R-95-05-25-14G - 5/25/1995ATTEST:
KS /RESOLITTION
R550525G
RESOLUTION NO. R- 95- 05- 25 -14G
WHEREAS, the City of Round Rock needs to cross under the
track of the Georgetown Railroad, near the water treatment plant,
with a raw waterline from Lake Georgetown, and
WHEREAS, the Georgetown Railroad has agreed to said crossing
on condition that the City execute a Pipeline License Agreement
( "Agreement "), and
WHEREAS, the City is willing to accept the terms and
conditions of the Agreement, Now Therefore
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK,
TEXAS,
That the Mayor is hereby authorized and directed to execute on
behalf of the City the Agreement with Georgetown Railroad, a copy
of said Agreement being attached hereto and incorporated herein for
all purposes.
RESOLVED this the 25th day of May, 1995.
E LAND, City Secretary
CHARLES CU ER, Mayor
City of Round Rock, Texas
PIPELINE LICENSE AGREEMENT
W I T N E S S E T H:
et ,J l ' afer 'Cinelss�
This Pipeline License Agreement (the "License") is made
and entered into effective the date last executed herein be-
low, by and between Georgetown Railroad Company, a Texas cor-
poration ( "GRR "), as licensor, and the City of Round Rock,
Texas ( "Round Rock "), as licensee.
WHEREAS, the City of Round Rock desires to construct a
twenty -four (24) inch pipeline, with a thirty -six (36) inch
incasement, for the transportation of water (the "Pipeline "),
which Pipeline will cross under the tracks of GRR; and
WHEREAS, GRR wishes to grant to the City of Round Rock
a license to construct and maintain the Pipeline;
NOW THEREFORE, the parties hereby agree as follows:
Article I
License Granted; Term; Consideration
For and in consideration of the mutual covenants and
contracts herein contained, GRR hereby grants to Round Rock
a license to construct and maintain the Pipeline to cross under
GRR's main line track and side track, 2,452 feet north of Mile
Post No. 5 and 61 feet south of the former common boundary line
between Texas Crushed Stone Company and Westinghouse Electric
Corporation, Williamson County, Texas and further described in
Exhibit "A" attached hereto and incorporated herein for all
pertinent purposes, on the terms and conditions described herein -
below. This License shall be effective from and after the date
fully executed, and shall terminate at such time as the Pipeline
is no longer used by the City of Round Rock for the use provided
hereinabove. In consideration of the granting of this License by
GRR, Round Rock agrees to pay to GRR, immediately upon execution
hereof, the sum of fifty dollars ($50.00).
Article II
Pipeline Location
The Pipeline shall be located as described in Article I
hereof. The Pipeline, when installed by Licensee, shall be installed
so that the upper surface of the pipe is at least four and one -half
(41) feet below the bottom of the rail thereover, or at such lower
depth which may be necessary to provide adequate support for the
rail. Installation shall be made in conformity with the engineer-
ing profile contained in Exhibit "A" hereto.
-2-
Article III
Responsibilities of Round Rock
3.1. Installation and Maintenance; Removal of Pipe
-3 -
Round Rock shall install or cause to be installed the
Pipeline at the location provided in Article I hereinabove.
The Pipeline shall be installed safely and in a good workman-
like manner, and during the construction, Round Rock or its
contractor involved in the construction shall secure a policy
of Owner's and Contractor's Protective Liability Insurance
with limits of liability of at least $2,000,000.00, naming
GRR as the named insured and loss payee. Round Rock agrees
to provide satisfactory evidence of such insurance coverage
prior to beginning construction of the Pipeline. During the
term of the License, Round Rock agrees that it will properly
maintain the Pipeline and will take any and all actions and
• expend any and all funds which may be required to maintain
the Pipeline. Round Rock further agrees that the construction,
maintenance, and operation of the Pipeline will comply with
all applicable State, Federal and local laws, rules or regula-
tions, and upon any notification by any person that the Pipeline
is not in compliance with such laws, rules and regulations,
Round Rock agrees to take prompt action to bring the Pipeline
into such compliance. In the event that Round Rock fails to
properly maintain the Pipeline or to take any action required
to bring the Pipeline into conformance with all applicable
laws, rules or regulations, the GRR, after 10 days notice
to Round Rock, may take any such action as may be reasonably
necessary to render the Pipeline safe for railroad operations
or in compliance with applicable laws, rules and regulations,
and Round Rock agrees that in the event GRR takes such action,
Round Rock shall, with twenty (20) days, reimburse GRR for
the actual cost of labor performed by or on behalf of GRR,
including wages of foremen, plus 10% to cover supervision and
accounting, plus vacation allowances, paid holidays and health
and welfare benefit payments applicable to such labor, GRR's
cost price of all materials f.o.b. GRR's rails plus 10% to
cover handling and accounting, plus freight at tariff to point .
