WHEREAS, the subdivider of the subdivision known as The Bluff at
Oaklands has applied to the City for acceptance of the public
subdivision improvements ( "Improvements ") for maintenance by the City,
and
WHEREAS, the subdivider has filed with the City Engineer an one
(1) year warranty bond against defects in materials and workmanship in
said Improvements, and
WHEREAS, the subdivider has filed with the City Engineer one (1)
set of reproducible "AS BUILT" plans for the Improvements, which further
contains or has attached thereto a certificate of a registered
professional engineer as required by §8.601(3)(b) of the City Code, and
WHEREAS, the subdivider has filed with the City Engineer an
affidavit that to the best of his information and belief, the
contractor(s) has complied with the regulations contained in Chapter 8
of the City Code, Now Therefore,
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS,
The Improvements contained within the subdivision known as The
Bluff at Oaklands are hereby accepted by the City for maintenance,
subject to the subdivider's warranty as provided in Chapter 8 of the
City Code.
RESOLVED this 8th day of Septem 994.
DATE:
TO: James R. Nuse, P.E.
Director of Public Works
FROM: Staff
RE: Project Completion
SUBJECT: "7"%e B f u Pf a7` 04 Wand s
As of 9/L/91 water, wastewater, street and drainage improvements for the above
referenced subdivision were satisfactorily completed.
As of MJ94
acceptance:
Date Received:
9/1// ¢- 1.
'/ //4P4 2.
50//9 f- 3.
1171/9i 4 .
9h//I 5.
tr Plat 7.
$/3//9 ¢ 8.
8 f7//9 f -
pr"j«umm„i
9/2/ 9 f-
6.
9. Subdivision Inspection Fee
MEMORANDUM
Public Works Inspector
. .
lic W Chief Inspector
Ul
Chief Engineer
this office is in receipt of the following documents required for council
Warranty bond or L. of C. - Street/Drainage 1 yr. _ / 2 yr. _
Warranty bond or L. of C. - Water /Wastewater 1 yr._ / 2 yr.
"As Built" plans one certified reproducible set and one print set.
Copy of letter to developer from his engineer notifying of completion.
Letter from developer to City Engineer notifying of completion and requesting
Council acceptance.
Oversize payment verification (coordinated with Planning Department).
$ 4;800.4o paid to City $
All easement filed.
Detention verification: Regional $ 49 /Z, QD Onsite
Paid to City
/929,DR
Amount = 1 1/2% of Actual Construction Cost
2) .4
Project Manager
due to Developer.
Check if applicable
09/06/94 14:11 ROUND ROCK PUBLIC WORKS -. 512'255 6676
Espey, Huston & Associates, Inc.
Engineering & Environmental Consultants
August 31, 1994
Mr. Frank Cimino
Bedford Falls Development Venture No. 3
1201 Spyglass Drive, Suite 208
Austin, Texas 78746
RE: The Bluff at Oaklands
Street, Drainage, Water and Wastewater Improvements
EH &A Project No. 15388 -05
Dear Mr. Cimino:
A representative of Espey. Huston & Associates, Inc. (EH&A) made a final walk - through of
The Bluff at Oaklands today August 31, 1994. The project is complete and was constructed
in general compliance with the approved construction plans.
Please find attached a punch list of items that must be completed and approved by my office
and the City of Round Rock Public Works Department by Friday, September 2, 1994.
Should you have any questions
Sincerely,
Stephen Ramsey, P.E.
Senior Project Manager
SA R/k m:J.iwaei 1i 53$eUFCFINACC.SAR
Attachment
or desire additional information, feel free to contact me.
i f
MAN "WM
/ yo; 9 47970 i.:,
NO. 247 903
P,Q. Box 519 • Austin, Texas 78767 -0519
206 Wild Baein Road, Suite 300 178746 -33431
DATE:
SUBJECT:
ITEM:
September 6, 1994
City Council Meeting, September 8, 1994
a
101. Consider a resolution accepting subdivision improvements
in The Bluff at the Oaklands.
STAFF RESOURCE PERSON: Jim Nuse
STAFF RECOMMENDATION:
The subdivision improvements are complete and staff recommends acceptance.