R-95-02-09-10J - 2/9/1995Mayor
Charles Culpepper
Mayor Pro.tem
Robert Shako
Council Members
Rod Morgan
Rick Stewart
Earl Palmer
Martha Chavez
Jimmy Joaeph
City Manager
Robert L. Bennett, Jr
City Attorney
Stephan L- Sheets
February 14, 1995
Joe Chesney
Construction Manager
Capital Excavation Company
P.O. Box 1301
Austin, TX 78767
Dear Mr. Chesney:
Resolution No. R- 95- 02- 09 -10J was approved by the Round Rock City Council
on February 9, 1995.
Enclosed is a copy of the resolution for your files. If you have any questions,
please do not hesitate to call.
Sincerely,
014/
oanne Land
Assistant City Manager/
City Secretary
Enclosure
THE CITY OF ROUND ROCK
221 East Main Street
Round Rock, Texas 78664
512- 255.3612
Fax 512 -255 -6676 1- 800- 735 -2989 (TDD) 1.800.735.2988 (Voice)
RESOLUTION NO. e - `15 aw- 4 T
WHEREAS, there is a need for certain parking improvements in
the 100 block of South Blair Street, and
WHEREAS, Capital Excavation Company has submitted a proposal
to construct said improvements, and
WHEREAS, the City Council wishes to accept the proposal of
Capital Excavation Company, Now Therefore
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK,
TEXAS,
That the Mayor is hereby authorized and directed to execute on
behalf of the City an agreement with Capital Excavation Company for
certain parking improvements in the 100 block of South Blair
Street.
RESOLVED this 9th day of February, 1995.
ATTEST:
KS /RESOLUTION
RS50209J
E LAND, City Secretary
CHARLES CU P' ° PER, Mayor
City of Round Rock, Texas
L
Q
X C
AUSTIN
Dear Al:
Sincerely,
AMA
* O SITEWORK • HIGHWAY CONTRACTORS
♦ P.O. BOX 1301 AUSTIN, TEXAS 78767 • (512) 440 -1717 • FAX (512) 440-0844
February 7, 1995
Mr. Alvin L. Wille, P.E., R.P.L.S.
City of Round Rock
221 East Main Street
Round Rock, Texas 786664
Re: PROJECT: Blair Street
Please review the attached pricing and exclusions. Pricing based on Plans and
Specifications on the above referenced project.
CAPITAL EXCAVATION COMPANY
Joe K. Chesney
Construction Manager
JKC:jkc
cc:'file -LP 384 corresp
� 4 � / �-y �
6-#)&65 e1.06Pf
m4ya,e.-
Concurrence City of Round Rock
Date
Sitework Excavation Streets Structures
Blasting Utilities
BLAIR STREET PROJECT
Owner: City of Round Rock
Page 1
APRROX.
No.
SPEC
ITEM
QUANTITY
UNIT
BID
AMOUNT
1
Unclassified Street Excavation
310.00
SY
49.00
42,790.00
2
HMACTY'A'
170.00
TN
$11.60
1,972.00
3
HMACTY'D'
235.00
SY
412.00
2,820.00
4
Curb and Gutter
225.00
LF
412.00
2,700.00
5
Concrete Sidewalk
528.00
SF
43.00
1,584.00
6
Revegetation (Block Sod)
165.00
SY
45.25
866.00
7
Remove Curb and Gutter
210.00
LF
43.50
735.00
8
Remove Old Concrete (Sidewalk
56.00
SY
411.50
644.00
TOTAL:
414,1 1 1.00
Temporary Erosion Control, Barricade and Traffic Control to be provided by City of Round Rock.
Labor & Equipment only for HMAC TY "A" provided by Capital Excavation Company
City of Round Rock to provide FOB jobsite TY "A"
BLAIR STREET PROJECT
Owner: City of Round Rock
Page 1
LL
X ��
- - ALL.-
PROPOSED T.0
ELEV.= 93.1
TIE INTO EXISTING
CURB 8 GUTTER
T.C. ELEV.= 92.18
TIE INTO EXISTING
CURB 8 GUTTER
T.C. ELEV.= 92.91
REMOVE EXISTING SIDEWALK
TIE TO EXISTING
SIDEWALK
30' 04,
PROPOSED T.C.