.of use, and excise taxes applicable to said labor and materials.,
Upon termination of this License, Round Rock shall take prompt
action to remove the pipe and all associated materials and re-
, pair any damage to GRR's property which may be caused by such
removal. Such removal shall be undertaken by Round Rock with-
out any demand from GRR, but shall in any event commence within
thirty (30) days after termination of this License and written
demand for removal being made by GRR.
3.2. Indemnification and Hold Harmless
During the term of this License, Round Rock agrees'to
-4-
indemnify GRR and hold it harmless from any suits, claims,
costs, loss or damage which may accrue to GRR, Round Rock or
third parties, from the operation of the Pipeline arising out
of, or occasioned by, the negligent acts of Round Rock or its
employees or agents. The loss or damage for which Round Rock
shall indemnify GRR and hold it harmless shall specifically
include, but not be limited to, the following: (a) damage to or
destruction of railroad track and track bed, railroad cars and
engines, or to the Pipeline; (b) personal injury to or damage to
property, owned, leased or operated by (i) GRR employees or
agents, (ii) Round Rock employees, agents or contractors, or
(iii) any third parties; and (c) economic loss to any party
caused by damage to or destruction of the Pipeline or the inter-
ruption of Pipeline service, caused by negligence of Round Rock,
its employees or agents. Such indemnification shall include all
actual monetary cost to GRR, including expenses and attorney's
fees.
Article IV
Representations and Warranties of Round Rock
Round Rock hereby represents and warrants to GRR that the
construction, operation and maintenance of the Pipeline have
been property approved by the City of Round Rock, and that
- 5 -
Round Rock has been authorized by resolution, or if required
by its Charter, by ordinance, to enter into this Pipeline
License Agreement, that the resolution or ordinance has not
been repealed and is in effect at the date of execution hereof,
and that this License Agreement is enforceable against Round
Rock in accordance with its terms. Round Rock further warrants
and represents that the city officer executing this License
has been duly authorized to execute the same on behalf of, and
as the act and deed of, City of Round Rock.
Article V
Assignment
The License hereby granted by GRR to Round! Rock is personal
to the grantee hereof, and Round Rock shall have no right to
assign this License without the express prior written consent
of GRR. GRR's rights hereunder shall be freely assignable.
-6-
•
(Seal)
Article VI
Notice
Any notice required or permitted hereunder shall be per-
sonally delivered or sent by registered or certified mail, re-
turn receipt requested to the addressee at the address listed
below, and such notice shall be effective on the date of de-
livery, or date of mailing.
Round Rock City of Round Rock
221 East Main Street
Round Rock, Texas 78664
Georgetown Railroad Company
EXECUTED on the date indicated below:
City of Round Rock
ATTEST: BY:
(Date) (Title)
(City Seal)
ATTEST: BY:
(Date) (Title)
-7-
Georgetown Railroad Company
P.O. Box 529
Georgetown, Texas 78627
Georgetown Railroad Company
President
40
T
FT.
(4 44 NOT0 3 1 it
� ?1X10 (0T,
I AU WI 5I
IOWA/NI /ONO 3031! WM SWIM LINA 0403311401
1 icy NI, eiNpalirllM2 1. ML Ca
IWr111J. io 13 0131. 311 KI LLIN 31 to fAXO(
AGE ARMOR INDICATING NORTH
RECTION RELATIVE TO CROSSING
• 0 rt
111(MO! -`--- ILA. 11311 ,LY
1
38 F
FORM 0R- 0404 -13
REV. OS -0I -90
APPLICATION FOR ENCASED
/ 1 NON - FLAMMABLE PIPELINE CROSSING
073. 311T
[lee Writ 31.
Georgetown Railroad Crossing
Sta. 23 +35
NO SCAN F
4 f !g! 1
k) CD,. rya
ALA GIINI WINO MI IL. N... ,, 11 /f, NIX.
+�LE�r�BLs
NOTE: ALL AVAILABLE DIMENSIONS MUST BE
FILLED IN 'ID EXPEDITE THIS APPL;CAT;ON,
0
- --- '7� , 25.
FT. I
/3 FT.
