R-95-02-23-10J - 2/23/1995RESOLUTION NO. R-95-0)-023-
lof
WHEREAS, the City of Round Rock has duly advertised for bids
for the construction of the East Water Loop Project, and
WHEREAS, Griffin - Austin Company, Inc., has submitted the
lowest and best bid, and
WHEREAS, the City Council wishes to accept the bid of
Griffin - Austin Company, Inc., Now Therefore,
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK,
TEXAS,
That the Mayor is hereby authorized and directed to execute on
behalf of the City a contract with Griffin - Austin Company, Inc.,
for the construction of the East Water Loop Project, a copy of said
contract being attached hereto and incorporated herein for all
purposes.
RESOLVED this 23rd day of February 1995.
ATTEST:
KS /RESOLiTTION
RSS0223J
/YL/ne..) c 7 a'n4
NE LAND, City Secretary
F�
HARLES CU I PFJ ER, Mayor
City of Round Rock, Texas
0221/95 16:06 ROUND ROCK PUBLIC WORKS • 5122556676
Fisher Hagood, Inc.
February 21, 1995
Mr. Al Wille
City of Round Rock
Public Works Department
2008 Enterprise Drive
Round Rock, Texas 78664
RE: Eastern Water Loop Project
Dear Mr, Willa:
Attached please find a copy of the bid tabulations for the above referenced project. A review of this
tabulation shows Griffin- Austin Co. to bo the low bidder at 9188,523.25.
We have discussed the scope of work for this project with Griffin- Austin and have determined they are
qualified to perform the work required for this project. In addition, we have contacted the City of
Austin, listed as a reference by Griffin - Austin, and they found Griffin - Austin's work to be of an
acceptable quality.
Fisher Hagood, Inc. therefore recommends that the City award the contract for the Eastern Water Loop
Project to Griffin - Austin Co., Inc. for the amount of 9188,523.25.
I trust this information is adequate for your needs; however, should you need additional information,
Please do not hesitate to call,
Sincerely,
FISHER HAGOOD, INC.
Terry R. Ha
Principal
TRH /jc
d, P.E.
p tcOF, T f � , I •
••
TERRY R. I4AG000
• 52960
4,M'4e `Z`�
.. S�ON/iL4
NO. 429 111
!Om Chisholm Trail, Suite 5200 • Hound Hock, Texas 7861f1 • (512) 24.4 -1546 • FAX (512) 388 -3690
�•.:clni, woe, Sw k D Iribu!ion • wu wsten. e,........:_.._ -..
- "•• 9e Sle.aler ColleUien "
t
BIB PROPOSAL _ -- ---
-_ -- . ........................�
ITEM
APPROX.
GRIFFIN AUSTIN CO.
; REDDICO CONST
C.C. CARTON CONST
BORAH,
INC.
140.
ITEM WITH UNIT BID WRITTEN
QTY
IN WORDS UNIT PRICE
AMOUNT
UNIT PRICE
AMOUNT
UNIT PRIC p
AMOUNT
UNI PRJC
1
750.0
LF
AMOUNT
S51t Fence, complete and in place. 52.00
$1,500.00
8130
$1,125.00
$2.50
$1,875.00
$2.00
$1,500.00
2
50.0
LF Rock Berm, complete and in place. 825.00
81,250.00
81030
$525.00
130.00
$1,500.00
$15
CO SR
3
4,995.0
LF 12' PVC (AW WA C -900, Class 200) ' 823.35
$33.00
$164,835.00
833.011
$3330
$167,33250
$116,633.25
8164,835.00
waterline, complete and in place.
81,400.00 $48.00
4
11111.11.111.
_
5
20.0
--
110.0
LP 12- Ductile Iron (AWWAC100,Class S50.00
$1,000.00
840.00
5800.00
870.00
waterline, compleie and N place.
-
-
--
I
_ -waterline,
LF ,' PVC (AWWA C -900, (]ass 200)
827.50
$2,58.5.(0
535.00
,850.BOr 545.00
14,950.00
complete and in place_ 1
I
F
6
42.0
LF
__-
7
2.0
6" Ductile Iron(AWWAC100, Clam
waterline, complete and in place.
$35.00
81,470.00
$23.90
_
81,003.80
--
850.00
$2,100.00
$45.00
51,890.00
EA
_
8
--
1.0
Co>mection to existing 12" waterlines, 81,200.00
complete and in place.
$2,400.00
$1,600.00
$3,200.00
81,200.00
52,400.00
$50 .
0.00
$1,000.00
Cat existing : waterline, install 81,000.00
$1,000.00
$
$ --
$950_00
8700.0 t
$70000
t Sta. 32 +19, 39' Rt., complete and in
place.
N
EASTERN W
N
iu
EASTERN WATER LOOP PROJECT - CITY OF ROUND ROCK
R/D PROPOSAL
GRIFFIN AUSTIN CO.
REDDICO CONST
ITEM WITH UNIT BID WRITTEN
IN WORDS
EA iRemove existing B x 8 tee and valve
UNIT PRICE
31,000.00
UNIT PRICE
AMOUNT, UNIT PRICE
32,600.00
31 .00.00
31,010.00
31,900.00
ITEM APPROX
NO. Olv
2 I 4.0 EA 1 2 x I2x 8" Tee.
complete and in p4a
complete and m place.
31,200.00 $2,400.00
at Sta. 33 +375, 41 Rt. , and 38+ , 51' RL,
connect in exisanb 8' mainline,
complete and in place.
12 x 12 x 12' Tee, complete and is pi
12 x 12 x 6' Tee, complete and in
2.0 EA 8" Gate Valve and box assembly,
!complete and is place.
&5(0.00 1 $1000.00
$1,500.00
3500.00 1 3180.00 j 3180.00
37,000.00 31,100.00
31,740.W
5260.00 81,040.00
$1,200.00
31,500.00
32,100.00
31 ,400.00
51,000.00 32,000.00
51,000.00
2
3300.00 3900.00 3523_00
31,200.00 $500.001 51,000.0D
3450.00 I 31 ,200.00
Si ,575.00 $400.00 i S1,200.00
3300.00 I 3200.00 3200.00
$12,000.00 I 3900.00 87,200.00
C-
EO
EASTERN WATER LOOP PROJECT - CITY OF ROUND ROCK
APPROX
ITEM WITH UNIT RID WRITTEN
mew box, tap, corp cock, and
M
REDDICO CONST
UNIT PRICE
Drain Hydrant Unit, complete and
$3,400.00 •
$1,200,00
50.00 $2.250.00
$1$0.00
1.0 FA 8" Plug, complete and in plane_ _ --
.. 0.00 •. t.00
-.Fire Ilydnm Unit, complete and •
$1,750.00 $7,000.00 $1800.00 57,200.00
�Jr
MI 1 . 0 MI 1, ' t.00 1,700.00 $1,800.00 $1,800.00
22 2.0
1,700.00 �-
_ m6ing, complrne and in place.
ma 1,800.0 MIR SY IGIAC and Bare Pavement Repair, -
�i. complete and in place.
$12.90
$23,220.00
UNIT PRICE AMOUNT
$0,000.00
$2,552.50
UNIT PRICE
C.C. CARTON CONST
5750.00 $3,750.00 $400.00
06IX1.00 $200.00
0300.00 $150.tt 0050.00
$1,200.00 $4,800.00
_-
$800.00 51,200.00 - 01,200.00
02,000.00
019,00.00 ` 015.00 $27,000.00
$0.50 $5,105.00
`;".W
iiiiiiiminimiamonmS1,600.00 01,000.00
Ill
13
o
N
O
EASTERN WATER LOOP PROJECT - CITY OF ROUND ROCK
GRIFFIN AUSTIN CO.
ITEM APPROX.
NO. QTY
25
BID PROPOSAL
ITEM WITH UNIT 131D WRITTEN/
IN WORDS
TOTAL BID alerts 1 t6ru 25):
L
STATEMENT' OR SEPARATE CHARGES:
UNIT PRICE AMOUNT
5188,523.25
Materiels:
889,890.00
Ml Other Charges
Total:
$98,633.25
5188,523.25 ,
1 1
REDDICO CONST C.C. CAR710N CONST
AMOUNT UNIT PRICE AMOUNT UNIT PRICE
54,050 $0.30 54,050.00
5238.44430 i S243,087.50
598,746.21]
5139,698.09
5238.44430
5128,082.50 I
5115,005.00 [
0243,087.50
a
, INC.
AMOUR
56,750.0
44,287.5(
583,000.00
5161,287.50
$244,287.50
LF 6' Ductile 4m UWWA CIO). Class
3710.40
530.00 67,300.00
$389,81000
RID MLOP72SAL
50.0 LF Rod Rom, onnipkee and in am 1
➢ 511.8 11550.03 511.35 3568.0(1 714 .00 5800.00 315.00 5750.8 320.8
4,995.0
oe, eo mpluc end to plane,
51,275.81 3139 01,2.50 61.80 S 1 -
04 31.50 51.175.00: 32.8
67,190.00 521.91
341.00 5620.8 133.00 1761.00 352.03 61,000.0
32,411.20 332.00 33,320.00
31.107.54 830.00 11,260.00 330.00 01,260.00 539.60
C m aao 10 noting 12" ea>crlieee 11,000.8
.00Plele end in plane.
1.0 EA IC'm esistin8 8' watealine. marl 231' 000.00
pl Sta. 320 19, 39' RI., ooeplwe W m plane,
2.0 01 011 wo1Ao8 8' waterline, install 24 1718.8 s
l 9a. 335 37.5, 41' 711., and 38 +06. 51' Rt. 1
eeesplete and le place.
I I
EASTERN WATER LOOP PROJECT • CITY OF 000011 NOCII
1 7462.52 - 3925.04
5288.00
5515011
8715.58
1115.511
t
1285.51
5500.8 - 51,000.8 31,000.8
338.8
3300.00
S1,060.4
51,80 00
32,000.8 5800.00
31,500.1
01,00]1
34,400.01
31 .631.01
S1,610.03
01,003.00 MOM 1 0500.00
1
05,026.09 3400.11 3300 .09
ITEM LAPPROx
NO. i QTV
16
7
0 2.0 FA Remove minim 8 • B me awl valve 3288.00
n Na. 734 37.5, 41 Rt. , and 15 *86, 31' Po., 2376. W
cormen to misting r waterline,
kee end it place:
4.0 111 12 x 12 n 5' Tee, complete ad is ph
EA
MID FROPObAL
REM WITH UNIT Om W ITTEN
IN WORDS
oomplcee ad in pine.
8 Ore V6ve .d boo ammo
complete and in place.
19 P EA ' P1o3 omplot end m pima,
IY
KEY 5E3
UNIT PRICE AMOUNT
0030.01
EASTERN WATER LOOP PROJECT - CITY OF ROUND ROCK
16,976.00
31
UNIT PRI
1336.
5952.66
CHAMPION 57Tg
2.0 127812. 12 x 12- Tee, complete and r pl 3434.00 5868.00 1614.26
3828.32.
5569.79 31,139.58
J.C. EVANS CONST RnEGEL11 CONST
AMOUNT UNIT PRICE AMOUNT
3672.76 ' 6400.00 000.40
550x00
00 ! 578010
11,332.72] 3715.03 3900.00 2710.110 s1 5336007 51,440.00
12x 12• ete=W -1 -I
"xeP Oa 3200.00 SI ]10.00 137527 31 12011 623000 $730.00 6330.03! 5990.02 5300.01
51,08000
10 EA x 6 x 6' Tee, mrnpleen end in plc 0Np 00 - 5235.60 2738.00 ¢Op - 00
520300 - 50110.03 s_23.aa i 1270.00
8.0 EA 12' One Vale •n4 tea essembl
58,00013 31.00010 1 38.000.00
37,621.21
51,000.00
3100.00
38,00)00
3
2338.00 597.67 5191.74 37110.03 D20.00
/MIT PRICE
SSSaOO 21,703.07
21070.00
360000
AMOUNT
65 1T1N ENGEVEERING
C4AT PRICE
00
A34010
s1.Q3aa
51 ,080.00
32,10010
390_00 118010 346.00 3180.00
1145.00 5145.07 . 29 374.29
58003 550.00 550.00 850.00 460.00 860.03
31.069 OS
xi 20000
54,80000
15.265.00 01.20
55.105 CO
3249,071.00
5239.080.
31,000.00 1400100
51,00000
4.000.03 5900.00
s1,800.07
1164.098.00
1249,098.00
_ 372,180.90 .9/1000 -00'
0168,010.00
5173,155.00
losamact ____... i1 rN� • � . �� ,b111 :rYtlt:lYi'l:�:ii� F � 1 �
0,69000 4n 7632 W mama -� �T PR1CJ
MINIM
® ®4 n Hydra) Una, oample4 and 11.00000 -
s lyso . ol ®� x1,7oo.07 31.200.00 12.000.00 S2.090 09 x7 aw no
®�[ a. Air ROW Vehe ��� +�
MI
WI IIIMM11.1111...111raz
MI madly 31.110. Da rc�oao
1,YN0.
� FOAM and Rs lyvmum Rpeir. ��
Y27,d
317,238.00
- -_�- S l 51500 W.W T8 .00
MUM
�� 50.90 52,042.00 31.03
1-C. EVANS CONS7
IIAEGEIBN OD \Sf AUSTIN FNG
5Y AO7 15.10500 x7.00
570,125.00 10
5268135.00
395,0000
EASTERN WATER LOOP PROJECT -pry OF ROUND ROCc
AMC
14,20
112.315.)
5295,090.0
389,Bfiq =01
1203,270.92
5773.130.06
02/21/95 16:05 ROUND ROCK PUELIC WORKS y 5122556676
STAFF RESOURCE PERSON; Jim Nuse
STAFF RECOMMENDATION:
On February 7, 1995, nine bids were opened for the East Water Loop Project.
Griffin- Austin Company was the lowest and best bidder at $188,523.25. Staff
recommends award to Griffin - Austin Company.
NO.429 , D10
DATE: February 21, 1995
SUBJECT: City Council Meeting, February 23, 1995
ITEM: 10J. Consider a resolution authorizing the Mayor to enter into a
contract for the construction of the East Water Loop Protect,
07/31/96 14:47 RO.FWROCK PUBLIC LeRRS - 512 245 9996
To: City of Round Rock
221 East Main Strad
Round Rock, Texas 78664
pa.ml4m.L4po
CERTIFICATE OF TDTSURANCE
PBD -7
Date: 7/31/95
NE1.639 t 1
Eastern Water Loop Project
Description of wank
TEAS IS TO CERTIFY THAT GRIFFIN- AUSTIN CO., INCis at the date of this certi&ate,
insured by this company with respect to the business operations hereinafter described, for the types of
insurance and in accordance with the provisions of the standard policies used by this company, and
further hereinafter described, Exceptions to standard policies are noted on the reverse side hereof.
TYPE OF POLICY EFFECTIVE EXPIRATION LIMITS OF
INS, Na DATE DATE LIABILITY
Statutory, State of
Workmen's TSF11356202 7/20/95 7/20/96 Texas, $100/500/100
Compensation TEXAS WORKERS" COMPENSATION INS. FUND Employer's Liability
Comprehensive oInjury
I
General CLS271395 7/31/95 7/31/96 s1,000,000 / person
Liability SCOTTSDALE INS .. CO. s i , U UO , UUU erson
Includes
Contractual
Liability
Covers Poperty Damage
Independent $ 1, 0 0 0, 0 0 0 /accident
Contractors 8 gregate
Owners Bodily Nary
Protective S N/ /person
$ N / A /accident
Property Damage
$ N/A !accident
Contractors $ N / A aggregate
27131/55 14:47 I01.14,10CK PUCK LYRICS • 512 295 8996
artificate of Insurance (continue fi
Comprehensive Bodily Iajwy
Automobile S N A /person
Liability $ r' /A /accident
Owned Vehicles Property Damage
Hired Vehicles $ N/A /accident
Non -owned Vehicles
Includes Contractual Liability
Contractual
Liability
*City of Round Rock added as additional insured except Worker's Comp.
NO. 639 uv2
The above policies either in the body thereof or by appropriate endorsement provide that they may not
be changed or canceled by the insurer in less than thirty (30) days after the insured has received written
notice of such change or cancellation.
The Certificate of insurance neither affirmatively or negatively amends extends, or alters the coverage
afforded by policy or policies indicated by this certificate.
o..
Texas Workers' Compensation Ins. Fund
Srnt tcrl 7n cn ra nra rnmpa ny
Name of Insurer
Hy:
ime Insurance Agency, Inc.
Title: Producer
Addren; 1507 S. IH -35
P130 -8
Austin, TX 78741
CHANGE
ORDER
PROJECT: Eastern Water Loop Project. CHANGE ORDER NUMBER: 1 (One)
(name, address) County Road 122, Round Rock, Texas
INITIATION DATE: June 15, 1995
TO (Contractor): Griffin — Austin Company, Inc.
ENGINEER'S PROJECT NO, 94049 —00
CONTRACT FOR: Water Line Extension
CONTRACT DATE: March 16, 1595
You are directed to make the following changes in this Contract:
Add 1,250 LE, install 1 foot of gravel on top of sand, complete in place for $3,00/1,F
to insure stability of roadway
Not valid until signed by both the Owner and Engineer.
Signature of the Conti indicates his agreement herewith, includicg any adjustmecf. in the Omit wet Sum er Contract Time.
The original (Contract. Sum) was $ 180.523.25
Net change by previously authorized Change Orders $ 0.00
The (Contract Sum) will be (increased) by this Change Order ....... ............................... . . ....... . . . .. . . . 9 3,750.00
The new (Contract Sum) including this change order will be $ ..... 192,073.25
The Contract Time will be (unchanged) by . . .. _ ....... .. ..... _ .. _ . .............................. (0) Days
The Dale of Substantial Completion as of the date of this Change Order therefore
ENGINEER
Fisher Hagood, lac.
One Chisholm Trail, Suite 5200
Round Rock, T% 78'81 /
#J16. / V
Distribution to:
OWNER •
ENGINEER •
CONTRACTOR •
FIELD ❑
OTHER ❑
CONTRACTOR
Griffin— AusCm, Inc.
P.O. Inc 9
Manr,yca, T% 75052 al
D, ..L_ 1 .1 h
Date -,13 -9-s"
Authorized,
OWNER
Ci19 of R
2000 Ent
Round Ro
Dale
$3,750.00
CONSTRUCTION SPECIFICATIONS
for
EASTERN WATER LOOP PROJECT
or
CITY OF ROUND ROCK
PUEIAC l'uVCRKS DEPARTMENT
COUNCILMEMEERS:
CHARLES (7:LH...FERRER
ROBERT STLUKA
ROD MORGAN
RICK STEWART
EARL PALMER
MARTHA CHAVEZ
JA „JOSEPH
CITY MANAGER:
ROBERT L. EENNETT
DIRECTOR OF PUBLIC WORKS:
JAMES NUSE, P.E.
JANU/•.RY, 1:]95
-I
:...
cp Fi s her 11. =!q '-!‘ Inc.
Lug Au, Intl
uoVIII.EliGlIda
/ cm. cbiaba. Tall putt (P?)6
Imal Rat, Taa MI! (61 2? 244-16a
MAYOR
MAYOR PRO-TEM
FH PROJECT #94049
11
Section Description Page
1.0 Notice to Bidders NB -1
2.0 Bid Documents BD -1
3.0 Post Bid Documents PBD -1
4.0 General Conditions GC -1
5.0 Special Conditions SC -1
6.0 Technical Specifications TS -1
table.mst/spec
TABLE OF CONTENTS
1.0 NOTICE TO BIDDERS
NOTICE TO BIDDERS
Sealed bids addressed to the Purchasing Agent, City of Round Rock, 221 East
Main Street, Round Rock, Texas 78664, for furnishing all labor, material and equipment
and performing all work required for the project titled Eastern Water Loop Project
(project includes approximately 4950 LF of 12" PVC waterline, valves, fittings and 1270
SY of pavement repair) will be received until 2:00 PM, February 7, 1995 then publicly
opened and read aloud at City Hall Council Chambers at the same address. Bid
envelopes should state date and time of bid and "Eastern Water Loop Project ". No bids
may be withdrawn after the scheduled opening time. Any bids received after scheduled
bid opening time will be returned unopened.
