Loading...
R-94-08-25-10E - 8/25/1994WSM Architects & Plan,,,,.g Consultants 20 September 1994 Mr. James R. Nuse, Director Public Works Department City of Round Rock 2008 Enterprise Round Rock, Texas 78664 Re: Master Plan for the City of Round Rock Yard and Round Rock Independent School District Project No. 9432 Dear Mr. Nuse: Enclosed is a revised copy of the Time and Cost Estimate for the referenced project. WSM and Baker - Aiklen can begin work immediately and we should be able to complete the Master Plan in thirty calendar days from the date of your approval of our services. I will be the primary contact for the WSM /Baker - Aicklen project team. We will coordinate all project activities through WSM. We will assume that you will be the primary contact for the City and for Round Rock ISD until we are told otherwise. We are looking forward to working with you, Don Howard, and your staffs. If the services outlined in the Time and Cost Estimate, the fees, and the time to perform the required services are agreeable to you please sign both copies of this letter of agreement and send one back to us for our records. Sincere toeltje (for WSM and Baker - Aicklen) Date Z..o 5c0r. James R. Nuse (for the City of Round Rock) JES /nr xc: Joe Baker Date 7010 Village Center • Austin, Texas 78731 - 3088.512.346 9472 • FAX 512.346 -8237 WSM Horace E. Wilson Joe Stoeltle Round Rock ISD ID :512- 244 -9453 OCT 10'94 11:31 No.004 P.03 SEP 7 - 94 WED I :14 W8N ARCHITKO'. AUSTIN TX P.02 Tra AND COST x6TIMATE9 POLL WASTZR PLUT POR CITY OT Itoptw ROCK a ROUND ROCK ISD YARD SITS (Revised) sunrise Road (Co. Road 115), Round Rock, Texas WSM 0432 ACTZVITY AND NoTIMATED =Mat 1. Meet with RR ISO and their architects to determine changes required in the existing 1992 plans for the Transportation Facility. Determine what kind of growth is to be expected and reflected in the Master Plan. tncorporate information into Master Plan Program. (6 WSM hours) 2. Meet with the City to determine what offices eta., will be at this site other than the Vehicle t�aintan- atcs nd City Yard. Incorporate information into Master Plan Program. (4 WSM 1our8) 3. Analyze the requirements of the 3990 Public Works Facility Project Analysis. Meet with the City to modify those program requirements to meet prevent needs at the sunrise Road site. incorporate information into Master Plan Program. (4 W$M hours() 4. Meet with the City and Baker - Aicklen to ascertain Codes, Ordinances, Laws, relationship to the aquifer, etc., that will affect this project. (2 WSM }Lours) (2 8 -A Hours) 5. Walk site with B er- Aicklen and members of the City and RR ISD staffs. (2 WSM Hours) (2 H -A Hours) 6. with in -put from Faker- Aicklen prepare a preliminary Master Plan (hand sketched). (6 WSM Hours) (2 8 - Hours) 7. Joint meeting with all parties to review the prelimi nary plan. (4 WSM Roure) 9. Prepare revised plan based on the review comments (hand sketched), (6 WSM hours) 9. Prepare an outline specification, a eliminary utility lay out, and preliminary cost estimate with Hakes- Aicklen, (12 WSM Hours) (30 B -A Hours) 10. Joint meeting with all parties( to review the revised plan and estimate. (4 WSM Hours) 11. Prepare final