditions of Agreement ' 1. Definition of Terms 1 1.01 Owner, Contractor and Engineer The Owner, the Contractor and the Engineer and those persons or organization ' identified as such in the Agreement and are referred to throughout the contract Documents as if singular in number and masculine in gender. The term Engineer means the Engineer or his duly authorized representative. The Engineer shall be understood to be the Engineer of the Owner, and nothing contained in the Contract Documents shall create any contractual or agency relationship between the Engineer and the Contractor. ' 1.02 Contract Documents The Contract Documents shall consist of the Notice to Contractors, Instructions to Bidders, Bid, Signed Agreement, Performance and Payment Bonds (when required), Special Bonds (when required), General Conditions of the Agreement, Construction 1 Specifications, Plans and all modifications thereof incorporated in any of documents before the execution of the agreement. ' The Contract Documents are complementary, and what is called for by any one shall be as binding as if called for by all. In case of conflict between any of Contract documents, priority of interpretation shall be in the following order: Signed , Agreement, Performance and Payment Bonds, Special Bonds (if any), Bid, Special Conditions of Agreement, Notice to Contractors, Technical Specifications, Plans, and General Conditions of Agreement. 1.03 Subcontractor ' The term Subcontractor, as employed herein, includes only those having a direct contract with the Contractor and it includes one who furnishes material worked to ' special design according to the plans or specifications of this work, but does not include one who merely furnishes material not so worked. 1.04 Sub - subcontractor The term Sub - Subcontractor means one who has a direct or indirect contract with a ' sub- contractor to perform any of the work at the site and includes one who furnishes material worked to a special design according to the plans or specifications of this work, but does not include one who merely furnishes material not so worked. 1 gencond.mst/spec GC -4 1 1.05 Written Notice 1.06 Work 1.07 Extra Work The term "Extra Work" as used in this contract shall be understood to mean and include all work that may be required by the Engineer or Owner to be done by the Contractor to accomplish any change, alteration or addition to the work shown upon the plans, or reasonably implied by the specifications, and not covered by the Contractor's Bid, except as provided under "Changes and Alteration," herein. 1.08 Working Day A "Working Day" is defined as any day not including Saturdays, Sundays or any legal holidays, in which weather or other conditions, not under the control of the Contractor, will permit construction of the principal units of the work for a period of not Less than seven (7) hours between 7:00 a.m. and 6:00 p.m. 1.09 Calendar Day "Calendar Day" is any day of the week or month, no days being excepted. 1.10 Substantially Completed By the term "substantially completed" is meant that the structure has been made suitable for use or occupancy or the facility is in condition to serve its intended purpose, but still may require minor miscellaneous work and adjustment. gencond.msl/spec Written notice shall be deemed to have been duly served if delivered in person to the individual or to an officer of the corporation for whom it is intended, or if delivered at or sent by registered mail to the last business address known to him who gives the notice. The Contractor shall provide and pay for all materials, machinery, equipment, tools, superintendence, labor, services, insurance, and all water, light, power, fuel, transportation and other facilities necessary for the execution and completion of the work covered by the contract documents. Unless otherwise specified, all materials shall be new and both workmanship and materials shall be of a good quality. The Contractor shall, if required, furnish satisfactory evidence as to the kind and quality of materials. Materials or work described in words which so applied have a well known technical or trade meaning shall be held to refer to such recognized standards. GC -5 2. Responsibilities of the Engineer and the Contractor 2.01 Owner - Engineer Relationship The Engineer will be the Owner's representative during construction. The duties, responsibilities and limitations of authority of the Engineer as the Owner's representative during construction are as set forth in the Contract Documents and shall not be extended or limited without written consent of the Owner and Engineer. The Engineer will advise and consult with the Owner, and all of Owner's instructions to the Contractor shall be issued through the Engineer. 2.02 Professional Inspection by Engineer The Engineer shall make periodic visits to the site to familiarize himself generally with the progress of the executed work and to determine if such work generally meets the essential performance and design features and the technical and functional engineering requirements of the Contract Documents; provided and except, however, that the Engineer shall not be responsible for making any detailed, exhaustive, comprehensive or continuous on -site inspection of the quality or quantity of the work or be in any way responsible, directly or indirectly, for the construction means, methods, techniques, s quences, quality, procedures, programs, safety precautions or lack of same incident thereto or in connection therewith. Notwithstanding any other provision of this agreement or any other Contract Document, the Engineer shall not be in any way responsible or liable for any acts, errors, omissions or negligence of the Contractor, any Subcontractor or any of the Contractor's or Subcontractor's agents, servants or employees or any other person, firm or corporation performing or attempting to perform any of the work. 2.03 Payments for Work The Engineer shall review Contractor's applications for payment and supporting data, determine the amount owed to the Contractor and recommend, in writing, payment to Contractor in such amounts; such recommendation of payment to Contractor constitutes a representation to the Owner of Engineer's professional judgement that the work has progressed to the point indicated to the best of his knowledge, information and belief, but such recommendation of an application for payment to Contractor shall not be deemed as a representation by Engineer that Engineer has made any examination to determine how or for what purpose Contractor has used the moneys paid on account of the Contract price. 2.04 Initial Determinations The Engineer initially shall determine all claims, disputes and other matters in question between the Contractor and the Owner relating to the execution or progress gencond.mstlspec GC -6 gcncond.msVspec of the work or the interpretation of the Contract Documents and the Engineer's decision shall be rendered in writing within a reasonable time, which shall not be construed to be less than ten (10) days. Appeal to arbitration upon mutual agreement may be taken as if his decision had been rendered against the party appealing. 2.05 Objections In the event the Engineer renders any decision which, in the opinion of either party hereto, is not in accordance with the meaning and intent of this contract, either party may file with the Engineer within thirty (30) days his written objection to the decision, and by such action may reserve the right to submit the question so raised to arbitration as hereinafter provided. 2.06 Lines and Grades Unless otherwise specified, all lines and grades shall be furnished by the Engineer or his representative. Whenever necessary, construction work shall be suspended to permit performance of this work, but such suspension will be as brief as practicable and the Contractor shall be allowed no extra compensation therefor. The contractor shall give the Engineer ample notice of the time and place where lines and grades will be needed. All stakes, marks, etc., shall be carefully preserved by the Contractor, and in case of careless destruction or removal by him or his employees, such stakes, marks, etc., shall be replaced at the Contractor's expense. 2.07 Contractor's Duty and Superintendence The Contractor shall give adequate attention to .the faithful prosecution and completion of this contract and shall keep on the work, during its progress, a competent English- speaking superintendent and any necessary assistants to supervise and direct the work. The superintendent shall represent the Contractor in his absence and all directions given to him shall be as binding as if given to the Contractor. The Contractor is and at all times shall remain an independent contractor, solely responsible for the manner and method of completing his work under this contract, with full power and authority to select the means, method and manner of performing such work, so long as such methods do not adversely affect the completed improvements, the Owner and Engineer being interested only in the result obtained and conformity of such completed improvements to the plans, specifications and contract. Likewise, the Contractor shall be solely responsible for the safety of himself, his employees and other persons, as well as for the protection and safety of the improvements being erected and the property of himself or any other person, as a GC -7 result of his operations hereunder. Engineering construction drawings and specifications as well as any additional information concerning the work to be performed passing from or through the Engineer shall not be interpreted as requiring or allowing Contractor to deviate from the plans and specifications, the intent of such drawings, specifications and any other such information being to define with specificity the agreement of the parties as to the work the Contractor is to perform. Contractor shall be fully and completely liable, at his own expense, for design, construction, installation and use, or non -use of all items and methods incident to performance of the contract, and for all loss, damage or injury incident thereto, either to person or property, including, without limitation, the adequacy of all temporary supports, shoring, bracing, scaffolding, machinery or equipment, safety precautions or devices, and similar items or devices used by him during construction. Any review of work in process, or any visit or observation during construction, or any clarification of plans and specifications, by the Engineer or Owner, or any agent, employee, or representative of either of them, whether through personal observation on the project site or by means of approval of shop drawings for temporary construction or construction processes, or by other means or method, is agreed by the Contractor to be for the purpose of observing the extent and nature of work completed or being perfornied, as measured against the drawings and specifications constituting the contract, or for the purpose of enabling Contractor to more fully understand the plans and specifications so that the completed construction work will conform thereto, and shall in no way relieve the Contractor from full and complete responsibility for the proper performance of his work on the project, including but not limited to the propriety of means and methods of the Contractor in performing said contract, and the adequacy of any designs, plans or other facilities for accomplishing such performance. Deviation by the Contractor from plans and specifications that may have been in evidence during any such visitation or observation by the Engineer, or any of his representatives, whether called to the contractor's attention or not shall in no way relieve Contractor from his responsibility to complete all work in accordance with said plans and specifications. 2.08 Contractor's Understanding It is understood and agreed that the Contractor has, by careful examination, satisfied himself as to the nature and location of the work, the conformation of the ground, the character, quality and quantity of the materials to be encountered, the character of equipment and facilities needed preliminary to and during the prosecution of the work, the general and local conditions, and all other matters which can in any way effect the work under this contract. The Contractor agrees that he will make no claim against the Owner or the Engineer if, in the prosecution of the work, he finds that the actual site or subsurface conditions encountered do not conform to those indicated by excavation, test excavation, test procedures, borings, explorations or other subsurface excavations. No verbal agreement or conversation with any officer, gencand.msl/spec GC -8 gencond.mst/spec agent or employee of the Owner or Engineer either before or after the execution of this contract, shall affect or modify any of the terms or obligations herein contained. 2.09 Character of Workers The Contractor agrees to employ only orderly and competent workers, skillful in the performance of the type of work required under this contract, to do the work; and agrees that whenever the Engineer shall inform him in writing that any workers on the work are, in his opinion, incompetent, unfaithful or disorderly, or refuse instructions from the Engineer in the absence of the Superintendent, such worker shall be discharged from the work and shall not again be employed on the work without the Engineer's written consent. No illegal alien may be employed by any Contractor for work on this project, and a penalty of $500.00 per day will be assessed for each day and for each illegal alien who works for the Contractor at this project. 2.10 Contractor's Buildings The building of structures for housing workers, or the erection of tents or other forms of protection, will be permitted only at such places as the Engineer shall direct, and the sanitary conditions of the grounds in or about such structures shall at all times be maintained in a manner satisfactory to the Engineer. 2.11 Sanitation Necessary sanitary conveniences for the use of laborers on the work, properly secluded from public observation, shall be constructed and maintained by the Contractor in such manner and at such points as slW1•be approved by the Engineer, and their use shall be strictly enforced. 