Bids must be submitted on City of Round Rock bid forms and must be
accompanied by an acceptable bid security as outlined in the Instructions to Bidders,
payable to the City of Round Rock, Texas equal to five percent (5 %) of the total bid
amount. Plans, Bid Forms, Specifications, and Instructions to Bidders may be obtained
from the engineer, Fisher Hagood, Inc., One Chisholm Trail, Suite 5200, Round Rock,
Texas beginning January 23, 1995 for a non - refundable charge of $25.00 per set.
In case of ambiguity, duplication, or obscurity in the bids, the City of Round Rock
reserves the right to construe the meaning thereof. The City of Round Rock further
reserves the right to reject any or all bids and waive any informalities and irregularities
in the bids received.
The successful bidder will be expected to execute the standard contract prepared
by the City of Round Rock, and to furnish performance and payment bonds as described
in the bid documents. Contractors and subcontractors shall pay to laborers, workmen,
and mechanics the prevailing wage rates as determined by the City of Round Rock.
City of Round Rock
Publish Dates:
Austin American Statesman: 1/23/95 Round Rock Leader: 1/23/95
1/30/95 1/30/95
noticebd.msdspec
NB -1
2.0 BID DOCUMENTS
INSTRUCTIONS TO BIDDERS
1. Prior to submitting any bid, bidders should read the plans, specifications, bid
form, contract and bond forms carefully; to inform themselves by their
independent research, test and investigation of the difficulties to be encountered
and judge for themselves of the accessibility of the work and all attending
circumstances affecting the cost of doing the work and the time required for its
completion and obtain all information required to make an intelligent bid.
2. Should the bidder find discrepancies in, or omissions from the plans,
specifications, or other documents, or should he be in doubt as to their meaning,
he should notify at once the Engineer and obtain clarification or addendum prior
to submitting any bid.
3. It shall be the responsibility of the bidder to see that his bid is received at the place
and time named in the Notice to Bidders. Bids received after closing time will be
returned unopened.
4. Bids shall be submitted in sealed envelopes plainly marked "Sealed Bid" and
showing the name of the project, the job number if applicable, and the opening
date and time.
5. Bids shall be submitted on bid forms furnished by the City of Round Rock.
6. All bids shall be accompanied by a certified cashier's check upon a National or
State bank in an amount not less than five percent (5 %) of the total maximum bid
price, payable without recourse to the City of Round Rock, or a bid bond in the
same amount from a reliable surety company, as a guarantee that the bidder will
enter into a contract and execute performance and payment bonds, as stipulated by
item 11 below, within ten (10) days after notice of award of contract to him Bid
guarantees must be submitted in the same sealed envelope with the bid. Bids
submitted without cheek or bid bonds will not be considered.
7. All bid securities will be returned to the respective bidders within twenty -five (25)
days after bids are opened, except those which the owner elects to hold until the
successful bidder has executed the contract. Thereafter, all remaining securities,
including security of the successful bidder, will be returned within sixty (60) days.
8. Until the award of the contract, the City of Round Rock reserves the right to reject
any and all bids and to waive technicalities; to advertise for new bids; or to do the
biddoc.mst /spec BD -1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
work otherwise when the best interest of the City of Round Rock will be thereby
promoted.
9. In case of ambiguity or lack of clarity in the statement of prices in the bids, the
City of Round Rock reserves the right to consider the most favorable analysis
thereof, or to reject the bid. Unreasonable (or unbalanced) prices submitted in a
bid may result in rejection of such bid or other bids.
10. Award of the contract, if awarded, will be made within sixty (60) days after
opening of the bids, and no bidder may withdraw his bid within said sixty (60) day
period of time unless a prior award is made.
11. Within ten (10) days after written notification of award of the contract, the
successful bidder must furnish a performance bond and a payment bond in the
amount of one - hundred percent (100 %) of the total contract price. If the total
contract price is $25,000.00 or less, the performance and payment bonds will not
be required. Said performance bond and payment bond shall be from an approved
surety company holding a permit from the State of Texas to act as surety or other
surety or sureties acceptable to the Owner, with approval prior to bid opening.
12. If the total contract price is less than $25,000.00 the performance and payment
bond requirement will be waived by the City of Round Rock. Payment will be
made following completion of the work.
13. Failure to execute the construction contract within ten (10) days of written
notification of award or failure to furnish the performance bond, or letter of credit
if applicable, and payment bond as required by item 11 above, shall be just cause
for the annulment of the award. In case of the annulment of the award, the bid
guarantee shall become the property of the City of Round Rock, not as a penalty,
but as a liquidated damage.
14. No contract shall be binding upon the City of Round Rock until it has been signed
by its Mayor after haling been duly authorized to do so by the City Council.
15. The Contractor shall not commence work under this contract until he has furnished
certification of all insurance required and such has been approved by the City of
Round Rock, nor shall the contractor allow any subcontractor to commence work
on his subcontract until proof of all similar insurance that is required of the
subcontractor has been furnished and approved.
biddoc.mst / spec BD -
16. Any quantities given in any portion of the contract documents, including the plans,
are estimates only, and the actual amount of work required may differ somewhat
from the estimates. The basis for the payment shall be the actual amount of work
done and /or material furnished.
17. No Texas sales tax shall be included in the prices bid for work under this contract.
This contract is issued by an organization which is qualified for exemption
pursuant to the provisions of Article 10.04 (h) of the Texas Limited Sales, Excise
and Use Tax Act. The contractor performing this contract may purchase, rent or
lease all materials, supplies, equipment used or consumed in the performance of
this contract by issuing to his supplier an exemption certificate complying with
State Comptroller's ruling #95 -0.07. Any such exemption certificate issued by the
contractor in lieu of the tax shall be subject to the provisions of the State
Comptroller's ruling #95 -0.09 as amended to be effective July 1, 1979.
18. No conditional bids will be accepted.
biddoc.mstlspec BD -
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
COMMERCIAL INDEMNITY
Insurance Company
BID BOND
KNOW ALL MEN BY THESE PRESENTS:
THAT GRIFFIN - AUSTIN CO., INC., P.O. BOX 9, MANCHACA, TEXAS 78652 as
Principal, and COMMERCIAL INDEMNITY INSURANCE COMPANY, as Surety, are held and
firmly bound unto CITY OF ROUND ROCK as Obligee, in the full and just sum of FIVE PERCENT
(5 %) OF THE AMOUNT BID lawful money of the United States, for the payment of which sum
well and truly to be made, we bind ourselves, our heirs, administrators, executors, successors
and assigns, jointly and severally, firmly by these presents.
WHEREAS, the Principal is hereby submitting its proposal for EASTERN WATER LOOP
PROJECT.
NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the
aforesaid Principal shall be awarded the contract the said Principal will, within the time required,
enter into a formal contract and give a good and sufficient bond to secure the performance of the
terms and conditions of the contract, then this obligation to be void; otherwise, the Principal and
Surety will pay unto the Obligee the difference in money between the amount of the bid of the said
Principal and the amount for which the Obligee legally contracts with another party to perform the
work if the latter amount be in excess of the former, but in no event shall liability hereunder
exceed the penal sum hereof.
Signed, sealed and delivered FEBRUARY 6, 1995
GRIFFIN - AUSTIN CO., INC.
PRINCIPAL
BOND NUMBER BD22027
By (SEAL)
NITY INSURANCE COMPANY
By �// r _(SEAL.)
PAU CAM RON ATTORNEY -IN -FACT
' Commercial Indemnity Insurance Company
P.O. Box 67
Austin, Texas 78767
1
KNOW ALL MEN BY THESE PRESENTS:
I That the Commercial Indemnity Insurance Company, a Corporation duly organized and existing under the laws of the State of Texas, having
its principal office in Austin, Texas, pursuant to the following resolution, adopted by the Board of Directors of the said Company on the 12th
day of May, 1994, to wit:
Resolved, that any officer of the Company shall have authority to make, execute and deliver a Power of Attorney constituting as Attorney -
In -Fact, such persons, firms, or corporations as may be selected from time to time.
111Bc
It Further Resolved, that the signature of any officer and the Seal of the Company may be affixed to any such Power of Attorney or any
certificate relating thereto by facsimile, and any such Power of Attorney or certificate bearing such facsimile signature or facsimile seal shall
be valid and binding upon the Company and any such powers so executed and certified by facsimile signature or facsimile seal shall be valid
' and binding upon the Company in the future with respect to any bond or undertaking to which it is attached." Commercial Indemnity Insurance
Company does hereby make, constitute and appoint :
PAUL CAMERON
S tate of Texas its true and lawful attomey(s) -in -fact, with full power and authority hereby conferred in its name, place and stead, to sign, execute,
'acknowledge and deliver in its behalf, and its act and deed, as follows:
The obligation of the Company shall not exceed one million (51,000,000.00) Dollars.
And to bind Commercial Indemnity Insurance Company thereby as fully and to the same extent as if such bond or undertaking was signed by
the duly authorized officer of the Commercial Indemnity Insurance Company, and all the acts of said Attorney(s) pursuant to the authority herein
I given, are hereby ratified and confirmed.
IN WITNESS WHEREOF, the Commercial Indemnity Insurance Company has caused these presents to be signed by any officer of the Company
and its Corporate Seal to be hereto affixed.
1
1
'State of Texas
County of Travis
'Commission Expires 8 -6 -97
1
1
COMMERCIAL
INDEMNITY INSURANCE CO.
John W. Schuler, President
BD 22027
POWER OF ATTORNEY
'On this 12th day of May, in the year 1994, before me Ann Bennett, a notary public, personally appeared John W. Schuler, personally known
to me to be the person who executed the within instrument as President, on behalf of the Corporation therein named and acknowledged to me
'that the Corporation executed it. nitTLVVINic
Ann Bennett, Notary Public
, CERTIFICATE
I, the undersigned, Secretary of Commercial Indemnity Insurance Company, DO HEREBY CERTIFY that the foregoing and attached Power
' of Attorney and Certificate of Authority remains in full force and has not been revoked:
Signed and Sealed at the said Company at Austin, Texas dated this 6 TH day of FEBRUARY , 19 95
"---P
L,,,/ CMN
Paul Cameron, Secretary
COMMERCIAL INDEMNITY
Insurance Company
(formerly Commercial Lloyd's Insurance Company)
IMPORTANT NOTICE
To obtain information or make a complaint:
You may contact John Schuler, President of Operations, whose direct dial
number is 512 -444 -7776. You may also fax us information at 512 -440 -0989.
You may also call Commercial Indemnity Insurance Company's toll -free
telephone number for information or to make a complaint at:
1- 800 - 234 -8046
You may also write to Commercial Indemnity Insurance Company : 3901 South
Lamar, Suite 350, Austin, Texas 78704.
You may contact the Texas Department of Insurance to obtain information on
companies, coverages, rights or complaints at:
1- 800 - 252 -3439
You may also write the Texas Department of Insurance: P.O. Box 149104,
Austin, Texas 78714 -9104, Fax 512 - 475 -1771.
PREMIUM OR CLAIM DISPUTES: Should you have a dispute concerning your
premium or about a claim you should contact the company first. If the dispute is
not resolved you may contact the Texas Department of Insurance.
ATTACH THIS NOTICE TO YOUR POLICY: This notice is for information only
and does not become a part of condition of the attached document.
BIDDING SHEET
JOB NAME: Eastern Water Loop Project
JOB LOCATION: Round Rock, Williamson County, Texas
OWNER: City of Round Rock, Texas
DATE: January 26, 1995
Gentlemen:
Pursuant to the foregoing Notice to Bidders and Instructions to Bidders, the
undersigned bidder hereby bids to do all the work, to furnish all necessary
superintendence, labor, machinery, equipment, tools, materials, insurance and
miscellaneous items, to complete all the work on which he bids as provided by the
attached supplemental specifications, and as shown on the plans for the construction of
Eastern Water Loop Project and binds himself on acceptance of this bid to execute a
contract and bond for completing said project within the time stated, for the following
prices, to wit:
biddoc.mst/spec BD -6
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
EASTERN WATER LOOP PROJECT
CITY OF ROUND ROCK, TEXAS
BID PROPOSAL
ITEM APPROX. ITEM WITH UNIT BID WRITTEN
NO. QTY IN WORDS UNIT PRICE AMOUNT
1 750.0 LF Silt Fence, complete and in place.
FOR /,•.cra DOLLARS o0
AND — o — CENTS 2.
2 50.0 LF Rock Berm, complete and in place.
FOR / '.>PDOLLARS
AND ^ u -- CENTS
3 4,995.0 LF 12" PVC (AWWA C -900, Class 200)
waterline, complete and in place.
ree DOLLARS
!rim _ _ CENTS • 35
4 20.0 LF 12" Ductile Iron (AWWA C100, Class 50)
waterline, complete and in place.
FOR ` DOLLARS AND o
— CENTS ' S0 (60o
5 110.0 LF 8" PVC (AWWA C -900, Class 200)
waterline, complete and in place.
FOR DOLLARS oo
AND -- cD — CENTS YO. CC/O O
6 42.0 LF 6" Ductile Iron (AWWA C100, Class 50)
waterline, complete and in place.
FOR.
AND
4. 1 -trP DOLLARS 35 %
CENTS
— o
BD -7
oo
116 ) 6, 33,15
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
7 2.0 EA Connection to existing 12" waterlines,
complete and in place. (�
FOR T L-, DOLLARS p0
AND — o -- CENTS 1,200..
8 1.0 EA Cut existing 8" waterline, install 2 -8" plugs
at Sta. 32 +19, 39' Rt., complete and in place.
FOR DOLLARS
AND _ o
9 2.0 EA Cut existing 8" waterline, install 2 -8" plugs
at Sta. 33 +37.5, 41' Rt., and 38 +86, 51' Rt.
complete and in place.
FOR b.'u ■a--0 DOLLARS 0o
AND — — CENTS I °°° 2000
10 2.0 EA Remove existing 8 x 8 tee and valve
at Sta. 33+37.5, 41' Rt., and 38 +86, 51' Rt.,
connect to existing 8" waterline,
complete and in pla ce.
FOR ( hund rekOLLARS c o
AND — o — CENTS j2-00
11 2.0 EA 12 x 12 x 12" Tee, complete and in place.
FOR �t.12 ^^"-�'� o g' DOLLARS
AND — o — CENTS 5ot7. /000.
12 4.0 EA 12 x 12 x 8" Tee, �complete �and in place.
FOR 7 v ^ Q DOLLARS
-1 -t
AND D — CENTS
13 3.0 EA 12 x 12 x 6" Tee, complete and in place.
FOR 7-4A (t` -eQA. Q DOLLARS
AND — o — CENTS
13D
CENTS
(Coo.
oa
Soo , —
Z`(0o
1 00o 0Q
00
Z 4-D o.
i
Zo
00 ob
Soo: ) � 5 o0
14 1.0 EA 8 x 8 x 6" Tee, complete and in place.
FOR ��. -e DOLLARS
AND — — CENTS
16 2.0 EA 8" Gate Valve and box assembly,
complete and J in�place.
FOR 71)Q,-- 5 ° DOLLARS
AND — CENTS
17 5.0 EA 6" Gate Valve and box assembly,
complete and in place.
FOR 9. b DOLLARS
AND — o CENTS
20 4.0 EA Fire Hydrant Unit, complete and
in place.
FOF .e4enleen � 1u ndreer Ft DOLLARS
AND 71JQ CENTS
BD -9
oo0
Soo,
15 8.0 EA 12" Gate Valve and box assembly,
complete and in place.
FOR T---,;11 DOLLARS
AND o — CENTS g ? S.
of
52a.
18 2.0 EA 12" Plug, complete ((and in place.
FOR •.-vo /ma DOLLARS
AND — a — CENTS z °C.
19 1.0 EA 8" Plug, complete and in place.
FOR /,O 44--Q DOLLARS p
AND yio CENTS Z�Q
150
`b
S ao
Ooo
206o
00
go
oo
z 37S.
ZD o.
21 1.0 EA Drain Hydrant Unit, complete and
in place.
FOR /For-DOLLARS 04
AND — o — CENTS /700.
22 2.0 EA 1" Air Relief Valve assembly with
meter box, tap, corp cock, and
tubing, complete and in place.
FORvfeen DOLLARS
AND — — CENTS 1 20 D. co
23 1,800.0 SY HMAC and Base Pavement Repair,
complete and in place.
FORght DOLLARS
AND — o -- CENTS
24 5,105.0 LF Trench Safety, complete and in place.
FOR ®ice
AND —
DOLLARS
CENTS /.
25 13,500.0 SY Revegetation, complete and in place.
FOR - ° DOLLARS
AND CENTS
TOTAL BID (Items 1 thru 25):
STATEMENT OF SEPARATE CHARGES:
Materials:
All Other Charges:
Total:
BD -10
I2 °
So
1 7oa
•rt 5o
1 /ig 5a3. aS
$ 1 $rlO, oo
$ 9:6,33. .s
fggsa3.
If this bid is accepted, the undersigned agrees to execute the contract and provide
necessary bonds and insurance certification as per the Instructions to Bidders and
commence work within ten (10) days after written Notice to Proceed. The undersigned
further agrees to complete the work in full within ninety (90) calendar days after the date
of the written Notice -to- Proceed.
The undersigned certifies that the bid prices contained in the bid have been carefully
checked and are submitted as correct and final. The Owner reserves the right to reject
any or all bids and may waive any informalities.
Respectfully Submitted,
A2; r P. 0. B
IPre6, d e yt M 4 Nickt kC A, I 7ff6 sz
Title for Address
On Fri ry -4-U, iJ Ca _71 "lc- 5 12
Name of Firm
F�b vt qr - /915
Date
Telephone
Secretar
BD -11
ctor is a Corporation
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
3.0 POST BID DOCUMENTS
THE STATE OF TEXAS
COUNTY OF WILLIAMSON
AGREEMENT
THIS AGREEMENT, made and entered into this x( day of Mn2C+,1 A.D. 1995, by
and between the CITY OF ROUND ROCK, TEXAS acting through it's Mayor, Party of
the First Part, hereinafter termed the OWNER, and Griffin- Austin Co., Inc. of the City
of Manchaca , County of Travis , State of Texas , Party of the Second Part, hereinafter
termed Contractor.
WITNESSETH: That for and in consideration of the payments and agreements
hereinafter mentioned, to be made and performed by said First Party (Owner), the said
Second Party (Contractor), hereby agrees with the first Party to commence and complete
the construction of certain improvements at the prices set forth in the Contractor's Bid
dated February 07, 1995 for certain improvements described as follows:
The Contractor shall perform all work shown on the Plans and described in the
Contract and shall meet all requirements of this Agreement, the General and Special
Conditions of the Contract; and such Orders and Agreements for Extra Work as may
subsequently be entered by the above named parties to this Agreement.
The Contractor hereby agrees to commence work under this contract within 10
consecutive calendar days after that date of the Notice to Proceed and shall cause work
to progress in a manner satisfactory to the Owner. Such work shall be completed in full
within ninety (90) calendar days after the date of the written Notice to Proceed. Time
is of the essence to this contract.
The Owner agrees to pay the Contractor in current funds, and to make payments
on account, for the performance of the work in accordance with the Contract, at the
prices set forth in the Contractor's Proposal, subject to additions and deductions, all as
provided in the General Conditions of the Agreement.
The following documents together with this Agreement, comprise the Contract, and
they are fully a part thereof as if herein repeated in full:
posibid. ms ✓spec
EASTERN WATER LOOP PROJECT
PBD -1
AGREEMENT - continued
The Notice to Bidders
The Instruction to Bidders
The Bidding Sheets
The Performance & Payment Bonds
The General Conditions of Agreement
The Special Conditions of Agreement
The Technical Specifications
Addenda
Change Orders
The Certificate of Insurance
The Plans
IN WITNESS WHEREOF the Parties to these presents have executed this
Agreement in multiple originals in the year and day first above written.