1411X0 LGCTR SHAM WIALLN(0 41.4110 1 IFttIM.I
(1) Alternate Bids: Ductile Iron, Steel or Steel Cylinder Concrete
•
_-- + r y
FT — ....._ ` I
T. .
1130 HO13 11 L FT.
+ irarrAEs »NU ! A
�
rirZ9 IYIO OIJ 311
11et wrI 11
Georgetown Railroad fr .
Westinghouse Ro
-
Road
38 nT.
, uru( -. ‘
CA IiC
IT OR LESS
OAR Ir -I0-
Mk 11• -Er
01E5 ar-Xr
�� OYOI 01' -34•
OYa 4r
Cr 4r
00ER OA WIr 1R
APPROVED IT LA, C0.
N0111 13311 CHANT 15 010.7
0 Cl 0 ITN 1010130,0 "173 D
STREWN Or 3%000 341.
TN
.0077 S1. 1a
STEEL CASING MALL
TH ICKNESS CHART
t SOD-
11 AI'
3754•
I STA.
3000.
1
1240-
5 /1E
S/3
7110•
1,
S/It-
3/1.
T0 TO FIGURE y CASINO
LRNOTH 3I7N 13401.3 OF
00011 DIG *10313 TEAR 101
OEMs 1 4,
11 AL 34 MAIMED HORIZONTAL 3IlTANCt1 TO AT RIGHT MOLLS TRW Or TRACE, B 1 N
31 CASINO TO EXTEND DE70110 THE CENTERLINE V TR AT RISK S T ANGLES 1HX 00100 00 1dr. k O r 4R 34 FT., .Y, . 4' 611. 073?.
AHD 331' LI67T Of RATLROAO A1471r• PROVIDE PROPER LENGTH WTIIO( CF TRACE, ism 3,
3) 0)HIA,AI Of 5O' 1506 ENE ENO OF LTV RAILROAD 65)00E, 5 01 ARY CUOMO, DR Rp4 ANT 33133X133 AREA.
4) ALL 441). 3 1I At0 T 01,1EDIE 3*? 10 DE1 0052(7 L O L1 1 of S 00 3 OF If SAILR0a0 3)01413 aq( IN ll,C YIGINITT 0' 00003)40.
S, G ROAD C 1 33 050 O 11 1333)3 35 10)30 ROAD HA50p, 040 OF 01.4.30m.
A) IS PIPELINE CROSSING WITTIH. DLOiCA3ED STREET O____YES1 k ND; -
C) 01S TES. 1' (O L I 7REET
N E OR TRANSMISSION LiNE "'
01 CARRIER PIPE 1
C0M•00iTY TO BE CONY D _taw Watar
OPERATING PRESSURE PSI n
WALL TMIGRN353 CC . I OIAMETCll__Z4. MATERIAL (1) ,)
03 CASINO PIPE 3
WALL THICKNESS 5/811 )DIAMETER 3611 ; MATERIAL steel I
NOTE, CASING WST HAVE 7' CLEARANCEIETWEEN CREATEST
OUTSIDE DIAMETER OF CARRIER PIPE AND INTERIOR DIAMETER OF
CASINO PiPE. *HEN FURNISHING 01013331ONS, OIVt OUTSIDE OP
CARRIER PIPE AND INSIDE 01 CASINO PIPE.
F1 lAsTHOD OF INSTALLING CASING PiPE (RIDER TRACK! 511
/A DRY BORE AND JACK INET BORE NOT PCRNIITTED))
TUNNEL ; OTHER
C) WILL CONSTRUCTION BE BY AN OUTSIDE CONTRACTOR? -YE5;.�}IBj
HI nISTANCC FROM OEN7ER LINE OP TRACE TO NEAR PACE OF 5 0 NO
.1ACK100 PITS WHEN MEASURED AT RIONT ANGLES 10 TRACK
3) APPI, )CANT HAS CONTACTED
OF U. P. COIAALMICATIOH DEPARTMENT AND HAS OETERMINEO FIBER • A R H ! N 1
OPTIC CABLE, DOES I.-.DOES NOT 1 EXIST IN VICINITY OF IA AIL 3000 3 4 119 ,4 4. N f uUNIcAT13HA ODUMIo, IN111C
N M ( TO BE PERFORMED. CONTA4111 IN 4NR a n A WM% rc u s.111N. (. ISTO"3 .11
LO ,1 nun srpl OEM ,.q,( 1-114,136-111/
EXHIBIT
..r A41rr r1 ete . y en WTI
3N-T•N
GEORGETOWN RAILROAD COMPANY
1). P.5 E. S. -- • •
ENCASED WATERLINE CROSSING AT
FELD WILLIAMSON, TEXAS
.0.04 1 1111X11 ,4NOn
FOR CITY OF ROUND ROCK
1 o.JA.0 .rI
RR PILE NO. 2 5 1.60 6ATE MA Y 20,95
DATE: May 23, 1995
SUBJECT: City Council Meeting - May 25, 1995
ITEM: 14G. Consider a resolution authorizing the Mayor to execute a license
agreement with Georgetown Railroad (near water treatment
plant).