2.12 Shop Drawings The Contractor shall submit to the Engineer, with such promptness as to cause no delay in his own work or in that of any other Contractor, four (4) checked copies, unless otherwise specified, of all shop and /or setting drawings and schedules required for the work of the various trades, and the Engineer shall pass upon them with reasonable promptness, making desired corrections. The Contractor shall make any corrections required by the Engineer, file with him two (2) corrected copies and furnish such other copies as may be needed. The Engineer's review of such drawings or schedules shall not relieve the Contractor from responsibility for deviations from drawings or specifications, unless he has in writing called the Engineer's attention to such deviations at the time of submission, nor shall it relieve him from responsibility for errors of any sort in shop drawings or schedules. It shall be the Contractor's responsibility to fully and completely review all shop drawings to ascertain their effect on his ability to perform the required contract work in accordance with the plans and GC -9 specifications and within the contract time. Such review by the Engineer shall be for the sole purpose of determining the general conformity of said shop drawings or schedules to result in finished improvements in conformity with the plans and specifications, and shall not relieve the Contractor of his duty as an independent contractor as previously set forth, it being expressly understood and agreed that the Engineer does not assume any duty to pass upon the propriety or adequacy of such drawings or schedules, or any means or methods reflected thereby, in relation to the safety of either person or property during Contractor's performance hereunder. 2.13 Preliminary Approval The Engineer shall not have the power to waive the obligations of this contract for the furnishing by the Contractor of good material, and of his performing good work as herein described, and in full accordance with the plans and specifications. No failure or omission of the Engineer to discover, object to or condemn any defective work or material shall release the Contractor from the obligations to fully and properly perform the contract, including without limitations, the obligation to at once tear out, remove and properly replace the same at any time prior to final acceptance upon the discovery of said defective work or material; provided, however, that the Engineer shall, upon`` request of the Contractor, inspect and accept or reject any material furnished, and in event the material has been once accepted by the Engineer, such acceptance shall be binding on the Owner, unless it can be clearly shown that such material furnished does not meet the specifications for this work. Any questioned work may be ordered taken up or removed for re- examination, by the Engineer, prior to final acceptance, and if found not in accordance with the plans and /or specifications for said work, all expense of removing, re- examination and replacement shall be borne by the Contractor, otherwise the expense thus incurred shall be allowed as Extra Work, and shall be paid for by the Owner; provided that, where inspection or approval is specifically required by the specifications prior to performance of certain work, should the Contractor proceed with such work without requesting prior inspection or approval he shall bear all expense of taking up, removing, and replacing this work if so directed by the Engineer. 2.14 Defects and Their Remedies gencond.mst/spcc It is further agreed that if the work or any part thereof, or any material brought on the site of the work for use in the work or selected for the same, shall be deemed by the Engineer as unsuitable or not in conformity with the plans, specifications, or the intent thereof, the Contractor shall after receipt of written notice thereof from the Engineer, forthwith remove such material and rebuild or otherwise remedy such work so that it shall be in full accordance with this contract. GC -10 2.15 Changes and Alterations The Contractor further agrees that the Owner may make such changes and alterations as the Owner may see fit, in the line, grade, form, dimensions, plans or materials for the work herein contemplated, or any part thereof, either before or after the beginning of the construction, without affecting the validity of this contract and the accompanying Performance and Payment Bonds. If such changes or alterations diminish the quantity of the work to be done, they shall not constitute the basis for a claim for damages, or anticipated profits on the work that may be dispensed with, except as provided for unit price items under Section 5 "Measurement and Payment ". If the amount of work is increased, and the work can fairly be classified under the specifications, such increase shall be paid for according to the quantity actually done and at the unit price, if any, established for such work under this contract, except as provided for unit price items under Section 5 "Measurement and Payment"; otherwise, such additional work shall be paid for as provided under Extra Work. In case the Owner shall make such changes or alterations as shall make useless any work already done or material already furnished or used in said work, then the Owner shall recompense the Contractor for any material or labor so used, and for any actual loss occasioned by such change, due to actual expense incurred in preparation for the work as originally planned. 2.16 Inspectors The Engineer may provide one (or more) field inspectors at the work site for the limited purpose of observing the work in progress and reporting back to the Engineer on the extent, nature, manner and performance of the work so that the Engineer may more effectively perform his duties hereunder. Such inspectors may also communicate between Engineer and Contractor their respective reports, opinions, questions, answers and clarifications concerning the plans, specifications and work but shall be deemed the agent of the Contractor for all purposes in communicating such matters. gencond.mst/spec Such inspector may confer with the Contractor or Contractor's superintendent concerning the prosecution of the work and its conformity with the plans and specifications but shall never be, in whole or part, responsible for, charged with, nor shall he assume, any authority or responsibility for the means, methods or manner of completing the work or of the superintendence of the work or of the Contractor's employees. It is expressly understood and agreed that any such inspector is not authorized by the Engineer or Owner to independently act for either or answer on behalf of either, any inquiries of the Contractor concerning the plans, specifications or work. No inspector's opinion; advice; interpretation of the plans or specifications of this contract; apparent or express approval of the means, methods or manner of Contractor's performance of work in progress or completed; or discovery or failure GC -11 to discover or object to defective work of materials shall release Contractor from his duty to complete all work in strict accordance with the plans and specifications or stop the Owner or Engineer ,from requiring that all work be fully and properly performed including, if necessary,' removal of defective or otherwise unacceptable work and the re -doing of such work. 3. General Obligations and Responsibilities 3.01 Keeping of Plans and Specifications Accessible The Engineer shall furnish the Contractor with an adequate and reasonable number of copies of all plans and specifications without expense to him and the Contractor shall keep one (1) copy of the same constantly accessible on the work, with the latest revisions noted thereon. 3.02 Ownership of Drawings 3.03 Adequacy of Design 3.04 Right of Entry The Owner reserves the right to enter the property or location of which the works herein contracted for are to be constructed or installed, by such agent or agents as he may elect, for the purpose of inspecting the work, or for the purpose of constructing or installing such collateral work as said Owner may desire. gencond.msl/spec All drawings, specifications and copies thereof furnished by the Engineer shall not be reused on other work, and, with the exception of the signed contract sets, are to be returned to him on - request, at the completion of the work. All models are the property of the Owner. It is understood that the Owner believes it has employed competent engineers and designers. It is therefore agreed that the Owner shall be responsible for the adequacy of the design, sufficiency of the Contract Documents, the safety of the structure and the practicability of the operations of the completed project; provided the Contractor has complied with the requirements of the said Contract Documents, all approved modifications thereof, and additions and alterations thereto approved in writing by the Owner. The burden of proof of such compliance shall be upon the Contractor to show that he has complied with the said requirements of the Contract Documents, approved modification thereof and all approved additions and alterations thereto. GC -12 3.05 Collateral Contracts gencond.mslispec The Owner agrees to provide by separate contract or otherwise, all labor and material essential to the completion of the work specifically excluded from this contract, in such manner as not to delay the progress of the work, or damage said Contractor, except where such delays are specifically mentioned elsewhere in the Contract Documents. The Owner will attempt to coordinate the collateral work of utility companies regulated by City franchises, but the City shall not be responsible for delays or other damages to the Contractor which may result from their acts or omissions. 3.06 Discrepancies and Omissions The Contractor shall provide written notice to the Engineer of any omissions or discrepancies found in the contract. It is further agreed that it is the intent of this contract that all work must be done and all material must be furnished in accordance with the generally accepted practice for construction, and in the event of any discrepancies between the separate contract documents, the priority of interpretation defined under "Contract Documents" shall govern. In the event that there is still any doubt as to the meaning and intent of any portion of the contract, specifications or drawings, the Engineer shall define which is intended to apply to the work. 3.07 Equipment, Materials and Construction Plant The Contractor shall be responsible for the care, preservation, conservation, and protection of all materials, supplies, machinery, equipment, tools, apparatus, accessories, facilities, all means of construction, and any and all parts of the work, whether the Contractor has been paid, partially paid, or not paid for such work, until the entire work is completed and accepted. 3.08 Damages In the event the Contractor is damaged in the course of completion of the work by the act, neglect, omission, mistake or default of the Owner or Engineer, thereby causing loss to the Contractor, the Owner agrees that he will reimburse the Contractor for such loss. In the event the Owner is damaged in the course of the work by the act, negligence, omission, mistake or default of the Contractor, or should the Contractor unreasonably delay the progress of the work being done by others on the job so as to cause loss for which the Owner becomes liable, then the Contractor shall reimburse the Owner for such loss. 3.09 Protection Against Accident to Employees and the Public The Contractor shall at all times exercise reasonable precautions for the safety of GC -13 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 gencond.msl/spcc employees and others on or near the work and shall comply with all applicable provisions of Federal, State, And Municipal safety laws and building and construction codes. All machinery and equipment and other physical hazards shall be guarded in accordance with the "Manual of Accident Prevention in Construction" of the Associated General Contractors of America except where incompatible with Federal, State, or Municipal laws or regulations. The Contractor shall provide such machinery guards, safe walkways, ladders, bridges, gangplanks, and other safety devices. The safety precautions actually taken and their adequacy shall be the sole responsibility of the Contractor, acting at his discretion as an independent contractor. In the event there is an accident involving injury to any individual on or near the work, the Contractor shall immediately notify the Owner and Engineer of the event and shall be responsible for recording the location of the event and the circumstances surrounding the event through photographs, interviewing witnesses, obtaining of medical reports and other documentation that defines the event. Copies of such documentation shall be provided to the Owner and the Engineer for their records. 3.10 Performance and Payment Bonds Unless otherwise specified, it is further agreed by the Parties to the Contract that the Contractor will execute, separate performance and payment bonds, each in the sum of one hundred (100%) percent of the total contract price, in standard forms for this purpose, guaranteeing faithful performance of the work and the fulfillment of any guarantee required, And further guaranteeing payment to all persons supplying labor and materials or furnishing him any equipment in the execution of the Contract. If the contract price is less that $50,000.00, a letter of credit may be furnished in lieu of a performance bond. It is agreed that the Contract shall not be in effect until such performance bond or letter of credit, and payment bond are furnished and approved by the owner. Unless otherwise specified, the cost of the premium for the performance bond or letter of credit, and payment bond shall be included in the price bid by the Contractor for the work under this Contract, and no extra payment for such bond or letter of credit will be made by the Owner. Unless otherwise approved in writing by the Owner, the surety company underwriting the bonds or letter of credit shall be acceptable according to the latest list of companies holding certificates of authority from the Secretary of the Treasury of the United States and shall be licensed to write such bonds or letters of credit in the State of Texas. 3.11 Losses from Natural Causes Unless otherwise specified, all loss or damage to the Contractor arising out of the GC -14 gencond.mst /spec nature of the work to be done, or from the action of the elements, or from any unforeseen circumstance in the prosecution of the same, or from unusual obstructions or difficulties which may be encountered in the prosecution of the work, shall be sustained and borne by the Contractor at his own cost and expense. 