ELEV.= 93.31
'J
73'
REMOVE EXISTING CURB 9 GUTTER
CONSTRUCT CURB 8 GUTTER
CONSTRUCT 8 -9' X 113 PARKING SPACES
PAINT 9 -4" X IB YELLOW STRIPES
PROPOSED T
ELEV.= 95.00
REMOVE EXISTING CURB 8 GUTTER 8 SIDEWALK
CONSTRUCT CURB 8 GUTTER
CONSTRUCT 10 -9 18 PARKING SPACES
PAINT 11 -4' X 18' YELLOW STRIPES
CONSTRUCT 132 L.F. OF
4 WIDE SIDEWALK
TIE TO EXISTING
ALLEY
PR•
- G u L.
TIE INTO EXISTING 1
CURB 8 GUTTER
T.C. ELEV.= 95.05
BLAIR STREET
TIE INTO EXISTING
CURB 8 GLITTER
T_C, ELEV.= 95.87
EX /5 T7A,3 S /Dg /4LK
_ -_ --
T -
REMOVE EXISTING SIDEWALK
PROPOSED T.0
ELEV.= 96.01
PAINT 2-
STRIPES 11
EX /S 7;714
�v« V *
•
Q # I T ? , : 0 SITEWORK • HIGHWAY CONTRACTORS
(� • AUSTIN s � Pa E10x 1301
FEB -03 -1995 14:00
February 3, 1995
Mr. Alvin L. Wille, P.E., R.P.L.S.
City of Round Rock
221 East Main Street
Round Rock, TX 78664
Re: PROJECT: Blair Street
Dear Al:
Please review the attached pricing for the above referenced project.
If I can explain the pricing any further, please do not hesitate to contact me.
Sincerely,
CAPITAL EXCAVATION COMPANY
Joe K. Chesney
Construction Manager
JKC: Ls
CC:1file -LP 384 corresp.
CAPITAL EXCAVATION CO 512 440 0944 P.1212
AUSTIN, TEXAS 78767 • (512) 440 -1717 • FAX (512) 440-0644
Sitewolk Excavation Streets Swctur.. ft+.aing lic:,aes
FEB -03 - 1895 14:01
CAPITAL EXCAVATION CO 512 440 0844 P.03
BLAIR STREET PROJECT
Owner: City of Round Rock
Page 1
APRROX.
No.
SPEC
ITEM
QUANTITY
UNIT
BID
AMOUNT
1
Unclassified Street Excavation
310.00
SY
89.00
$2,790.00
2
HMAC TY 'A'
170.00
TN
811.60
1,972.00
3
HMAC TY 'D'
236.00
SY
512.00
2,820.00
4
Curb and Gutter
225.00
LF
512.00
2,700.00
5
Concrete Sidewalk
528.00
SF
53.00
1,584.00
6
4' Double Yellow C/L Stripe
600.00
LF
$1.20
600.00
7
Revegetation (Block Sod/
166.00
SY
55.25
866.00
Remove Curb and Gutter
210.00
LF
83.50
735.00
L
Remove Old Concrete (Sidewalk
56.00
SY
411.50
644.00
4" White Parking Strip
360.00
LF
80.60
216.00
TOTAL:
814,927.00
fvdusions: Temporary Erosion Canirol, Barricade and Traffic Control
L a m & Equipment only for HMAC TY "A"
City of Round Rock to providc FOB jubsire TY "A"
FEB -03 - 1895 14:01
CAPITAL EXCAVATION CO 512 440 0844 P.03
BLAIR STREET PROJECT
Owner: City of Round Rock
Page 1
DATE: February 6, 1995
SUBJECT: City Council Meeting, February 9, 1995
ITEM: 10J. Consider a resolution authorizing the Mayor to enter into an
agreement with Capital Excavation Company for parking
improvements in the 100 block of South Blair Street.
STAFF RESOURCE PERSON: Jim Nuse
STAFF RECOMMENDATION
This agreement will provide for additional parking spaces in the 100 block of South
Blair Street which will compensate for any spaces eliminated with Main Street
construction. Staff recommends approval.