R-96-05-23-14C - 5/23/1996ATTEST: LAND, City Secretary RESOLUTION NO. R- 96- 05- 23 -14C WHEREAS, Round Rock, Texas Investments, Inc. has proposed a letter agreement (Exhibit "A ") related to cost participation for drainage improvements for the Interchange Business Park subdivision and surrounding properties, and WHEREAS, the City's share of the cost will come from the City's regional detention fund, and WHEREAS, the City Council wishes to confirm its acceptance of the terms of said letter agreement, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the City Council hereby accepts and approves the terms of the aforesaid letter agreement, a copy of which is attached hereto as Exhibit "A." RESOLVED this 23 day of May, 1996. C '•LES C PER, Mayor City of Roun. Rock, Texas 1:tA May 2, 1996 Doucet & Associates, Inc. EXHIBIT A Mr. Jim Nuse, P.E., Director of Public Works City of Round Rock Public Works and Building Inspection 2008 Enterprise Drive Round Rock, TX 78664 Re: Shared costs for Interchange Business Park drainage improvements Job No. 10001.20 Dear Mr. Nuse: As you are aware, we are designing channel improvements along the east property line of Interchange Business Park (IBP) subdivision. Since a majority of the drainage that passes through IBP is from an offsite source , we propose that the costs necessary to design and construct the drainage improvements should also be shared with offsite participants. The drainage area for the channel along the east property line is 112.12 acres of which IBP accounts for 24.57 acres and offsite drainage area accounts for 87.55 acres. The following is a breakout of drainage areas, percentages and project costs. Cost Share Breakout East Channel - 112.12 acre drainage area I.D. Drainage Area Percentages Project Cost IBP 24.57 ac 21.9 % $11,894 Offsite 87.55 ac 78.1 % $42,415 Total 112.12ac 100% $54,309 Another issue is the additional drainage easement necessary to contain the proposed channel sections. The drainage improvements have been sized to serve the entire drainage basin assuming fully developed 100 year conditions. This results in additional drainage easements being required. The current 30' drainage easement for the east channel will need to be widened by 15 feet for a distance of 1600 feet. It is my understanding that the adjacent property to the east (Wayne Dresser Tract) dedicated by plat note a 15' public utility easement (P.U.E.). The power line that currently exists within the 15' P.U.E. along the east property line of IBP could be moved east onto Wayne Dressers tract, and the vacated 15' P.U.E. could be added to the current 30 foot drainage easement without taking more land from Interchange Business Park. Attached for your review, is the Engineer's Cost Estimate that was used to determine project costs for the East Channel. Also attached is an updated Engineers Cost Estimate for the West Channel based upon engineered plans. If you have any questions please call. Sincerely, (EL-L-04-44 Toe Grasso, P.E. cc: Vincent Mercandate c:proiawl000L usez.docl DA Doucet & Associates, Inc. Item Description Quantity Unit Unit Amount Price 1. 15' wide grass lined channel with 5:1 side slopes 1500 LF $12.00 18,000 2. 12' wide grass lined channel with 5:1 side slopes 1100 LF $11.00 12,100 3. Extended concrete rip -rap at existing culvert 280 SY $37.00 10,360 4. Extend Concrete Retaining Wall at existing culvert 280 SF $30.00 8,400 under Doublecreek Drive 5. Silt fence 40 LF $1.50 60 6. Rock Berrn 40 LF $20.00 800 7. Stabilized Construction Entrance 1 LS $800.00 800 Sub Total $50,520 Engineering & Surveying @ 7.5% $3,789 Total project cost $54,309 25% Round Rock Contingency $13,577 Grand Total $67,886 ENGINEER'S COST ESTIMATE INTERCHANGE BUSINESS PARK EAST CHANNEL IMPROVEMENTS ROUND ROCK, TEXAS APRIL 17, 1996 JOB No. 010001 DA Doucet & Associates, Inc. ENGINEERS COST ESTIMATE INTERCHANGE BUSINESS PARK WEST CHANNEL IMPROVEMENTS ROUND ROCK, TEXAS APRIL 17, 1996 JOB No. 010001 Item Description Quantity Unit Unit Amount Price 1. 