Loading...
R-95-03-09-10E - 3/10/1995RESOLUTION NO. £ 9 5 - 63 - 09-/D 6 WHEREAS, the subdivider of the subdivision known as Deepwood Center, Section 2 subdivision has applied to the City for acceptance of the public subdivision improvements ( "Improvements ") for maintenance by the City, and WHEREAS, the subdivider has filed with the City Engineer an one (1) year warranty bond against defects in materials and workmanship in said Improvements, and WHEREAS, the subdivider has filed with the City Engineer one (1) set of reproducible AS BUILT" plans for the Improvements, which further contains or has attached thereto a certificate of a registered professional engineer as required by §8.601(3)(b) of the City Code, and WHEREAS, the subdivider has filed with the City Engineer an affidavit that to the best of his information and belief, the contractor(s) has complied with the regulations contained in Chapter 8 of the City Code, Now Therefore, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, The Improvements contained within the subdivision known as the Deepwood Center, Section 2 subdivision are hereby accepted by the City for maintenance, subject to the subdivider's warranty as provided in Chapter 8 of the City Code. RESOLVED this 9th day of March, 95. ATTEST: 10 .0UA4Ai r J:IE IL./. KS /RESOLUTION RS0309E NE LAND, City Secretary ( t CHARLES C UWE PPER, Mayor City of Ro nd Rock, Texas DATE: 3/6/9.6 TO: James R. Nuse, P.E. Director of Public Works As of 3/619! acceptance: Date Received: MEMORANDUM FROM: Staff RE: Project Completion SUBJECT: Dec pwool C enter, Sec ti 2 5 41301 rt.is/on As of 3/0/5 f water, wastewater, street and drainage improvements for e above referenced subdivision were satisfactorily completed. /i/4. 1. Warranty bond or L. of C. - Street/Drainage 1 yr. _ / 2 yr. 3/6/9f 2. Warranty bond or L. of C. - Water /Wastewater 1 yr.,( / 2 yr. 3 //f9S 3. As Built" plans one certified reproducible set and one print set. 3//19f 4. Copy of letter to developer from his engineer notifying of completion. 3//195" 5. Letter from developer to City Engineer notifying of completion and requesting ty r4 Council acceptance. &id y FN,.; r 6. Oversize payment verification (coordinated with Planning Department). $ — paid to City $ — due to Developer. Pw. Plaf 7. All easement filed. Regional $ — Onsite — Paid to City Check if applicable V/l9f 9. Subdivision Inspection Fee ' 38I. IS Chief Engineer this office is in receipt of the following documents required for council Amount = 1 1/2% of Actual Construction Cost ,(. .:.tilt Project Manager BAKER - AICKLEN & ASSOCIATES, INC. Consulting Engineers March 1, 1995 Mr. James R. Nuse, P.E. Director of Public Works City of Round Rock 2008 Enterprise Round Rock, TX. 78664 RE: Deepwood Center, Section 2 Water, Wastewater and Storm Sewer Service Improvements Dear Mr. Nuse, Please be advised that all improvements on the above referenced project have been completed in substantial compliance with the approved plans and specifications and the City of Round Rock Subdivision Code. Attached please find one reproducible set of As- Built drawings, and one blueline set of As- Builts for the Project. We hereby request acceptance of these improvements by the City of Round Rock. Very truly yours, Baker - Aicklen & Associates, Inc. William Waeltz, P.E. Project Manager AWW /kls cc: Mr. Al Wille, P.E., R.P.L.S.; City of Round Rock Mr. John Lewis, Deepwoods Center Joint Venture 116 E. Main St., Suite 206 • Round Rock, Texas 713664 • 512/244 -9620 • FAX 512/244 -9623 14 BAKER - AICKLEN Ek ASSOCIATES, INC. Consulting Engineers March 1, 1995 Mr. Al Witte, P.E., R.P.L.S. City of Round Rock Public Works Dept. 2008 Enterprise Round Rock, TX. 78664 RE: Deepwood Center, Section 2 Water, Wastewater and Storm Sewer Service Improvements Subdivision Inspection Fees Dear ill -, Please be advised the final construction cost of the above referenced project is $25,410.00. In accordance with the City of Round Rock Subdivision Ordinance please find enclosed a check in the amount of $ 381.15 from the developer, Deepwoods Center Joint Venture, for payment of the Subdivision Inspection Fees. This amount represent 1.5 % of the final construction cost. The Engineers Letter of Concurrence, and the as -built drawings, were submitted previously. We would request that at the March 9th meeting of the Round Rock City Council the acceptance of these subdivision improvements by the City will be considered. If you have any questions or comments, please advise. Sincerely, A t" . am Waeltz, P.E. cc: Mr. John Lewis, Deepwood Center Joint Venture 116 E. Main St., Suite 206 • Round Rock, Texas 78664 • 512/244 -9620 • FAX 512/244 -9623 DATE: March 7, 1995 SUBJECT: City Council Meeting, March 9, 1995 ITEM: 10E. Consider a resolution accepting subdivision improvements for Deepwood Center, Section 2. STAFF RESOURCE PERSON: Jim Nuse STAFF RECOMMENDATION: Subdivision improvements are complete and Staff recommends acceptance.