ATTEST: n � ,/
By: (tAi 2i ( i GG
C Secretary
By: t J
Secretary, i'Contractor
is a Corporation or
otherwise registered with
the Secretary of the State
postbid.msdspec
PBD -2
By:
Party of the First Part (Owner)
- City of Round Rock
Party of the Serlond P
(Contractor)
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
PERFORMANCE BOND
THE STATE OF TEXAS BOND NO. BD 22379
COUNTY OF WILLIAMSON
KNOW ALL MENBY THESE PRESENTS: That GRIFFIN- AUSTIN co. , INC. of the
City of MANCHACA , County of TRAVIS , and State of
TEXAS , as Principal, and C R n C irF rrr3ronnry uthorized under the law
of the State of Texas to act as surety on bonds for principals, are held and firmly bound
E,pgOOBRAOCK, TEXAS, (Owner), in the penal sum ofoNE HUNDRED EIGHTY
TWENTY THRRF AND 25/100 dollars ($188,523.25 ) for the payment
whereof, well and truly to be made the said Principal and Surety bind themselves, and
their heirs, administrators, executors, successors and assigns, jointly and severally, by
these presents:
WHEREAS, the Principal has entered into a certain written contract with the Owner
dated 'the _ 16TH day of MARCH , 19_9_5_ to which
the.cdntract is hereby referred to and made a part hereof as fully and to the same extent
as if copied at length herein consisting of:
EASTERN WATER LOOP PROJECT
NOW, THEREFORE, THE CONDITIONS OF THIS OBLIGATION IS SUCH, that if
the said Principal shall faithfully perform said Contract and shall, in all respects, duly and
faithfully observe and perform all and singular the covenants, conditions and agreements
in and by said Contract, agreed and covenanted by the Principal to be observed and
performed, including but not limited to, the repair of any and all defects in said work
occasioned by and resulting from defects in materials furnished by or workmanship of,
the Principal in performing the work covered by said Contract and occurring within a
period of twelve (12) months from the date of the contract Completion Certificate and all
other covenants and conditions, according to the true intent and meaning of said Contract
and the Plans and Specifications hereto annexed, then this obligation shall be void;
otherwise to remain in full force and effect;
PROVIDED, HOWEVER, that this bond is executed pursuant to the provisions of
Chapter 2253, Texas Government code, as amended, and all liabilities on this bond shall
be determined in accordance with the provisions of said Chapter 2253 to the same extent
as if it were copied at length herein.
pastbid.msdspec
PBD -3
PERFORMANCE BOND (continued)
Surety, for value received, stipulates and agrees that no change, extension of time,
alteration or addition to the term of the contract, or to the work performed thereunder,
or the plans, specifications, or drawings accompanying the same, shall in anywise affect
its obligation on this bond, and it does hereby waive notice of any such change, extension
of time, alteration or addition to the terms of the contract, or to the work to be performed
thereunder.
IN WITNESS WHEREOF, the said Principal and Surety have signed and sealed this
instrument this 16TH
19 95.
GRIFFIN— AUSTIN CO., INC.
COMMERCIAL INDEMNITY INSURANCE COMPANY
Principal Surety
B
-
r/7/./-(.11-(1
Title
P.O. BOX 9, MANCHACA, TX 78652
Address
The name and address of the Resident Agent of Surety is :
TIME INSURANCE AGENCY, INC.
1507 S. IH -35, AUSTIN TEXAS 78741
postbid. msdspec
PBD -4
By:
day of MARCH
JOHN W. SCHULER, ATTORNEY —IN —FACT
Title
1507 S. LB-35, AUSTIN, TEXAS 78741
Address
THE STATE OF TEXAS
COUNTY OF WILLIAMSON
postbid.msdspec
PAYMENT BOND
KNOW ALL MEN BY THESE PRESENTS: That GRIFFIN - AUSTIN CO. , INC . , of the
City of MANCHACA , Count TRAVIS , and State of
TEXAS as Principal, itlili6rized under the laws of the
State of Texas to act as Surety on Bonds for Principals, are held and firmly bound unto
TIC CITY OF ROUND ROCK, (OWNER), and all subcontractors, workers, laborers,
mechanics and suppliers as their interest may appear, all of whom shall have the right to
sue u A ot bond, in the penal sum of ONE HUNDRED EIGHTY EIGHT THOUSAND FIVE HUNDRED
-.,_ _ 5 _ 1 Dollars ($ 188,523.25 ) for the payment
whereof, well and truly be made the said Principal and Surety bind themselves and their
heirs, administrators, executors, successors, and assigns, jointly and severally, by these
presents:
WHEREAS, the Principal has entered into a certain written contract with the Owner,
dated the 16TH day of MARCH , 19 95, CO which
Contract is hereby referred to and made a part hereof as fully and to the same extent as
if copied at length herein consisting of: EASTERN WATER LOOP PROJECT
THE CONDITION OF THIS OBLIGATION IS SUCH, that if the said Principal shall
well and truly pay all subcontractors, workers, laborers, mechanics, and suppliers, all
monies to them owing by said Principals for subcontracts, work, labor, equipment,
supplies and materials done and furnished for the construction of the improvements of
said Contract, then this obligation shall be and become null and void; otherwise to remain
in full force and effect.
PROVIDED, HOWEVER, that this bond is executed pursuant to the provisions of
Chapter 2253, Texas Government code, as amended, and all liabilities on this bond shall
be determined in accordance with the provisions of said Chapter 2253 to the same extent
as if it were copied at length herein.
Surety, for value received, stipulates and agrees that no change, extension of time,
alteration or addition to the terms of the contract, or to the work performed thereunder,
or the plans, specifications or drawings accompanying the same shall in anywise affect
it's obligation on this bond, and it does hereby waive notice of any such change,
extension of time, alteration or addition to the terms of the contract, or to the work to be
performed thereunder.
PBD -5
BOND NO. BD 22379
PAYMENT BOND (continued)
IN WITNESS WHEREOF, the said Principal and Surety have signed and sealed this
Instrument this 16Th day of MARCH , 19 95.
GRIFFIN— AUSTIN CO., INC.
Principal
Title
P.O. BOX 9. MANCHACA. TX 78652 1507 S IH -35. AUSTIN. TEXAS 78741
Address Address
The name and address of the Resident Agent of Surety is :
TIME INSURANCE AGENCY, INC.
1507 S. IH -35, AUSTIN, TEXAS 78741
postbid.mst/spec
PBD -6
COMMERCIAL INDEMNITY INSURANCE COMPANY
Surety
By:
JOHN W. SCHULER, ATTORNEY —IN —FACT
Title
Commercial Indemnity Insurance Company
' P.O. Box 67
Austin, Texas 78767
1
1
111 County ▪ of Texas
County of Travis
COMMERCIAL
INDEMNITY INSURANCE CO.
John W. Schuler, President
BD 223i9
POWER OF ATTORNEY
KNOW ALL MEN BY THESE PRESENTS:
That the Commercial Indemnity Insurance Company, a Corporation duly organized and existing under the laws of the State of Texas, having
1 its principal office in Austin, Texas, pursuant to the following resolution, adopted by the Board of Directors of the said Company on the 12th
day of May, 1994, to wit:
, Resolved, that any officer of the Company shall have authority to make, execute and deliver a Power of Attorney constituting as Attorney-
In -Fact, such persons, firms, or corporations as may be selected from time to time.
I Be It Further Resolved, that the signature of any officer and the Seal of the Company may be affixed to any such Power of Attorney or any
certificate relating thereto by facsimile, and any such Power of Attorney or certificate bearing such facsimile signature or facsimile seal shall
be valid and binding upon the Company and any such powers so executed and certified by facsimile signature or facsimile seal shall be valid
and binding upon the Company in the future with respect to any bond or undertaking to which it is attached." Commercial Indemnity Insurance
I Company does hereby make, constitute and appoint :
JOHN W. SCHULER
State of Texas its true and lawful attorney(s)-in-fact, with full power and authority hereby conferred in its name, place and stead, to sign, execute,
I acknowledge and deliver in its behalf, and its act and deed, as follows:
The obligation of the Company shall not exceed one million ($1,000,000.00) Dollars.
' And to bind Commercial Indemnity Insurance Company thereby as fully and to the same extent as if such bond or undertaking was signed by
the d my authorized officer of the Commercial Indemnity Insurance Compan y, and all the acts of said Attorney(s) pursuant to the authority herein
given, are hereby ratified and confirmed.
I IN WITNESS WHEREOF, the Commercial Indemnity Insurance Company has caused these presents to be signed by any officer of the Company
and its Corporate Seal to be hereto affixed.
' On this 12th day of May, in the year 1994, before me Ann Bennett, a notary public, personally appeared John W. Schuler, personally known
to me to be the person who executed the within instrument as President, on behalf of the Corporation therein named and acknowledged tome
'that the Corporation executed it.
' Commission Expires 8 -6 -97 Ann Bennett, Notary Public
▪ CERTIFICATE
▪ I, the undersigned, Secretary of Commercial Indemnity Insurance Company, DO HEREBY CERTIFY that the foregoing and attached Power
▪ of Attorney and Certificate of Authoritylemains in full force and has not been revoked:
I Signed and Sealed at the said Company at Austin,. Texas dated this 16TH day of MOH , 19 95
L Nnvnte. -•---
1
1
Paul Cameron, Secretary
ANN BENNETT
NOTARY PUBLIC
'eludes
onti actual
Lability
rner's
ntractors
xatbid.mstispec
F
City of Round Rock
221 East Main Street
Round Rock, Texas 78664
)CeCtiVe CLS243903 04 -06 -95
SCOTTSDALE INSURANCE COMPANY
k *NAMED INSURED: CITY OF ROUND ROCK
rtilicate of Insurance (continued)
PBD -7
04 -06 -96
CERTIFICATE OF INSURANCE
Date: APRIL 5, 1995
EASTERN WATER LOOP PROJECT
Description of Work
IS IS TO CERTIFY THAT GRIFFIN - AUSTIN COMPANY, INC. iS, at the date of this certificate,
ared by this company with respect to the business operations hereinafter described, for the types of
arance and in accordance with the provisions of the standard policies used by this company, and
they hereinafter described. Exceptions to standard policies are noted on the reverse side hereof.
PE OF POLICY EFFECTIVE EXPIRATION LIMITS OF
3. NO. DATE DATE LIABILITY
Statutory, State of
W TSF11356201 07 -20 -94 07 -20 -95 Texas, $100 /500 /100
mpensati0n TEXAS WORKERS COMPENSATION 'INSURANCE. FUND Employer's Liability
*30 DAY NOTICE OF CANCELLATION IN FAVOR OF THE CITY OF ROUND ROCK.
mprehensive Bodily Injury
oral CLS217403 07 -20 -94 07 -20 -95 $ 1, 000,000. /person
.blllty SCOTTSDALE INSURANCE COMPANY _
$ 1,000,000. /person
* *ADDITIONAL INSURED WITH A 30 DAY NOTICE OF CANCELLATION IN FAVOR OF THE
CITY OF ROUND ROCK.
'ovens Property Damage
lependent $ 1,000,000. /accident
ntractors $ 1. 000,000.aggregate
Bodily Injury
$ 500,000. /person
$ 5oo,o0o. /accident
Property Damage
$ 500,000. /accident
$ 1,000,000. aggregate
rehensive
iobile
ity
Led Vehicles
ides Contractual Liability
tractual
duty
postbd.mcd
r
Name of Insurer
Address: 1507 S. 1N -35
PBD -8
_) r
Body In1�Y
$ N/A /person
$ N/A /accident
Property Damage
d Vehicles $ N/A /accident
-owned Vehicles
bove.policies either in the body thereof or by appropriate endorsement provide that they may not
urged or canceled by the insurer in less than thirty (30) days after the insured has received written
of such change or cancellation.
; ertificate of Insurance neither affirmatively or negatively amends extends, or alters the coverage
ied by policy or policies indicated by this certificate.
TEXAS WORKERS' COMPENSATION INSURANCE FUND
SCOTTSDALE INSURANCE COMPANY
By: >c
7fME I URANCE AGENCY, INC.
Title: ( \ PRODUCE \
AUSTIN, TEXAS 78741
1
Jl ��!f!i SwF
ACORi ■ URANC : BIND+ DATE(MMNO/YY) •
>:.. _..: 04/06/95
THIS BINDER 1S A TEMPORARY INSURANCE CONTRACT, SUBJECT TO THE CONDITIONS SHOWN ON THE REVERSE SIDE OF THIS FORM.
PRODUCER
TIME INSURANCE AGENCY, INC.
1507 SOUTH IH -35
AUSTIN TX 78741
CODE(
AGENCY UU ER ID: AGRIAS 0 - 7
INSURED
CITY OF ROUND ROCK
221 EAST MAIN STREET
ROUND ROCK TX 78664
PROPERTY CAUSES OF LOSS
BASIC 1 BROAD
SPEC
GENERAL UUUJUTY
X COMMERCIAL GENERAL LIABILITY
CLAIMS MADE X I OCCUR
X OWNER'S & CONTRACTORS PROT
X $500. BI /PD DED
AUTOMOBLE LIABILITY
ANY AUTO
AU. OWNED AUTOS
SCHEDULED AUTOS
HIRED AUTOS
NON•OWNED AUTOS
AUTO PHYSICAL DAMAGE DEDUCTIBLE
COLLISION
OTRER THAN COL
GARAGE /JABOT)
ANY AUTO
EXCESS LIARILRY
UMBRELLA FORM
OTHER THAN UMBRELLA FORM
WORKER'S COMPENSATION
MID
EMPLOYERS LIABILITY
I uc,w,E *(512) 447 -7773
[SUBCODE:
tt?
CITY OF ROUND ROCK
COMPANY
SCOTTSDALE INS CO
DATE
EFFECTIVE
TIME
04/06/95
12:01
RETRO DATE FOR CLAIMS MADE:
ALL VEHICLES SCHEDULED VEHICLES
RETRO DATE FOR CLAIMS MADE:
221 EAST MAIN STREET
ROUND ROCK TX 78664 JOHN W SCHULE
• f� 93 ... �Y Th :114 t�UlYl�1C� P STAG IN UIiMP ONO kiEY
X
AM
PM
05/06/95
THIS BINDER 18 ISSUED TO EXTEND COVERAGE IN THE ABOVE NAMED COMPANY
PER EXPIRING POLICY*:
DESCRIPTION OF OPERATIONSNEHIC ES/PROPERTY (Including Location)
PROJECT: EASTERN WATER LOOP
TYPE OF INSURANCE
OOVERAGE/PORM$
AMOUNT
DEDUCTIBLE COINS %
GENERAL AGGREGATE
PRODUCTS - COMP/OP AGO
PERSONAL & ADV INJURY
EACH OCCURRENCE
FIRE DAMAGE (Any one ere)
MED EXP (Any one person)
COMBINED SINGLE LIMIT
BODILY INJURY (Per person)
BODILY INJURY (Per eooldena
PROPERTY DAMAGE
MEDICAL PAYMENTS
PERSONAL INJURY PROT
UNINSURED MOTORIST
ACTUAL CASH VALUE
STATED AMOUNT
OTHER
AUTO ONLY • EA ACCIDENT
OTHER THAN AUTO ONLY:
EACH ACCIDENT
AGGREGATE
EACH OCCURRENCE
AGGREGATE
SELF-INSURED RETENTION
STATUTORY IJMITS
EACH ACCIDENT
DISEASE • POLICY LIMIT
DISEASE • EACH EMPLOYEE
MORTGAGEE X ADDITIONAL INSURED
LOSS PAYEE
BIDER e
GRIA50957
EXPMTION
DATE TIME
12E11 AM
NOON
$1,000,000
$ 500,000
UEXCLUDED
$ 500,000
sEXCLUDED
sEXCLUDED
$
SPECIAL PENDING RECEIPT OF ORIGINAL POLICY. STANDARD POLICY EXCLUSIONS AND
DGDmr --' LIMITATIONS HEREBY APPLY.
COVERAGES
LOAN R
AUTHORED REPRESENTATIVE
LB
ACl3TiTJ o oM11oiN - 1
1
This Company binds the kind(s) of insurance stipulated on the reverse side. The Insurance is subject to the
terms, conditions and limitations of the policy(ies) in current use by the Company.
This binder may be cancelled by the Insured by surrender of this binder or by written notice to the Company
stating when cancellation will be effective. This binder may be cancelled by the Company by notice to the
Insured in accordance with the policy conditions. This binder is cancelled when replaced by a policy. If this
binder is not replaced by a policy, the Company is entitled to charge a premium for the binder according to the
Rules and Rates in use by the Company.
The mortgagee or Obligee of any mortgage or other instrument given for the purpose of creating a lien on real
property shall accept as evidence of insurance a written binder issued by an authorized insurer or its agent if
the binder includes or is accompanied by: the name and address of the borrower: the name and address of the
lender as loss payee; a description of the insured real property; a provision that the binder may not be canceled
within the term of the binder unless the lender and the insured borrower receive written notice of the cancel-
lation at least ten (10) days prior to the cancellation; except in the case of a renewal of a policy subsequent to
the closing of the loan, a paid receipt of the full amount of the applicable premium, and the amount of
insurance coverage.
Any person who refuses to accept a binder which provides coverage of less than $1,000,000.00 when proof is
required: (A) Shall be fined not more than $500.00, and (B) is liable to the party presenting the binder as proof
of insurance for actual damages sustained therefrom.
APfRCI 7'.'
CONDITIONS
Applicable In Delaware
Chapter 21 Tide 25 Paragraph 2119
Applicable in Nevada
1
1
I ertjfite of Insurance (continued)
1
II posthid.msuspec
1
CERTIFICATE OF INSURANCE
if: City of Round Rock Date: MARCH 16, 1995
221 East Main Street
Round Rock, Texas 78664 EASTERN WATER LOOP PROJECT
Description of Work
l
PBD -7
1
IS IS TO CERTIFY THAT GRIFFIN— AUSTIN COMPANY, INC. is, at the date of this certificate,
I ured by this company with respect to the business operations hereinafter described, for the types of
urance and in accordance with the provisions of the standard policies used by this company, and
hereinafter described. Exceptions to standard policies are noted on the reverse side hereof.
1rther
TYPE OF POLICY EFFECTIVE EXPIRATION LIMITS OF
S. NO. DATE DATE LIABILITY
Statutory, State of
orlcmen's TSF11356201 07 -20 -94 07 -20 -95 Texas, $100 /500 /100
ompensation TEXAS WORKERS COMPENSATION INSURANCE FUND Employer's Liability
mprehensive Bodily Injury
eneral CLS217403 07 -20 -94 07 -20 -95 $ 1,000,000. /person .
rl ability SCOTTSDALE INSURANCE COMPANY $ 1,000,000. /person
ncludes
Contractual
I l L i a b il ity
l overs Property Damage
dependent $ 1,000,000. /accident
ontractors $ 1, 000 , o00 . aggregate
Iv
ner's Bodily Injury
otective $ N/A /person
$ N/A /accident
Property Damage
$ N/A /accident
retractors $ N/A aggregate
Tomprehensive Bodily Injury
Automobile $ N /A /person
.iability $ N/A /accident
Owned Vehicles Property Damage
Hired Vehicles $ N/A /accident
Non -owned Vehicles
Includes Contractual Liability
Contractual
Liability
[he above policies either in the body thereof or by appropriate endorsement provide that they may not
)e changed or canceled by the insurer in less than thirty (30) days after the insured has received written
iotice of such change or cancellation.
Che Certificate of Insurance neither affirmatively or negatively amends extends, or alters the coverage
ifforded by policy or policies indicated by this certificate.
postbid.msVspec
TEXAS WORKERS' COMPENSATION INSURANCE FUND
SCOTTSDALE INSURANCE COMPANY
Name of Insurer
By:
z
T SURANCE AGENCY, INC.
