Loading...
R-95-08-24-13F - 8/24/1995X - OK )-/_ f/ /- RECEIVED JAN u o #P2 /ef /5 395 , Texas Department of Transportation P.O. DRAWER 15426 • AUSTIN, TEXAS 78761 -5426 • (512) 832 -7000 CONTROL: 1378 -06 -006 PROJECT: CC 1378 -6 -6 COUNTY: WILLIAMSON HIGHWAY: FM 3406 City of Round Rock Mr. Bob Bennett, City Manager 221 East Main Street Round Rock, Texas 78664 -5299 Dear Mr. Bennett: In accordance with a Construction Agreement entered into by the State and City of Round Rock on the above referenced project, attached please find a Final Cost Statement outlining expenditures on said project. Also attached is a State warrant in the amount of $32,151.97 which represents a refund due the City as shown on the cost statement. If you have any questions concerning this matter, please call the office of the Director of Construction at 832 -7033. Attachments cc: Klotz JANUARY 6, 1997 Sincerely, Terrell A. Jackson, Jr., P.E. Director of Constr.ct:o_ ,Texas Department of Transportation DANNY STABENO ENGINEERING SPECIALIST AUSTIN DISTRICT Meiling Address P.O. Drawer 15426 Austin, TX 78761-5428 An Equal Opportunity Employer 0111. Address 7901 N. IN 35 Au91ln, TX 78753 512/832 -7033 Fax 512/832.7149 FINAL COST STATEMENT PROJECT: CC 1378 -6 -6 HIGHWAY: FM 3406: DRAINAGE IMPROVEMENTS COUNTY: WILLIAMSON PRELIMINARY ENGINEERING REVIEW $ 3,348.39 CONSTRUCTION ENGINEERING 7,479.55 CONSTRUCTION BID ITEMS 174,048.94 INDIRECT COST (8.41 %) 15,548.15 $ 200,425.03 TOTAL DEPOSITED 1N ESCROW BY CITY OF ROUND ROCK $ 232,577.00 LESS ACTUAL COST 200,425.03 REFUND DUE CITY OF ROUND ROCK $ 32,151.97 THE STATE OF TEXAS PAYMENT INFORMATION (DETACH THIS PORTION AND KEEP FOR YOUR RECORDS) No, 127858347 ISSUE DATE 12 13 96 FUND NO 0917 PpmENT mom TEAS AGENCY TX DEPT OF TRANSPORTATION No OEECRIPTION COMITY/POLITIC 318 ROAD TR ACCT TEtEVRONENUMBER 15121 703 - 5872 INVOICE NO F1 3406 RENEW INV DATE PAYEE NO. 17460174851 000 PAYEE NAME CITY OF R01RL ROCK NOT - INVOICEDESCRIPIICN DOG NO INVOICE AMOUNT 94378541 032,151.97 0ARRANT TOTAL 032,151.97 0927 601 94378541 17460174851 00D DECEISER 13, 1996 PAY 1 Detach here before depositing *ate (Comptroller of 3ublir Accnunt5 127068.347 TREASURY WARRANT NO 127858347 Detach here before ce00003 1: L 4 L 6 41: THIRTY 710 1101080 ONE ID0LRE0 FIFTY QE OOLLAR% AND 97/100 G Or, CITY OF ROUO ROCK 221 EAST WAIN ROM) ROCK, TX 78666 -5299 L278583470 DOLLARS CENTS 032,151.97 VOID AFTER 00/31/1999 ,Texas Department of Transportation WILLIAM C GARBADE DISTRICT ENGINEER P 0 DRAWER 15426 NEAS AUSTIN TX 78761.5426 744-;2.i 01 Fold at line over top of envelope to the right of the return address CERTIFIED P 214 151 395 MAIL City of Round Rock Mr. Bob Bennett, City Manager 221 East Main Street Round Rock, Texas 78664 -5299 11111111 I% r11111111 ∎1111L11I,111111111111I1t,11111 RECEIVED JAN U 4941? t1/08/97 14:34 COMMENTS: fkoo TRANSMISSION OK TX /RX NO. CONNECTION TEL CONNECTION ID START TIME USAGE TIME PAGES RESULT a aaaaaa******aaaaaaaaaaaaaa aas ACTIVITY REPORT aaa asasas******aaaaaaaaaaaaaas 5530 PUBLIC WORKS 01/08 14:33 00'54 5 OK 9 218 5563 /-8-9 CITY OF ROUND ROCK 221 EAST MAIN STREET ROUND ROCK, TEXAS 78664 TELEPHONE # 512- 218 -5400 FAX # 512- 218 -7097 TELEFAX TRANSMISSION COVER PAGE DATE G� TOTAL PAGES INCLUDING COVER SHEET: \ ATTENTION: DEPARTMENT: COMPANY: FAX #: FROM: 808 DEPARTMENT: DEPT. PHONE #: COMPANY: City of Round Rock, Texas 0 