R-95-03-09-10E - 3/10/1995RESOLUTION NO. £ 9 5 - 63 - 09-/D 6
WHEREAS, the subdivider of the subdivision known as Deepwood
Center, Section 2 subdivision has applied to the City for acceptance of
the public subdivision improvements ( "Improvements ") for maintenance by
the City, and
WHEREAS, the subdivider has filed with the City Engineer an one
(1) year warranty bond against defects in materials and workmanship in
said Improvements, and
WHEREAS, the subdivider has filed with the City Engineer one (1)
set of reproducible AS BUILT" plans for the Improvements, which further
contains or has attached thereto a certificate of a registered
professional engineer as required by §8.601(3)(b) of the City Code, and
WHEREAS, the subdivider has filed with the City Engineer an
affidavit that to the best of his information and belief, the
contractor(s) has complied with the regulations contained in Chapter 8
of the City Code, Now Therefore,
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS,
The Improvements contained within the subdivision known as the
Deepwood Center, Section 2 subdivision are hereby accepted by the City
for maintenance, subject to the subdivider's warranty as provided in
Chapter 8 of the City Code.
RESOLVED this 9th day of March, 95.
ATTEST:
10 .0UA4Ai r J:IE IL./.
KS /RESOLUTION
RS0309E
NE LAND, City Secretary
( t
CHARLES C UWE PPER, Mayor
City of Ro nd Rock, Texas
DATE: 3/6/9.6
TO: James R. Nuse, P.E.
Director of Public Works
As of 3/619!
acceptance:
Date Received:
MEMORANDUM
FROM: Staff
RE: Project Completion
SUBJECT: Dec pwool C enter, Sec ti 2 5 41301 rt.is/on
As of 3/0/5 f water, wastewater, street and drainage improvements for e above
referenced subdivision were satisfactorily completed.
/i/4. 1. Warranty bond or L. of C. - Street/Drainage 1 yr. _ / 2 yr.
3/6/9f 2. Warranty bond or L. of C. - Water /Wastewater 1 yr.,( / 2 yr.
3 //f9S 3. As Built" plans one certified reproducible set and one print set.
3//19f 4. Copy of letter to developer from his engineer notifying of completion.
3//195" 5. Letter from developer to City Engineer notifying of completion and requesting
ty r4 Council acceptance.
&id y FN,.; r 6. Oversize payment verification (coordinated with Planning Department).
$ — paid to City $ — due to Developer.
Pw. Plaf 7. All easement filed.
Regional $
— Onsite —
Paid to City Check if applicable
V/l9f 9. Subdivision Inspection Fee ' 38I. IS
Chief Engineer
this office is in receipt of the following documents required for council
Amount = 1 1/2% of Actual Construction Cost
,(. .:.tilt
Project Manager
BAKER - AICKLEN
& ASSOCIATES, INC.
Consulting Engineers
March 1, 1995
Mr. James R. Nuse, P.E.
Director of Public Works
City of Round Rock
2008 Enterprise
Round Rock, TX. 78664
RE: Deepwood Center, Section 2
Water, Wastewater and Storm Sewer Service Improvements
Dear Mr. Nuse,
Please be advised that all improvements on the above referenced project have been
completed in substantial compliance with the approved plans and specifications and the
City of Round Rock Subdivision Code. Attached please find one reproducible set of As-
Built drawings, and one blueline set of As- Builts for the Project.
We hereby request acceptance of these improvements by the City of Round Rock.
Very truly yours,
Baker - Aicklen & Associates, Inc.
William Waeltz, P.E.
Project Manager
AWW /kls
cc: Mr. Al Wille, P.E., R.P.L.S.; City of Round Rock
Mr. John Lewis, Deepwoods Center Joint Venture
116 E. Main St., Suite 206 • Round Rock, Texas 713664 • 512/244 -9620 • FAX 512/244 -9623
14
BAKER - AICKLEN
Ek ASSOCIATES, INC.
Consulting Engineers
March 1, 1995
Mr. Al Witte, P.E., R.P.L.S.
City of Round Rock
Public Works Dept.
2008 Enterprise
Round Rock, TX. 78664
RE: Deepwood Center, Section 2
Water, Wastewater and Storm Sewer Service Improvements
Subdivision Inspection Fees
Dear ill -,
Please be advised the final construction cost of the above referenced project is
$25,410.00. In accordance with the City of Round Rock Subdivision Ordinance please
find enclosed a check in the amount of $ 381.15 from the developer, Deepwoods Center
Joint Venture, for payment of the Subdivision Inspection Fees. This amount represent 1.5
% of the final construction cost.
The Engineers Letter of Concurrence, and the as -built drawings, were submitted
previously. We would request that at the March 9th meeting of the Round Rock City
Council the acceptance of these subdivision improvements by the City will be considered.
If you have any questions or comments, please advise.
Sincerely,
A t" . am Waeltz, P.E.
cc: Mr. John Lewis, Deepwood Center Joint Venture
116 E. Main St., Suite 206 • Round Rock, Texas 78664 • 512/244 -9620 • FAX 512/244 -9623
DATE: March 7, 1995
SUBJECT: City Council Meeting, March 9, 1995
ITEM: 10E. Consider a resolution accepting subdivision improvements for
Deepwood Center, Section 2.
STAFF RESOURCE PERSON: Jim Nuse
STAFF RECOMMENDATION:
Subdivision improvements are complete and Staff recommends acceptance.