15' wide grass lined channel with 5:1 side slopes 1000 LF $8.50 8,500 2. 12' wide grass lined channel with 5:1 side slopes 1960 LF $7.50 14,700 3. 2 parallel 5' wide by 2' tall pre -cast box culvert 60 LF $310.00 18,600 4. Flared concrete wingwalls 2 EA $1,500.00 3,000 5. Concrete rip -rap at channel bends 673 SY $37.00 24,901 6. Silt fence 40 LF $1.50 60 7. Rock Berm 40 LF $20.00 800 8. Stabilized construction entrance 1 LS $1,00.00 1,000 Sub Total $71,561 Engineering & Surveying @ 7.5% $5,367 Total project cost $76,928 25 %Round Rock Contingency $19,232 Grand Total $96,160 .114R1 - 11114110171 COOT. le 10 LSO Cal 1.1 10.22 LO1 7'" On) 20600 00-l4 147.00 1127 379.01 111.4.2 On) 17104 DIM .10 1.01 OLO 177.70 LAO AMAX 0 ( No) 07111 LC1 0.0 7170. ODA. Mama • N ‘s, 070111 EC. 10 [MILK MLA • 4.01 10 VW COC1.C. 777C ••• 131.00111.701 of re 1011 „,1 ) ( 1 / / ■ \ MO= 2, OW NaCe/.11177 . • 111.63 q.� lama 777r • WOO 6711111 ea SO 111971111..L.11.112.1.1111.7,J.M. L 11.0 •••• ▪ 4641 be In *0..00 of Ine. sad ....11•0 ealed as. L 4.11 be BO. fr .1•1 410 .0. ••••• *le . oan ania els .. L hae. m mama. bmbe aacaa ma pada* a.. =azaa ese.... 16 .01 4.1 aeara• ... ta magas aPaa) ‘ 0s.ral .11. NOLL. ry 11= of .11/ el Yam, raan sada mow .1 11. M of . wo Ja I. b. Gana: aa maatablity al Owbooter • elebb. .0.7 0.1 .6.. and le num CP. 0. Tat • O • 011.11C4 01.11711 . - MN MO I. wry. ORM Xmsw PO.= 4144 NIORFLIED TO Ai.. SAM Wet COM 14F.L WO. ORM IS MOM. TO '. /210g 1.111 MCD 4/ • 111714117 00311.1. IF .01 SIN CNONNOC OMNI COWL 0.1.1 1.14.4100 IPPIC77.7/C 2. TO.. MOO= 1001 1107.111.141111010.0. MCI ON MC MI NO NOT /MU IS 11111710.2.0417 PIM MSLMMO wan MINIM K. Par a- M...17 N. TOMO 00010171.1 OF 10.1.01 PAM Me lt A COIOLT 11101.111117 1"... CNN OS sumo 0010 17frairwi. cr "Ir E ircorr4F% lerlialVireice dr= • "" ••••••-•'' •L' ROCK BERL1 ▪ .61•111 .011 *a 1 aa- ao W. el *um et 4" of to. CO • 00.1n CI 41.00 .0. M.. eels ect Ir. and .e• • be r...1 fr see.. 7. V=1. se sal a aari aa. ad se Ia. 1T• re. se ma. •antrt1 aaa at ea aand ea by aa.aalm e• .••• • para. a Damao Dad per 7 owl .• 4••••• • . et OS 00e. e.1•14...• seed ••••• .r nr. el NO 1010 ••••• T.. rhs: le Pa. Mr narimaar. mamma.. all • aanan of ma, ta 19.) a.* *as ta 14 saw. 0.• wee del Ls 1.0. arc.. IN • mar. 0.01. eNde as.. • reta suffle.1e 000.0 soak 00 ea 1. • 0011 In* .... • 1/7 eff .0404.1 pa. •• ...Oa 10 fr. eel be vote. satl ofihne bee. is L a0re.r.1 be crol O.10 1. •14 a.rhe 11 1 • 0. azoaa 00e 0 10/ 10 400 ORAPMC 54.41.0 LEGEND vac.. is WO P. Poo PS 1010 0.14 1.1aC clot .CPC 1.00.11 111.0 ne.l. • Ise. 1.67.1,47 t V. oot 11 Ia.... F CO WO ofs vs. II 0.410411411 CO• ar..... off WO in CO. 0.14x OJT • ... • 014. a L. & ....11.S.< 6 YAW ACIMIMSE I/Ma• , O.1 09 rai ... 1a6 IVO ..11 OCR WO 97.170. - . 4 . MS= VaInt DC - 10 - 10 . Capia7fig ryDrI,PC 90.10 DC MOO ONISIACC 00.4.1 MCA 0004140.7 0 11 !!11 fur 1-3-Fa b•• 10 sem 'woo SHEET 2 or 7 April 8, 1996 Mr. Tim Nuse, P.E., Director of Public Works City of Round Rock Public Works and Building Inspection 2008 Enterprise Drive Round Rock, Tx 78664 Re: Proposal for Engineering Services for Channel Improvement downstream of Gattis School Road, West ofDoublecreek Dr. in Round Rock, Texas Dear Mr. Nuse: I. DESIGN SERVICES II. SURVEYING SERVICES r Doucet & Associates, Inc. (D &A) is pleased to provide this proposal for Civil Engineering and Surveying services. It is our understanding that the City of Round Rock (Client) desires channel improvement plans for two tributaries downstream of Gattis School Road west ofDoublecreek Drive. D &A proposes to provide the following services: A. Flood Plain Determination - D &A will provide the Client with maps and data compromising the flood plan as it currently exists. B. Channel Improvements - D &A will provide the Client with channel plan and profiles with necessary details for obtaining City of Round Rock approvals. A. Design Surveys - Provide cross section information at 50 feet