1 3.12 Protection of Adjoining Property The said Contractor shall take proper means to protect the adjacent or adjoining property or properties in any way encountered, which might be injured or seriously affected by any process of construction to be undertaken under this Agreement, from any damage or injury by reason of said process of construction; and he shall be liable for any and all claims for such damage on account of his failure to fully protect all adjoining property. The Contractor agrees to indemnify, save and hold harmless the Owner and Engineer against any claim or claims for damages due to any injury to any adjacent or adjoining property, arising or growing out of the performance of the contract regardless of whether or not it is caused in part by a party indemnified hereunder, but any such indemnity shall not apply to any claim of any kind arising solely out of the existence or character of the work. 3.13 Protection Against Claims of Subcontractors, Laborers, Materialmen and Furnishers of Machinery, Equipment and Supplies The Contractor agrees that he will indemnify and save the Owner and Engineer harmless from all claims growing out the lawful demands of Subcontractors, laborers, workers, mechanics, materialmen and furnishers of machinery and parts thereof, equipment, power tools, and all supplies, including commissary, incurred in the furtherance of the performance of this contract. When so desired by the Owner, Contractor shall furnish satisfactory evidence that all obligations of the nature hereinabove designated have been paid, discharged or waived. If the Contractor fails to do so, then the Owner may at the option of the Contractor either pay directly any unpaid bills, of which the Owner has written notice, or withhold from the Contractor's unpaid compensation a sum of money deemed reasonably sufficient to liquidate any and all such lawful claims until satisfactory evidence is furnished that all liabilities have been fully discharged, whereupon payments to the Contractor shall be resumed in full, in accordance with the terms of this contract, but in no event shall the provisions of this sentence be construed to impose any obligation upon the Owner by either the Contractor or his Surety. 3.14 Protection Against Royalties or Patented Invention The Contractor shall pay all royalties and license fees, and shall provide for the use of any design, device, material or process covered by letter patent or copyright by suitable legal agreement with the patentee or owner. The contractor shall defend all suits or claims for infringement of any patent or copyright rights and shall indemnify GC -15 1 and save the Owner and Engineer harmless from any loss on account thereof, except that the Owner shall defend all such suits and claims and shall be responsible for all such loss when a particular design, device, material or process or the product of a particular manufacturer or manufacturers is specified or required by the Owner; provided, however, if choice of alternate design, device, material or process is allowed to the Contractor, then Contractor shall indemnify and save Owner harmless form any loss on account thereof. If the material or process specified or required by the Owner is known by the Contractor to be an infringement, the Contractor shall be responsible for such loss unless he promptly gives such information to the Owner. 1 3.15 Laws and Ordinances ' The Contractor shall at all times observe and comply with all Federal, State and local laws, ordinance and regulations, which in any manner affect the contract or the work, and shall indemnify and save harmless the Owner and Engineer against any claim 1 arising from the violation of any such laws, ordinances, and regulations whether by the Contractor or his employees, except where such violations are called for by the provisions of the Contract Documents. If the Contractor observes that the plans and ' specifications are at variance therewith, he shall promptly notify the Engineer in writing, and any necessary changes shall be prepared as provided in the contract for changes in the work. I the Contractor performs any work knowing it to be contrary ' to such laws, ordinances, rules and regulations, and without such notice to the Engineer, he shall bear all costs arising therefrom. In case the Owner is a body politic and corporate, the law from which it derives its powers, insofar as the same 1 regulates the objects for which, or the manner in which, or the conditions under which the Owner may enter into contract, shall be controlling, and shall be considered as part of this contract, to the same effect as though embodied herein. ' 3.16 , Assignment and Subletting The Contractor further agrees that he will retain personal control and will give his personal attention to the fulfillment of this contract and that he will not assign by ' Power of Attorney, or otherwise, or sublet said contract without the written consent of the Engineer, and that no part or feature of the work will be sublet to anyone objectionable to the Engineer or the Owner. The Contractor further agrees that the ' subletting of any portion or feature of the work, or materials required in the performance of this contract, shall not relieve the Contractor from his full obligations to the Owner, as provided by this Agreement. ' 3.17 Indemnification ' The Contractor shall defend, indemnify and hold harmless the Owner and the Engineer and their respective officers, agents and employees, from and against all damages, claims, losses, demands, suits, judgements and costs, including reasonable gencond.msUapec 0046 1 1 attorneys' fees and expenses, arising out of or resulting from the performance of the work, provided that any such damages, claim, loss, demand, suit, judgment, cost or expense: gencond.msl/spec 1. Is attributable to bodily injury, sickness, disease or death to any person including Contractor's employees and any Subcontractor's employees and any Sub - Subcontractor's employees or to injury to or destruction of tangible property including Contractor's property (other than the work itself) and the property of any Subcontractor of Sub - Subcontractor including the loss of use resulting therefrom; and, 2. Is caused in whole or in part by any intentional or negligent act or omission of the Contractor, any Subcontractor, any Sub - subcontractor or anyone directly or indirectly employed by any one of them or anyone for whose acts any of them may be liable, regardless of whether or not it is caused in part by a party indemnified hereunder. The obligation of the Contractor under this Paragraph shall not extend to the liability of the Engineer, his agents or employees arising out of the preparation of maps, plans, reports, surveys, Change Orders, designs or specifications, or the approval of maps, plans, reports, surveys, Change Orders, designs or specifications or the issuance of or the failure to give directions or instructions by the Engineer, his agents or employees, provided such is the sole cause of the injury or damage. In any and all claims against the Owner or the Engineer or any of their agents or employees by any employee of the Contractor, any Subcontractor, any Sub - Subcontractor, anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, the indemnification obligation under Paragraph 3.17 shall not be limited in any way by any limitation on the amount or type of damages, compensation or benefits payable by or for the Contractor or any Subcontractor or Sub - Subcontractor under workmen's compensation acts, disability benefit acts or other employee benefit acts. 3.18 Insurance The Contractor shall carry insurance as follows for the duration of this contract. A. Statutory Workmen's Compensation. B. Comprehensive General Liability Insurance with minimum Bodily Injury limits of $300,000 for each occurrence including like coverage for acts and omissions of Subcontractors and contractual liability coverage. GC -17 gencond.mst/apec C. Property Damage Insurance with minimum limits of $50,000 for each occurrence including like coverage for acts and omissions of Subcontractors and contractual liability coverage. D. Automobile Liability Insurance for all owned, non - owned, and hired vehicles with minimum limits for Bodily Injury of $100,000 for each person and $300,000 for each occurrence and Property Damage minimum limits of $50,000 for each occurrence. Contractor shall require subcontractors to provide Automobile Liability Insurance with same minimum limits. The Contractor shall not commence work at the site under this contract until he has obtained all required insurance and until such insurance has been approved by the Owner and Engineer. The Contractor shall not allow any Subcontractors to commence work until all insurance required has been obtained and approved. Approval of the insurance by the Owner and Engineer shall not relieve or decrease the liability of the contractor hereunder. The required insurance must be written by a company licensed to do business in Texas at the time the policy is issued. In addition, the company must be acceptable to the Owner and all insurance (other than Workmen's compensation) shall be endorsed to include the Owner as an additional insured thereunder. The Contractor shall not cause any insurance to be cancelled nor permit any insurance to lapse. All insurance certificates shall include a clause to the effect that the policy shall not be cancelled or reduced, restricted or limited until ten (10) days after the Owner has received written notice as evidenced by return receipt of registered or certified letter. Certificates of Insurance shall contain transcripts from the proper office of the insurer, evidencing in particular those insured, the extent of the insurance, the location and the operations to which the insurance applies, the expiration date, and the above mentioned notice of cancellation clause. 3.19 Final Clean -up Upon the completion of the work and before acceptance and final payment will be made, the Contractor shall clean and remove from the site of the work, surplus and discarded materials, temporary structures and debris of every kind. He shall leave the site of the work in a neat and orderly condition at least equal to that which originally existed. Surplus and waste materials removed from the site of the work shall be disposed of at locations satisfactory to the Engineer. In the event Contractor fails or refuses to clean and remove surplus materials and debris as above provided, the Owner or Engineer may do so, or cause same to be done, at the Contractor's expense and the reasonable cost thereof shall be deducted from the final payment. GC -18 3.20 Guarantee Against Defective Work The contractor warrants the materials and workmanship and that the work is in conformance with the plans and specifications included in this contract for a period of one year from the date of acceptance of the project. Said warranty binds the contractor to correct any work that does not conform with such plans and specifications or any defects in workmanship or materials furnished under this contract which may be discovered within the said one year period. The Contractor shall at his own expense correct such defect within thirty days after receiving written notice of such defect from the Owner or Engineer by repairing same to the condition called for in the contract documents and plans and specifications. Should the Contractor fail or refuse to repair such defect within the said thirty day period or to provide acceptable assurances that such repair work will be completed within a reasonable time thereafter, the Owner may repair or cause to be repaired any such defect at the Contractor's expense. 3.21 Testing of Materials Unless otherwise specified, testing of all materials to be incorporated into the project will be as directed by the Engineer at the expense of the Owner. All retesting for work rejected on the basis of test results will be at the expense of the Contractor and the extent of the retesting shall be determined by the Engineer. The Engineer may require additional testing for failing tests and may require two passing retests before acceptance will be made by the Owner. The testing laboratory will be designated by the Owner. gencond.msUspec All materials to be incorporated into the project must 'meet the requirements of these specifications. For manufactured materials such as reinforcing steel, expansion joint materials, concrete pipe, cement, miscellaneous steel, cast iron materials, etc., the Contractor will be required to furnish a manufacturer's certificate stating that the material meets the requirements specified for this project. 4. Prosecution and Progress 4.01 Time and Order of Completion It is the meaning and intent of this contract, unless otherwise herein specifically provided, that the Contractor shall be allowed to prosecute his work at such times and seasons, in such order of precedence, and in such manner as shall be most conducive to economy of construction; provided, however, that the order and the time of prosecution shall be such that the work shall be substantially completed as a whole and in part, in accordance with this contract, the plans and specifications, GC -19 and within the time of completion designated in the Bid: provided, also, that when the Owner is having other work done, either by contract or by his own force, the Engineer may direct the time and manner of constructing the work done under this contract, so that conflict will be avoided and the construction of the various works being done for the Owner shall be harmonized. The Contractor shall submit, at such times as may reasonably be requested by the Engineer, schedules which shall show the order in which the Contractor proposes to carry on the Work, with dates at which the Contractor will start the several parts of the work, and estimated dates of completion of the several parts. 4.02 Extension of Time Should the Contractor be delayed in the completion of the work by any act or neglect of the Owner or Engineer, or of any employee of either, or by other contractors employed by the Owner, or by changes ordered in the work, or by strikes, lockouts, fires, and unusual delays by common carriers, or unavoidable cause or causes beyond the Contractor's control, or by any cause which the Engineer shall decide justifies the delay, then an extension of time shall be allowed for completing the work, sufficient to compensate for the delay, the amount of the extension to be determined by the Engineer, provided, however, that the Contractor shall give the Engineer prompt notice in writing of the cause of such delay. Adverse weather conditions will not be justification for extension of time on "Calendar Days" contracts. 