Title: PRODUCE
Address. s S. Ix -35
PBD -8
AUSTIN, TEXAS 78741
-1
1
1
1
1
1
1
1
The above policies either in the body thereof or by appropriate endorsement provide that they may not
be changed or canceled by the insurer in less than thirty (30) days after the insured has received written
notice of such change or cancellation.
The Certificate of Insurance neither affirmatively or negatively amends extends, or alters the coverage
afforded by policy or policies indicated by this certificate.
* *SHOW CITY OF ROUND ROUND
AS AN ADDITIONAL INSURED
U15-
U16-
U17-
Com prehensive W 17 - 6 7 2
Automobile U06 - 631
Liability N U06
Owned Veh INDE
}
Hired Vehicles - U15- 0781 -C23 -53A 9/23/94 to 3/23/95 $1 MILLI014accident
CONTINUOUS POLICY
Non - owned Vehicles - U15- 0781 - C23 -53A 9/23/94 to 3/23/95
CONTINOUS POLICY
Includes Contractual Liability
Contractual
Liability
postbid.msUspee
CONTINUOUS POLICY
2224- C30 -53B 81 CHEV PU 9/30/94 to 3/30/95
5038- B31 -53A 93 FORD PU 2/28/94 td 8/31/95
2688- F12 -53 81 FORD 12/12/94 to 6/12.495,
8- A17 -53 84 INT 1/17/95 to 7/17/95 unfitly Injury
8- A17 -53H 88 CHEV 1/17/95 to 7/17/95 $1 1ILLT 0 1 /person
8 -A17 -53H TRAILER 1/17/95 to 7/17/95 $1 MILLIONaccident
R. 80 CHEV PU 3/8/95 to 9/8/95
N/A
STATE FARM MUTUAL AUTO INSURANCE COMPANY
Title:
Address: 8705 SHOAL CREEK BLVD, SUITE 102
PBD -8
44.4 - xc- 59 6 a0. „ .
AGENT
AUSTIN, TX 78757
0 4 -04 -1 90_ ;C '70
Property Damage
GREG PEARSON, CLU, Agent
8705 Shoal Creek Blvd., 4102
Austin, Texas 78757
Bus. 512-451-0188
Res. 512-258-5872
TOTAL P. 02
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
>A II CONTINUOUS POLICY
U15- 2224- C30 -53B 81 CHEV PU 9/30/94 to 3/30/95
U16- 5038- B31 -53A 93 FORD PU 2/28/94 td 8/31/95
1J17- 2688- F12 -53 81 FORD 12/12/94 to 6/12.49
ComprehensiveWl7- 6728- A17 -53 84 INT 1/17/95 to 7/17/95 1 MTLLIO y
Automobile U06- 6318- A17 -53H 88 CHEV 1/17/95 to 7 $ �Tperson
Liability U06- 6318 -A17 -53H TRAILER 1/17/95 to 7/17/95 $1 MILLIONaccident
NEW BINDER. 80 CHEV PU 3/8/95 to 9/8/95
Owned Vehicles property Damage
Hired Vehicles - U15 0781 - C23 - 53A 9/23/94 to 3/23/95 $1 MILLiWWiaccident
CONTINUOUS POLICY
Non - owned Vehicles - U15- 0781 - C23 -53A 9/23/94 to 3/23/95
CONTINOUS POLICY
Includes Contractual Liability
Contractual
Liability
poidAdAsUspee
N/A
The above policies either in the body thereof or by appropriate endorsement provide that they may not
he changed or canceled by the Insurer in less than thirty (30) days after the insured has received written
notice of such change or cancellation.
The Certificate of Insurance neither affirmatively or negatively amends extends, or alters the coverage
afforded by policy or policies indicated by this certificate.
STATE FARM MUTUAL AUTO INSURANCE COMPANY
Name of Insur
By:
Title: AGEN
PBD -8
AUSTIN, TX 78757
Address: 8705 SHOAL CREEK BLVD, SUITE 102
TOTAL P.02
1
MAINTENANCE BOND
BOND NUMBER AMOUNT
KNOW ALL MEN BY THESE PRESENTS,
Thatwe,
(hereinafter called the "Principal ") as
Principal, and the a Corporation duly organized
under the laws of the State of and duly licensed to
transact business in the State of (hereinafter called the
"Surety"), as Surety, are held and firmly bound unto THE CITY OF ROUND ROCK,
TEXAS (hereinafter called the "Obligee "), in the sum of
dollars ($ ) for the
payment of which sum well and truly to be made, we, the said Principal and the said
Surety, bind ourselves, our heirs, executors, administrators, successors and assigns,
jointly and severally, firmly, by these presents.
Sealed with our seals and dated this day of , A.D. nineteen
hundred and
WHEREAS, the said Principal has heretofore entered into a contract with
Dated
postbid.mst/Spec
, 19 , for construction of
WHEREAS, the said Principal is required to guarantee the construction of all
improvements installed under said contract, against defects in materials or workmanship,
which may develop during the period of year(s) from the date of
acceptance of the project above described, by Owner:
The City of Round Rock, Texas
NOW, THEREFORE, THE'tONDITIONS OF THE OBLIGATIONS IS SUCH, that if
said Principal shall faithfully carry out and perform the said guarantee, and shall, on due
notice, repair and make good at its own expense any and all defects in materials or
workmanship in the said work which may develop during the period of
year(s) from the date of acceptance of the project above described, by Owner:
The City of Round Rock, Texas
PBD -9
1
MAINTENANCE BOND (continued) 1
OR shall pay over, make good and reimburse to the said Obligee all loss and damage
which said Obligee may sustain by reason of failure or default of said Principal so to do,
then this obligation shall be null and void; otherwise shall remain in full force and effect.
Principal Surety 1
By: By:
1
1
1
1
1
1
1
1
1
1
1
pastbid.mst / spec PB D -10
1
4.0 GENERAL CONDITIONS
1
1 General Conditions of Agreement
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Contents
1. Definition of Terms
1.01 - Owner, Contractor and Engineer
1.02 - Contract Documents
1.03 - Subcontractor
1.04 - Sub - Subcontractor
1.05 - Written Notice
1.06 - Work
1.07 - Extra Work
1.08 - Working Day
1.09 - Calendar Day
1.10 - Substantially Completed
2. Responsibilities of the Engineer and the Contractor
2.01 - Owner - Engineer Relationship
2.02 - Professional Inspection by Engineer
2.03 - Payments for Work
2.04 - Initial Determinations
2.05 - Objections
2.06 - Lines and Grades
2.07 - Contractor's Duty and Superintendence
2.08 - Contractor's Understanding
2.09 - Character of Workers
2.10 - Contractor's Buildings
2.11 - Sanitation
2.12 - Shop Drawings
2.13 - Preliminary Approval
2.14 - Defects and Their Remedies
2.15 - Changes and Alterations
2.16 - Inspectors
gencmd.msUspec
GC -1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
3. General Obligations and Responsibilities
3.01 - Keeping of Plans and Specifications Accessible
3.02 - Ownership of Drawings
3.03 - Adequacy of Design
3.04 - Right of Entry
3.05 - Collateral Contracts
3.06 - Discrepancies and Omissions
3.07 - Equipment, Materials and Construction PIant
3.08 - Damages
3.09 - Protection Against Accident to Employees and the Public
3.10 - Performance and Payment Bonds
3.11 - Losses from Natural Causes
3.12 - Protection of Adjoining Property
3.13 - Protection Against Claims of Subcontractors, etc.
3.14 - Protection Against Royalties or Patented Invention
3.15 - Laws and Ordinances
3.16 - Assignment and Subletting
3.17 - Indemnification
3.18 - Insurance
3.19 - Final Clean-Up
3.20 - Guarantee Against Defective Work
3.21 - Testing of Materials
4. Prosecution and Progress
4.01 - Time and Order of Completion
4.02 - Extension of Time
4.03 - Hindrances and Delays
5. Measurement and Payment
5.01 - Quantities and Measurements
5.02 - Estimated Quantities
5.03 - Price of Work
5.04 - Partial Payments
5.05 - Use of Completed Portions
5.06 - Final Completion and Acceptance
5.07 - Final Payment
5.08 - Payments Withheld
5.09 - Delayed Payments
gencond.msNspec
GC -2
6. Extra Work and Claims
6.01 Change Orders
6.02 Minor Changes
6.03 Extra Work
6.04 Time of Filing Claims
6.05 Continuing Performance
6.06 Arbitration
7. Abandonment of Contract
7.01 Abandonment by Contractor
7.02 Abandonment by Owner
8. Subcontractors
8.01 Award of Subcontracts for Portions of Work
8.02 Subcontractual Relations
8.03 Payments to Subcontractors
9. Separate Contracts
9.01 Owner's Right to Award Separate Contracts
9.02 Mutual Responsibility of Contractors
9.03 Cutting and Patching Under Separate contracts
10. Protection of Persons and Property
10.01 Safety Precautions and Programs
10.02 Safety of Persons and Property
10.03 Location and Protection of Utilities
gencond.mst/spec
GC -3
1. Definition of Terms
1.02 Contract Documents
gencond.mst/spec
General Conditions of Agreement
1.01 Owner, Contractor and Engineer
The Owner, the Contractor and the Engineer and those persons or organization identified
as such m the Agreement and are referred to throughout the contract Documents as if
singular in number and masculine in gender. The term Engineer means the Engineer or
his duly authorized representative. The Engineer shall be understood to be the Engineer
of the Owner, and nothing contained in the Contract Documents shall create any
contractual or agency relationship between the Engineer and the Contractor.
The Contract Documents shall consist of the Notice to Contractors, Instructions to
Bidders, Bid Form, Signed Agreement, Performance and Payment Bonds (when
required), Special Bonds (when required), General Conditions of the Agreement,
Construction Specifications, Plans and all modifications thereof incorporated in any of
documents before the execution of the agreement.
The Contract Documents are complementary, and what is called for by any one shall be
as binding as if called for by all. In case of conflict between any of Contract documents,
priority of interpretation shall be in the following order: Signed Agreement, Performance
and Payment Bonds, Special Bonds (if any), Bid, Special Conditions of Agreement,
Notice to Contractors, Technical Specifications, Plans, and General Conditions of
Agreement.
1.03 Subcontractor
The term Subcontractor, as employed herein, includes only those having a direct contract
with the Contractor and it includes one who furnishes material worked to special design
according to the plans or specifications of this work, but does not include one who
merely furnishes material not so worked.
1.04 Sub - subcontractor
The term Sub - Subcontractor means one who has a direct or indirect contract with a sub-
contractor to perform any of the work at the site and includes one who furnishes material
worked to a special design according to the plans or specifications of this work, but does
not include one who merely furnishes material not so worked.
GC -4
1.05 Written Notice
1.06 Work
Written notice shall be deemed to have been duly served if delivered in person to the
individual or to an officer of the corporation for whom it is intended, or if delivered at
or sent by registered mail to the last business address known to him who gives the notice.
The Contractor shall provide and pay for all materials, machinery, equipment, tools,
superintendence, labor, services, insurance, and all water, light, power, fuel,
transportation and other facilities necessary for the execution and completion of the work
covered by the contract documents. Unless otherwise specified, all materials shall be
new and both workmanship and materials shall be of a good quality. The Contractor
shall, if required, furnish satisfactory evidence as to the kind and quality of materials.
Materials or work described in words which so applied have a well known technical or
trade meaning shall be held to refer to such recognized standards.
1.07 Extra Work
The term "Extra Work" as used in this contract shall be understood to mean and include
all work that may be required by the Engineer or Owner to be done by the Contractor
to accomplish any change, alteration or addition to the work shown upon the plans, or
reasonably implied by the specifications, and not covered by the Contractor's Bid, except
as provided under "Changes and Alteration," herein.
1.08 Working Day
gencond.msUspec
A "Working Day" is defined as any day not including Saturdays, Sundays or any legal
holidays, in which weather or other conditions, not under the control of the Contractor,
will permit construction of the principal units of the work for a period of not less than
seven (7) hours between 7:00 a.m. and 6:00 p.m.
1.09 Calendar Day
"Calendar Day" is any day of the week or month, no days being excepted.
1.10 Substantially Completed
By the term "substantially completed" is meant that the structure has been made suitable
for use or occupancy or the facility is in condition to serve its intended purpose, but still
may require minor miscellaneous work and adjustment.
GC -5
2. Responsibilities of the Engineer and the Contractor
2.01 Owner - Engineer Relationship
gencond..t /spec
The Engineer will be the Owner's representative during construction. The duties,
responsibilities and limitations of authority of the Engineer as the Owner's representative
during construction are as set forth in the Contract Documents and shall not be extended
or limited without written consent of the Owner and Engineer. The Engineer will advise
and consult with the Owner, and all of Owner's instructions to the Contractor shall be
issued through the Engineer.
2.02 Professional Inspection by Engineer
The Engineer shall make periodic visits to the site to familiarize himself generally with
the progress of the executed work and to determine if such work generally meets the
essential performance and design features and the technical and functional engineering
requirements of the Contract Documents; provided and except, however, that the
Engineer shall not be responsible for making any detailed, exhaustive, comprehensive or
continuous on -site inspection of the quality or quantity of the work or be in any way
responsible, directly or indirectly, for the construction means, methods, techniques,
sequences, quality, procedures, programs, safety precautions or lack of same incident
thereto or in connection therewith. Notwithstanding any other provision of this
agreement or any other Contract Document, the Engineer shall not be in any way
responsible or liable for any acts, errors, omissions or negligence of the Contractor, any
Subcontractor or any of the Contractor's or Subcontractor's agents, servants or
employees or any other person, firm or corporation performing or attempting to perform
any of the work.
2.03 Payments for Work
The Engineer shall review Contractor's applications for payment and supporting data,
determine the amount owed to the Contractor and recommend, in writing, payment to
Contractor in such amounts; such recommendation of payment to Contractor constitutes
a representation to the Owner of Engineer's professional judgement that the work has
progressed to the point indicated to the best of his knowledge, information and belief,
but such recommendation of an application for payment to Contractor shall not be
deemed as a representation by Engineer that Engineer has made any examination to
determine how or for what purpose Contractor has used the moneys paid on account of
the Contract price.
2.04 Initial Determinations
The Engineer initially shall determine all claims, disputes and other matters in question
between the Contractor and the Owner relating to the execution or progress of the work
GC -6
or the interpretation of the Contract Documents and the Engineer's decision shall be
rendered in writing within a reasonable time, which shall not be construed to be less than
ten (10) days. Appeal to arbitration upon mutual agreement may be taken as if his
decision had been rendered against the party appealing.
2.05 Objections
In the event the Engineer renders any decision which, in the opinion of either party
hereto, is not in accordance with the meaning and intent of this contract, either party may
file with the Engineer within thirty (30) days his written objection to the decision, and
by such action may reserve the right to submit the question so raised to arbitration as
hereinafter provided.
2.06 Lines and Grades
gencond.msJspec
Unless otherwise specified, all lines and grades shall be furnished by the Engineer or his
representative. Whenever necessary, construction work shall be suspended to permit
performance of this work, but such suspension will be as brief as practicable and the
Contractor shall be allowed no extra compensation therefor. The contractor shall give
the Engineer ample notice of the time and place where lines and grades will be needed.
All stakes, marks, etc., shall be carefully preserved by the Contractor, and in case of
careless destruction or removal by him or his employees, such stakes, marks, etc., shall
be replaced at the Contractor's expense.
2.07 Contractor's Duty and Superintendence
The Contractor shall give adequate attention to the faithful prosecution and completion
of this contract and shall keep on the work, during its progress, a competent English -
speaking superintendent and any necessary assistants to supervise and direct the work.
The superintendent shall represent the Contractor in his absence and all directions given
to him shall be as binding as if given to the Contractor.
The Contractor is and at all times shall remain an independent contractor, solely
responsible for the manner and method of completing his work under this contract, with
full power and authority to select the means, method and manner of performing such
work, so long as such methods do not adversely affect the completed improvements, the
Owner and Engineer being interested only in the result obtained and conformity of such
completed improvements to the plans, specifications and contract.
Likewise, the Contractor shall be solely responsible for the safety of himself, his
employees and other persons, as well as for the protection and safety of the
improvements being erected and the property of himself or any other person, as a result
of his operations hereunder. Engineering construction drawings and specifications as
well as any additional information concerning the work to be performed passing from or
GC -7
through the Engineer shall not be interpreted as requiring or allowing Contractor to
deviate from the plans and specifications, the intent of such drawings, specifications and
any other such information being to define with specificity the agreement of the parties
as to the work the Contractor is to perform. Contractor shall be fully and completely
liable, at his own expense, for design, construction, installation and use, or non -use of
all items and methods incident to performance of the contract, and for all loss, damage
or injury incident thereto, either to person or property, including, without limitation, the
adequacy of all temporary supports, shoring, bracing, scaffolding, machinery or
equipment, safety precautions or devices, and similar items or devices used by him
during construction.
Any review of work in process, or any visit or observation during construction, or any
clarification of plans and specifications, by the Engineer or Owner, or any agent,
employee, or representative of either of them, whether through personal observation on
the project site or by means of approval of shop drawings for temporary construction or
construction processes, or by other means or method, is agreed by the Contractor to be
for the purpose of observing the extent and nature of work completed or being
performed, as measured against the drawings and specifications constituting the contract,
or for the purpose of enabling Contractor to more fully understand the plans and
specifications so that the completed construction work will conform thereto, and shall in
no way relieve the Contractor from full and complete responsibility for the proper
performance of his work on the project, including but not limited to the propriety of
means and methods of the Contractor in performing said contract, and the adequacy of
any designs, plans or other facilities for accomplishing such performance. Deviation by
the Contractor from plans and specifications that may have been in evidence during any
such visitation or observation by the Engineer, or any of his representatives, whether
called to the contractor's attention or not shall in no way relieve Contractor from his
responsibility to complete all work in accordance with said plans and specifications.
2.08 Contractor's Understanding
gencond.mst/spec
It is understood and agreed that the Contractor has, by careful examination, satisfied
himself as to the nature and location of the work, the conformation of the ground, the
character, quality and quantity of the materials to be encountered, the character of
equipment and facilities, needed preliminary to and during the prosecution of the work,
the general and local conditions, and all other matters which can in any way effect the
work under this contract. The Contractor agrees that he will make no claim against the
Owner or the Engineer if, in the prosecution of the work, he finds that the actual site or
subsurface conditions encountered do not conform to those indicated by excavation, test
excavation, test procedures, borings, explorations or other subsurface excavations. No
verbal agreement or conversation with any officer, agent or employee of the Owner or
Engineer either before or after the execution of this contract, shall affect or modify any
of the terms or obligations herein contained.
GC -8
2.09 Character of Workers
The Contractor agrees to employ only orderly and competent workers, skillful in the
performance of the type of work required under this contract, to do the work; and agrees
that whenever the Engineer shall inform him in writing that any workers on the work
are, in his opinion, incompetent, unfaithful or disorderly, or refuse instructions from the
Engineer in the absence of the Superintendent, such worker shall be discharged from the
work and shall not again be employed on the work without the Engineer's written
consent. No illegal alien may be employed by any Contractor for work on this project,
and a penalty of $500.00 per day will be assessed for each day and for each illegal alien
who works for the Contractor at this project.
2.10 Contractor's Buildings
The building of structures for housing workers, or the erection of tents or other forms
of protection, will be permitted only at such places as the Engineer shall direct, and the
sanitary conditions of the grounds in or about such structures shall at all times be
maintained in a manner satisfactory to the Engineer.
2.11 Sanitation
2.12 Shop Drawings
gencond.mst / spec
Necessary sanitary conveniences for the use of laborers on the work, properly secluded
from public observation, shall be constructed and maintained by the Contractor in such
manner and at such points as shall be approved by the Engineer, and their use shall be
strictly enforced.