STAFF RESOURCE PERSON: Bob Bennett
STAFF RECOMMENDATION:
Texas Crushed Stone has requested their Industrial District be extended an
additional 7 years. If the District is extended, the City would be unable to annex into
the area for 7 years. Mr. Bill Snead has offered to donate waterline easements and at
least 10 acres for the expansion of the water plant as a consideration for the District.
PIPELINE LICENSE AGREEMENT
This Pipeline License Agreement (the "License") is made
and entered into effective the date last executed herein be-
low, by and between Georgetown Railroad Company, a Texas cor-
poration ( "GRR "), as licensor, and the City of Round Rock,
Texas ( "Round Rock "), as licensee.
W I T N E S S E T H:
WHEREAS, the City of Round Rock desires to construct a
twenty -four (24) inch pipeline, with a thirty -six (36) inch
incasement, for the transportation of water (the "Pipeline "),
which Pipeline will cross under the tracks of GRR; and
WHEREAS, GRR wishes to grant to the City of Round Rock
a license to construct and maintain the Pipeline;
NOW THEREFORE, the parties hereby agree as follows:
Article I
License Granted; Term; Consideration
For and in consideration of the mutual covenants and
contracts herein contained, GRR hereby grants to Round Rock
a license to construct and maintain the Pipeline to cross under
GRR's main line track and side track, 2,452 feet north of Mile
Post No. 5 and 61 feet south of the former common boundary line
between Texas Crushed Stone Company and Westinghouse Electric
Corporation, Williamson County, Texas and further described in
Exhibit "A" attached hereto and incorporated herein for all
pertinent purposes, on the terms and conditions described herein -
below. This License shall be effective from and after the date
fully executed, and shall terminate at such time as the Pipeline
is no longer used by the City of Round Rock for the use provided
hereinabove. In consideration of the granting of this License by
GRR, Round Rock agrees to pay to GRR, immediately upon execution
hereof, the sum of fifty dollars ($50.00).
Article II
Pipeline Location
The Pipeline shall be located as described in Article I
hereof. The Pipeline, when installed by Licensee, shall be installed
so that the upper surface of the pipe is at least four and one -half
(43) feet below the bottom of the rail thereover, or at such lower
depth which may be necessary to provide adequate support for the
rail. Installation shall be made in conformity with the engineer-
ing profile contained in Exhibit "A" hereto.
-2-
Article III
Responsibilities of Round Rock
3.1. Installation and Maintenance; Removal of Pipe
-3-
Round Rock shall install or cause to be installed the
Pipeline at the location provided in Article I hereinabove.
The Pipeline shall be installed safely and in a good workman-
like manner, and during the construction, Round Rock or its
contractor involved in the construction shall secure a policy.
of Owner's and Contractor's Protective Liability Insurance
with limits of liability of at least $2,000,000.00, naming
GRR as the named insured and loss payee. Round Rock agrees
to provide satisfactory evidence of such insurance coverage
prior to beginning construction of the Pipeline. During the
term of the License, Round Rock agrees that it will properly
maintain the Pipeline and will take any and all actions and
expend any and all funds which may be required to maintain
the Pipeline. Round Rock further agrees that the construction,
maintenance, and operation of the Pipeline will comply with .
all applicable State, Federal and local laws, rules or regula-
tions, and upon any notification by any person that the Pipeline
is not in compliance with such laws, rules and regulations,
Round Rock agrees to take prompt action to bring the Pipeline
into such compliance. In the event that Round Rock fails to
properly maintain the Pipeline or to take any action required
to bring the Pipeline into conformance with all applicable
laws, rules or regulations, the GRR, after 10 days notice
to Round Rock, may take any such action as may be reasonably .
necessary to render the Pipeline safe for railroad operations
or in compliance with applicable laws, rules and regulations,
and Round Rock agrees that in the event GRR takes such action,
Round Rock shall, with twenty (20) days, reimburse GRR for
the actual cost of labor performed by or on behalf of GRR,
including wages of foremen, plus 10% to cover supervision and
accounting, plus vacation allowances, paid holidays and health
and welfare benefit payments applicable to such labor, GRR's
cost price of all materials f.o.b. GRR's rails plus 10% to
cover handling and accounting, plus freight at tariff to point
.of use, and excise taxes applicable to said labor and materials.
