R-94-05-26-10A - 5/26/1994WHEREAS, the Brushy Creek Municipal Utility District ( "the
District ") desires to take its North Wastewater Plant off -line and
transport its sewage directly into the Regional Wastewater System;
and
RESOLUTION NO. k.94 - D5 I QIq
WHEREAS, the District is currently negotiating with the City
of Austin to utilize the planned regional collection system; and
WHEREAS, the City of Round Rock desires to assist the
District during the interim period of negotiations by allowing a
diversion of flows which will disconnect the existing plant from
operation over the Edwards Aquifer; Now Therefore
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK,
TEXAS,
KS\RESOLUTION
RS05264A
1. That the City Council of Round Rock approves in principal
the letter dated May 20, 1994, signed by District Board
member Jimmy Griffith, said letter being attached hereto
and incorporated herein as Exhibit "A ".
2. That the staff is hereby directed to prepare a Letter of
Understanding to be signed by the City and the District
which evidences the terms and conditions as set out in
the letter attached as Exhibit "A ".
RESOLVED this 26th day of May, 199
gr
P �'
CHARLES CULP E
City of Round Ro
Mayor
Texas
ATTEST:
,.4i AI A/
1
J
LAND, City Secretary
2.
May 20. 1994
Non. Cicalas Culpepper, Mayor
City of hound Rock
221 1'.. Main
Round Rock, 'ream 78664
I)cur Mayor Culpepper.
Jimmy Griffith
16422 Pocono Dr.
Austin, Texas 78717
The following is intended to be the basis of a Letter of Understanding and Principle regarding the
Brushy creek MUD's North Wastewater Plant. lithe text is appropriate, and If it is acceptable,
we will have our attorney put it into the form of a resolution which we can pure on Tuesday
night. 1 f them: is any concern about the involvement of the attorney, than wo can put it into a
format which we all agree upon.
The two ere icics aro in agreement that the Brushy Creek MUD North Wastewater Plant should be
token oil :line and that the sewage received at this site should be transported and treated within
the regional system. The positions of rho two entities is generally as follows,
t. 'rho Brushy Crook Municipal Utility District desires to take its North Wastewater Plant
till' line and and the sewage currently received at that plant Into the Regional Wastewater
System. The North Wastewater Plant is in very poor physical condition, and failure of one or
Faun ot'the steel walls appears possible at any time. 'therefore, the MUD desires to take the
plant off line as Soon as possible. further, the MUD recognizes the benefits of and the need for
regimunizution in areas such as wastewater collection and treatment,
2. The City of Round Rook is agreeable to this approach, particularly because discharge
from this plant is in the recharge, one of the Edwards Aquifer, which supplies some of the
isolable water for the City of Round Rock.
I Iw liblluwing items outline the understanding and prineiph s which will guide this process.
I. Thu Brushy Creek MUD will commence immediate efforts to obtain a contract with the
City of Austin to receive end treat the waste for the Brushy Creek North Section. The MUD will
uggrct.srvely. and expeditiously pursue this contract.
2. In the interim from present until a contract with the City of Austin is signed, Round Rock
.tgrc s to allow a diversions of flows from the North Wastewater Plant to the regional collection
.y;ncnt This interim agreement will be valid for 180 days. The City of Austin contract Is
1
EXHIBIT
o
1
rapceted at hu executed within that time frame. If at the end of 180 days, Ruch contract is not yet
eneuuted. then representatives of Round Rock and the MUD will discuss a further extension of
this preliminary agreement, or alternatively, a long -term agreement.
3. 'I4ue Brushy Creek MUD North Wastewater Plant will be taken off-line as soon as a
pliy +ieul bale cttn be made to the regional collection system. This tie will be made Into a inc l
which is approximately 75' west of the North Wastewater Plant. This tie•in will be made at the
rxpcnsc of the MUD.
4 l liug for transportation and treatment ol'this waste during the interim period will he at
charge of 52.75/1000 gallons of wastewater treated If Lite diversion line Is connected Into the
rcpiondl systant before u meter is available for measurement of flows. the billing will be based on
tot .tvvrauti daily slow as measured in the same month of 1993,
5. The permit for the Nonh Wuatcwuter Plant will continue to bo valid until the contract
with the City of Austin is obtained, At the time such contract is executed, Brushy Crock MUD
will take any necessary steps to invalidate the discharge permit for the North Wastewater Plant.
n. Round Rock agrees that no capital recovery fees (CRP's) will bo uollooted for the existing
l ' us4(ux or May 24, 1994) servod by the North Wastewater Plant, Any future homes built in
, crviuc area will pay the appropriate CRP as outlined in the wastewater contract to be
extroutcd with the City ol'Austin. !tarry new home is tied in during the Interim period, the CRF
will he us determined by the City of Round Rock,
Icigin now I ant looking fur input on the wording and layout, as well as the form, When I gal that
hack. I will work up a final form which can be prsaentcd to the Brushy Creek MUD Board of
Directors on Tuesday night. 1 understand that Routed Ruck will place this on their agenda for
next '1 hunduy night. The MUD) will adopt a Letter of Understanding and Principles and submit
that to Round Rock for their consideration at their council meeting.
1'kusc return (by fax) if possible any comments that you have
Nineetety
•
c
Jithmy irillith
c'huinu.tn. Wutor /Wastewaer /Planning Committee
liru::lty t'rs k MUD
MAY-24-94- T U E 1 =22 R MARK DIET Z
•
BRUSHY CREEK MUNICIPAL UTILITY DISTRICT
RESOLUTION NO.