4.03 Hindrances and Delays 5. Measurement and Payment 5.01 Quantities and Measurements gencond.mst/spec No claims shall be made by the Contractor for damages resulting from hindrances or delays from any cause (except where the work is stopped by order of and for the convenience of the Owner) during the progress of any portion of the work embraced in this contract. In case said work shall be stopped by the act of the Owner, then such expense as in the judgment of the Engineer is caused by such stoppage of said work shall be paid by the Owner to the Contractor. No extra or customary measurements of any kind will be allowed, but the actual measured and /or computed length, area, solid contents, number and weight only shall be considered, unless otherwise specifically provided. GC -20 5.02 Estimated Quantities gcncond.maUspec This agreement, including the specifications, plans and estimate, is intended to show clearly all work to be done and material to be furnished hereunder. Where the estimated quantities are shown for the various classes of work to be done and material to be furnished under this contract, they are approximate and are to be used only as a basis for estimating the probable cost of the work and for comparing the bids offered for the work. It is understood and agreed that the actual amount of work to be done and material to be furnished under this contract may differ somewhat from these estimates, and that where the basis for payment under this contract is the unit price method, payment shall be for the actual amount of such work done and material furnished. Where payment is based on the unit price method, the Contractor agrees that he will make no claim for damages, anticipated profits or otherwise on account of any differences which may be found between the quantities of work actually done, the material actually furnished under this contract and the estimated quantities contemplated and contained in the bid; provided, however, that in case the actual quantity of any major item should become as much as 20% more than, or 20% less than the estimated or contemplated quantity for such items, then either party to this Agreement, upon demand, shall be entitled to revised consideration upon the portion of the work above or below 20% of the estimated quantity. A "Major Item" shall be construed to be any individual bid item incurred in the bid that has a total cost equal to or greater that five (5) percent of the total contract cost, computed on the basis of the bid quantities and thg•eontract unit prices. Any revised consideration is to be determined by agreement between the parties, otherwise by the terms of this Agreement, as provided under "Extra Work ". 5.03 Price of Work In consideration of the furnishing of all the necessary labor, equipment and material, and the completion of all work by the Contractor, and on the completion of all work and on the delivery of all material embraced in this Contract in full conformity with the specifications and stipulations herein contained, the Owner agrees to pay the Contractor the prices set forth in the Bid hereto attached, which is made a part of this contract. The Contractor hereby agrees to receive such prices in full for furnishing all material and all labor required for the aforesaid work, also for all expense incurred by him, and for well and truly performing the same and the whole thereof in the manner and according to this Agreement. GC-21 5.04 Partial Payments gencond.msVspec Based upon Application for Payment submitted to the Engineer by the Contractor and Certificates for Payment issued by the Engineer (the Engineer shall examine and approve or modify and approve said Applications for Payment), the Owner shall make progress payments on account of the Contract Sum to the Contractor as provided below and elsewhere in the Contract: 1. The period covered by each Application for Payment shall be for a period of one (1) month up to and including the twenty-fifth (25th) day of the month preceding the month in which payment will be made. 2. All Applications for Payment will be presented to the City Council for approval on the second Thursday of each month. 3. All Applications for Payment will be submitted to the Engineer for approval no later than the Tuesday of the week prior to the scheduled meeting of the City Council. 4. Payment will normally be made the Friday of the week following the week of the scheduled ingeting of the City Council. Unless otherwise provided in the Contract Documents, each Application for Payment shall be based upon the schedule of values submitted by the Contractor in accordance with the Contract Documents. The schedule of values shall allocate the entire Contract Sum among the various portions of the Work and be prepared in such form as provided for in the Contract Documents. Subject to the provisions of the Contract Documents, the amount of each progress payment shall be normally computed as follows: 1. Take that portion of the Contract Sum properly allocable to completed Work as determined by multiplying the percentage completion of each portion of the Work by the share of the total Contract Sum allocated to that portion of the Work in the schedule of values, less retainage of ten percent (10 %). 2. Add that portion of the contract properly allocable to materials and equipment and suitably stored at the site for subsequent incorporation in the completion of the project, or as otherwise provided for in the Contract Documents, less ten percent (10 %) retainage. GC -22 geacond.msUspec 3. Subtract the aggregate of previous payments made by the Owner and any other additions or deletions as provided for in the Contract Documents. It is understood, however, that in case the whole work be near to completion and some unexpected and unusual delay occurs due to no fault or neglect on the part of the Contractor, and Owner may - upon written recommendation of the Engineer - pay a reasonable and equitable portion of the retained percentage to the Contractor; or the Contractor at the Owner's option, may be relieved of the obligation to fully complete the work and, thereupon, the Contractor shall receive payment of the balance due him under the contract subject only to the conditions stated under "Final Payment". 5.05 Use of Completed Portions The Owner shall have the right to take possession of and use any completed or partially completed portions of the work, notwithstanding the time for completing the entire work or such portions may not have expired but such taking possession and use shall not be deemed an acceptance of any work not completed in accordance with the Contract Documents. If such prior use increases the cost of or delays the work, the Contractor shall be entitled to such extra compensation, or extension of time, or both, as the Engineer may determine. The Contractor shall notify the Engineer when, in the Contractor's opinion, the contract is "substantially completed" and when so notifying the Engineer, the Contractor shall furnish to the Engineer in writing a detailed list of unfinished work. The Engineer will review the Contractor's list of unfinished work and will add thereto such items as the Contractor has failed to include. The "substantial completion" of the structure or facility shall not excuse the Contractor from performing all of the work undertaken, whether of a minor or major nature, and thereby completing the structure or facility in accordance with the Contract Documents. 5.06 Final Completion and Acceptance Within ten (10) days after the Contractor has given the Engineer written notice that the work has been completed, or substantially completed, the Engineer and the Owner shall inspect the work and within said time, if the work be found to be completed in accordance with the Contact Documents, the Engineer shall issue to the Owner and the Contractor his Certificate of Completion, and thereupon it shall be the duty of the Owner to issue a Certificate of Acceptance of the work to the Contractor or to advise the Contractor in writing of the reason for non - acceptance. GC -23 5.07 Final Payment Neither the Certificate of Acceptance nor the final payment, nor any provision in the Contract Documents, shall relieve the Contractor of the obligation for fulfillment of any warranty which may be required. 5.08 Payments Withheld The Owner may, on account of subsequently discovered evidence, withhold or nullify the whole or part of any certificate to such extent as may be necessary to protect himself from loss on dctount of: a) Defective work not remedied or other obligations hereunder not done. b) Claims filed or reasonable evidence indicating probable filing of claims. c) Failure of the Contractor to make payments properly to subcontractors or for material or labor. d) Damage to the Owner or another contractor's work, material or equipment. e) Reasonable doubt that the work can be completed for the unpaid balance of the contract amount. gencond.mst/spec Upon the issuance of the Certificate of Completion, the Engineer shall proceed to make final measurements and prepare final statement for the value of all work performed and materials furnished under the terms of the Agreement and shall certify same to the Owner. The Application for Final Payment will be submitted to the City Council for approval on the second Thursday of the month immediately following the receipt of the Application for Final Payment. Payment will normally be made the Friday of the week following the week of the scheduled meeting of the City Council. f) Reasonable indication that the work will not completed within the contract time. g) Other causes affecting the performance of the contract. When the above grounds are removed or the Contractor provides a Surety Bond satisfactory to the Owner, which will protect the Owner in the amount withheld, payment shall be made for amounts withheld because of them. GC -24 5.09 Delayed Payments gcncond.mst/spec Should the Owner fail to make payment to the Contractor of the sum named in any partial or final statement, when payment is due, then the Owner shall pay to the Contractor, in addition to the sum shown as due by such statement, interest thereon at the rate of 6% per annum, unless otherwise specified, from date due as provided under 'partial payments' and final 'payments,' until fully paid, which shall fully liquidate any injury to the Contractor growing out of such delay in payment. It is expressly agreed that delay by the Owner in making payment to the Contractor of the sum named in any partial or final statement shall not constitute a breach of this contract on the part of the Owner nor an abandonment thereof nor shall it to any extent or for any time relieve the Contractor of his obligations to fully and completely perform hereunder. 6. Extra Work and Claims 6.01 Change Orders Without invalidating this Agreement, the Owner may, at any time or from time to time, order additions, deletions or revisions to the work; such changes will be authorized by Change Order to be prepared by the Engineer for execution by the Owner and the Contractor. The Change Order shall set forth the basis for any change in contract price, as hereinafter set forth for Extra Work, and any change in contract time which may result from the change. In the event the Contractor shall refuse to execute a Change Order which has been prepared by the Engineer and executed by the Owner, The Engineer may in writing instruct the Contractor to proceed with the work as set forth in the Change Order and the Contractor may make claim against the Owner for Extra Work involved therein, as hereinafter provided. 6.02 Minor Changes The Engineer may authorize minor changes in the work not inconsistent with the overall intent of the Contract Documents and not involving an increase in Contract Price. If the Contractor believes that any minor change or alteration authorized by the Engineer involves Extra Work and entitles him to an increase in the Contract Price, the Contractor shall make written request to the Engineer for a written Field Order. In such case, the Contractor by copy of his communication to the Engineer or otherwise in writing shall advise the Owner of his request to the Engineer for a GC -25 written Field Order and that work involved may result in an increase in the Contract Price. Any request by the Contractor for a change in Contract Price shall be made prior to beginning the work covered by the proposed change. 