001 WHEREAS, the City of Round Rock desires the construction of culverts on FM 3406 at Onion Creek to improve the drainage, and WHEREAS, the Texas Department of Transportation has submitted an agreement to provide said culverts, and WHEREAS, the City Council desires to enter into said agreement with the Texas Department of Transportation, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City an agreement with the Texas Department of Transportation for the construction of culverts on FM 3406 at Onion Creek, a copy of said agreement being attached hereto and incorporated herein for all purposes. RESOLVED this 24th day of August, 1995. ATTEST: E LAND, City Secretary K: \RESOLlTTI \RS50824F.WP0 /kg RESOLUTION NO. R- 95- 08- 24 -13F CHARLES C PPER, Mayor City of Round Rock, Texas STATE OF TEXAS S COUNTY OF WILLIAMSON § c0Py CSJ 1378 -06 -900 Williamson County THIS AGREEMENT is made between the City of Round Rock, hereinafter called the "City ", acting by and through its duly authorized Officers and the State of Texas, hereinafter called the "State ", acting by and through its Texas Transportation Commission. WHEREAS, the City desires the construction of drainage improvements on FM 3406 at Onion Creek. The City has requested the State to construct or have constructed this work on behalf of the City. The estimated construction cost of this work is Two Hundred Thirty -two Thousand Five Hundred Seventy -seven and No /100 Dollars ($232,577.00), including contingencies, construction engineering, preliminary engineering review, and including indirect costs at the rates in effect for the fiscal years during which the work is accomplished. The indirect cost rate will be based on the Texas Department of Transportation's Indirect Cost Plan. CSJ 1378 -06 -900 Williamson County NOW THEREFORE, it is understood that this proposed work will be constructed by the State and the City will transmit to the State with the return of this agreement, executed by the City, a warrant or check made payable to the Texas Department of Transportation in the amount of Two Hundred Thirty -two Thousand Five Hundred Seventy - seven and No /100 Dollars ($232,577.00), to be used in paying for the proposed work required by the City. It is further understood that the State will construct only those items for the City as requested and required by the City. In the event it is determined the funding provided by the City will be insufficient to cover the State's costs under this agreement, the City will within 30 days from receipt of the State's written notification provide the additional funding to cover the State's anticipated additional costs. In the event the amount as paid is more than the actual cost of the City's share, as herein established, then the excess amount will be returned to the City. presents to be executed in duplicate counterparts, but this agreement shall not be valid until signed by representative of each party. BY: Date: IN TESTIMONY WHEREOF, the parties hereto have caused these CITY OF ROUND ROCK Party of the First Part Title: I r i Av Certified as being executed for the purpose and effect of activating and /or carrying out the orders, established policies, or work programs heretofore approved and authorized by the Texas Department of Transportation Commission under the authority of Minute Order 100002. By: Manager, Review and Negotiated Contracts