plans, outline specifications and Cost estimate. (12 WSM Hours) (4 E - Hours) Round Rock ISD ID :512- 244 -9453 OCT 10'94 11 :32 No.004 P.04 l *31P- 7' - W E D i -14 WeM ARCHITECT: AUSTIN TX R.076 12. Joint meeting with all parties to review the final plan and estimate. (3 W6M Hours) (3 B -A Hours) 13. Final assembly of data and lane. 14. Time spent to date: (12 W8M Hours) (4 B -A Hours) Preliminary fact gathering and planning, (10 WSM Uoura) (4 B -A Hours) Digitising site date. (30 WOM hours) 15, Administrative employees time. (10 WSM hours) 16. Total time required, 101 WSM prefeestonal hours WSM technical and administrative hours total our 51 Baker- kicklen professional hours 19. CADD work on final plan is not a part of the primary work for this study. It can be added at Round Rock , s option in the future. (32 WSM Hours) (2 S.A Hours) 18, There aril no Costs suggested for surveys, This would probably e a line item in the estimate for work Which will be required, probably in the first phase of the work when the seventy -five acres are sub- divided. ANTICIPATED END PRODUCTS 1, Comprehensive Masten' plan or plans, at 1° m 100', rhowing all maw proposed sits improvements and buildings', new proposed utilities, proposed subdi- vision of the its and prnpnsrd phasing of the work. 2. Written material including a brief descriptiQt1 of the i eta, program, a construction coat estimate (not ncluding the school istrict'e project costa) and an outline specificat upon which the estima are based. We intend to present as much comprehensive information graphically ae we can and keep the written explanation to a minimum. COST FOR PROVIDING TUX RASTER PLANT 0.3,000.00 DEC- 6-94 T U E 13:44 W S M ARCHITECTS AUSTIN T X P.02 MASTER PLAN FOR THE CITY OF ROUND ROCK ROUND ROCK INDEPENDENT SCHOOL DISTRICT Prepared By WSM Architects & Planning Consultants 7010 Village Center R gq- o &g -lo DC — 6-94 T U E 13:45 W S M ARCHITECTS AUSTIN T X P.03 JviLUy b170QSVA b r ....,, b Baker - Aicklen & Asociates, Inc. 9111 Tollyville Road, Suite 107 Austin, Texas 78759 6 December 1994 separate ones. Most of the School District's vehicles needing these services stay at the Sunrise Road site when not in use. Most of the City's vehicles using these facilities arrive from off site. Page 1 of 3 DEC— 6-94 T U E 13:45 W S M ARCHITECTS AUSTIN TX P.04 Both the City and the School District will have a significantly high volume of traffic using the site. The high traffic volume facilities need to be closest to Sunrise Road to get the traffic load off the Public Boulevard as quickly as possible. Together the City's Water and Waste Water Department and Streets, Drainage, & Signs Department will add about fifty or sixty vehicles to the local traffic. They will typically arrive by private conveyance in the mornings and leave at the end of the work day. During the work day City trucks, tractors, etc., will be coming and leaving at unscheduled intervals. Much of the materials and equipment stored by both departments requires protection from the elements. Several open sided, storage buildings are recommended for the protection of equipment and materials and for the protection of the aquifer below. The City Vehicle