6.03 Extra Work gen cand.mst/e pcc It is agreed that the basis of compensation to the Contractor for work either added or deleted by a Change Order or for which a claim for Extra Work is made shall be determined by the unit prices upon which this contract was bid to the extent such work can be fairly classified within the various work item descriptions and for work items that cannot be so classified by one or more of the following methods: Method (A) By agreed unit prices; or Method (B) By agreed lump sum; or Method (C) If neither Method (A) nor Method (B) be agreed upon before the Extra Work is commenced, then the Contractor shall be paid the "actual field cost" of the work, plus fifteen (15) percent. In the event said Extra Work be performed and paid for under Method (C), then the provisions of this paragraph shall apply and the "actual field cost" is hereby defined to include the cost to the Contractor of all workmen, such as foreman, timekeepers, mechanics and laborers, and materials, supplies, trucks, rentals on machinery and equipment, for the time actually employed or used on such Extra Work, plus actual equipment, for the time actually employed or used on such Extra Work, plus actual transportation charges necessarily incurred, together with all power, fuel, lubricants, water and similar operating expenses, also all necessary incidental expenses incurred directly on account of such Extra Work, including Social Security, Old Age Benefits and other payroll taxes, and, a rateable proportion of premiums on Performance and Payment Bonds and Maintenance Bonds, Public Liability and Property Damage and Workmen's Compensation, and all other insurance as may be required by any law or ordinance, or directed by the Owner, or by them agreed to. The Engineer may direct the form in which accounts of the "actual field cost" shall be kept and the records of these accounts shall be made available to the Engineer. The Engineer or Owner may also specify in writing, before the work commences, the method of doing the work GC -26 gencond.msl/spec and the type and kind of machinery and equipment to be used; otherwise these matters shall be determined by the Contractor. Unless otherwise agreed upon, the prices for the use of machinery and equipment shall be determined by using 100 per cent, unless otherwise specified, of the latest schedule of Equipment Ownership Expense adopted by the Associated General Contractors of America. Where practicable the terms and prices for the use of machinery and equipment shall be incorporated in the Written Extra Work Order. The fifteen (15 %) percent of the "actual field cost" to be paid the Contractor shall cover and compensate him for his profit, overhead, general superintendence and field office expense, and all other elements of cost and expense not embraced within the "actual field cost" as herein defined, save that where the Contractor's Camp or Field Office must be maintained primarily on account of such Extra Work; then the cost to maintain and operate the same shall be included in the "actual field cost" No claim for Extra Work of any kind will be allowed unless ordered in writing by the Engineer. In case any orders or instructions, either oral or written, appear to the Contractor to involve Extra Work for which he should receive compensation or an adjustment in the construction time, he shall make written request to the Engineer for written order authorizing such Extra Work. Should a difference of opinion arise as to what does or does not constitute Extra Work, or as to the payment therefor, and the Engineer insists upon its performance, the Contractor shall proceed with the work after making written request for written order and shall keep an accurate account of the "actual field cost" thereof, as provided under Method (C). The Contractor will thereby preserve the right to submit the matter of payment to arbitration, as hereinbelow provided. 6.04 Time of Filing Claims It is further agreed by both parties hereto that all questions of dispute or adjustment presented by the Contractor shall be in writing and filed with the Engineer within thirty (30) days after the Engineer has given any directions, order or instruction to which the Contractor desires to take exception. The Engineer shall reply within thirty (30) days to such written exceptions by the Contractor and render his final decision in writing. In case the Contractor should appeal from the Engineer's decision, any demand for arbitration shall be filed with the Engineer and the Owner in writing within ten (10) days after the date of delivery to Contractor of the Engineer's final decision. It is further agreed that final acceptance of the work by the Owner and the acceptance by the Contractor of the final payment shall be a bar to any claims by either party, except claims by Owner for defective work or enforcement of warranties and except as noted otherwise in the contract documents. 6.05 Continuing Performance The Contractor shall continue performance of the contract during all disputes or GC -27 disagreements with the Owner. The production or delivery of goods, the furnishing of services and the construction of projects or facilities shall not be delayed, prejudiced or postponed pending resolution of any disputes or disagreements, except as the Owner may otherwise agree in writing. 6.06 Arbitration gencond.met/epec All questions of dispute under this Agreement shall be submitted to arbitration at the request of either party to the dispute. The parties may agree upon one arbiter, otherwise, there shall be three, one named in writing by each party, and the third chosen by the two arbiters so selected; or if the arbiters fail to select a third within ten (10) days, he shall be chosen by a District Judge serving the County in which the major portion of the project is located, unless otherwise specified. Should the party demanding arbitration fail to name an arbiter within ten (10) days of the demand, his right to arbitrate shall lapse, and the decision of the Engineer shall be final and binding on him. Should the other party fail to choose an arbiter within ten (10) days, the Engineer shall appoint such arbiter. Should either party refuse or neglect to supply the arbiters with any papers or information demanded in writing, the arbiters are empowered by both parties to take ex parte proceedings. The arbiters shall act -with promptness. The decision of any two shall be binding on both parties to the contract. The decision of the arbiters upon any questions submitted to arbitration under this contract shall be a condition precedent to any right of legal action. The decision of the arbiter or arbiters may be filed in court to carry it into effect. The arbiters, if they deem the case demands it, are authorized to award the party whose contention is sustained, such sums as they deem proper for the time, expense and trouble incident to the appeal, and if the appeal was taken without reasonable cause, they may award damages for any delay occasioned thereby. The arbiters shall fix their own compensation unless otherwise provided by agreement, and shall assess the cost and charges of the arbitration upon either or both parties. The award of the arbiters must be made in writing. 7. Abandonment of Contract 7.01 Abandonment by Contractor In case the Contractor should abandon and fail or refuse to resume work within ten (10) days after written notification from the Owner, or the Engineer, or if the Contractor fails to comply with the orders of the Engineer, when such orders are consistent with the Contract Documents, then, and in that case, where performance GC -28 gen and payment bonds exist, the Sureties on these bonds shall be notified in writing and directed to complete the work, and a copy of said notice shall be delivered to the Contractor. After receiving said notice of abandonment the Contractor shall not remove from the work any machinery, equipment, tools, materials or supplies then on the job, but the same, together with any materials and equipment under contract for the work, may be held for use on the work by the Owner or the Surety on the performance bond, or another contractor in completion of the work; and the Contractor shall not receive any rental or credit therefor (except when used in connection with Extra Work, where credit shall be allowed as provided for under Section 6, Extra Work and Claims), it being understood that the use of such equipment and materials will ultimately reduce the cost to complete the work and be reflected in the final settlement. Where there is no performance bond provided or in case the Surety should fail to commence compliance with the notice for completion hereinbefore provided for, within ten (10) days after service of such notice, then the Owner may provide for completion of the work in either of the following elective manners: (1) The Owner may thereupon employ such force of men and use such machinery, equipment, tools, materials and supplies as said Owner may deem necessary to complete the work and charge the expense of such labor, machinery, equipment, tools, materials and supplies to said Contractor, and expense so charged shall be deducted and paid by the Owner out of such moneys as may be due, or that may thereafter at any time become due to the Contractor under and by virtue of this Agreement. In case such expense isless than the sum which would have been payable under this contract, if the same had been completed by the Contractor, then said Contractor shall receive the difference. In case such expense is greater than the sum which would have been payable under this contract, if the same had been completed by said Contractor, then the Contractor and /or his Surety shall pay the amount of such excess to the Owner, or (2) The Owner under competitive bids, taken after notice published as required by law, may let the contract for the completion of the work under substantially the same terms and conditions which are provided in this contract. In case there is any increase in cost to the Owner under the new contract as compared to what would have been the cost under this contract, such increase shall be charged to the Contractor and the Surety shall be and remain bound therefor. However, should the cost to complete any such contract prove to be less than would have been the cost to complete under this contract, the Contractor and /or his Surety shall be credited therewith. GC -29 When the work shall have been substantially completed the Contractor and his Surety shall be so notified and Certificates of Completion and Acceptance, as provided in Paragraph 5.06 hereinabove, shall be issued. A complete itemized statement of the contract accounts, certified to by the Engineer as being correct, shall then be prepared and delivered to the Contractor and his Surety, whereupon the Contractor and /or his Surety, or the Owner as the case may be, shall pay the balance due as reflected by said statement, within fifteen (15) days after the date of such Certificate of Completion. In the event the statement of accounts shows that the cost to complete the work is less than that which would have been the cost to the Owner had the work been completed by the Contractor under the terms of this contract; or when the Contractor and /or his Surety shall pay the balance shown to be due by them to the owner, then all machinery, equipment, tools, materials or supplies left on the site of the work shall be turned over to the Contractor and /or his Surety. Should the cost to complete the work exceed the contract price, and the Contractor and /or his Surety fail to pay the amount due the Owner within the time designated hereinabove, and there remains any machinery, equipment, tools, materials or supplies on the site of the work, notice thereof, together with an itemized list of such equipment and materials, shall be mailed to the Contractor and his Surety at the respective addresses designated in this contravt,'provided, however, that actual written notice given in any manner will satisfy this condition. After mailing, or other giving of such notice, such property shall be held at the risk of the Contractor and his Surety subject only to the duty of the Owner to exercise ordinary care to protect such property. After fifteen (15) days from the date of said notice the Owner may sell such machinery, equipment, tools, materials or supplies and apply the net sum derived from such sale to the credit of the Contractor and his Surety. Such sale may be made at either public or private sale, with or without notice, as the Owner may elect. The Owner shall release any machinery, equipment, tools, materials, or supplies, which remain on the work, and belong to persons other than the Contractor or his Surety, to their proper owners. The books on all operations provided herein shall be opened to the Contractor and his Surety. 7.02 Abandonment by Owner gencond.methpec In case the Owner shall fail to comply with the terms of this contract, and should fail to comply with said terms within ten (10) days after written notification by the Contractor, then the Contractor may suspend or wholly abandon the work, and may remove therefrom all machinery, tools and equipment, and all materials on the site of work that have not been included in payments to the Contractor and have not been wrought into the work. And thereupon the Engineer shall make an estimate of the total amount earned by the Contractor, which estimate shall include the value of all work actually completed by said Contractor (at the prices stated in the attached bid where unit prices are used), the value of all partially completed work at a fair and GC -30 equitable price, and the amount of all Extra Work performed at the prices agreed upon, or provided for by the terms of this contract, and a reasonable sum to cover the cost of any provisions made by the Contractor to carry the whole work to completion and which cannot be utilized. The Engineer shall then make a fmal statement of the balance due the Contractor by deducting from the above estimate all previous payments by the Owner and all other sums that may be retained by the Owner under the terms of this Agreement and shall certify same to the Owner who shall pay to the Contractor on or before thirty (30) days after the date of the notification by the Contractor the balance shown by said final statement as due the Contractor, under the terms of this Agreement. 8. Subcontractors 8.01 Award of Subcontracts for Portions of the Work gencond.mst/spec Unless otherwise specified in the Contract Documents or in the Instructions to Bidders, the Contractor, as soon as practicable after the award of the Contract, shall furnish to the Engineer in writing for acceptance by the Owner and the Engineer a list of the names of the Subcontractors proposed for the principal portions of the work. The Engineer shall promptly notify the Contractor in writing if either the Owner or the Engineer, after due investigation, has reasonable objection to any Subcontractor on such list and does not accept him. Failure of the Owner or Engineer to make objection promptly to any Subcontractor on the list shall constitute acceptance of such Subcontractor. The Contractor shall not contract with any Subcontractor or any person or organization (including those who are to furnish materials or equipment fabricated to a special design) proposed for portions of the work designated in the Contract Documents or in the Instructions to Bidders or, if none is so designated, with any Subcontractor proposed for the principal portions of the work who has been rejected by the Owner and the Engineer. The Contractor will not be required to contract with any Subcontractor or person or organization against whom he has a reasonable objection. If the Owner or Engineer refuses to accept any Subcontractor or person or organization on a list submitted by the Contractor in response to the requirements of the Contract Documents or the Instructions to Bidders, the Contractor shall submit an acceptable substitute and the Contract amount shall be increased or decreased by the difference in cost occasioned by such substitution and an appropriate change order shall be issued; however, no increase in the Contract amount shall be allowed for any such substitution unless the Contractor has acted promptly and responsively in submitting for acceptance any list or lists of names as required by the Contract Documents or the Instructions to Bidders. GC -31 gencond.msl/spec If the Owner or the Engineer requires a change of any proposed Subcontractor or person or organization previously accepted by them, the Contract amount shall be increased or decreased by the difference in cost occasioned by such change and an appropriate Change Order shall be issued. The Contractor shall not make any substitution for any Subcontractor or person or organization who has been accepted by the Owner and the Engineer, unless the substitution is acceptable to the Owner and the Engineer. 