R-96-02-08-10A - 2/8/1996Mayor
Charles Culpepper
Mayor Pro -tem
Earl Palmer
Council Members
Robert Sduka
Rod .Horgan
Rick Stewart
Hartha Chavez
Jnnm■ Joseph
City Manager
Robert L. Bennett. Jr.
City Attorney
Stephan L Sheets
February 13,1996
John H. Konzen, CWI
President
HOT Inspection Services, Inc.
P.O. Box 1208
Round Rock, TX 78680
THE CITY OF ROUND ROCK
221 East Main Street
Round Rock, Texas 78664
512 - 255.3612
Resolution No. R- 96- 02- 08 -10A was
Council on February 8, 1996.
Enclosed is a copy of the resolution.
not hesitate to call.
Joanne Land
Assistant City Manager/
City Secretary
Enclosure(s)
approved by the Round Rock City
If you have any questions, please do
Fax 512-255-6676 1- 800 - 735 -2989 (TDD) 1. 800. 735.2988 (Voice)
Therefore
WHEREAS, the City of Round Rock has previously entered into
an agreement with Heart of Texas, Inc. for structural steel and
inspection services, and
WHEREAS, the City desires to renew said agreement, Now
ATTEST:
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK,
TEXAS,
That the Mayor is hereby authorized and directed to execute on
behalf of the City an extension and renewal of the structural steel
inspection services agreement with Heart of Texas, Inc., said
agreement being attached hereto and incorporated herein for all
purposes.
RESOLVED this 8th day of February, 1996.
IAILU
E LAND, City Secretary
C \NPDOCS \RRSOLVII \RS60208A WPD /kg
RESOLUTION NO. R- 96- 02- 08 -10A
CHARLES CUL E R, Mayor
City of Round Rock, Texas
4 i
HOT INSPECTION SERVICES, INC.
Welding Conaulients & Inspection Specialists
Welding & Fabrication
Inspection & Testing
January 10, 1996
James R. Nuse, P.E.
Director of Public Works
City Of Round Rock
221 E. Main Street
Round Rock, Texas 78664
Dear Jim:
MAILING: P.O. So: 12oe
Round Rock. TX 78880
SHIPPING: 1411 Sam Bass Rd.
Round Rock, TX 78881
(512) 244.2523 FAX: 2440607
The structural steel inspection contract will expire on February 9 of this year.
This marks our tenth year as being the special Inspector on behalf of the city
which makes it appropriate that I share some of the past history and monetary
results from our Inspection contract with you.
Over the past ten years we have Inspected sixty -four (64) building projects
equaling 2,375,450 square feet. Our permitted collections from these projects
have totaled $81,991.00 that does not include $2,150.00 of uncollected fees or
donated inspection time. In summary our total time logged for these 64 projects
equals 2,147 hours that calculates to be $85,880.00 at our normal inspection
rate of $40.00/hr. As you can see the difference is $2,340.00 Less than what the
fees would have been at the hourly rate charge. Because we are local and
have been able to expedite the inspections In a productive manner, the logged
time and collected fees do not seem to be far apart. Please know that our
inspection procedures and logged hours do not include any nonproductive
time such as administration. Attached is a break down of the project totals for
each of the 10 years.
In closing I would like to reiterate the importance of special inspections such as
our steel inspection and the remaining building inspections conducted by your
staff. This year more than ever, I have seen substandard quality products,
workmanship and supervision on the jobsite. Without the inspectors doing their
Job correctly some of these projects may have resulted In failure. As you know
we encountered a few problems this past year that I felt were a result of cost
cutting and a disregard of quality standards by the contractor. The issues were
professionally evaluated and discussed then finally assumed by the ultimate
decision makers of these projects, being the owner, engineer, and architect.
NOT INSPECTION SERVICES, INC.
Welding Coneultanta & Inspection Specialism
Welding & Fabrication
Inspection & Testing
As always I wilt continue to make sure that the safety and best Interest of our
community is considered when servicing the inspection contract that we have
with the City Of Round Rock. If you feel that extending the inspection period for
more than one year is appropriate, I would certainly like to talk with you about
an extended period. Jim, I appreciate your confidence and support In
recommending the renewal of our contract as you have done In the past.
Respectfu submitted,
John
Pre - iL•Y nt
JH lap
WI
attachments
Copy: Mark Remmert - Chief Building Official
File
MAILING: P.o. Box 1209
Round Roek, TX moo
SHIPPING: 1411 Sam eau Rd,
Round Rock, TX 79681
(512) 244.2523 FAX: 244-0607
HOT INSPECTION SERVICES, INC.
Welding Consultants 8 Inspection Specialists
Welding & Fabrication
Inspection & Testing
MAILING: P.O. Box 1208
Round Rock, TX 78680
SHIPPING: 1411 Sam Bass Rd.
Round Rock. TX 78881
(512) 2442523 FAX: 244-0807
CORR STRUCTURAL INSPECTION DATA
YEAR LEA SQ. FOOTAGE LOGGED TIME BLDG TOTAL
1986 $ 3,548 120,300 130 hrs 2
1987 $ 430 12,280 22 hrs 1
1988 $ 7,713 220,300 216 hrs 9
1989 $ 1,784 50,900 46 hrs 3
1990 $ 3,017 86,200 81 hrs 2
1991 $ 1,481 42,328 40 hrs 2
1992 $ 3,835 109,591 102 hrs 4
1993 $ 8,253 235,800 204 hrs 7
1994 $11,274 322,139 296 hrs 7
1995 $40,656 1,175,620 1,010 hrs 27
DATE: February 6, 1996
SUBJECT: City Council Meeting, February 8, 1996
ITEM: 10A. Consider a resolution renewing the Structural Steel Inspection
Agreement with Heart of Texas Inspection Services.
STAFF RESOURCE PERSON: Jim Nuse
STAFF RECOMMENDATION:
Enclosed is a letter from HOT Inspection Services. For 10 years HOT Inspection
has provided these services. Staff recommends extending this agreement for an
additional year.