Maintenance Facility will employ approximately ten to fourteen employees who will arrive and depart once each day. The traffic caused by vehicles coming and going for scheduled and emergency maintenance should average no more than thirty vehicles per day. This poses little impact on the traffic volume. The Solution: 1. Plan the commercial lot locations so that they have Sunrise Road street frontage. A Sunrise Road address should make the lots more attractive to potential buyers. 2. Locate the functions with the greatest traffic count nearer the Sunrise Road intersection. The School District's bus and employee drives are closest with the fueling and washing driveways next. 3, Place all of the City and School District property on the west side of the high ridge running through the center of the site. This make it possible to process all of the rain water runoff through a single filtration pond. This arrangement will eliminate the cost of building separate ponds. 4. Arrange the Public Boulevard to provide street frontage for the privately owned land on the north side of the site. This also allows room on the south side of the Boulevard required for the City's and School District's facilities, Page 2 of 3 DEC— 6-94 T U E 13:46 W S M ARCHITECTS AUSTIN T X p.05 MASTER PLAN FOR THE CITY OF ROUND ROCK & ROUND ROCK INDEPENDENT SCHOOL DISTRICT Prepared By WSM Architects & Planning Consultants 7010 Village Center Austin, Texas and Baker - Aicklen & Asociates, Inc. 9111 Iollyville Road, Suite 107 Austin, Texas 78759 6 December 1994 DEC- 6 -94 TUE 13:46 WSM ARCHITECTS AUSTIN TX P.06 Project Phasing: Phase I: A. Subdivide the site, B. Design and install utilities - water, and waste water, C. Design and install Public Boulevard from Sunrise Road to the turn around. Design and install all curb cuts for future streets and driveways. Design and Install the storm sewers and filtration pond. Phase I Total Phase A, Round Rock Independent School District's bus maintenance facility with associated parking, security, etc. B. Round Rock Independent School District's bus maintenance site drainage, C. Joint use Vehicle Wash and Fueling facilities with associated paving, etc. Phase II Total * To he developed by Architecture + Plus Phase III: A. City of Round Rock Water and Waste Water Depart- ment and Streets, Drainage, and Signs Department facilities. Phase 111 Total Phase IV: A. City of Round Rock Vehicle Maintenance Facility. Phase IV Total Page 3 of 3 $ 20,000.00 $ 290,000.00 450,000.00 $ 760,000.00 $ 103,400.00 $ 897.100 00 $1,500,100.00 $ 878,100.00 $1,677,200.00 DEC- 6-94 T U E 19:47 W S M ARCHITECTS AUSTIN TX P.07 COST ESTIMATE FOR MASTER PLAN FOR THE CITY OF ROUND ROCK ROUND ROCK INDEPENDENT SCHOOL DISTRICT Prepared By WSM Architects & Planning Consultants 7010 Village Center Austin, Texas and Baker Aicklen & Asociates, Inc. 9111 Jollyville Road, Suite 107 Austin, Texas 78759 6 December 1994 Reverse Two Year Warranty Paving' Asphalt Paving Curb and Gutter VEHICLE WASH and FOELINa FACXLITXE9 TOTAL 1 L9 m $ 29,000 ea - $ 29,000.00 1 L8 m $ 10,000 ea - 9 10.000 00 $ 280,600.00 7,867 SY W $ 20.00 /SY - $ 157,300.00 1,070 LF 0 $ 8.40/LF - 9 9,000.00 $ 166,300.00 Drainages