8.02 Subcontractual Relations All work performed for the Contractor by a Subcontractor shall be pursuant to an appropriate written agreement between the Contractor and the Subcontractor (and where appropriate between Subcontractors and Sub - subcontractors) which shall contain provisions that: (1) preserve and protect the rights of the Owner and Engineer under the Contract with respect to the work to be performed under the subcontract so that the subcontracting thereof will not prejudice such rights; (2) require , that such work be performed in accordance with the requirements of the Contract Documents; (3) require submission to the Contractor of the applications for payment under each . subcontract to which the Contractor is a party, in reasonable time to enable the Contractor to apply for payment in accordance with this contract; (4) require that all claims for additional costs, extensions of time, damages for delays or otherwise with respect to subcontracted portions of the work shall be submitted to the Contractor (via any Subcontractor or Sub - subcontractor where appropriate) in sufficient time so that the Contractor may comply in the manner provided in the Contract Documents for like claims by the Contractor upon the Owner; (5) obligate each subcontractor specifically to consent to the provisions of this section. A copy of all such Subcontract Agreements shall be filed by the Contractor with the Engineer before the Subcontractor shall be allowed to commence work. 8.03 Payments to Subcontractors The Contractor shall pay each Subcontractor, upon receipt of payment from the Owner, an amount directly based upon the value of the work performed and allowed to the Contractor on account of such Subcontractor's work, less the percentage GC -32 retained from payments to the Contractor. The Contractor shall also require each Subcontractor to make similar payments to his subcontractors. If the Engineer fails to approve a payment for any cause which is the fault of the Contractor and not the fault of a particular Subcontractor, the Contractor shall pay the Subcontractor on demand, made at any time after the Certificate for Payment should otherwise have been issued, for his work to the extent completed, less the retained percentage. The Engineer may, on request and at his discretion, furnish to any Subcontractor, if practicable, information regarding percentages of completion certified to the Contractor on account of work done by such Subcontractors. Neither the Owner nor the Engineer shall have any obligation to pay or to see to the payment of any moneys to such Subcontractor except as may otherwise be required. 9. Separate Contracts 9.01 Owner's Right to Award Separate Contracts gencond.mst/cpec The Owner reserves the right to award other contracts in connection with other portions of the project under these or similar conditions of the Contract. When separate contracts are awarded for different portions of the Project, The Contractor" in the contract documents in each case shall be the contractor who signs each separate contract. 9.02 Mutual Responsibility of Contractors The Contractor shall afford other contractors reasonable opportunity for the introduction and storage of their materials and equipment and the execution of their work, and shall properly connect and coordinate his work with theirs. If any part of the Contractor's work depends for proper execution or results upon the work of any other separate contractor, the Contractor shall inspect and promptly report to the Engineer any apparent discrepancies or defects in such work that render it unsuitable for such proper execution and results. Failure of the Contractor to so inspect and report shall constitute an acceptance of the other contractor's work as fit and proper to receive his Work, except as to defects which may develop in the other separate contractor's work after the execution of the Contractor's Work. Should the Contractor cause damage to the work or property of any separate contractor on the project, the Contractor shall, upon due notice, settle with such GC -33 other contractor by agreement or arbitration, if he will so settle. If such separate contractor sues the Owner or initiates an arbitration proceeding on account of any damage alleged to have been so sustained, the Owner shall notify the Contractor who shall defend such proceedings at the Contractor's expense, and if any judgment or award against the Owner arises therefrom the Contractor shall pay or satisfy it and shall reimburse the Owner for all attorney's fees and court or arbitration costs which the Owner has incurred. 9.03 Cutting and Patching under Separate Contracts The Contractor shall be responsible for any cutting, fitting and patching that may be required to complete his work except as otherwise specifically provided in the Contract Documents. The Contractor shall not endanger any work of any other contractors by cutting, excavating or otherwise altering any work and shall not cut or alter the work of any other contractor except with the written consent of the Engineer. 10. Protection of Persons and Property 10.01 Safety Precautions and Programs 10.02 Safety of Persons and Property gcncond.mstspec Any costs caused by defective or ill-timed work shall be borne by the party responsible therefor. The Contractor shall be responsible for initiating, maintaining and supervising all safety precautions and programs in connection with the work. The Contractor shall take all reasonable precautions for the safety of, and shall provide all reasonable protection to prevent damage, injury, or loss to: (1) all employees on the work and all other persons who may be affected thereby: (2) all the work and all materials and equipment to be incorporated therein, whether in storage or off the site, under the care, custody or control of the Contractor or any of his Subcontractors or Sub - Subcontractors; and (3) other property at the site or adjacent thereto, including trees, shrubs, ]awns, walks, pavements, fences, roadways, structures and utilities not designated for removal, relocation or replacement in the course of construction. GC -34 gencond.mst/spec The Contractor shall comply with all applicable laws, ordinances, rules, regulations and lawful orders of any public authority having jurisdiction for the safety of persons or property or to protect them from damage, injury or loss. He shall erect and maintain, as required by existing conditions and progress of the work, all reasonable safeguards for safety and protection, including posting danger signs and , warnings against hazards, promulgating safety regulations and notifying ownes and users of adjacent utilities. When the use or storage of explosives or other hazardous materials or equipment is necessary for the execution of the work, the Contractor shall exercise the utmost care and shall carry on such activities under the supervision of properly qualified personnel. ' All Blasting, including methods of storing and handling explosives and highly inflammable materials, shall conform to Federal, State, Local Laws and Ordinances. All City Ordinances shall be complied with even though some or all of the blasting is done outside the City Limits unless the applicable Ordinance is in conflict with the law of the jurisdiction where the action is being taken. The following is a list of requirements in addition to Federal, State, and Local Laws and Ordinances. 1. The Contractor shall furnish the City of Round Rock with a Certificate of Blasting Insurance in the amount of $300,000.00 for each contract, at least twenty-four hours prior to using explosives. A blasting permit must be obtained from the City at least five (5) days prior to use of explosives. If Blasting is covered tintler the Contractors General Insurance Certificate for each contract, a separate blasting certificate will not be required. 2. The following public utility companies and City Department will be notified by the Contractor, on every occasion, at least twenty-four (24) hours prior to the use of explosives: Police, Fire, Water and Wastewater, Electric, Gas, Telephone and the City Engineering Department. 3. Explosive materials to be used shall be limited to blasting agents and dynamite, unless prior approval of other materials is obtained in writing from the Engineering Department. 4. During blasting, all reasonable precautions shall be taken to protect pedestrians, passing vehicles, and public or private property. Blasting mats or protective cover shall be used when required by the City Inspector, the permit, or by safe blasting practices. GC -35 gencond.mst/spec 5. All explosives shall be stored in accordance with Chapter 5, Section 5.200, of the City Code. 6. The Director of Engineering or his representative shall have the right to limit the use of explosives and/or blasting methods which in his opinion are dangerous to the public or nearby property of any kind. 7. The Contractor, at his expense, shall promptly repair or replace all items known to be damaged as a result of blasting. All claims of damage shall be investigated by the City or by Consulting Firms approved by the City. 8. The Contractor shall maintain accurate records throughout the Blasting operations showing the type explosive used, number of holes, pounds per hole, depth of hole, total pounds per shot, delays used, date and time of blast and initials of the Inspector. The Contractor is fully responsible for all claims resulting from his blasting operation. All damage or loss to any property referred to in this article caused in whole or in part by the Contractor, any Subcontractor, any Sub - subcontractor, or anyone directly or indirectly employedby any of them, or by anyone for whose acts any of them may be liable, shall be remedied by the Contractor, except damage or loss attributable solely to faulty Drawings or Specifications or solely to the acts or omissions of the Owner or Engineer or anyone employed by either of them, and not attributable in any degree to the fault or negligence of the Contractor. The contractor shall designate a responsible member of his organization at the site whose duty shall be the prevention of accidents. This person shall be the Contractor's superintendent unless otherwise designated in writing by the Contractor to the Owner and the Engineer. 10.03 Location and Protection of Utilities Notwithstanding any other provision of this contract, the Contractor shall be solely responsible for the location and protection of any and all public utility lines and utility customer service lines in the work area. The Contractor shall exercise due care to locate and to mark, uncover or otherwise protect all such lines in the construction zone and any of the Contractor's work or storage areas. Upon request, the Owner shall provide such information as it has about the location and grade of water, sewer, gas, and telephone and electric lines and other utilities in the work area but such information shall not relieve or be deemed to be in satisfaction of the Contractor's obligation hereunder, which shall be primary and nondelegable. Any such lines damaged by the Contractor's operations shall be immediately repaired by the Contractor or he shall cause such damage to be repaired at his expense. GC -36 5.0 SPECIAL CONDITIONS SECTION 01- INFORMATION 01 - 01 ENGINEER The word "Engineer" in these Specifications shall be understood as referring to Fisher, Hagood & Hejl, Inc., 301 Hesters Crossing, Suite 110, Round Rock, Texas 78681, Engineer of the Owner, or the Engineer's authorized representative to act in any particular position for the Owner. 01 -02 COPIES OF PLANS AND SPECIFICATIONS FURNISHED The Agreement will be prepared in not less than five (5) counterpart (original signed) sets. Owner will furnish Contractor two (2) sets of conforming Contract Documents and Specifications and four (4) sets of Plans free of charge, and additional sets will be obtained from the Engineer at commercial reproduction rates plus 10% fo; iandling. 01 -03 GOVERNING CODES All construction as provided for under these Plans and Specifications shall be governed by any existing Resolutions, Codes and Ordinances, and any subsequent amendments or revisions thereto as set forth by the Owner. 01 -04 LIQUIDATED DAMAGES FOR FAILURE TO COMPLETE ON TIME The Contractor agrees that time is of the essence for this Contract and that the definite value of damages which would result from delay would be incapable of ascertainment and uncertain, so that for each day of delay beyond the number days of herein agreed upon for the completion of the work herein specified and contracted for, after due allowance for such extension of time as is provided for under the provisions of Section 4.02 of the General Conditions, the Owner may withhold permanently from the Contractor's total compensation, not as penalty but as liquidated damages, the sum of $100.00 per calendar day. specond.mst /spec SC -1 1 01 -05 LOCATION The location of work shall be as mentioned in the Notice to Bidders and as indicated on Plans. 01 -06 USAGE OF WATER All water used during construction shall be provided by the City. The City shall specify the location from which the Contractor is to procure water. The Contractor shall be responsible for providing all apparatus necessary for procuring, storing, transporting and using water during construction. The Contractor shall strive to use that amount of water which is reasonable to perform the work associated with this contract and shall endeavor to avoid excessive waste. The Contractor will be required to pay for all water used if it is found that unnecessary or excessive waste is occurring during construction. 