The Contractor shall submit to the Engineer, with such promptness as to cause no delay
in his own work or in that of any other Contractor, four (4) checked copies, unless
otherwise specified, of all shop and /or setting drawings and schedules required for the
work of the various trades, and the Engineer shall pass upon them with reasonable
promptness, making desired corrections. The Contractor shall make any corrections
required by the Engineer, file with him two (2) corrected copies and furnish such other
copies as may be needed. The Engineer's review of such drawings or schedules shall
not relieve the Contractor from responsibility for deviations from drawings or
specifications, unless he has in writing called the Engineer's attention to such deviations
at the time of submission, nor shall it relieve him from responsibility for errors of any
sort in shop drawings or schedules. It shall be the Contractor's responsibility to fully
and completely review all shop drawings to ascertain their effect on his ability to perform
the required contract work in accordance with the plans and specifications and within the
contract time.
GC -9
gencond.msdspec
Such review by the Engineer shall be for the sole purpose of determining the general
conformity of said shop drawings or schedules to result in finished improvements in
conformity with the plans and specifications, and shall not relieve the Contractor of his
duty as an independent contractor as previously set forth, it being expressly understood
and agreed that the Engineer does not assume any duty to pass upon the propriety or
adequacy of such drawings or schedules, or any means or methods reflected thereby, in
relation to the safety of either person or property during Contractor's performance
hereunder.
2.13 Preliminary Approval
The Engineer shall not have the power to waive the obligations of this contract for the
furnishing by the Contractor of good material, and of his performing good work as
herein described, and in full accordance with the plans and specifications. No failure or
omission of the Engineer to discover, object to or condemn any defective work or
material shall release the Contractor from the obligations to fully and properly perform
the contract, including without limitations, the obligation to at once tear out, remove and
properly replace the same at any time prior to final acceptance upon the discovery of said
defective work or material; provided, however, that the Engineer shall, upon request of
the Contractor, inspect and accept or reject any material furnished, and in event the
material has been once accepted by the Engineer, such acceptance shall be binding on the
Owner, unless it can be clearly shown that such material furnished does not meet the
specifications for this work.
Any questioned work may be ordered taken up or removed for re- examination, by the
Engineer, prior to final acceptance, and if found not in accordance with the plans and /or
specifications for said work, all expense of removing, re- examination and replacement
shall be borne by the Contractor, otherwise the expense thus incurred shall be allowed
as Extra Work, and shall be paid for by the Owner; provided that, where inspection or
approval is specifically required by the specifications prior to performance of certain
work, should the Contractor proceed with such work without requesting prior inspection
or approval he shall bear all expense of taking up, removing, and replacing this work if
so directed by the Engineer.
2.14 Defects and Their Remedies
It is further agreed that if the work or any part thereof, or any material brought on the
site of the work for use in the work or selected for the same, shall be deemed by the
Engineer as unsuitable or not in conformity with the plans, specifications, or the intent
thereof, the Contractor shall after receipt of written notice thereof from the Engineer,
forthwith remove such material and rebuild or otherwise remedy such work so that it
shall be in full accordance with this contract.
GC -10
2.15 Changes and Alterations
The Contractor further agrees that the Owner may make such changes and alterations as
the Owner may see fit, in the line, grade, form, dimensions, plans or materials for the
work herein contemplated, or any part thereof, either before or after the beginning of the
construction, without affecting the validity of this contract and the accompanying
Performance and Payment Bonds.
If such changes or alterations diminish the quantity of the work to be done, they shall not
constitute the basis for a claim for damages, or anticipated profits on the work that may
be dispensed with, except as provided for unit price items under Section 5 "Measurement
and Payment ". If the amount of work is increased, and the work can fairly be classified
under the specifications, such increase shall be paid for according to the quantity actually
done and at the unit price, if any, established for such work under this contract, except
as provided for unit price items under Section 5 "Measurement and Payment "; otherwise,
such additional work shall be paid for as provided under Extra Work. In case the Owner
shall make such changes or alterations as shall make useless any work already done or
material already furnished or used in said work, then the Owner shall recompense the
Contractor for any material or labor so used, and for any actual loss occasioned by such
change, due to actual expense incurred in preparation for the work as originally planned.
2.16 Inspectors
gencond.mslspec
The Engineer may provide one (or more) field inspectors at the work site for the limited
purpose of observing the work in progress and reporting back to the Engineer on the
extent, nature, manner and performance of the work so that the Engineer may more
effectively perform his duties hereunder. Such inspectors may also communicate between
Engineer and Contractor their respective reports, opinions, questions, answers and
clarifications concerning the plans, specifications and work but shall be deemed the agent
of the Contractor for all purposes in communicating such matters.
Such inspector may confer with the Contractor or Contractor's superintendent concerning
the prosecution of the work and its conformity with the plans and specifications but shall
never be, in whole or part, responsible for, charged with, nor shall he assume, any
authority or responsibility for the means, methods or manner of completing the work or
of the superintendence of the work or of the Contractor's employees. It is expressly
understood and agreed that any such inspector is not authorized by the Engineer or
Owner to independently act for either or answer on behalf of either, any inquiries of the
Contractor concerning the plans, specifications or work. No inspector's opinion; advice;
interpretation of the plans or specifications of this contract; apparent or express approval
of the means, methods or manner of Contractor's performance of work in progress or
completed; or discovery or failure to discover or object to defective work of materials
shall release Contractor from his duty to complete all work in strict accordance with the
plans and specifications or stop the Owner or Engineer from requiring that all work be
GC -11
fully and properly performed including, if necessary, removal of defective or otherwise
unacceptable work and the re -doing of such work.
3. General Obligations and Responsibilities
3.01 Keeping of Plans and Specifications Accessible
The Engineer shall furnish the Contractor with an adequate and reasonable number of
copies of all plans and specifications without expense to him and the Contractor shall
keep one (1) copy of the same constantly accessible on the work, with the latest revisions
noted thereon.
3.02 Ownership of Drawings
gencond.msUspec
All drawings, specifications and copies thereof furnished by the Engineer shall not be
reused on other work, and, with the exception of the signed contract sets, are to be
returned to him on request, at the completion of the work. All models are the property
of the Owner.
3.03 Adequacy of Design
It is understood that the Owner believes it has employed competent engineers and
designers. It is therefore agreed that the Owner shall be responsible for the adequacy of
the design, sufficiency of the Contract Documents, the safety of the structure and the
practicability of the operations of the completed project; provided the Contractor has
complied with the requirements of the said Contract Documents, all approved
modifications thereof, and additions and alterations thereto approved in writing by the
Owner. The burden of proof of such compliance shall be upon the Contractor to show
that he has complied with the said requirements of the Contract Documents, approved
modification thereof and all approved additions and alterations thereto.
3.04 Right of Entry
The Owner reserves the right to enter the property or location of which the works herein
contracted for are to be constructed or installed, by such agent or agents as he may elect,
for the purpose of inspecting the work, or for the purpose of constructing or installing
such collateral work as said Owner may desire.
3.05 Collateral Contracts
The Owner agrees to provide by separate contract or otherwise, all labor and material
essential to the completion of the work specifically excluded from this contract, in such
GC -12
manner as not to delay the progress of the work, or damage said Contractor, except
where such delays are specifically mentioned elsewhere in the Contract Documents. The
Owner will attempt to coordinate the collateral work of utility companies regulated by
City franchises, but the City shall not be responsible for delays or other damages to the
Contractor which may result from their acts or omissions.
3.06 Discrepancies and Omissions
The Contractor shall provide written notice to the Engineer of any omissions or
discrepancies found in the contract. It is further agreed that it is the intent of this
contract that all work must be done and all material must be furnished in accordance with
the generally accepted practice for construction, and in the event of any discrepancies
between the separate contract documents, the priority of interpretation defined under
"Contract Documents" shall govern. In the event that there is still any doubt as to the
meaning and intent of any portion of the contract, specifications or drawings, the
Engineer shall define which is intended to apply to the work.
3.07 Equipment, Materials and Construction Plant
gencond.msddspec
The Contractor shall be responsible for the care, preservation, conservation, and
protection of all materials, supplies, machinery, equipment, tools, apparatus, accessories,
facilities, all means of construction, and any and all parts of the work, whether the
Contractor has been paid, partially paid, or not paid for such work, until the entire work
is completed and accepted.
3.08 Damages
In the event the Contractor is damaged in the course of completion of the work by the
act, neglect, omission, mistake or default of the Owner or Engineer, thereby causing loss
to the Contractor, the Owner agrees that he will reimburse the Contractor for such loss.
In the event the Owner is damaged in the course of the work by the act, negligence,
omission, mistake or default of the Contractor, or should the Contractor unreasonably
delay the progress of the work being done by others on the job so as to cause loss for
which the Owner becomes liable, then the Contractor shall reimburse the Owner for such
loss.
3.09 Protection Against Accident to Employees and the Public
The Contractor shall at all times exercise reasonable precautions for the safety of
employees and others on or near the work and shall comply with all applicable provisions
of Federal, State, and Municipal safety laws and building and construction codes. All
machinery and equipment and other physical hazards shall be guarded in accordance with
the "Manual of Accident Prevention in Construction" of the Associated General
Contractors of America except where incompatible with Federal, State, or Municipal
GC -13
gencoml.msr/spec
laws or regulations. The Contractor shall provide such machinery guards, safe
walkways, ladders, bridges, gangplanks, and other safety devices. The safety
precautions actually taken and their adequacy shall be the sole responsibility of the
Contractor, acting at his discretion as an independent contractor.
In the event there is an accident involving injury to any individual on or near the work,
the Contractor shall immediately notify the Owner and Engineer of the event and shall
be responsible for recording the location of the event and the circumstances surrounding
the event through photographs, interviewing witnesses, obtaining of medical reports and
other documentation that defines the event. Copies of such documentation shall be
provided to the Owner and the Engineer for their records.
3.10 Performance and Payment Bonds
If the contract price is $25,000.00 or less no payment or performance bond shall be
required. It is agreed that the Contract shall not be in effect until such performance bond
or letter of credit, and payment bond are furnished and approved by the owner.
Unless otherwise specified, the cost of the premium for the performance and payment
bonds shall be included in the price bid by the Contractor for the work under this
Contract, and no extra payment for such bonds will be made by the Owner.
Unless otherwise approved in writing by the Owner, the surety company underwriting
the bonds shall be licensed to write such bonds or letters of credit in the State of Texas.
3.11 Losses from Natural Causes
Unless otherwise specified, all loss or damage to the Contractor arising out of the nature
of the work to be done, or from the action of the elements, or from any unforeseen
circumstance in the prosecution of the same, or from unusual obstructions or difficulties
which may be encountered in the prosecution of the work, shall be sustained and borne
by the Contractor at his own cost and expense.
3.12 Protection of Adjoining Property
The said Contractor shall take proper means to protect the adjacent or adjoining property
or properties in any way encountered, which might be injured or seriously affected by
any process of construction to be undertaken under this Agreement, from any damage
or injury by reason of said process of construction; and he shall be liable for any and all
claims for such damage on account of his failure to fully protect all adjoining property.
The Contractor agrees to indemnify, save and hold harmless the Owner and Engineer
against any claim or claims for damages due to any injury to any adjacent or adjoining
property, arising or growing out of the performance of the contract regardless of whether
or not it is caused in part by a party indemnified hereunder, but any such indemnity shall
GC -14
not apply to any claim of any kind arising solely out of the existence or character of the
work.
3.13 Protection Against Claims of Subcontractors, Laborers, Materialmen and
Furnishers of Machinery, Equipment and Supplies
gencond.msdspec
The Contractor agrees that he will indemnify and save the Owner and Engineer harmless
from all claims growing out the lawful demands of Subcontractors, laborers, workers,
mechanics, materialmen and furnishers of machinery and parts thereof, equipment, power
tools, and all supplies, including commissary, incurred in the furtherance of the
performance of this contract. When so desired by the Owner, Contractor shall furnish
satisfactory evidence that all obligations of the nature hereinabove designated have been
paid, discharged or waived. If the Contractor fails to do so, then the Owner may at the
option of the Contractor either pay directly any unpaid bills, of which the Owner has
written notice, or withhold from the Contractor's unpaid compensation a sum of money
deemed reasonably sufficient to liquidate any and all such lawful claims until satisfactory
evidence is furnished that all liabilities have been fully discharged, whereupon payments
to the Contractor shall be resumed in full, in accordance with the terms of this contract,
but in no event shall the provisions of this sentence be construed to impose any obligation
upon the Owner by either the Contractor or his Surety.
3.14 Protection Against Royalties or Patented Invention
The Contractor shall pay all royalties and license fees, and shall provide for the use of
any design, device, material or process covered by letter patent or copyright by suitable
legal agreement with the patentee or owner. The contractor shall defend all suits or
claims for infringement of any patent or copyright rights and shall indemnify and save
the Owner and Engineer harmless from any loss on account thereof, except that the
Owner shall defend all such suits and claims and shall be responsible for all such loss
when a particular design, device, material or process or the product of a particular
manufacturer or manufacturers is specified or required by the Owner; provided, however,
if choice of alternate design, device, material or process is allowed to the Contractor,
then Contractor shall indemnify and save Owner harmless form any loss on account
thereof. If the material or process specified or required by the Owner is known by the
Contractor to be an infringement, the Contractor shall be responsible for such loss unless
he promptly gives such information to the Owner.
3.15 Laws and Ordinances
The Contractor shall at all times observe and comply with all Federal, State and local
laws, ordinance and regulations, which in any manner affect the contract or the work,
and shall indemnify and save harmless the Owner and Engineer against any claim arising
from the violation of any such laws, ordinances, and regulations whether by the
Contractor or his employees, except where such violations are called for by the
GC -15
provisions of the Contract Documents. If the Contractor observes that the plans and
specifications are at variance therewith, he shall promptly notify the Engineer in writing,
and any necessary changes shall be prepared as provided in the contract for changes in
the work. If the Contractor performs any work knowing it to be contrary to such laws,
ordinances, rules and regulations, and without such notice to the Engineer, he shall bear
all costs arising therefrom. In case the Owner is a body politic and corporate, the law
from which it derives its powers, insofar as the same regulates the objects for which, or
the manner m which, or the conditions under which the Owner may enter into contract,
shall be controlling, and shall be considered as part of this contract, to the same effect
as though embodied herein.
3.16 Assignment and Subletting
The Contractor further agrees that he will retain personal control and will give his
personal attention to the fulfillment of this contract and that he will not assign by Power
of Attorney, or otherwise, or sublet said contract without the written consent of the
Engineer, and that no part or feature of the work will be sublet to anyone objectionable
to the Engineer or the Owner. The Contractor further agrees that the subletting of any
portion or feature of the work, or materials required in the performance of this contract,
shall not relieve the Contractor from his full obligations to the Owner, as provided by
this Agreement.
3.17 Indemnification
genccnd.msNspec
The Contractor shall defend, indemnify and hold harmless the Owner and the Engineer
and their respective officers, agents and employees, from and against all damages,
claims, losses, demands, suits, judgements and costs, including reasonable attorneys' fees
and expenses, arising out of or resulting from the performance of the work, provided that
any such damages, claim, Loss, demand, suit, judgment, cost or expense:
1. Is attributable to bodily injury, sickness, disease or death to any person including
Contractor's employees and any Subcontractor's employees and any Sub -
Subcontractor's employees or to injury to or destruction of tangible property
including Contractor's property (other than the work itself) and the property of
any Subcontractor of Sub - Subcontractor including the loss of use resulting
therefrom; and,
2. Is caused in whole or in part by any intentional or negligent act or omission of
the Contractor, any Subcontractor, any Sub - subcontractor or anyone directly or
indirectly employed by any one of them or anyone for whose acts any of them
may be liable, regardless of whether or not it is caused in part by a party
indemnified hereunder.
GC -16
3.18 Insurance
The Contractor shall carry insurance as follows for the duration of this contract.
A. Statutory Workmen's Compensation.
Definitions:
gencond.mstlspec
The obligation of the Contractor under this Paragraph shall not extend to the liability of
the Engineer, his agents or employees arising out of the preparation of maps, plans,
reports, surveys, Change Orders, designs or specifications, or the approval of maps,
plans, reports, surveys, Change Orders, designs or specifications or the issuance of or
the failure to give directions or instructions by the Engineer, his agents or employees,
provided such is the sole cause of the injury or damage.
In any and all claims against the Owner or the Engineer or any of their agents or
employees by any employee of the Contractor, any Subcontractor, any Sub -
Subcontractor, anyone directly or indirectly employed by any of them or anyone for
whose acts any of them may be liable, the indemnification obligation under Paragraph
3.17 shall not be limited in any way by any limitation on the amount or type of damages,
compensation or benefits payable by or for the Contractor or any Subcontractor or Sub -
Subcontractor under workmen's compensation acts, disability benefit acts or other
employee benefit acts.
Certificate of coverage ( "certificate ") - A copy of a certificate of
insurance, a certificate of authority to self- insure issued by the Texas
Workers' Compensation Commission, or a coverage agreement (TWCC-
81, TWCC -82, TWCC -83, or TWCC -84), showing statutory workers'
compensation insurance coverage for the person's or entity's employees
providing services on a project, for the duration of the project.
Duration of the project - includes the time from the beginning of the work
on the project until the contractor's /person's work on the project has been
completed and accepted by the governmental entity.
Persons providing services on the project ( "subcontractor" in & 406,096 -
includes all persons or entities performing all or part of the services the
Contractor has undertaken to perform on the project, regardless of
whether that person contracted directly with the Contractor and regardless
of whether that person has employees. This includes, without limitation,
independent contractors, subcontractors, leasing companies, motor
carriers, owner - operators, employees of any such entity, or employees of
any entity which furnishes persons to provide services on the project.
"Services" include, without limitation, providing, hauling, or delivering
GC -17
gencond. /spec
equipment or materials, or providing labor, transportation, or other
service related to a project. "Services" does not include activities
unrelated to the project, such as food /beverage vendors, office supply
deliveries, and delivery of portable toilets.
The Contractor shall provide coverage, based on proper reporting of classification
codes and payroll amounts and filing of any coverage agreements, that meets the
statutory requirements of Texas Labor Code, Section 401.011(44) for all
employees of the Contractor providing services on the project, for the duration
of the project. This coverage shall include the following terms:
(a) Employer's Liability limits of $100,000.00 for each accident is
required.
(b) "Texas Waiver of Our Right to Recover From Others"
Endorsement WC 42 03 04 shall be included in this policy.
(c) Texas must appear in Item 3A of the Worker's Compensation
coverage or Item 3C must contain the following: Ass States except those
listed in 3A and the States of NV, ND, OH, WA, WV, and WY.
The Contractor must provide a certificate of coverage to the governmental entity
prior to being awarded the contract.
If the coverage period shown on the Contractor's current certificate of coverage
ends during the duration of the project, the Contractor must, prior to the end of
the coverage period, file a new certificate of coverage with the governmental
entity showing that coverage has been extended.
The Contractor shall obtain from each person providing services on a project, and
provide to the governmental entity:
(a) a certificate of coverage, prior to that person beginning work on
the project, so the governmental entity will have on file certificates of
coverage showing coverage for all persons providing services on the
project; and
(b) no later than seven calendar days after receipt by the Contractor,
a new certificate of coverage showing extension of coverage, if the
coverage period shown on the current certificate of coverage ends during
the duration of the project.
The Contractor shall retain all required certificates of coverage for the duration
of the project and for one year thereafter.
GC -18
gencond.msUspec
The Contractor shall notify the governmental entity in writing by certified mail
or personal delivery, within 10 calendar days after the Contractor knew or should
have known, or any change that materially affects the provision of coverage of
any person providing services on the project.
The Contractor shall post on each project site a notice, in the text, form and
manner prescribed by the Texas Workers' Compensation Commission, informing
all persons providing services on the project that they are required to be covered,
and stating how a person may verify coverage and report lack of coverage.