Storm Sewer 450 LF 9 $ 30.00 /LF • $ 13,500.00 Inlets 4 ea 5 $ 2,500 /ea • $ 10.000.00 $ 23,500.00 Fencing' 6' high w/ three strands of barbed wire 950 LF ® $ 11.00 /LF - $ 10,500.00 3' Gates 2 ea ® $ 197.00/LF • $ 400.00 45' Sliding Gates 5 ea 0 $3000.00/LF - 9 15.000.00 $ 25,900.00 Landscaping: 1 L8 ® $ 6,000 L8 - $ 6,000.00 Contingency: 1 L8 5 6 LS - 9 74,700,00 Subtotal, $ 822,000.00 Professional Fees' (Architectural 6.74 - 955,100 Civil Engineering - $20,000) - $ 75,100.00 Cost Estimates - Page 1 of 4 6 December 1994 $ 897,100.00 DEC S -94 TUE 13:47 WSM ARCHITECTS AUSTIN TX P_9S CITY OF ROUND ROCK VEHICLE MAINTENANCE SHOPS Building: 18,000 SF 4 $ 65.00 /SF - $1,170,000.00 Paving: Aaphalt 1,256 SY m $ 20.00/SY • $ 25,100.00 Concrete 4,883 SY 0 $ 30.00 /SY • $ 146,500.00 Curbs and Gutters 275 LF 47 $ 8.40 /LP - 5 2 100,0Q $ 173,900.00 Drainage: Storm Sewer 700 LF e $ 35,00/LF - $ 24,500.00 Inlets 6 ea w $ 2,500/ea • $ 16.000.OQ $ 39,500.00 Fencing: 6' high w/ three strands of barbed wire 1,015 LF ® $ 11.00 /LF • $ 11,200.00 3' Gates 3 ea 4 $ 197 ea • $ 600.00 40' Gates 5 ea 0 $ 3,000 ea • $ 15.000.00 $ 26,800.00 Landscaping: 1 LS 0 $ 4,000 LS • $ 4,000.00 Contingency: 1 LS 0' $ LS - $ 141,400.00 Subtotal' $1.555.600.00 Professional Fes': (Architectural 6.4t • $99,600 Civil Engineering • $22,000 • $ 121,600.00 CITY OF ROUND ROCK VERICLH 1AINTENANCE SHOPS TOTAL $1,671,200.00 Cost Estimates - Page 2 of 4 6 December 1994 DEC— G-94 T U E 1 3:48 W S H ARCHITECTS AUSTIN T X P. 0 9 PROPOSED PROJECT COST ESTIMATE FOR MASTER PLAN FOR CITY OF ROUND ROCK & ROUND ROCK INDEPENDENT SCHOOL DISTRICT Sunrise Road, Round Rook, Tows 6 Ducembo71994 JOENT USE VEHICLE WASH and FUELING FACILITIES Fueling Building (Pre- engineered): Building 6,750 8F ® $ 12,00/SF • $ 81,000.00 Tanks (10,000 gal) ea ® $ 27,000 ea • $ 54,000.00 Equipment 1 LS ® $ - $ 110.000.00 $ 245,000.00 Wash Facility Building (Pre - engineered w/ CMd partitions): Building 5,700 SF ® $ 18.00 /50 • $ 102,600.00 Automatic Bus Wash 1 ea ® $ 55,000 ea - $ 55,000.00 Automatic Auto Wash 1 ea W $ 35,000 ea - $ 35,000.00 Pressure Wash 2 ea 41 $ 6,000 ea - $ 12,000.00 Booms 1 LS ® $ 2,000 LS • $ 2,000.00 Water Reclaim System 1 ea ® $ 35,000 ea - $ 35,000.00 Reverse Osmosis System, Water Softener, Pumps 1 LS @ $ 29,000 ea • $ 29,000.00 Two Year Warranty 1 Ls ® $ 10,000 ea - 5 10.000.00 $ 280,600.00 Paving: Aophalt Paving 7,867 SY :D $ 20.00 /SY - $ 157,300.00 Curb and Gutter 1,070 LF 0 $ 8.40 /LF • 5 9,000.00 $ 166,300.00 Drainage: Storm Sewer 450 LF 0' $ 30.00/LF - $ 13,500.00 Inlets 4 ea 6 $ 2,500/ea - S 10,000.00 $ 23,500.00 Fencing: 6 high w/ three strands of barbed wire 950 LP ® $ 11.00 /LF - $ 10,500.00 3 Setae 2 ea O $ 197.00 /LF - $ 400.00 45 Sliding Gates 5 ea ® $3000.00 /LF - 5 15.000.00 $ 25,900.00 Landscaping: 1 LS W $ 6,000 LS - $ 6,000.00 Contingency: 1 T,S (d $ LS - S 74.700.00 Subtotal: $ 822,000.00 Professional Peees (Architectural 6.74 - $55,100 Civil Engineering - $20,000) - $ 75,100.00 VBBICLB WASS and FUBLING FACILITIES TOTAL $ 897,100.00 Cost Ectrmates - Page 1 of 4 6 December 1994 DEC— 6-94 T U E 13 :4 9 W S M ARCH I T E C T S AUSTIN TX P. 10 CITY OF ROUND ROCK WATER AND WASTE WATER FACILITIES AND