01 -07 PAY ESTIMATES If pay estimates from the Contractor are not received by the Engineer on or before the time specified in Section 5.04 of the General Conditions, then the pay estimate will not be processed and will be returned to Contractor.' SECTION 02- SPECIAL CONSIDERATIONS 02 -01 CROSSING UTILITIES Prior to commencing the work associated with this contract, it shall be the Contractor's responsibility to make arrangements with the Owners of such utility companies to uncover their particular utility lines or otherwise confirm their location. Certain utility companies perform such services at their own expense, however, where such is not the case, the Contractor will cause such work to be done at his own expense. 1 specond.mst /spec SC -2 ' 1 02 -02 UTILITY SERVICES FOR CONSTRUCTION The Contractor will be responsible for providing his own utility services while performing the work associated with this contract. No additional payment will be made for this item. 02 -03 GUARANTEES The Contractor warrants the materials and workmanship and that the work is in conformance with the plans and specifications included in this contract for the period that the Maintenance Bond, as outlined in Section 04 of the Special Conditions, is in effect. Upon notice from Owner, the Contractor shall repair defects in all construction or materials which develop during specified period and at no cost to Owner. Neither final acceptance, Certificate of Completion, final payment nor any provision in Contract Documents relieves Contractor of above guarantee. , Notice of observed defects will be given with reasonable promptness. Failure to repair or replace defect upon notice entitles Owner to repair or replace same and recover reasonable cost thereof from Contractor. 02 -04 WAGE RATE Contractors are required to pay the prevailing wage rates to laborers, workmen and mechanics employed on behalf of the City engaged in the construction of public works. The wage rate for these jobs shall be the general prevailing wage rates for work of a similar character. This applies to Contractors and Subcontractors. The Contractor and Subcontractors shall keep and make available records of workers and their wages. Prevailing wage rates are published by the U.S. Department of Labor, Bureau of Labor Statistics, Southwestern Division and the Texas Employment Commission for the Austin Job Bank Area. The wage rate shall not be less than the minimum wage rates set by the U.S. Department of Labor, Employment Standards Administration, Wage and Hour Division. There is a penalty of $10.00 per worker per day or portion of a day that the prevailing wage rate is not paid by the Contractor or Subcontractor. specond.mst /spec SC - 02 -05 LIMIT OF FINANCIAL RESOURCES The Owner has a limited amount of financial resources committed to this Project; therefore, it shall be understood by all bidders that the Owner may be required to change and /or delete any items which he may feel is necessary to accomplish all or part of the scope of work within its limit of financial resources. Contractor shall be entitled to no claim for damages anticipated profits on any portion of work that may be omitted. At any time during the duration of this contract, the Owner reserves the right to omit any work from this contract. Unit prices for all items previously approved in this contract shall be used to delete or add work per change order. 02 -06 CONSTRUCTION REVIEW The Owner shall provide a project representative to review the quality of materials and workmanship. 02 -07 LIMITS OF WORK AND PAYMENT It shall be the obligation of the Contractor to complete all work included in this Contract, so authorized, by the Owner, as described in the contract documents and technical specifications. All items of work not specifically paid for in the bid proposal shall be included in the unit price bids. Any question arising as to the limits of work shall be left up to the interpretation of the Engineer. 02 -08 PAYMENT FOR MATERIALS ON HAND Owner will not pay for materials on hand. Payment will be made for work completed in accordance with monthly estimate procedure stipulated in the General Conditions of the Agreement. 02 -09 "AS- BUILT" DRAWINGS The Contractor shall mark all changes and revisions on all of his copies of the working drawings during the course of the Project as they occur. Upon completion of the Project and prior to final specond.mst /spec SC - acceptance and payment, the Contractor shall submit to the Engineer one set of his working drawings, dated and signed by himself and his project superintendent and labeled as "As- Built ", that shows all changes and revisions outlined above and that shows field locations of all above ground appurtenances including but not limited to valves, fire hydrants and manholes. These as -built drawings shall become the property of the Owner. Each appurtenance shall be located by at least two (2) horizontal distances measured from existing, easily identifiable, immovable appurtenances such as fire hydrants or valves. Property pins can be used for as- builts tie -ins provided no existing utilities as previously described are available. Costs for delivering as -built drawings shall be subsidiary to other bid items. 02 -10 LAND FOR WORK Owner provides, as indicated on Drawings, land upon which work is to done, right,of -way for access to same and such other lands which are designated for use of Contractor. Contractor provides, at his expense and without liability of Owner, any additional land and access thereto that may be required for his construction operations, temporary construction facilities, or for storage of materials. 02 -11 DEVIATIONS OCCASIONED BY UTILITY STRUCTURES Whenever existing utilities, not indicated on Plans, present obstructions to grade and alignment of proposed improvements immediately notify engineer, who without delay, will determine if existing utilities are to be relocated, or grade and alignment of proposed improvements changed. Where necessary to move existing services,poles, guy wires, pipelines, etc., as determined by the Engineer, the Contractor will make arrangements with the owner of the utility to be moved and have it moved. The costs of any utility relocations will be at the Contractor's sole expense. Owner will not be liable for relocations costs or damages on account of delays due to changes made by owners of privately owned utilities which hinder progress of the work. specond.mst /spec SC - 1 02 -12 CONSTRUCTION STAKING All construction staking required to complete the work associated ' with this contract shall be provided by the Contractor. The Contractor shall be responsible for determining the layout and ' extent of staking necessary to construct the improvements to the lines and grades shown in the Plans. This item shall not be paid for separately and shall be considered subsidiary to other bid items. ' 1 1 SECTION 03- TRAFFIC CONTROL Access shall be provided for residents and emergency vehicles at all times. When it becomes necessary to restrict access, the Contractor shall notify all applicable agencies (ie. Fire Department, Police, E.M.S., Public Works, etc.). At the end of each day two lanes of traffic shall be opened to the public. The Contractor shall be responsible for all maintenance, signing and safety precautions necessary for traffic control. This item shall be considered subsidiary to other bid items and no additional compensation shall be given for complying with this Special Condition. 1 SECTION 04- MAINTENANCE BOND Per City of Round Rock Ordinances, a two (2) year Maintenance Bond naming the City of Round Rock as obligee will be required for public streets constructed without lime stabilization of subgrade material when the Plasticity Index of the subgrade is above 24. Maintenance Bond shall remain in effect for two (2) years from date of City of Round Rock acceptance of improvements. A one (1) year Maintenance Bond in the amount of one hundred (100 %) percent of the contract price will be required for all other improvements and shall be submitted prior to final payment. Such bonds shall be from an approved surety company holding a permit from the State of Texas to act as surety (and acceptable according specond.mst /spec SC - 1 to the latest list of companies holding certificates of authority from the Secretary of the Treasury of the United States) or other surety or sureties acceptable to the Owner prior to final payment. SECTION 5 INSURANCE Section 3.18 of the General Conditions of the Agreement is hereby amended to include the following: 3.18 Insurance Contractor shall carry insurance in the following types and amounts for the duration of this Contract, which shall include items owned by Owner in care, custody and control of Contractor prior and during construction and warranty period, and furnish Certificates of, Insurance along with copies of policy declaration pages and all 'policy endorsements as evidence thereof: a. Statutory Worker's Compensation and minimum $100,000 Employers Liability Insurance. b. Commercial General Liability Insurance with minimum limits of $500,000 per occurrence and $1,000,000 Aggregate or $500,000 for this designated project and $100,000 Fire Damage. c. Automobile Liability Insurance for all owned, nonowned and hired vehicles with minimum limits for Bodily Injury of $250,000 for each person and $500,000 for each occurrence and Property Damage limits of $100,000 or Combined Single Limit of $600,000. d. On all new or remodeling building projects: All Risk Builders Risk Insurance for insurable building projects shall be insured in the amount of the contract price for such improvements. Owner and Contractor waive all rights against each other for damages caused by fire or other perils specond.mst /spec SC - to the extent covered by Builders Risk Insurance required under this section, except as to such rights as they may have in the proceeds of such insurance. Contractor shall require similar waivers by Subcontractors and Sub - subcontractors. e. Owner and Contractor's Protective Policy. The Contractor shall provide and maintain during the life of this contract and until all work under said contract has been completed and accepted by the Owner, an Owner's and Contractor's Protective Policy which co- insures the Owner and the Owner's agents and employees with the same Commercial General Liability coverage as described above, entitled "Commercial General Liability Insurance." When offsite storage is permitted, policy will be endorsed for transit and off site storage in amounts sufficient to protect property being' transported or stored. This insurance shall include, as insured, City of Round Rock, Contractor, Subcontractors and Sub - subcontractors in the work, as their respective interest may appear. If insurance policies are not written for.amount specified in b. and c. above, Contractor is required to carry an Excess Liability Insurance Policy for any difference in amounts specified. Contractor shall be responsible for deductibles and self insured retentions, if any, stated in policies. Any self insured retention shall not exceed ten percent of minimum required limits. All deductibles or self insured retentions shall be disclosed on Certificate of Insurance required above. Contractor shall not commence work at site under this Contract until he has obtained required insurance and until such insurance has been reviewed by Owner's Contract Administration Office. Contractor shall not allow any Subcontractors to commence work until insurance required has been obtained and approved. Approval of insurance by Owner shall not relieve or decrease liability of Contractor hereunder. specond.mst /spec SC -8 Insurance to be written by a company licensed to do business in the State of Texas at the time policy is issued and acceptable to owner. Contractor shall produce an endorsement to each effected policy: 1. Naming City of Round Rock, 221 East Main Street, Round Rock, Texas 78664 as additional insured (except Workers' Compensation and Builders Risk). 2. That obligates the insurance company to notify Joanne Land, City Secretary, City of Round Rock, 221 East Main Street, Round Rock, Texas 78664 of any and all changes to policy 30 days prior to change. 3. That the "other" insurance clause shall not apply to Owner where City of Round Rock is an additional insured shown on policy. , It is intended that policies required in this agreement, covering both Owner and Contractor, shall be considered primary coverage as applicable. Contractor shall not cause any insurance to be canceled nor permit any insurance to lapse during term of this Contract or as required in the Contract. If Contractor is underwritten on a claim -made basis, the retroactive date shall be prior to, or coincident with, the date of this Contract and the Certificate of Insurance shall state that coverage is claims made and also the retroactive date. Contractor shall maintain coverage for duration of this Contract and for two years following completion of this Contract. Contractor shall provide the City annually a Certificate of Insurance as evidence of such insurance. It is further agreed that Contractor shall provide Owner a 30 day notice of aggregate erosion, an advance of the retroactive date, cancellation and /or renewal. specond.mst /spec SC -9 It is also agreed that Contractor will invoke the tail option at request of Owner and the Extended Reporting Period (ERP) premium shall be paid by Contractor. Owner reserves the right to review insurance requirements of this section during effective period of the Contract and to make reasonable adjustments to insurance coverages and their 'limits when deemed necessary and prudent by Owner based upon changes in statutory law, court decisions or the claims history of the industry as well as Contractor. Owner shall be entitled, upon request, and without expense, to receive copies of policies and all endorsements thereto and may make any reasonable requests for deletion or revision or modification of particular policy terms, conditions, limitations or exclusions, except where policy provisions are established by law or regulation binding upon either of the parties hereto or the underwriter on any of such policies. Actual losses not covered by insurance as required by the section shall be paid by Contractor. specond.mst /spec SC -10 6.0 TECHNICAL SPECIFICATIONS ITEM 1 GENERAL DESCRIPTION 1.01 SCOPE OF WORK The work covered by these Specifications consists of furnishing all labor, equipment, appliances, materials and performing all operations in connection with the installation of approximately 7,300 SY of new HMAC, base, and subgrade prep., 16,150 SF of combined concrete and landscaped median, curb and gutter, drainage structures and piping, as well as pavement marking and temporary and permanent erosion and sedimentation controls complete in accordance with the Plans, and subject to the terms and conditions of the Contract Documents. 