RESOLUTION AND ORDER RELATING TO
INTERIM WASTEWATER AGREEMENT
WITH TEE CITY OF ROUND ROCK
STATE OF TEXAS p
COUNTY OF WILLIAMSON 6
BRUSHY CREEK MUNICIPAL UTILITY DISTRICT S
P _ 02
WHEREAS, Urusby Greek Municipal utility District ( "thu
District") has a permit to operate a wastewater treatment facility
for the tsruahy Creek North lest inn as approv-d key t.hr• Tflac:c: in open
meeting on May 11, 1994; and
WHEREAS, the District has an obligation to provide wastewater
treatment for the existing users and the future build out. of Brushy
Creek North Section; and
WHEREAS, the District desire: to disconnect its existing plant
from service; and
WHEREAS, the District has been in negotiations with the City
of Austin which may result in .c contract with the City of Austin to
utilize the planned regionn1 collection eystem and treatment
facility; and
WHEREAS, the City of Round Rock wishes to assist in the
interim period of negotiations by allowing a diversion of flows
which will disconnect the existing plant from operation over the
Edwards Aquifer;
NOW THEREFORE, BE IT RESOLVED AND ORDERED BY THE BOARD OF
DIRECTORS OF BRUSHY CREEK MIINIM PAL UTILITY DISTRICT THAT:
1. The findings in the preamble hereof arc true and .ulnpted
as findings of fact.
2. The District will commence immediate efforts to obtain a
contract with the City of Austin to receive and treat the waste for
the Brush Creek North Section. The District will expeditiously
pursue this contract.
3. Until a contract with the City of Austin is signed, the
District and Round Rock will agree to allow a diversions of flows
from the North Wastewater Plant to the regional collection system.
This interim agreement will be rot 180 days. The city of Austin
contract is expected to be executed within that time frame. If at
MAY-24-94 T U E .1 3: 2 3 R MARK D I E T Z
the end of 180 days, such contract is not yet executed, but
negotiations are proceeding in good faith between Austin and the
District then representatives nt Rcnnd Rnr.k And the D1 trir:t will
extend this preliminary agreement. IIowever, if such negotiations
are not going to proceed then the District will alternatively
discuss a long -term agreement with the City of Round Rock.
4. The District North Wastewater Plant will be taken off -
line as soon as a physical tie -in can be made to the regional
collection system. This tie will be made into a line which is
approximately 75' west of the North Wastewater Plant. This tie -in
will be made at the expense of the District.
5. The District will agree to pay Round Rock for
transportation and treatment of this waste at a charges of
$2.75/7000 gallons of wastewater treated. Tf the diversion line is
connected into the regional system before a meter is available for
measurement of flows, the District will agree to pay a charge baser]
on an average daily flow as measured in the same month for the
preceding year.
6. The permit for the North Wastewater Plant will continue
to be valid until the contract is executed with the City of Austin
or the City of Round Rock which provides at least as great a
discharge capacity as the current permit. At the time such
contract is executed, the District will take an necessary steps to
invalidate thn discharge permit for the North Wastewater Plant.
7. The District and Round Rock would agree that no capital
recovery fees (CRF's) will be collected for the existing homes
served by the North Wastewater Plant as of the date of the
agreement. If any new connection is made during the interim
period, the CRF will be that charged by City of Round Rock by
ordinance.
IT IS RESOLVED AND ORDERED that the president of the District
is authorized to enter into an agreement with the City of Round
Rock which sets forth the foregoing terms and conditions.
ATTEST:
secretary
Board of Directors
. ,. P - 0 3
BRUSHY CREEK MUNICIPAL UTTTTTY
DISTRICT
President
Board of Directors
DATE: May 24, 1994
SUBJECT: City Council Meeting, May 26, 1994
ITEM: 10A. Consider a resolution authorizing the Mayor to sign a letter of
understanding in principle with Brushy Creek MUD for the
extension of regional wastewater service to Brushy Creek
North.
STAFF RESOURCE PERSON: Jim Nuse
STAFF RECOMMENDATION
Enclosed is a copy of a Letter of Understanding of Principle regarding wastewater service to
Brushy Creek North. This letter will serve as a basis for a resolution by both the Brushy Creek
MUD and the City of Round Rock to permit the MUD to abandon their North plant thus
eliminating a discharge over the aquifer. The MUD is expected to pass a similar resolution on
May 24.
Mayor
Charles Culpepper
Mayor Pro•tem
Robert St!aka
Council Members
Rod Morgan
Rick Stewart
Earl Palmer
Martha Chavez
Jimmy Joseph
City Manager
Robot L. Bennett, Jr.
City Attorney
Stephan L. Sheets
June 6, 1994
John Adams
General Manager;:_
Brushy Creek MUD
901 Great Oaks Drive
Round Rock, TX 78681 -2506
Dear Mr. Adams:
Resolution No. R- 94- 05- 26 -10A was approved by the Round; Roc
City Council on May 26, 1994.
Enclosed is a copy of the resolution for your files. If you have any
questions, please do not hesitate to call.
Sincerely,
ieuva
Joanne Land
Assistant City Manager/
City Secretary
Enclosure
TSE CITY OF.ROUND ROC%
otw.xrn
221 EastMainStreet
Round Rock, Texas 78664
612 - 256 -3612
Fax 512-255-6676 1-800-735-2989 (TDD) 1- 800 - 735 -2988 (Voice)