Upon termination of this License, Round ,Rock shall take prompt
action to remove the pipe and all associated materials and re-
pair any damage to GRR's property which may be caused by such
removal. Such removal shall be undertaken by Round Rock with-
out any demand from GRR,, but shall in any event commence within,
thirty (30) days after termination of this License and written
demand for removal being made by GRR.
3.2. Indemnification and Hold Harmless
During the term of this License, Round Rock agrees to
-4-
1
indemnify GRR and hold it harmless from any suits, claims,
costs, loss .. or damage which may accrue to GRR, Round Rock or
third parties, from the. operation of the Pipeline arising out
of, or occasioned by, the negligent acts of Round Rock or its
employees or agents. The loss or damage for which Round Rock
shall indemnify GRR and hold it harmless shall specifically
include, but not be limited to, the following: (a) damage to or
destruction of railroad track and track bed, railroad cars and
engines, or to the Pipeline; (b) personal injury to or damage to
property, owned, leased or operated by (i) GRR employees or
agents, (ii.) Round Rock employees, agents or contractors, or
(iii) any third parties; and (c) economic loss to any party
caused by damage to or destruction of the Pipeline or the inter-
ruption of Pipeline service, caused by negligence of Round Rock,
its employees or agents. Such indemnification shall include all
actual monetary cost to GRR, including expenses and attorney's
fees.
Article IV
Representations and Warranties of Round Rock
Round Rock hereby represents and warrants to GRR that the
construction, operation and maintenance of the Pipeline have
been properly approved by the City of Round Rock, and that
- 5 -
Round Rock has been authorized by resolution, or if required
by its Charter, by ordinance, to enter into this Pipeline
License Agreement, that the resolution or ordinance has not
been repealed and is in effect at the date of execution hereof,
and that this License Agreement is enforceable against Round
Rock in accordance with its terms. Round Rock further warrants
and represents that the city officer executing this License
has been duly authorized to execute the same on beheif of, and
as the act and deed of,'the City of Round Rock.
Article V
Assignment
The License hereby granted by GRR to Round! Rock is personal
to the grantee hereof, and Round Rock shall have no right to
assign this. License without the express prior written consent
of GRR. GRR's rights hereunder shall be Freely assignable.
-6-
Article VI
Notice
Any notice required or permitted hereunder shall be per-
sonally delivered or sent by registered or certified mail, re-
turn receipt requested to the addressee at the address listed
below, and such notice shall be effective on the date of de-
livery, or date of mailing.
Round Rock City of Round Rock
221 East Main Street
Round Rock, Texas 78664
ATTEST:
Georgetown Railroad Company
EXECUTED on the date indicated below:
(City Seal)
(Date)
(Seal)
-7-
Georgetown Railroad Company
P.O. Box 529
Georgetown, Texas 78627
City of Round Rock
BY:
BY:
rnPYak,
(Title)
Georgetown Railroad Company
(Title)
Georgetown Railroad Crossing
Sta. 23 +35
ACE ARROW INDICATING NORTH
RCCTION RELATIVE TO CROSSING
/ 1 S APPLICATION FOR ENCASED
NON - FLAMMABLE PIPELINE CROSSING
_ft
tr.
lut I"}1 31 11
1
WIJKST A. A. TO.M! tY
101135101 r1710 01JEC }f
1133 607E SI
I OIlTAR1S µq14 IRA* rR111 UK Warm 1 ism m aOWT105R 1 I rlMil'� w
FT
1 ivlr 10 A LOK SLIMY LIK 11 Atcomel Got
38 TT.
NO SCAT
1 ' 4
. FORM 06- 0000
REV. 0.01_90
NOTE: ALL AVAILABLE DIMENS10N5 MUST BE
FILLED IN 10 EXPEDITE THIS APPLICATION,
ppnr� F7 -- -._
S ET.
tut molt
19 �
1 rEMi 11X01
{l
10CRI11 { W }S 1 *1700 01440(1 1
i {I
GOO Railroad
T t
,
St Rg�10U5e Road
O
MA 011*
cis N.r. 7 1.