YARD STREETS, DRAINAGE, AND SIGNS FACILITIES AND YARD Buildings (Pre- engineered): Administrative Building (12' eave ht.) 5,600 SP @ $ 35.00 /SF - $ 196,000.00 W &WW and SDS covered Storage (14" eave ht., open sides) 4,800 6F Q $ 8.80/SF - $ 42,200.00 W &WW Covered Equip. Sto. (14' eave ht., open sides) 2,000 SF W $ 8.25/SF - $ 24,800.00 SDS Covered Equip. Sta. (14' eave ht., open sides) 4,000 SF ® $ 8.25/SF - $ 33,000.00 SDS Covered Storage w/o Sins (16' eave ht., open sides) 2,700 SF 9) $ 8.50/SF - S 73,000.00 $ 319,000.00 Outdoor Storage Bins: 6" Concrete Slab 3,000 OF W $ 2.00 /SF $ 6,000.00 Walla (6' -0" tall) 250 LF ® $ 70.00 /LF - S 1 7.500.90 $ 23,500.00 Paving: Asphalt 6,150 SY 0 $ 20.00/SY - $ 123,000.00 Concrete 6,783 SY @ $ 30.00 /eY - $ 203,500.00 Curbs and Gutters 620 LF ® $ 8.40 /LF - $ 5,200.00 Pavement Edge (12" x 6 ") 790 LF ® $ 6.00 /LP - 6 4.700,00 $ 336,400.00 Drainage: Storm Sewer 300 LF e $ 30.00 /LF - $ 9,000.00 Inlets 2 es :0 $ 2,500 /ea - s 5.000.0Q $ 14,000.00 Fencing: 6' high w/ three strands of barbed wire 950 LF 0 $ 11.00 /LF - $ 10,500.00 3' Gates 3 ea W $ 197.00 ea - $ 600.00 40' Gates 4 ea $ $3000.00 ea - S 12 000.00 $ 23,100.00 Landscaping: 1 LS w $ 3,000 LS - $ 3,000,00 Continganays 1 LS O $ LS - $ 71,900.00 Subtotal, 9 790.800.00 Professional Feast (Architectural 6.6$ - $52,200 civil Engineering - $35,000 $ 87,200.00 WATER AND WASTE WATER FACILITIES AND YARD AND STREETS, DRAINAGE, AND SIGNS FACILITIES AND YARD TOTAL $ 878,100.00 Cost Estimates - Page 3 of 4 6 December .1994 DEC- 6- 9 4 T U E 1 3 4 9 W S M ARCH I T E C T S A U S T I N TX P_ 1 1 ROUND ROCK INDEPENDENT SCHOOL DISTRICT BUS MAINTENANCE FACTLTTY Drainages Storm Sower 2,025 LP W $ 35.00 /LF • $ 70,900.00 Inlets 13 ea W $ 2,500/ea - S 42,500.0e $ 103,400.00 Cost Estimates - Page 4 of 4 6 December 1994 WHEREAS, the City of Round Rock has requested proposals for the submission of a master site plan for the City of Round Rock ( "City ") /Round Rock Independent School District ( "RRISD ") joint yard site, and WHEREAS,WSM, Inc. has submitted the best proposal, and WHEREAS, the City Council wishes to accept the proposal of WSM, Inc., Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That City staff is hereby authorized and directed to negotiate on behalf of the City final terms of a contract with WSM, Inc., for the preparation of a master site plan for the City /RRISD yard site. RESOLVED this 25th day of August, 1994. ATTEST: KS /RESOLUTION RS40825E RESOLUTION NO. /l,' `7 `7- 08 -,Q `)0 LAND, City Secretary CHARLES CULP'PP , Mayor City of Round •ock, Texas 00/22/94 , 17:06 ROUND ROCK PUBLIC WORKS . 512 255 6676 w DATE: August 22, 1994 SUBJECT: City Council Meeting, August 26, 1994 i ITEM: 10E. Consider a resolution concerning the master site plan on the joint yard site. STAFF RESOURCE PERSON: Jim Nusa STAFF RECOMMENDATION: Four firms responded to an RFQ for the Master Site Planning for the joint RRISD /City of Round Rock yard site improvements. A team from the School District and the City evaluated the proposals and recommend the firm of WSM. Staff requests that it be allowed to negotiate an agreement with WSM for action by both City and School Board. NO. 190 P16