Date: CSJ 1378 -06 -900 Williamson County a duly authorized TEXAS DEPARTMENT OF TRANSPORTATION Party of the Second Part Texas Department of Transportation Mr. Fred Lockwood, P.E. Lockwood Engineers, Inc. 4412 Spicewood Springs Rd Suite 800 Austin, Texas 78759 Dear Mr. Lockwood: P.O. DRAWER 15426 *AUSTIN, TEXAS 78761 -5426 • (512) 832 -7000 August 2, 1995 Please find attached two (2) original copies of the escrow agreement for the construction of drainage improvements on FM 3406 at Onion Creek as requested by the City of Round Rock. Please deliver both copies of this agreement to the City for execution by the responsible city official. Once both copies have been executed by the City of Round Rock they should be returned to this office along with a check or warrant for the dollar amount stated in the agreement. After both originals of the agreement have been executed by TxDOT, one original copy of the agreement will be transmitted back to the City for their records. If you or the City of Round Rock have any questions, please feel free to contact this office. Sincerely, Wesley M. Burford, P.E. D Des Engineer WMB:WMW:dr An Equal Opportunity Employer Mr. James R. Nuse Director of Public Works City of Round Rock 2008 Enterprise Street Round Rock, TX 78664 Dear Jim: ■ • A '` illi • DH INVESTMENT COMPANY August 8, 1995 Re: Wood Glen Subdivision Culverts on FM 3406 at the crossing of Onion Branch Creek PUBLIC WORKS DEEPT Pursuant to discussions at our recent meeting, 3406, Ltd. agrees to pay to the City of Round Rock, $79,040.53 as the remainder of its share of the construction costs for the culverts at FM 3406. 3406, Ltd.'s share of the construction costs of the culvert is calculated as follows: Wood Glen Planned Single Family Area 142 Acres Regional Stormwater Detention Fee x $800 Per Acre Total Regional Stormwater Detention Fee for Wood Glen Single Family $113,600.00 Less Amounts Paid: Phase 1, Section 1, Regional Stormwater Detention Fee $19,113.60 Engineering Fees for Design of FM 3406 Culverts $15,445.87 Balance of Future Regional Stormwater Detention Fees 87. 0480.53 We will provide you with a check for the balance of our share of the culverts, $79,040.53, within ten (10) days from the date you notify me. It is our understanding that once you have received the balance of our Regional Stormwater Detention Fees, the City of Round Rock will submit to the Texas Department of Transportation the funds for the estimated costs of construction of the culverts together with the Escrow Agreement as required by TxDOT. As you know, time is very important to us in the completion of the construction of these culverts therefore, any thing you can do to expedite this process with TxDOT will be greatly appreciated. RO. BOX 702 • 2722 S. MEDFORD • LUFKIN, TEXAS 75901 • 409- 634 -7707 Mr. James R. Nuse August 8, 1995 Page 2 If you have any questions, please feel free to contact me. DAYi:sk cc: Fred Lockwood wc,p\nuse3.lh Sincerely, David A. Hill DATE: August 22, 1995 SUBJECT: City Council Meeting, August 24, 1995 ITEM: 13F. Consider a resolution authorizing the Mayor to enter into a contract with the Texas Department of Transportation for the construction of additional culverts on FM 3406 at Onion Creek. STAFF RESOURCE PERSON: Jim Nuse STAFF RECOMMENDATION: Currently, storm waters will back up on the north side of FM 3406 at Onion Creek. When they reach