The Contractor shall contractually require each person with whom it contracts to
provide services on project, to:
(a) provide coverage, based on proper reporting of classification codes
and payroll amounts of filing of any coverage agreements, that meets the
statutory requirements of Texas Labor Code, Section 401.011(44) for all
of its employees providing services on the project, for the duration of the
project;
(b) provide to the Contractor, prior to that person beginning work on
the project, a certificate of coverage showing that coverage is being
provided for all employees of the person providing services on the project,
for the duration of the project;
(c) provide the Contractor, prior to the end of the coverage period, a
new certificate of coverage showing extension of coverage, if the coverage
period shown on the current certificate of coverage ends during the
duration of the project;
(d) obtain from each other person with whom it contracts, and provide
to the Contractor:
(1) a certificate of coverage, prior to the other person
beginning work on the project; and
(2) a new certificate of coverage showing extension of
coverage, prior to the end of the coverage period, if the coverage
period shown on the current certificate of coverage ends during the
duration of the project;
(e) retain all required certificates of coverage on file for the duration
of the project and for one year thereafter;
(f) notify the governmental entity in writing by certified mail or
personal delivery, within 10 calendar days after the person knew or should
have known, of any change that materially affects the provision of
coverage of any person providing services on the project; and
GC -19
gencond.msJspec
(g) contractually require each person with whom it contracts, to
perform as required by paragraphs (a) - (g), with the certificates of
coverage to be provided to the person for whom they are providing
services.
By signing this contract, or providing, or causing to be provided a certificate of
coverage, the Contractor is representing to the governmental entity that all
employees of the Contractor who will provide services on the project will be
covered by workers' compensation coverage for the duration of the project, that
the coverage will be based on proper reporting of classification codes and payroll
amounts, and that all coverage agreements will be filed with the appropriate
insurance carrier or, in the case of a self - insured, with the Commission's Division
of Self- Insurance Regulation. Providing false or misleading information may
subject the Contractor to administrative penalties, criminal penalties, civil
penalties, or other civil actions.
The Contractor's failure to comply with any of these provisions is a breach of
contract by the contractor that entitles the governmental entity to declare the
contract void if the Contractor does not remedy the breach within ten calendar
days after the receipt of notice of breach from the governmental entity.
B. Comprehensive General Liability Insurance with minimum Bodily Injury limits
of $300,000 for each occurrence including like coverage for acts and omissions
of Subcontractors and contractual liability coverage.
C. Property Damage Insurance with minimum limits of $50,000 for each occurrence
including like coverage for acts and omissions of Subcontractors and contractual
liability coverage.
D. Automobile Liability Insurance for all owned, non - owned, and hired vehicles with
minimum limits for Bodily Injury of $100,000 for each person and $300,000 for
each occurrence and Property Damage minimum limits of $50,000 for each
occurrence. Contractor shall require subcontractors to provide Automobile
Liability Insurance with same minimum limits.
The Contractor shall not commence work at the site under this contract until he has
obtained all required insurance and until such insurance has been approved by the Owner
and Engineer. The Contractor shall not allow any Subcontractors to commence work
until all insurance required has been obtained and approved. Approval of the insurance
by the Owner and Engineer shall not relieve or decrease the liability of the contractor
hereunder.
The required insurance must be written by a company licensed to do business in Texas
at the time the policy is issued. In addition, the company must be acceptable to the
GC -20
3.19 Final Clean -up
gencond.msJspec
Owner and all insurance (other than Workmen's compensation) shall be endorsed to
include the Owner as an additional insured thereunder.
The Contractor shall not cause any insurance to be cancelled nor permit any insurance
to lapse. All insurance certificates shall include a clause to the effect that the policy shall
not be cancelled or reduced, restricted or limited until ten (10) days after the Owner has
received written notice as evidenced by return receipt of registered or certified Letter.
Certificates of Insurance shall contain transcripts from the proper office of the insurer,
evidencing in particular those insured, the extent of the insurance, the location and the
operations to which the insurance applies, the expiration date, and the above mentioned
notice of cancellation clause.
Upon the completion of the work and before acceptance and final payment will be made,
the Contractor shall clean and remove from the site of the work, surplus and discarded
materials, temporary structures and debris of every kind. He shall leave the site of the
work in a neat and orderly condition at least equal to that which originally existed.
Surplus and waste materials removed from the site of the work shall be disposed of at
locations satisfactory to the Engineer.
In the event Contractor fails or refuses to clean and remove surplus materials and debris
as above provided, the Owner or Engineer may do so, or cause same to be done, at the
Contractor's expense and the reasonable cost thereof shall be deducted from the final
payment.
3.20 Guarantee Against Defective Work
The contractor warrants the materials and workmanship and that the work is in
conformance with the plans and specifications included in this contract for a period of
one year from the date of acceptance of the project. Said warranty binds the contractor
to correct any work that does not conform with such plans and specifications or any
defects in workmanship or materials furnished under this contract which may be
discovered within the said one year period. The Contractor shall at his own expense
correct such defect within thirty days after receiving written notice of such defect from
the Owner or Engineer by repairing same to the condition called for in the contract
documents and plans and specifications. Should the Contractor fail or refuse to repair
such defect within the said thirty day period or to provide acceptable assurances that such
repair work will be completed within a reasonable time thereafter, the Owner may repair
or cause to be repaired any such defect at the Contractor's expense.
3.21 Testing of Materials
Unless otherwise specified, testing of all materials to be incorporated into the project will
GC -21
gencond.nisJspec
be as directed by the Engineer at the expense of the Owner. All retesting for work
rejected on the basis of test results will be at the expense of the Contractor and the extent
of the retesting shall be determined by the Engineer. The Engineer may require
additional testing for failing tests and may require two passing retests before acceptance
will be made by the Owner. The testing laboratory will be designated by the Owner.
All materials to be incorporated into the project must meet the requirements of these
specifications. For manufactured materials such as reinforcing steel, expansion joint
materials, concrete pipe, cement, miscellaneous steel, cast iron materials, etc., the
Contractor will be required to furnish a manufacturer's certificate stating that the material
meets the requirements specified for this project.
4. Prosecution and Progress
4.01 Time and Order of Completion
It is the meaning and intent of this contract, unless otherwise herein specifically
provided, that the Contractor shall be allowed to prosecute his work at such times and
seasons, in such order of precedence, and in such manner as shall be most conducive to
economy of construction; provided, however, that the order and the time of prosecution
shall be such that the work shall be substantially completed as a whole and in part, in
accordance with this contract, the plans and specifications, and within the time of
completion designated in the Bid: provided, also, that when the Owner is having other
work done, either by contract or by his own force, the Engineer may direct the time and
manner of constructing the work done under this contract, so that conflict will be avoided
and the construction of the various works being done for the Owner shall be harmonized.
The Contractor shall submit, at such times as may reasonably be requested by the
Engineer, schedules which shall show the order in which the Contractor proposes to
carry on the Work, with dates at which the Contractor will start the several parts of the
work, and estimated dates of completion of the several parts.
4.02 Extension of Time
Should the Contractor be delayed in the completion of the work by any act or neglect of
the Owner or Engineer, or of any employee of either, or by other contractors employed
by the Owner, or by changes ordered in the work, or by strikes, lockouts, fires, and
unusual delays by common carriers, or unavoidable cause or causes beyond the
Contractor's control, or by any cause which the Engineer shall decide justifies the delay,
then an extension of time shall be allowed for completing the work, sufficient to
compensate for the delay, the amount of the extension to be determined by the Engineer,
provided, however, that the Contractor shall give the Engineer prompt notice in writing
of the cause of such delay. Adverse weather conditions will not be justification for
extension of time on "Calendar Days" contracts.
GC -22
4.03 Hindrances and Delays
No claims shall be made by the Contractor for damages resulting from hindrances or
delays from any cause (except where the work is stopped by order of and for the
convenience of the Owner) during the progress of any portion of the work embraced in
this contract. In case said work shall be stopped by the act of the Owner, then such
expense as in the judgment of the Engineer is caused by such stoppage of said work shall
be paid by the Owner to the Contractor.
5. Measurement and Payment
5.01 Quantities and Measurements
No extra or customary measurements of any kind will be allowed, but the actual
measured and /or computed length, area, solid contents, number and weight only shall be
considered, unless otherwise specifically provided.
5.02 Estimated Quantities
gencond.mstispec
This agreement, including the specifications, plans and estimate, is intended to show
clearly all work to be done and material to be furnished hereunder. Where the estimated
quantities are shown for the various classes of work to be done and material to be
furnished under this contract, they are approximate and are to be used only as a basis for
estimating the probable cost of the work and for comparing the bids offered for the work.
It is understood and agreed that the actual amount of work to be done and material to be
furnished under this contract may differ somewhat from these estimates, and that where
the basis for payment under this contract is the unit price method, payment shall be for
the actual amount of such work done and material furnished.
Where payment is based on the unit price method, the Contractor agrees that he will
make no claim for damages, anticipated profits or otherwise on account of any
differences which may be found between the quantities of work actually done, the
material actually furnished under this contract and the estimated quantities contemplated
and contained in the proposal; provided, however, that in case the actual quantity of any
major item should become as much as 20% more than, or 20% less than the estimated
or contemplated quantity for such items, then either party to this Agreement, upon
demand, shall be entitled to revised consideration upon the portion of the work above or
below 20% of the estimated quantity.
A "Major Item" shall be construed to be any individual bid item incurred in the bid that
has a total cost equal to or greater that five (5) percent of the total contract cost,
computed on the basis of the bid quantities and the contract unit prices.
GC -23
Any revised consideration is to be determined by agreement between the parties,
otherwise by the terms of this Agreement, as provided under "Extra Work ".
5.03 Price of Work
In consideration of the furnishing of all the necessary labor, equipment and material, and
the completion of all work by the Contractor, and on the completion of all work and on
the delivery of all material embraced in this Contract in full conformity with the
specifications and stipulations herein contained, the Owner agrees to pay the Contractor
the prices set forth in the Bid hereto attached, which is made a part of this contract. The
Contractor hereby agrees to receive such prices in full for furnishing all material and all
labor required for the aforesaid work, also for all expense incurred by him, and for well
and truly performing the same and the whole thereof in the manner and according to this
Agreement.
5.04 Partial Payments
gencond.mstlspec
Based upon Application for Payment submitted to the Engineer by the Contractor and
Certificates for Payment issued by the Engineer (the Engineer shall examine and approve
or modify and approve said Applications for Payment), the Owner shall make progress
payments on account of the Contract Sum to the Contractor as provided below and
elsewhere in the Contract:
1. The period covered by each Application for Payment shall be for a period of one
(1) month up to and including the twenty -fifth (25th) day of the month preceding
the month in which payment will be made.
2. All Applications for Payment will be presented to the City Council for approval
on the second Thursday of each month.
3. All Applications for Payment will be submitted to the Engineer for approval no
later than the Tuesday of the week prior to the scheduled meeting of the City
Council.
4. Payment will normally be made the Friday of the week following the week of the
scheduled meeting of the City Council.
Unless otherwise provided in the Contract Documents, each Application for
Payment shall be based upon the schedule of values submitted by the Contractor
in accordance with the Contract Documents. The schedule of values shall allocate
the entire Contract Sum among the various portions of the Work and be prepared
in such form as provided for in the Contract Documents.
GC -24
gencand.mst /spec
Subject to the provisions of the Contract Documents, the amount of each progress
payment shall be normally computed as follows:
1. Take that portion of the Contract Sum properly allocable to completed
Work as determined by multiplying the percentage completion of each
portion of the Work by the share of the total Contract Sum allocated to
that portion of the Work in the schedule of values, less retainage of ten
percent (10 %).
2. Add that portion of the contract properly allocable to materials and
equipment and suitably stored at the site for subsequent incorporation in
the completion of the project, or as otherwise provided for in the Contract
Documents, less ten percent (10 %) retainage.
3. Subtract the aggregate of previous payments made by the Owner and any
other additions or deletions as provided for in the Contract Documents.
It is understood, however, that in case the whole work be near to completion and some
unexpected and unusual delay occurs due to no fault or neglect on the part of the
Contractor, and Owner may - upon written recommendation of the Engineer - pay a
reasonable and equitable portion of the retained percentage to the Contractor; or the
Contractor at the Owner's option, may be relieved of the obligation to fully complete the
work and, thereupon, the Contractor shall receive payment of the balance due him under
the contract subject only to the conditions stated under "Final Payment ".
5.05 Use of Completed Portions
The Owner shall have the right to take possession of and use any completed or partially
completed portions of the work, notwithstanding the time for completing the entire work
or such portions may not have expired but such taking possession and use shall not be
deemed an acceptance of any work not completed in accordance with the Contract
Documents. If such prior use increases the cost of or delays the work, the Contractor
shall be entitled to such extra compensation, or extension of time, or both, as the
Engineer may determine.
The Contractor shall notify the Engineer when, in the Contractor's opinion, the contract
is "substantially completed" and when so notifying the Engineer, the Contractor shall
furnish to the Engineer in writing a detailed list of unfinished work. The Engineer will
review the Contractor's list of unfinished work and will add thereto such items as the
Contractor has failed to include. The "substantial completion" of the structure or facility
shall not excuse the Contractor from performing all of the work undertaken, whether of
a minor or major nature, and thereby completing the structure or facility in accordance
with the Contract Documents.
GC -25
5.06 Final Completion and Acceptance
Within ten (10) days after the Contractor has given the Engineer written notice that the
work has been completed, or substantially completed, the Engineer and the Owner shall
inspect the work and within said time, if the work be found to be completed in
accordance with the Contact Documents, the Engineer shall issue to the Owner and the
Contractor his Certificate of Completion, and thereupon it shall be the duty of the Owner
to issue a Certificate of Acceptance of the work to the Contractor or to advise the
Contractor in writing of the reason for non - acceptance.
5.07 Final Payment
Upon the issuance of the Certificate of Completion, the Engineer shall proceed to make
final measurements and prepare final statement for the value of all work performed and
materials furnished under the terms of the Agreement and shall certify same to the
Owner.
The Application for Final Payment will be submitted to the City Council for approval on
the second Thursday of the month immediately following the receipt of the Application
for Final Payment. Payment will normally be made the Friday of the week following
the week of the scheduled meeting of the City Council.
Neither the Certificate of Acceptance nor the final payment, nor any provision in the
Contract Documents, shall relieve the Contractor of the obligation for fulfillment of any
warranty which may be required.
5.08 Payments Withheld
genco.d n tIspec
The Owner may, on account of subsequently discovered evidence, withhold or nullify the
whole or part of any certificate to such extent as may be necessary to protect himself
from loss on account of:
a) Defective work not remedied or other obligations hereunder not done.
b) Claims filed or reasonable evidence indicating probable filing of claims.
c) Failure of the Contractor to make payments properly to subcontractors or for
material or labor.
d) Damage to the Owner or another contractor's work, material or equipment.
e) Reasonable doubt that the work can be completed for the unpaid balance of the
contract amount.
GC -26
f) Reasonable indication that the work will not completed within the contract time.
g) Other causes affecting the performance of the contract.
When the above grounds are removed or the Contractor provides a Surety Bond
satisfactory to the Owner, which will protect the Owner in the amount withheld, payment
shall be made for amounts withheld because of them.
5.09 Delayed Payments
Should the Owner fail to make payment to the Contractor of the sum named in any
partial or final statement, when payment is due, then the Owner shall pay to the
Contractor, in addition to the sum shown as due by such statement, interest thereon at
the rate of 6% per annum, unless otherwise specified, from date due as provided under
'partial payments' and final 'payments,' until fully paid, which shall fully liquidate any
injury to the Contractor growing out of such delay in payment. It is expressly agreed
that delay by the Owner in making payment to the Contractor of the sum named in any
partial or final statement shall not constitute a breach of this contract on the part of the
Owner nor an abandonment thereof nor shall it to any extent or for any time relieve the
Contractor of his obligations to fully and completely perform hereunder.
6. Extra Work and Claims
6.01 Change Orders
6.02 Minor Changes
gencond.msdspec
Without invalidating this Agreement, the Owner may, at any time or from time to time,
order additions, deletions or revisions to the work; such changes will be authorized by
Change Order to be prepared by the Engineer for execution by the Owner and the
Contractor. The Change Order shall set forth the basis for any change in contract price,
as hereinafter set forth for Extra Work, and any change in contract time which may
result from the change.
In the event the Contractor shall refuse to execute a Change Order which has been
prepared by the Engineer and executed by the Owner, The Engineer may in writing
instruct the Contractor to proceed with the work as set forth in the Change Order and the
Contractor may make claim against the Owner for Extra Work involved therein, as
hereinafter provided.
The Engineer may authorize minor changes in the work not inconsistent with the overall
intent of the Contract Documents and not involving an increase in Contract Price. If the
GC -27
Any request by the Contractor for a change in Contract Price shall be made prior to
beginning the work covered by the proposed change.
gencond.mst/spec
Contractor believes that any minor change or alteration authorized by the Engineer
involves Extra Work and entitles him to an increase in the Contract Price, the Contractor
shall make written request to the Engineer for a written Field Order.
In such case, the Contractor by copy of his communication to the Engineer or otherwise
in writing shall advise the Owner of his request to the Engineer for a written Field Order
and that work involved may result in an increase in the Contract Price.
6.03 Extra Work
It is agreed that the basis of compensation to the Contractor for work either added or
deleted by a Change Order or for which a claim for Extra Work is made shall be
determined by the unit prices upon which this contract was bid to the extent such work
can be fairly classified within the various work item descriptions and for work items that
cannot be so classified by one or more of the following methods;
Method (A)
By agreed unit prices; or
Method (B)
By agreed Lump sum; or
Method (C)
If neither Method (A) nor Method (B) be agreed upon before the Extra
Work is commenced, then the Contractor shall be paid the "actual field
cost" of the work, plus fifteen (15) percent.
In the event said Extra Work be performed and paid for under Method (C), then the
provisions of this paragraph shall apply and the "actual field cost" is hereby defined to
include the cost to the Contractor of all workmen, such as foreman, timekeepers,
mechanics and laborers, and materials, supplies, trucks, rentals on machinery and
equipment, for the time actually employed or used on such Extra Work, plus actual
equipment, for the time actually employed or used on such Extra Work, plus actual
transportation charges necessarily incurred, together with all power, fuel, lubricants,
water and similar operating expenses, also all necessary incidental expenses incurred
directly on account of such Extra Work, including Social Security, Old Age Benefits and
other payroll taxes, and, a rateable proportion of premiums on Performance and Payment
Bonds and Maintenance Bonds, Public Liability and Property Damage and Workmen's
GC -28
Compensation, and all other insurance as may be required by any law or ordinance, or
directed by the Owner, or by them agreed to. The Engineer may direct the form in
which accounts of the "actual field cost" shall be kept and the records of these accounts
shall be made available to the Engineer. The Engineer or Owner may also specify in
writing, before the work commences, the method of doing the work and the type and
kind of machinery and equipment to be used; otherwise these matters shall be determined
by the Contractor. Unless otherwise agreed upon, the prices for the use of machinery
and equipment shall be determined by using 100 per cent, unless otherwise specified, of
the latest schedule of Equipment Ownership Expense adopted by the Associated General
Contractors of America. Where practicable the terms and prices for the use of
machinery and equipment shall be incorporated in the Written Extra Work Order. The
fifteen (15 %) percent of the "actual field cost" to be paid the Contractor shall cover and
compensate him for his profit, overhead, general superintendence and field office
expense, and all other elements of cost and expense not embraced within the "actual field
cost" as herein defined, save that where the Contractor's Camp or Field Office must be
maintained primarily on account of such Extra Work; then the cost to maintain and
operate the same shall be included in the "actual field cost."
No claim for Extra Work of any kind will be allowed unless ordered in writing by the
Engineer. In case any orders or instructions, either oral or written, appear to the
Contractor to involve Extra Work for which he should receive compensation or an
adjustment in the construction time, he shall make written request to the Engineer for
written order authorizing such Extra Work. Should a difference of opinion arise as to
what does or does not constitute Extra Work, or as to the payment therefor, and the
Engineer insists upon its performance, the Contractor shall proceed with the work after
making written request for written order and shall keep an accurate account of the "actual
field cost" thereof, as provided under Method (C). The Contractor will thereby preserve
the right to submit the matter of payment to arbitration, as hereinbelow provided.