73 PT.
(CAS,K 1 .049/119116 ASLOW
41.01* 1 1![1.114.1
�•-- 2 5. 4 7.
I
FOR CITY OF ROUND ROCK
linder Concrete
STEEL CASING WALL
TNC KS,. CHART
Tea A!S GA41�1l
IJM" Ir oA US9
6i 11. OWR Ir -Ir
s„- oval Rr -tr
Tito• DYER av
911 one e44 Er - ,A
54 dra 4 .
AYry IT 3.4, Co.
kora rMIS our I8 ONLY
P1633 TN STILL YIELD
STRKMGTN or 75.000 rot.
TOAWLA TO FIGURE )' CA11N0
I.RNOTN •:rN ANGLE of
31108011)0 OTHLR THAN SCA
.2SoL
7T80.
. Air{.
. u6o-
NSTEC
it ALL HORIZONTAL 016TAN1,t1 TO SE NEAIUWED AT AIGNT MOLES PRW OF TRA
!1 CASINO TO EIIiCND 810010 T1K CENTEIkiN[ N 719135 AT 111011* ARpL�s Dm G nA' 17101!7 AS 0013D. aTCR of ]e • 1c Tr., 911 7G Pr„ y7
AND 011001)0 101917 40 RAILROAD RlOrlr +O►•nY IT )#3[5355* 70 PROVIDE PROAq Lb10TN OUi1IDt 0/ TRADK,
37 MIH 115511 o f So' TROY tNE ENO OF AN} 191111050 6RIDOE, R a ANr • - 1JLV[Ilr, GR
41 s(4s(41411. R
AEPR3S3NTATIVE WIT 1t PRE00MT OLNINC IN0rALLAr1011 IF RA 11.66.131 S[ DUis 7p*1 IN TIC VI C ' 1 . 19 ' OR CCC00IN0.
]7 AL46xx.04.3 F Irma 0033017 INC.4011 6ACA:DLLS OF 3R1003S: S OF ROAD ERO*SINO* 6 09E3614 *150111,08 1 0193 ROAD NASA, 04 I of CIAYEA97.
A)
15 PIPELINE CROSSING WITHI II,MICATED STREET O___YESL a Nn;
S1 (F YES. NAME OF STREET
C) DISTRIBUTION LINE OR TRANSMISSION LINE A
01 CARRIER PIPS
COMMODITY TO BE CoNYE4go Raw Water
OPERATING SS 1 IOt A UETCn 2 i MATERIAL, (1) „I
1) CASINO PIPE 7
HALL THICKNESS 5 /811 :DIAMETER 3611 MATERIAL steel 1
N0TE1 CASING MUST N AYS E• CLEARANCE BETWEEN GREATEST
OUTSIDE DIAMETER OF CARRIER PIPE AND INTERIOR DIAMETER OF
CASINO PIPE. WHEN FURNISNINO DIMENSIONS, Gott OUTSIDE 01
CARRIER PIPE AND INSIDE of CASINO PIPE,
FI ME'THgp OF INSTALLING CASING PIPE UNDER TRACK( 51;
A ORT BORE AND JACK (WOY BORE NOT PCPoaITTCD)I
TUNNEL :OTHER
0) WILL CONSTRUCTION BE 80 AN OUTSIDE CONTRACTOR7_.X TES;—_
HS DISTANCE 30034 011)7311 LING OF TRACK TO NEAR FACE OF 5OfT111 ND
.IACK INC PITS VIER MEASURED AT 11101)7 ANGLES TO TRACK 1 f 9 r
[) .0 U I.. uta CONTACTED Aldo HAS DETERMINED FIBER
op010 CABLE DOES I._.,._DOEL HOT I EXIST IN VICINITY OF
WORK TO BE PERFORMED.
(1) Alternate Bids: Ductile Iron, Steel or Steel Cy
EXNIBTT '
.."wuw W *Fr -*art •In 111 711F7.0
.0*Mn N
6
.d f3 j
GEORGETOVIN RAILROAD COMPANY
w A R N 1 N 0
13 0 41110.6 IL F
0}17,,3110 16 Vv.wcf Or 011 .O.1. to K939.11( 4/ IS KMI * IA
M IWO Wr10 :RILL 3 1- 147 010
40wi.w
0.411 I FN�77{ -10]
SN-TH1
I*. P.
ENCA SED CROSS NC AT
FELD, WILLIAMSON, TEXAS
1 Mikff w tN111Y1
RR FILE N0.E- 251.60bATEMAY20,95
ORIGINAL
File: E-251.601
A4
C)--ni