a certain level, the water flows over FM 3406 making travel hazardous. In conjunction with TxDOT and the developers of the Wood Glen subdivision, the culverts will be improved to eliminate the highway flooding potential. The cost of the improvements is estimated at $232,577. The developer agrees to pay $79,040.53 and the balance will come from regional detention. Staff recommends entering into this agreement with TxDOT. Mayor Charles Culpepper Mayor Pro-tem Earl Palmer Council Members Robert Srluka Rod Morgan Rick Stewart Martha Chavez Jimmy Joseph City Manager Robert L Bennett. Jr- City Attorney Stephan L Sheets September 26, 1995 Mr. Wesley M. Burford, P.E. District Design Engineer Texas Department of Transportation .b. Drawer 15426 iistin, Texas 78761 -5426 Dear Mr. Burford: The Round Rock City Council approved Resolution No. R- 95- 08- 24-13F at their regularly scheduled meeting on August 24, 1995. Enclosed is a copy of the resolution, two original agreements and a check in the amount of $232,577.00. Please return one original agreement to us after it has been approved. If you have any questions, please do not hesitate to contact me. Sincerely, oanne Land Assistant City Manager/ City Secretary enclosures THE CITY OF ROUND ROCK 221 East Main Street Round Rock, Texas 78664 512- 255 -3612 Fred Lockwood, P.E. Lockwood Engineers, Inc. David A. Hill DH Investment Company Fax 512-255-6676 1-800-735-2989 (TDD) 1- 800 - 735 -2988 (Voice) OUN (1411 R4 Ilk'(11MOWff �1 CITY OF ROUND ROCK, TEXAS OESORlnoN Chick: 041164 CONSTR —FM 3406 ! ONION CREEK 0.04116411' 1:11,49 L97861: 043000469711• THE FACE OF THIS DOCUMENT HAS A COLORED BACKGROUND ON WHITE PAPER ECRY.Ct C � Dot• 221 E HAil49R� R4 Y81 :PN. 151A2.55.3612 9=60 -9s AMOUNT 11232, 577. 00 4 560 0 041164 s 'G LIVIrvG WITHA _ **r* * ******* ** **** rt ** * ** ***** * * ** *23.2. 5770 and 00/100 PAY TO THE t :.,: �` VOID,AF 096 ORDER 'TEXAS DEPT ,OF TRANSPORTATION ROUND ROB oPEiATiNG ACCOUNT PO DRAWER '15426 ATTN: THOMAS: -E WORD JR -PE I-- AUSTIN, TX 78761-5426 � BANK ONE TEXAS. NA - - - ROUND ROCK. TEXAS 232577. 00 090695 232577. 00 0. 00 232577. 00 m SENDER: • Complete ite 1 and/or 2 for adtetonal services. • Com etete Items 9, and 40 & b. • Prfn14/ogr name and address on Ne reverse of this form so diet we ban rerun *le Gerd to you. • Await tlde forts tote front of the me1pleoe, or on the boor if apace does not permit. Vhtte efeNnmRec►rptReouast f• mttlemeR*00bstw,i ha erddanumber • The Henan Reeaipt vole show to whom the snide was dewed and the date g dowsed. 3: Article Addressed to: 1 Mr. Wesley M. Burford, P.E. District Design Engineer Texas Dept. of Transportation P.O. Drawer 15426 Austin, TX 78761 -5426 $. Signetuie (Addressee) 8. 5 41 WS Priem I also wish to receive the following services (for an extra fee): 1. ❑ Addressee's Address 2. ❑ Restricted Delivery Consult postmaster for fee. 4e. Arfde Number 437 i ❑ Insured ❑cnD C3 Retur ecafpt for 1 M andse 1 1 7 7 P 052 801 4b. Service Type ❑9gistered / Certified ❑ Express Meil 7. Date r 8. :Ad drae4ee'sliddrase (Only if requested ,, fess is 'paid) • i iii 991 .tuaaecn -4 414 DOMESTIC Rama RE UNITED STATES POSTAL SERVICE J s` I N j_ PM Official Business 03 i /995 II II I PENAL USE TO VOID OP"P6ST Print your name, address and ZIP Code here CITY OF ROUND ROCK ADMINISTRATION 221 EAST MAIN STREET N ItII IFIII II,I!� 1 1 4,PPFI'61T ifitI19