6.04 Time of Filing Claims
gencond.mst/spec
It is further agreed by both parties hereto that all questions of dispute or adjustment
presented by the Contractor shall be in writing and filed with the Engineer within thirty
(30) days after the Engineer has given any directions, order or instruction to which the
Contractor desires to take exception. The Engineer shall reply within thirty (30) days
to such written exceptions by the Contractor and render his final decision in writing. In
case the Contractor should appeal from the Engineer's decision, any demand for
arbitration shall be filed with the Engineer and the Owner in writing within ten (10) days
after the date of delivery to Contractor of the Engineer's final decision. It is further
agreed that final acceptance of the work by the Owner and the acceptance by the
Contractor of the final payment shall be a bar to any claims by either party, except
claims by Owner for defective work or enforcement of warranties and except as noted
otherwise in the contract documents.
GC -29
6.05 Continuing Performance
The Contractor shall continue performance of the contract during all disputes or
disagreements with the Owner. The production or delivery of goods, the furnishing of
services and the construction of projects or facilities shall not be delayed, prejudiced or
postponed pending resolution of any disputes or disagreements, except as the Owner may
otherwise agree in writing.
6.06 Arbitration
gencond.mst/spec
All questions of dispute under this Agreement shall be submitted to arbitration at the
request of either party to the dispute. The parties may agree upon one arbiter, otherwise,
there shall be three, one named in writing by each party, and the third chosen by the two
arbiters so selected; or if the arbiters fail to select a third within ten (10) days, he shall
be chosen by a District Judge serving the County in which the major portion of the
project is located, unless otherwise specified. Should the party demanding arbitration fail
to name an arbiter within ten (10) days of the demand, his right to arbitrate shall lapse,
and the decision of the Engineer shall be final and binding on him. Should the other
party fail to choose an arbiter within ten (10) days, the Engineer shall appoint such
arbiter. Should either party refuse or neglect to supply the arbiters with any papers or
information demanded in writing, the arbiters are empowered by both parties to take ex
parte proceedings.
The arbiters shall act with promptness. The decision of any two shall be binding on both
parties to the contract. The decision of the arbiters upon any questions submitted to
arbitration under this contract shall be a condition precedent to any right of legal action.
The decision of the arbiter or arbiters may be filed in court to carry it into effect.
The arbiters, if they deem the case demands it, are authorized to award the party whose
contention is sustained, such sums as they deem proper for the time, expense and trouble
incident to the appeal, and if the appeal was taken without reasonable cause, they may
award damages for any delay occasioned thereby. The arbiters shall fix their own
compensation unless otherwise provided by agreement, and shall assess the cost and
charges of the arbitration upon either or both parties. The award of the arbiters must be
made in writing.
7. Abandonment of Contract
7.01 Abandonment by Contractor
In case the Contractor should abandon and fail or refuse to resume work within ten (10)
days after written notification from the Owner, or the Engineer, or if the Contractor fails
GC -30
genccnd.mst/spec
to comply with the orders of the Engineer, when such orders are consistent with the
Contract Documents, then, and in that case, where performance and payment bonds
exist, the Sureties on these bonds shall be notified in writing and directed to complete
the work, and a copy of said notice shall be delivered to the Contractor.
After receiving said notice of abandonment the Contractor shall not remove from the
work any machinery, equipment, tools, materials or supplies then on the job, but the
same, together with any materials and equipment under contract for the work, may be
held for use on the work by the Owner or the Surety on the performance bond, or
another contractor in completion of the work; and the Contractor shall not receive any
rental or credit therefor (except when used in connection with Extra Work, where credit
shall be allowed as provided for under Section 6, Extra Work and Claims), it being
understood that the use of such equipment and materials will ultimately reduce the cost
to complete the work and be reflected in the final settlement.
Where there is no performance bond provided or in case the Surety should fail to
commence compliance with the notice for completion hereinbefore provided for, within
ten (10) days after service of such notice, then the Owner may provide for completion
of the work in either of the following elective manners:
(1)
The Owner may thereupon employ such force of men and use such
machinery, equipment, tools, materials and supplies as said Owner may
deem necessary to complete the work and charge the expense of such
labor, machinery, equipment, tools, materials and supplies to said
Contractor, and expense so charged shall be deducted and paid by the
Owner out of such moneys as may be due, or that may thereafter at any
time become due to the Contractor under and by virtue of this Agreement.
In case such expense is less than the sum which would have been payable
under this contract, if the same had been completed by the Contractor,
then said Contractor shall receive the difference. In case such expense is
greater than the sum which would have been payable under this contract,
if the same had been completed by said Contractor, then the Contractor
and /or his Surety shall pay the amount of such excess to the Owner, or
(2) The Owner under competitive bids, taken after notice published as
required by law, may let the contract for the completion of the work under
substantially the same terms and conditions which are provided in this
contract. In case there is any increase in cost to the Owner under the new
contract as compared to what would have been the cost under this
contract, such increase shall be charged to the Contractor and the Surety
shall be and remain bound therefor. However, should the cost to
complete any such contract prove to be less than would have been the cost
to complete under this contract, the Contractor and /or his Surety shall be
credited therewith.
GC -31
When the work shall have been substantially completed the Contractor and his Surety
shall be so notified and Certificates of Completion and Acceptance, as provided in
Paragraph 5.06 hereinabove, shall be issued. A complete itemized statement of the
contract accounts, certified to by the Engineer as being correct, shall then be prepared
and delivered to the Contractor and his Surety, whereupon the Contractor and /or his
Surety, or the Owner as the case may be, shall pay the balance due as reflected by said
statement, within fifteen (15) days after the date of such Certificate of Completion.
In the event the statement of accounts shows that the cost to complete the work is less
than that which would have been the cost to the Owner had the work been completed by
the Contractor under the terms of this contract; or when the Contractor and /or his Surety
shall pay the balance shown to be due by them to the owner, then all machinery,
equipment, tools, materials or supplies left on the site of the work shall be turned over
to the Contractor and/or his Surety. Should the cost to complete the work exceed the
contract price, and the Contractor and /or his Surety fail to pay the amount due the Owner
within the time designated hereinabove, and there remains any machinery, equipment,
tools, materials or supplies on the site of the work, notice thereof, together with an
itemized list of such equipment and materials, shall be mailed to the Contractor and his
Surety at the respective addresses designated in this contract, provided, however, that
actual written notice given in any manner will satisfy this condition. After mailing, or
other giving of such notice, such property shall be held at the risk of the Contractor and
his Surety subject only to the duty of the Owner to exercise ordinary care to protect such
property. After fifteen (15) days from the date of said notice the Owner may sell such
machinery, equipment, tools, materials or supplies and apply the net sum derived from
such sale to the credit of the Contractor and his Surety. Such sale may be made at either
public or private sale, with or without notice, as the Owner may elect. The Owner shall
release any machinery, equipment, tools, materials, or supplies, which remain on the
work, and belong to persons other than the Contractor or his Surety, to their proper
owners. The books on all operations provided herein shall be opened to the Contractor
and his Surety.
7.02 Abandonment by Owner
gencond.msdspx
In case the Owner shall fail to comply with the terms of this contract, and should fail to
comply with said terms within ten (10) days after written notification by the Contractor,
then the Contractor may suspend or wholly abandon the work, and may remove
therefrom all machinery, tools and equipment, and all materials on the site of work that
have not been included in payments to the Contractor and have not been wrought into the
work. And thereupon the Engineer shall make an estimate of the total amount earned
by the Contractor, which estimate shall include the value of all work actually completed
by said Contractor (at the prices stated in the attached proposal where unit prices are
used), the value of all partially completed work at a fair and equitable price, and the
amount of all Extra Work performed at the prices agreed upon, or provided for by the
terms of this contract, and a reasonable sum to cover the cost of any provisions made by
GC -32
gencond.ms ✓spec
the Contractor to carry the whole work to completion and which cannot be utilized. The
Engineer shall then make a final statement of the balance due the Contractor by deducting
from the above estimate all previous payments by the Owner and all other sums that may
be retained by the Owner under the terms of this Agreement and shall certify same to the
Owner who shall pay to the Contractor on or before thirty (30) days after the date of the
notification by the Contractor the balance shown by said final statement as due the
Contractor, under the terms of this Agreement.
8. Subcontractors
8.01 Award of Subcontracts for Portions of the Work
Unless otherwise specified in the Contract Documents or in the Instructions to Bidders,
the Contractor, as soon as practicable after the award of the Contract, shall furnish to the
Engineer in writing for acceptance by the Owner and the Engineer a list of the names of
the Subcontractors proposed for the principal portions of the work. The Engineer shall
promptly notify the Contractor in writing if either the Owner or the Engineer, after due
investigation, has reasonable objection to any Subcontractor on such list and does not
accept him. Failure of the Owner or Engineer to make objection promptly to any
Subcontractor on the list shall constitute acceptance of such Subcontractor.
The Contractor shall not contract with any Subcontractor or any person or organization
(including those who are to furnish materials or equipment fabricated to a special design)
proposed for portions of the work designated in the Contract Documents or in the
Instructions to Bidders or, if none is so designated, with any Subcontractor proposed for
the principal portions of the work who has been rejected by the Owner and the Engineer.
The Contractor will not be required to contract with any Subcontractor or person or
organization against whom he has a reasonable objection.
If the Owner or Engineer refuses to accept any Subcontractor or person or organization
on a list submitted by the Contractor in response to the requirements of the Contract
Documents or the Instructions to Bidders, the Contractor shall submit an acceptable
substitute and the Contract amount shall be increased or decreased by the difference in
cost occasioned by such substitution and an appropriate change order shall be issued;
however, no increase in the Contract amount shall be allowed for any such substitution
unless the Contractor has acted promptly and responsively in submitting for acceptance
any list or lists of names as required by the Contract Documents or the Instructions to
Bidders.
If the Owner or the Engineer requires a change of any proposed Subcontractor or person
or organization previously accepted by them, the Contract amount shall be increased or
decreased by the difference in cost occasioned by such change and an appropriate Change
Order shall be issued.
GC -33
gencond.msUspec
The Contractor shall not make any substitution for any Subcontractor or person or
organization who has been accepted by the Owner and the Engineer, unless the
substitution is acceptable to the Owner and the Engineer.
8.02 Subcontractual Relations
All work performed for the Contractor by a Subcontractor shall be pursuant to an
appropriate written agreement between the Contractor and the Subcontractor (and where
appropriate between Subcontractors and Sub - subcontractors) which shall contain
provisions that:
(1) preserve and protect the rights of the Owner and Engineer under the
Contract with respect to the work to be performed under the subcontract
so that the subcontracting thereof will not prejudice such rights;
(2) require that such work be performed in accordance with the requirements
of the Contract Documents;
(3) require submission to the Contractor of the applications for payment under
each subcontract to which the Contractor is a party, in reasonable time to
enable the Contractor to apply for payment in accordance with this
contract;
(4) require that all claims for additional costs, extensions of time, damages
for delays or otherwise with respect to subcontracted portions of the work
shall be submitted to the Contractor (via any Subcontractor or Sub -
subcontractor where appropriate) in sufficient time so that the Contractor
may comply in the manner provided in the Contract Documents for like
claims by the Contractor upon the Owner;
(5) obligate each subcontractor specifically to consent to the provisions of this
section.
A copy of all such Subcontract Agreements shall be filed by the Contractor with the
Engineer before the Subcontractor shall be allowed to commence work.
8.03 Payments to Subcontractors
The Contractor shall pay each Subcontractor, upon receipt of payment from the Owner,
an amount directly based upon the value of the work performed and allowed to the
Contractor on account of such Subcontractor's work, less the percentage retained from
payments to the Contractor. The Contractor shall also require each Subcontractor to
make similar payments to his subcontractors.
If the Engineer fails to approve a payment for any cause which is the fault of the
GC -34
Contractor and not the fault of a particular Subcontractor, the Contractor shall pay the
Subcontractor on demand, made at any time after the Certificate for Payment should
otherwise have been issued, for his work to the extent completed, less the retained
percentage.
The Engineer may, on request and at his discretion, furnish to any Subcontractor, if
practicable, information regarding percentages of completion certified to the Contractor
on account of work done by such Subcontractors.
Neither the Owner nor the Engineer shall have any obligation to pay or to see to the
payment of any moneys to such Subcontractor except as may otherwise be required.
9. Separate Contracts
9.01 Owner's Right to Award Separate Contracts
gencond.mst/spec
The Owner reserves the right to award other contracts in connection with other portions
of the project under these or similar conditions of the Contract.
When separate contracts are awarded for different portions of the Project, "The
Contractor" in the contract documents in each case shall be the contractor who signs each
separate contract.
9.02 Mutual Responsibility of Contractors
The Contractor shall afford other contractors reasonable opportunity for the introduction
and storage of their materials and equipment and the execution of their work, and shall
properly connect and coordinate his work with theirs.
If any part of the Contractor's work depends for proper execution or results upon the
work of any other separate contractor, the Contractor shall inspect and promptly report
to the Engineer any apparent discrepancies or defects in such work that render it
unsuitable for such proper execution and results. Failure of the Contractor to so inspect
and report shall constitute an acceptance of the other contractor's work as fit and proper
to receive his Work, except as to defects which may develop in the other separate
contractor's work after the execution of the Contractor's Work.
Should the Contractor cause damage to the work or property of any separate contractor
on the project, the Contractor shall, upon due notice, settle with such other contractor
by agreement or arbitration, if he will so settle. If such separate contractor sues the
Owner or initiates an arbitration proceeding on account of any damage alleged to have
been so sustained, the Owner shall notify the Contractor who shall defend such
proceedings at the Contractor's expense, and if any judgment or award against the Owner
GC -35
9.03 Cutting and Patching under Separate Contracts
10. Protection of Persons and Property
10.01 Safety Precautions and Programs
10.02 Safety of Persons and Property
gencond.mstlspec
arises therefrom the Contractor shall pay or satisfy it and shall reimburse the Owner for
all attorney's fees and court or arbitration costs which the Owner has incurred.
The Contractor shall be responsible for any cutting, fitting and patching that may be
required to complete his work except as otherwise specifically provided in the Contract
Documents. The Contractor shall not endanger any work of any other contractors by
cutting, excavating or otherwise altering any work and shall not cut or alter the work of
any other contractor except with the written consent of the Engineer.
Any costs caused by defective or ill -timed work shall be borne by the party responsible
therefor.
The Contractor shall be responsible for initiating, maintaining and supervising all safety
precautions and programs in connection with the work.
The Contractor shall take all reasonable precautions for the safety of, and shall provide
all reasonable protection to prevent damage, injury, or loss to:
(1)
all employees on the work and all other persons who may be affected
thereby:
(2) all the work and all materials and equipment to be incorporated therein,
whether in storage or off the site, under the care, custody or control of the
Contractor or any of his Subcontractors or Sub - Subcontractors; and
(3) other property at the site or adjacent thereto, including trees, shrubs,
lawns, walks, pavements, fences, roadways, structures and utilities not
designated for removal, relocation or replacement in the course of
construction.
The Contractor shall comply with all applicable laws, ordinances, rules, regulations and
lawful orders of any public authority having jurisdiction for the safety of persons or
property or to protect them from damage, injury or loss. He shall erect and maintain,
as required by existing conditions and progress of the work, all reasonable safeguards for
safety and protection, including posting danger signs and other warnings against hazards,
promulgating safety regulations and notifying owners and users of adjacent utilities.
GC -36
1
When the use or storage of explosives or other hazardous materials or equipment is 1
necessary for the execution of the work, the Contractor shall exercise the utmost care and
shall carry on such activities under the supervision of properly qualified personnel 1
All Blasting, including methods of storing and handling explosives and highly
inflammable materials, shall conform to Federal, State, Local Laws and Ordinances. All
City Ordinances shall be complied with even though some or all of the blasting is done
outside the City Limits unless the applicable Ordinance is in conflict with the law of the
jurisdiction where the action is being taken. 1
The following is a list of requirements in addition to Federal, State, and Local Laws and
1 Ordinances.
1. The Contractor shall furnish the City of Round Rock with a Certificate of
Blasting Insurance in the amount of $300,000.00 for each contract, at least
twenty-four hours prior to using explosives. A blasting permit must be
obtained from the City at least five (5) days prior to use of explosives. '
If Blasting is covered under the Contractors General Insurance Certificate
for each contract, a separate blasting certificate will not be required.
2. The following public utility companies and City Department will be
notified by the Contractor, on every occasion, at least twenty -four (24)
hours prior to the use of explosives: Fire, Police, Water and Wastewater,
Electric, Gas, Telephone and the City Engineering Department.
3. Explosive materials to be used shall be limited to blasting agents and
dynamite, unless prior approval of other materials is obtained in writing
from the Engineering Department.
4. During blasting, all reasonable precautions shall be taken to protect
pedestrians, passing vehicles, and public or private property. Blasting
mats or protective cover shall be used when required by the City
Inspector, the permit, or by safe blasting practices.
5. All explosives shall be stored in accordance with Chapter 5, Section
5.200, of the City Code.
6. The Director of Engineering or his representative shall have the right to '
limit the use of explosives and /or blasting methods which in his opinion
are dangerous to the public or nearby property of any kind. '
7. The Contractor, at his expense, shall promptly repair or replace all items
known to be damaged as a result of blasting. All claims of damage shall ,
be investigated by the City or by Consulting Firms approved by the City.
gencand.mst / spec GC -37 1
1
gencond. ms/spec
8. The Contractor shall maintain accurate records throughout the Blasting
operations showing the type explosive used, number of holes, pounds per
hole, depth of hole, total pounds per shot, delays used, date and time of
blast and initials of the Inspector. The Contractor is fully responsible for
all claims resulting from his blasting operation.
All damage or loss to any property referred to in this article caused in whole or in part
by the Contractor, any Subcontractor, any Sub- subcontractor, or anyone directly or
indirectly employed by any of them, or by anyone for whose acts any of them may be
liable, shall be remedied by the Contractor, except damage or loss attributable solely to
faulty Drawings or Specifications or solely to the acts or omissions of the Owner or
Engineer or anyone employed by either of them, and not attributable in any degree to the
fault or negligence of the Contractor.
The contractor shall designate a responsible member of his organization at the site whose
duty shall be the prevention of accidents. This person shall be the Contractor's
superintendent unless otherwise designated in writing by the Contractor to the Owner and
the Engineer.
10.03 Location and Protection of Utilities
Notwithstanding any other provision of this contract, the Contractor shall be solely
responsible for the location and protection of any and all public utility lines and utility
customer service lines in the work area. The Contractor shall exercise due care to locate
and to mark, uncover or otherwise protect all such lines in the construction zone and any
of the Contractor's work or storage areas. Upon request, the Owner shall provide such
information as it has about the location and grade of water, sewer, gas, and telephone
and electric lines and other utilities in the work area but such information shall not
relieve or be deemed to be in satisfaction of the Contractor's obligation hereunder, which
shall be primary and nondelegable. Any such lines damaged by the Contractor's
operations shall be immediately repaired by the Contractor or he shall cause such damage
to be repaired at his expense.
GC -38
5.0 SPECIAL CONDITIONS
1
1 SECTION 01- INFORMATION
01 -01 ENGINEER
1 The word "Engineer" in these Specifications shall be understood as
referring to the Fisher Hagood, Inc., One Chisholm Trail, Suite 5200,
1 Round Rock, Texas 78681, Engineer of the Owner, or the Engineer's
authorized representative to act in any particular position for the Owner.
01 -02 COPIES OF PLANS AND SPECIFICATIONS FURNISHED
The Agreement will be prepared in not less than five (5) counterpart
1
(original signed) sets. Owner will furnish Contractor two (2) sets of
conforming Contract Documents and Specifications and four (4) sets of
' Plans free of charge, and additional sets will be obtained from the Engineer
at commercial reproduction rates plus 10% for handling.