1.02 GOVERNING TECHNICAL SPECIFICATIONS NOTE: The item number designation shown in parentheses adjacent to captions herein is an revised or amended reference to City of Austin Standard Specifications. The current City of Austin Standard Specifications as adopted and amended by the City of Round Rock and the current City of Austin Erosion and Sedimentation Control Manual are hereby referred to and included in this contract as fully and to the same extent as if copied at length herein and they shall be applied to this project except as modified in these Specifications and on the Plans. Note that copies of the Austin Specifications governing the major items of work are attached at the end of this section for ease of reference. techspec.mst/spec Wherever the term "City of Austin" is used in the Austin Specifications, it shall be construed to mean the City of Round Rock. Wherever the term "Engineer" is used in the Austin Specifications, it shall be construed to mean the City of Round Rock. TS -1 1 ITEM 2 CONTROL OF WORK 2.01 CLEAN -UP 2.01.1 CONSTRUCTION SITE During construction the Contractor shall keep the site free and ' clean from all rubbish and debris and shall clean -up the site ' promptly when notified to do so by the Engineer. The Contractor shall, at his own expense, maintain the streets and roads free from dust, mud, excess earth or debris which constitutes a nuisance or danger to the public using the thoroughfare, or the II of adjacent properties. Care shall be taken to prevent spillage on streets and roads over ' which hauling is done, and any such spillage or debris deposited on streets, due to the Contractor's operations, shall be immediately ' removed. 2.01.2 BACKWORK ' The Contractor shall coordinate his dperations in such a manner as to prevent the amount of clean -up and completion of back works from becoming excessive. Should such a condition exist, the Engineer may order all or portions of the work to cease and refuse to allow any work to commence until the back work is done to the Engineer's satisfaction. 2.02 GRADING The Contractor shall do such grading in and adjacent to the construction area associated with this contract as may be necessary to leave such areas in a neat and satisfactory condition approved by the Engineer. 1 iechspec.msUspec TS -2 1 ITEM 3 EXAMINATION AND REVIEW 3.01 EXAMINATION OF WORK The work covered under this Contract shall be examined and reviewed by the Engineer, representatives of all governmental entities which have jurisdiction, and the Owner's authorized representative. The quality of material and the quality of installation of the improvements shall be to the satisfaction of the Engineer. It shall be the Contractor's responsibility for the construction methods and safety precautions in the undertaking of this Contract. 3.02 NOTIFICATION The Engineer and Owner must be notified a minimum of 24 -hours in advance of beginning construction, testing, or requiring presence of the Engineer, project representative, or Owner's representative. 3.03 CONSTRUCTION STAKING The Engineer shall furnish the Contractor reference points and benchmarks that, in the Engineer's opinion, provide sufficient information for the Contractor to perform construction staking. 3.04 PROTECTION OF STAKES. MARKS. ETC. All engineering and surveyor's stakes, marks, property corners, etc., shall be carefully preserved by the Contractor, and in case of destruction or removal during the course of this project, such stakes, marks, property corners, etc., shall be replaced by the Contractor at the Contractor's sole expense. techspeamsuspec TS -3 ITEM 4 PROTECTION AND PRECAUTION 4.01 WORK IN FREEZING WEATHER Portions of the work may continue as directed by the Engineer. 4.02 PROTECTION OF TREES, PLANTS AND SHRUBS The Contractor shall take necessary precautions to preserve all existing trees, plants and shrubs but where it is justifiable and necessary the Contractor may remove trees and plants for construction right -of -way but only with approval of the Engineer. 4.03 TRAFFIC CONTROL MEASURES AND BARRICADES Traffic control measures and barricades shall be installed in accordance with the Texas Manual of Uniform Traffic Control Devices and in other locations deemed necessary by the Engineer, for the protection life and property. Under no circumstances will any existing road be permitted to remain closed over a weekend. No separate pay will be made for this item. Costs for this item shall be subsidiary to other items of.work. 4.04 PROPERTY LINES AND MONUMENTS The Contractor shall be responsible for the protection, reference and resetting of property corner monuments if disturbed. 4.05 DISPOSAL OF SURPLUS MATERIAL The Contractor shall at his own expense, make arrangement for the disposal of surplus material, such as rock, trees, brush and other unwanted backfill materials. tcchspec.msUspcc TS -4 4.06 CONTRACTOR'S USE OF PREMISES techspec.mst/spec The Contractor shall, at his own expense, provide additional space as necessary for his operations and storage of materials. ITEM 5 MATERIALS 5.01 TRADE NAMES Except as specified otherwise, wherever in the specifications an article or class of material is designated by a trade name or by the name or catalog number of any maker, patentee, manufacturer, or dealer, such designations shall be taken as intending to mean and specify the articles described or another equal thereto in quality, finish, and serviceability for the purpose intended, as may be determined and judged by the Engineer in his sole discretion. 5.02 MATERIALS AND WORKMANSHIP No material which has been used by the Contractor for any temporary purpose whatever is to be incorporated in the permanent structure without the written consent of the Engineer. Where materials or equipment are specified by a trade or brand name, it is not the intention of the owner to discriminate against an equal product of another manufacturer, but rather to set a definite standard of quality for performance, and to establish an equal basis for the evaluation of bids. Where the words "equivalent ", "proper" or "equal to" are used, they shall be understood to mean that the item referred to shall be "proper ", the "equivalent" of, or "equal to" some other item, in the opinion or judgement of the Engineer. Unless otherwise specified, all materials shall be the best of their respective kinds and shall be in all cases fully equal to approved samples. Notwithstanding that the words "or equal to" or other such expressions may be used in the specifications in connection with a material, manufactured article or process, the material, article or process specifically designated TS -5 tochapec.msUspec shall be used, unless a substitute is approved in writing by the Engineer, and the Engineer will have the right to require the use of such specifically designated material, article or process. 5.03 HOT MIX ASPHALTIC CONCRETE (HEM 340) Provide a uniform mixture of coarse aggregate, fine aggregate, asphaltic material, and mineral filler graded as defined by Type D (Fine Graded Surface Course). 5.04 CONCRETE FOR STRUCTURES (HEM 403) All concrete shown shall be Class A as defined by Standard Specifications. Slump shall be a maximum of 4 inches and minimum of 2 inches. Concrete shall be air - entrained. 5.05 REINFORCING STEEL (ITEM 406) All reinforcing steel shall be ASTM A615, Grade 60. TS -6 WHEREAS, the City of Round Rock has duly advertised for bids for improvements to Creekbend Boulevard, and WHEREAS, Round Rock Construction, Inc. has submitted the lowest and best bid, and WHEREAS, the City Council wishes to accept the bid of Round Rock Construction, Inc., Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City a contract with Round Rock Construction, Inc. for improvements to Creekbend Boulevard, a copy of said contract being attached hereto and incorporated herein for all purposes. RESOLVED this 24th day of June, 1993. ATTEST: NE LAND, City Secretary KS /RESOL VnON/RS06243B RESOLUTION NO. R 93-06. -c2-9,6 CHARLES CUtPEPPER, Mayor City of Round Rock, Texas 01100.004 Ba Glean., Cary of Round Hark He E.6naled oa.apin and Ik404...I ken LW Pd. Ta1d IN Pine Taal um Hire Told IAN Pion T.64 U0Po Total No. gaily In Wvb In Rams Prim In F., Price FFp.s Pin In Nunn Price FFpm Wee mutt Wt0YEDFMS 1,000 V 58 Fence, compete one F dom. 1150 $2,70000 pr Gaol foot. CO V Redd B. cOffISBN and n pare, pr fried font. 1 FA 50001004 Ca410.01e, Entrance, .pinta ad n plan. Par mob. 1.200 .8 Omenp, Grubbing of ROM per Spend Gan4Oan and 00o, complete and i. Nom per peed root. 5 9,650 SY Street Ea0.v0an end Oopeml. to Muds dry eaoo.abcn nRm 8.0.0 to groin for construct, of 030.00, P. 1. and in place, pr 05000 Yard. 6 9.650 SY Su0gmd. P.pmlen, conp1e1e and n Owe. pin 000x• yard. 7 7.450 57 16 6n.. complete and n Noce, pr 05000 0.04 8 7,410 SY 2 Aspalt, complete it plans, p.r .au00 yard, 1,200 V 5a. Cut Peernsl. co•pete ad n 0400*. pr G.ml lop6. 10 2,900 SF Eoot.g Permanent PemaM, 000940. ad F pone. p more foot. 11 1,260 IF Gan end Gutter 43.03 in waling 17.60 18.40000 1800 59,600.00 pavement section, complete end in pace, FY fined foot, 12 6,100 V Curb a4 Cutler, including bale 54.4015 and trA4d back of curb. oerp44 end F Once. per Wool feel. ROUO ROCK CONSTRUCTION ROCERSCOCS0RUC1KIN AOSf lENG./T:RM 0E00920 CONSTRUCT/3N CHASMCONIPACING 14.75 124975.00 S1 60 12.880.00 11.35 1243060 11500 160000 112.00 1460.00 114.00 156100 11500 4720 00 11500 460060 11.54 52700 CO 4 13.24040 1550.00 955030 000.00 1500.00 5 CO $40000 9500 CO 150040 550000 150000 SA 00 1 4 .8 0000 13 00 13. 600.00 13 00 13.600 O0 ' 1300 13.600 00 1610 19.990.00 1300 120,05000 1330 136,87000 13 426,95000 14 70 44535500 16 165.62000 1690 10.68540 1 17,720 60 1200 41030000 4010 117,370 00 1110 19.65000 1720 43335600 17 95 159,466 00 17.70 15759660 17.60 455.3 00 17 65 156,70660 14.10 13038140 5410 430,36110 943 13136100 13.70 117,40740 1375 127.76750 4036 11,20010 1200 1200060 1100 11,26003 Si CO 41,20040 1040 4480.20 1660 11,450.00 90.40 51,16000 1050 46,05000 50.30 1670 00 SO40 51,16000 47.30 9476100 15.50 133,55000 45.45 134.46560 4650 1710000 1800 $2.30000 16.50 541,46000 $200 442706.00 Creelnen &deem 4lemmn City m Room Pock ROOOROCK CONSTRUCTOR R00O5 C018(1810110N AUSTIN t]ICINCER91C REDC9:0170167R110T1011 CRISCOCONORACTNC Imo 0.Gneled Sesuyba not W Resat Ron W Rica Talal 09418,4.. Total W Pao Total W Re Tech W Non Total 114 Oneroy In Wade Napes R4. In Forst Price IFp+s 84 hrmute Rio In roves Pl'u 13 1,200 1F Asphalt repor abg nes alb k 746ey, 8200 {2.00000 1130 91.800 00 1500 56,00000 3200 12490 90 83.75 {1,50000 complete mtl in place. per Men Met 14 1.150 5F CO24et. Y6, ro plet. end in place, 11,80 $207000 9220 92,530,40 9235 82,702.50 1220 12.530 00 9200 12,30000 per scone loot 15 8,550 57 5108.20 echidna lords t horn finish. 9210 117955.00 3200 117,100.00 1235 320,09250 3220 818,810.00 1190 116.24500 compete 0w a place. per moon 1001 16 2 FA Boom.. (50 lied F «6), complete 11.200,00 12.40000 81,10000 /2-200 CO 11,00000 12,00000 41.400.00 12.80000 81.00000 T2.00000 and In place. per lock. 17 4.300 SY Permanent Fm en Cont.. Complete $0.80 83,44020 1060 1256000 90.75 /5,22500 1035 31,50500 11.50 16,45000 amd n peon per mono lam 18 650 LF Pavement Working (8e502644a Pont) 3060 $39000 1055 8 357.50 4030 83325 CO 80.0 132500 10.50 8325 CO Sorel 44 9111e, complete area a place, per Meet Met 19 3,400 LF Pavement Oohing (R.5.4. 7406) 10.30 81.02000 8015 18 ,400 10.30 91.020 00 8025 3850.00 9025 1852 00 Sorel 4 98.te, lQ tag • 40 00. compete ol'n place, Per 8non1 6441. 20 115 FA Pm<ret 600025, Satre Batton - Type 14 16 00 869000 1600 869000 16,40 169000 15.20 859800 /5.20 159800 mmpele a n in place, per eon, 21 5 EA Wed 14595r. of nd a6 coed .468 980.00 140000 970 CO 83m0 CO 875.00 /575 CO 117000 1055.90 80300 131500 panted and nonn complete area 'n place. per tech 22 5 FA Sl ap 59^0. mry amd it place. • 920000 81.00000 120000 81,00000 122000 91,100.00 127000 81,35020 118500 192500 per eons TOTAL STREET IFRO9O,ata5 102.31200 8217,56450 1228.104 00 1259.37400 8262,12350 Cree.ind Onll[VYN Edesmm OW of lee, 0415 Nom Ednded N¢ Tunny ORAIIAGE IMPROVEMENTS Ompfiad Ui Pl'v dim le Waab 23 5 EA 1P Curb Net. e.g..... pan, Der earA. 24 1 EA 20 Curb Yet, (4 4Ne 10) complete and in pas, Per hoc. 25 200 IF 16' RCP. CI®I Storm Sever, compete are in pea, Per Geed foal. 3 EA holey Outten, compete and in pore. per each 27 200 IF Trench Safety. a rmpd. and n pen, per Pied loot, 26 390 IF 18' RCP, Clam 11 Stem 5.- (3 - 1301.0920) .AA 6 to 1 end treatment complete and in pan, per geed 1401, 29 2.000 SF S Gael. IBpmp for ces0 end ImNwt. complete Oed'n Owe. per mpmn Nall. TOTAL DRAE4AGE WROYEIEN15 TOTAL P18CE 60 FOR STREET Ale dUE1ACE EEiIO5F7F31E5 ROAD ROCK CONSTRUICT.. ROGERS CONSTRUCTON A402140GIEERDLG REDOICO CONS1RUCT3P 6:PASCO COI0IRACUIG UAPr. Ted Uri Prim Told um Pio Ted U6Prm TOW Uri Prior Ted FFgas Him 5Fgmw Prim 9Fgrs Rim In Form Rim In rpm Plum 81,90000 89.500.00 42.60000 112,00000 42.05040 410,25000 41,900.00 49,500 90 12.55030 112350.00 1260000 4261000 4.000.0 10.00000 12.80000 42.60000 2.000.00 1260040 13.50000 63.500 00 13500 12.00000 13000 46.00040 12000 86.600.00 .ti 43000 48,00000 15300 111.000.00 41.2040 15.60040 11.60000 10.60000 11.75040 15.25000 11.60]00 ILA0000 1250000 47.50000 1203 TACO00 4500 81.00000 8100 4200 00 4005 110.00 4600 680000 124 CO 110.92000 12200 16.56000 125.00 19.75040 131.00 812090 CO 12000 17.600.00 4100 10.25.00 11.80 13.900 00 1635 13.10000 44.60 19.03000 12.25 44,500 861 62000 139.96000 462150 00 144.60040 8.7A M 00 4243,93200 1257.844 50 120.254 00 1201974 CO 8309.973 50 DATE: June 22, 1993 SUBJECT: City Council Meeting, June 24, 1993 ITEM: 9B. Consider a resolution authorizing the Mayor to enter into a contract for street improvements to Creekbend Boulevard. STAFF RESOURCE PERSON: Jim Nuse STAFF RECOMMENDATION: On June 8, 1993, five (5) bids were received for the construction of Creekbend Blvd. Round Rock Construction was the lowest and best bid at $243,932. Round Rock Construction has performed successfully on other recent projects and staff recommends acceptance of their bid as soon as the other participants in the joint construction agreement, HF2M and Fox and Jacobs meet their fiscal requirements. Therefore, please authorize the Mayor to enter into the agreement when the City Attorney is satisfied with the other contractual obligations.