1 01 -03 GOVERNING CODES
All construction as provided for under these Plans and Specifications shall
1
be governed by any existing Resolutions, Codes and Ordinances, and any
subsequent amendments or revisions thereto as set forth by the Owner.
1 01 -04 LIOUIDATED DAMAGES FOR FAILURE TO COMPLETE ON
TIME
1 The Contractor agrees that time is of the essence for this Contract and that
the definite value of damages which would result from delay would be
1 incapable of ascertainment and uncertain, so that for each day of delay
beyond the number days of herein agreed upon for the completion of the
' work herein specified and contracted for, after due allowance for such
extension of time as is provided for under the provisions of Section 4.02
of the General Conditions, the Owner may withhold permanently from the
Contractor's total compensation, not as penalty but as liquidated damages,
the sum of $100.00 per calendar day.
01 -05 LOCATION
The location of work shall be as mentioned in the Notice to Bidders and as
1 indicated on Plans.
1 specond.mst/spec SC -1
1
1
01 -06 USAGE OF WATER 1
All water used during construction shall be provided by the City. The City
shall specify the location from which the Contractor is to procure water.
The Contractor shall be responsible for providing all apparatus necessary
for procuring, storing, transporting and using water during construction.
The Contractor shall strive to use that amount of water which is reasonable
to perform the work associated with this contract and shall endeavor to
avoid excessive waste. The Contractor will be required to pay for all water
used if it is found that unnecessary or excessive waste is occurring during
construction. 1
01 -07 PAY ESTIMATES 1
If pay estimates from the Contractor are not received by the Engineer on
or before the time specified in Section 5.04 of the General Conditions, then
the pay estimate will not be processed and will be returned to Contractor.
1
SECTION 02- SPECIAL CONSIDERATIONS
02 -01 CROSSING UTILITIES 1
Prior to commencing the work associated with this contract, it shall be the
Contractor's responsibility to make arrangements with the Owners of such
utility companies to uncover their particular utility lines or otherwise
confirm their location. Certain utility companies perform such services at
their own expense, however, where such is not the case, the Contractor will
cause such work to be done at his own expense.
02 -02 UTILITY SERVICES FOR CONSTRUCTION
The Contractor will be responsible for providing his own utility services
while performing the work associated with this contract. No additional
payment will be made for this item.
02 -03 GUARANTEES 1
The Contractor warrants the materials and workmanship and that the work 1
is in conformance with the plans and specifications included in this contract
specond. mst/spec SC -2 1
1
for the period that the Maintenance Bond, as outlined in Section 04 of the
Special Conditions, is in effect. Upon notice from Owner, the Contractor
shall repair defects in all construction or materials which develop during
specified period and at no cost to Owner. Neither final acceptance,
Certificate of Completion, final payment nor any provision in Contract
Documents relieves Contractor of above guarantee. Notice of observed
defects will be given with reasonable promptness. Failure to repair or
replace defect upon notice entitles Owner to repair or replace same and
recover reasonable cost thereof from Contractor.
02 -04 WAGE RATE
Contractors are required to pay prevailing wage rates to laborers, workmen
and mechanics employed on behalf of the City engaged in the construction
of public works. The wage rate for these jobs shall be the general
prevailing wage rates for work of a similar character. This applies to
Contractors and Subcontractors. The Contractors and Subcontractors shall
keep and make available records of workers and their wages. Contractors
and Subcontractors shall pay the prevailing wage rates as adopted by the
Owner. There is a statutory penalty of $60.00 per worker per day or
portion of a day that the prevailing wage rate is not paid by the Contractor
or any Subcontractor.
02 -05 LIMIT OF FINANCIAL RESOURCES
The Owner has a limited amount of financial resources committed to this
Project; therefore, it shall be understood by all bidders that the Owner may
be required to change and /or delete any items which he may feel is
necessary to accomplish all or part of the scope of work within its limit of
financial resources. Contractor shall be entitled to no claim for damages
anticipated profits on any portion of work that may be omitted. At any
time during the duration of this contract, the Owner reserves the right to
omit any work from this contract. Unit prices for all items previously
approved in this contract shall be used to delete or add work per change
order.
02 -06 CONSTRUCTION REVIEW
The Owner shall provide a project representative to review the quality of
materials and workmanship.
specond.msUspec SC -
02 -07 LIMITS OF WORK AND PAYMENT
It shall be the obligation of the Contractor to complete all work included in
this Contract, so authorized by the Owner, as described in the contract
documents and technical specifications. All items of work not specifically
paid for in the bid proposal shall be included in the unit price bids. Any
question arising as to the limits of work shall be left up to the interpretation
of the Engineer.
02 -08 PAYMENT FOR MATERIALS ON HAND
Owner will not pay for materials on hand. Payment will be made for work
completed in accordance with monthly estimate procedure stipulated in the
General Conditions of the Agreement.
02 -09 "AS- BUILT" DRAWINGS
The Contractor shall mark all changes and revisions on all of his copies of
the working drawings during the course of the Project as they occur. Upon
completion of the Project and prior to final acceptance and payment, the
Contractor shall submit to the Engineer one set of his working drawings,
dated and signed by himself and his project superintendent and labeled as
"As- Built ", that shows all changes and revisions outlined above and that
shows field locations of all above ground appurtenances including but not
limited to valves, fire hydrants and manholes. These as -built drawings shall
become the property of the Owner. Each appurtenance shall be located by
at least two (2) horizontal distances measured from existing, easily
identifiable, immovable appurtenances such as fire hydrants or valves.
Property pins can be used for as- builts tie -ins provided no existing utilities
as previously described are available. Costs for delivering as -built drawings
shall be subsidiary to other bid items.
02 -10 LAND FOR WORK
Owner provides, as indicated on Drawings, land upon which work is to
done, right -of -way for access to same and such other lands which are
designated for use of Contractor. Contractor provides, at his expense and
without liability of Owner, any additional land and access thereto that may
be required for his construction operations, temporary construction
facilities, or for storage of materials.
specond. mst /spec SC -
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
02 -11 DEVIATIONS OCCASIONED BY UTILITY STRUCTURES
Whenever existing utilities, not indicated on Plans, present obstructions to
grade and alignment of proposed improvements immediately notify
engineer, who without delay, will determine if existing utilities are to be
relocated, or grade and alignment of proposed improvements changed.
Where necessary to move existing services,poles, guy wires, pipelines, etc.,
as determined by the Engineer, the Contractor will make arrangements with
the owner of the utility to be moved and have it moved. The costs of any
utility relocations will be at the Contractor's sole expense. Owner will not
be liable for relocations costs or damages on account of delays due to
changes made by owners of privately owned utilities which hinder progress
of the work.
02-12 CONSTRUCTION STAKING
All construction staking required to complete the work associated with this
contract shall be provided by the Contractor. The Contractor shall be
responsible for determining the layout and extent of staking necessary to
construct the improvements to the lines and grades shown in the Plans.
This item shall not be paid for separately and shall be considered subsidiary
to other bid items.
SECTION 03- TRAFFIC CONTROL
Access shall be provided for residents and emergency vehicles at all times.
When it becomes necessary to restrict access, the Contractor shall notify all
applicable agencies (ie. Fire Department, Police, E.M.S., Public Works,
etc.). At the end of each day two lanes of traffic shall be opened to the
public. The Contractor shall be responsible for all maintenance, signing
and safety precautions necessary for traffic control. This item shall be
considered subsidiary to other bid items and no additional compensation
shall be given for complying with this Special Condition.
SECTION 04- MAINTENANCE BOND
Per City of Round Rock Ordinances, a two (2) year Maintenance Bond
naming the City of Round Rock as obligee will be required for public
streets constructed without lime stabilization of subgrade material when the
specond.mst/spec SC -
Plasticity Index of the subgrade is above 24. Maintenance Bond shall
remain in effect for two (2) years from date of City of Round Rock
acceptance of improvements.
A one (1) year Maintenance Bond in the amount of one hundred (100 %)
percent of the contract price will be required for all other improvements and
shall be submitted prior to final payment. Such bonds shall be from an
approved surety company holding a permit from the State of Texas to act
as surety or other surety or sureties acceptable to the Owner prior to final
payment.
SECTION 5 INSURANCE
Section 3.18 of the General Conditions of the Agreement is hereby amended
to include the following:
3.18 Insurance
Contractor shall carry insurance in the following types and amounts for the
duration of this Contract, which shall include items owned by Owner in
care, custody and control of Contractor prior and during construction and
warranty period, and furnish Certificates of Insurance along with copies of
policy declaration pages and all policy endorsements as evidence thereof:
a. Statutory Worker's Compensation and minimum $100,000
Employers Liability Insurance.
b. Commercial General Liability Insurance with minimum limits of
$500,000 per occurrence and $1,000,000 Aggregate or $500,000 for
this designated project and $100,000 Fire Damage.
c. Automobile Liability Insurance for all owned, nonowned and hired
vehicles with minimum limits for Bodily Injury of $250,000 for each
person and $500,000 for each occurrence and Property Damage
limits of $100,000 or Combined Single Limit of $600,000.
d. On all new or remodeling building projects: All Risk Builders Risk
Insurance for insurable building projects shall be insured in the
amount of the contract price for such improvements. Owner and
Contractor waive all rights against each other for damages caused by
specond. mst /spec SC -6
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
fire or other perils to the extent covered by Builders Risk Insurance
required under this section, except as to such rights as they may
have in the proceeds of such insurance. Contractor shall require
similar waivers by Subcontractors and Sub - subcontractors.
e. Owner and Contractor's Protective Policy. The Contractor shall
provide and maintain during the life of this contract and until all
work under said contract has been completed and accepted by the
Owner, an Owner's and Contractor's Protective Policy which co-
insures the Owner and the Owner's agents and employees with the
same Commercial General Liability coverage as described above,
entitled "Commercial General Liability Insurance."
When offsite storage is permitted, policy will be endorsed for transit and
off site storage in amounts sufficient to protect property being transported
or stored.
This insurance shall include, as insured, City of Round Rock, Contractor,
Subcontractors and Sub - subcontractors in the work, as their respective
interest may appear.
If insurance policies are not written for amount specified in b. and c.
above, Contractor is required to carry an Excess Liability Insurance Policy
for any difference in amounts specified.
Contractor shall be responsible for deductibles and self insured retentions,
if any, stated in policies. Any self insured retention shall not exceed ten
percent of minimum required limits. All deductibles or self insured
retentions shall be disclosed on Certificate of Insurance required above.
Contractor shall not commence work at site under this Contract until he has
obtained required insurance and until such insurance has been reviewed by
Owner's Contract Administration Office. Contractor shall not allow any
Subcontractors to commence work until insurance required has been
obtained and approved. Approval of insurance by Owner shall not relieve
or decrease liability of Contractor hereunder.
Insurance to be written by a company licensed to do business in the State
of Texas at the time policy is issued and acceptable to owner.
Contractor shall produce an endorsement to each effected policy:
specond.mstlspec SC -7
1. Naming City of Round Rock, 221 East Main Street, Round Rock,
Texas 78664 as additional insured (except Workers' Compensation
and Builders Risk).
2. That obligates the insurance company to notify Joanne Land, City
Secretary, City of Round Rock, 221 East Main Street, Round Rock,
Texas 78664 of any and all changes to policy 30 days prior to
change.
3. That the "other" insurance clause shall not apply to Owner where
City of Round Rock is an additional insured shown on policy. It is
intended that policies required in this agreement, covering both
Owner and Contractor, shall be considered primary coverage as
applicable.
Contractor shall not cause any insurance to be canceled nor permit any
insurance to lapse during term of this Contract or as required in the
Contract.
If Contractor is underwritten on a claim -made basis, the retroactive date
shall be prior to, or coincident with, the date of this Contract and the
Certificate of Insurance shall state that coverage is claims made and also the
retroactive date. Contractor shall maintain coverage for duration of this
Contract and for two years following completion of this Contract.
Contractor shall provide the City annually a Certificate of Insurance as
evidence of such insurance. It is further agreed that Contractor shall
provide Owner a 30 day notice of aggregate erosion, an advance of the
retroactive date, cancellation and /or renewal.
It is also agreed that Contractor will invoke the tail option at request of
Owner and the Extended Reporting Period (ERP) premium shall be paid by
Contractor.
Owner reserves the right to review insurance requirements of this section
during effective period of the Contract and to make reasonable adjustments
to insurance coverages and their limits when deemed necessary and prudent
by Owner based upon changes in statutory law, court decisions or the
claims history of the industry as well as Contractor.
specond.mst / spec SC -8
Owner shall be entitled, upon request, and without expense, to receive
copies of policies and all endorsements thereto and may make any
reasonable requests for deletion or revision or modification of particular
policy terms, conditions, limitations or exclusions, except where policy
provisions are established by law or regulation binding upon either of the
parties hereto or the underwriter on any of such policies.
Actual losses not covered by insurance as required by the section shall be
paid by Contractor.
specond.msUspec SC -9
6.0 TECHNICAL SPECIFICATIONS
ITEM 1 GENERAL DESCRIPTION
1.01 SCOPE OF WORK
The work covered by these Specifications consists of furnishing all labor,
equipment, appliances, materials and performing all operations in
connection with the installation of
complete in accordance with the Plans, and subject to the terms and
conditions of the Contract Documents.
1.02 GOVERNING TECHNICAL SPECIFICATIONS
techspec.mst/spec
NOTE: The item number designation shown in parentheses adjacent to
captions herein is a reference to City of Austin Standard Specifications.
STREET, WATER, SEWER AND DRAINAGE IMPROVEMENTS
The current City of Austin Standard Specifications as adopted and amended
by the City of Round Rock and the current City of Austin Erosion and
Sedimentation Control Manual are hereby referred to and included in this
contract as fully and to the same extent as if copied at length herein and
they shall be applied to this project except as modified in these
Specifications and on the Plans. Note that copies of the Austin
Specifications governing the major items of work are attached at the end of
this section for ease of reference.
Wherever the term "City of Austin" is used in the Austin Specifications, it
shall be construed to mean the City of Round Rock.
Wherever the term "Engineer" is used in the Austin Specifications, it shall
be construed to mean the City of Round Rock.
ITEM 2 CONTROL OF WORK
2.01 CLEAN -UP
2.01.1 CONSTRUCTION SITE
During construction the Contractor shall keep the site free and clean from
all rubbish and debris and shall clean -up the site promptly when notified to
do so by the Engineer.
TS -1
2.01.2 BACKWORK
2.02 GRADING
techspec.mst/spec
The Contractor shall, at his own expense, maintain the streets and roads
free from dust, mud, excess earth or debris which constitutes a nuisance or
danger to the public using the thoroughfare, or the occupants of adjacent
properties.
Care shall be taken to prevent spillage on streets and roads over which
hauling is done, and any such spillage or debris deposited on streets, due
to the Contractor's operations, shall be immediately removed.
The Contractor shall coordinate his operations in such a manner as to
prevent the amount of clean -up and completion of back works from
becoming excessive. Should such a condition exist, the Engineer may order
all or portions of the work to cease and refuse to allow any work to
commence until the back work is done to the Engineer's satisfaction.
The Contractor shall do such grading in and adjacent to the construction
area associated with this contract as may be necessary to leave such areas
in a neat and satisfactory condition approved by the Engineer.
ITEM 3 EXAMINATION AND REVIEW
3.01 EXAMINATION OF WORK
The work covered under this Contract shall be examined and reviewed by
the Engineer, representatives of all governmental entities which have
jurisdiction, and the Owner's authorized representative. The quality of
material and the quality of installation of the improvements shall be to the
satisfaction of the Engineer. It shall be the Contractor's responsibility for
the construction methods and safety precautions in the undertaking of this
Contract.
3.02 NOTIFICATION
The Engineer and Owner must be notified a minimum of 24 -hours in
advance of beginning construction, testing, or requiring presence of the
Engineer, project representative, or Owner's representative.
TS -2
3.03 CONSTRUCTION STAKING
The Engineer shall furnish the Contractor reference points and benchmarks
that, in the Engineer's opinion, provide sufficient information for the
Contractor to perform construction staking.
3.04 PROTECTION OF STAKES, MARKS, ETC.
All engineering and surveyor's stakes, marks, property corners, etc., shall
be carefully preserved by the Contractor, and in case of destruction or
removal during the course of this project, such stakes, marks, property
corners, etc., shall be replaced by the Contractor at the Contractor's sole
expense.
ITEM 4 PROTECTION AND PRECAUTION
4.01 WORK IN FREEZING WEATHER
Portions of the work may continue as directed by the Engineer.
4.02 PROTECTION OF TREES. PLANTS AND SHRUBS
The Contractor shall take necessary precautions to preserve all existing
trees, plants and shrubs but where it is justifiable and necessary the
Contractor may remove trees and plants for construction right -of -way but
only with approval of the Engineer.
4.03 TRAFFIC CONTROL MEASURES AND BARRICADES
techspec. mstspec
Traffic control measures and barricades shall be installed in accordance with
the Texas Manual of Uniform Traffic Control Devices and in other
locations deemed necessary by the Engineer, for the protection life and
property. Under no circumstances will any existing road be permitted to
remain closed over a weekend. No separate pay will be made for this item.
Costs for this item shall be subsidiary to other items of work.
TS -3
1
4.04 PROPERTY LINES AND MONUMENTS
The Contractor shall be responsible for the protection, reference and
resetting of property corner monuments if disturbed.
4.05 DISPOSAL OF SURPLUS MATERIAL '
The Contractor shall at his own expense, make arrangement for the disposal
of surplus material, such as rock, trees, brush and other unwanted backfill
materials.
4.06 CONTRACTOR'S USE OF PREMISES
The Contractor shall, at his own expense, provide additional space as
necessary for his operations and storage of materials.
1
ITEM 5 MATERIALS
5.01 TRADE NAMES
Except as specified otherwise, wherever in the specifications an article or
class of material is designated by a trade name or by the name or catalog
number of any maker, patentee, manufacturer, or dealer, such designations
shall be taken as intending to mean and specify the articles described or
another equal thereto in quality, finish, and serviceability for the purpose
intended, as may be determined and judged by the Engineer in his sole
discretion.
5.02 MATERIALS AND WORKMANSHIP
No material which has been used by the Contractor for any temporary
purpose whatever is to be incorporated in the permanent structure without
the written consent of the Engineer. Where materials or equipment are
specified by a trade or brand name, it is not the intention of the owner to
discriminate against an equal product of another manufacturer, but rather
to set a definite standard of quality for performance, and to establish an
equal basis for the evaluation of bids. Where the words "equivalent ", '
"proper" or "equal to" are used, they shall be understood to mean that the
item referred to shall be "proper ", the "equivalent" of, or "equal to" some 1
other item, in the opinion or judgement of the Engineer. Unless otherwise
techspec.msuspec TS -4 1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
techspec.msVspec
specified, all materials shall be the best of their respective kinds and shall
be in all cases fully equal to approved samples. Notwithstanding that the
words or equal to" or other such expressions may be used in the
specifications in connection with a material, manufactured article or
process, the material, article or process specifically designated shall be
used, unless a substitute is approved in writing by the Engineer, and the
Engineer will have the right to require the use of such specifically
designated material, article or process.
5.03 HOT MIX ASPHALTIC CONCRETE (ITEM 340)
Provide a uniform mixture of coarse aggregate, fine aggregate, asphaltic
material, and mineral filler graded as defined by Type D (Fine Graded
Surface Course).
5.04 CONCRETE FOR STRUCTURES (ITEM 403)
All concrete shown shall be Class A as defined by Standard Specifications.
Slump shall be a maximum of 4 inches and a minimum of 2 inches.
Concrete shall be air - entrained.
5.05 REINFORCING STEEL (ITEM 406)
All reinforcing steel shall be ASTM A615, Grade 60.
(continue with Technical Specifications as necessary)
TS -5