intervals. Its our understanding at this time that the large pond will be drained and Topographic work in this area won't be required. B. Land Descriptions & Sketches for Necessary Drainage Easements - Provide the necessary drainage easement descriptions & sketches to complete this project. It is our understanding that only three parcels of land would be affected per our field visit. C. Construction Staking - Prepare a control plan for construction staking purposes. This plan may be used by others for construction purposes. This proposal does not include the following items and those items not specifically described above: 1. Environmental Site Assessment 2. Geotechnical Investigations or other environmental studies 3. Landscape Plans 4. Construction Inspection If required, D &A would be happy to assist the Client in obtaining the above services. We will invoice on an hourly basis for coordination of these services. COMPENSATION Services described above will be provided on the following basis: Tasks Basis of Payment Estimated Fees I. Design Services A. Flood Plain Determination Lump Sum $2,000 B. Channel Improvements Lump Sum $8,000 II. Surveying Services Provide one(1) set of slope stakes on each side of drainage channel with cutsheets for construction. A Design Survey Lump Sum $1,800 B. Land Descriptions & Sketches Lump Sum $2,000 C. Construction Staking Lump Sum $2,000 The above fees do not include items such as permit application and /or permit fees, plotting charges, blueline expenses, etc. These items will be invoiced at cost. If additional services are requested by Client, D &A will invoice hourly for these services using current hourly rate. If this Proposal, the attached Rate Schedule, and the Agreement of Professional Services meet your requirements, you may indicate your approval by executing this document in the space provided below and returning it to our office. We will recognize receipt of the executed copy as our notice to proceed. We look forward to working with you on this project. If you have any questions, require clarification, or wish to discuss any aspect of this proposal, please do not hesitate to call. Sincerely, Joe Grasso, P. E. Project Manager ACCEPTED: Date April 30, 1996 Jim Nuse, P.E. Director of Public Works City of Round Rock 2008 Enterprise Drive Round Rock, Texas 78664 STENDEBACH & ASSOCIATES, INC. PLANNING AND DEVELOPMENT CONSULTANTS RE: Drainage improvements, Interchange Business Park. Dear Mr. Nuse: Further to our discussions this morning, we are pleased to confirm the following agreement related to drainage improvements for Interchange Business Park and surrounding properties. We have attached the cost estimates for the above noted drainage improvements, prepared by Doucet & Associates, Inc.. These are labeled as Exhibit "A ". Our request for cost sharing for the drainage area along the east boundary is as follows. 1. The drainage improvements located within the boundaries of Interchange Business Park which serve the eastern portion of Interchange Business Park together with the western portions of the Wayne / Dresser Subdivision plat and other properties within the upstream drainage basin will be constructed by Round Rock, Texas Investments, Inc., the owners of Interchange Business Park (Owners). 2. The Owners will be reimbursed, from City of Round Rock Regional Detention Funds, for the percentage of the cost of the East Channel Improvements which serve upstream users upon completion of these improvements. These improvements and the cost distribution are identified in the Letter from Doucet & Associates, Inc. which is attached hereto as Exhibit "A ". 3. The fifteen foot (15') Public Utility Easement located adjacent to the east boundary of Interchange Business Park will be converted to a Drainage and Storm Sewer Easement. The power lines located within this easement will be relocated to the fifteen foot (15') Public Utility Easement located along the west boundary of the Wayne / Dresser Subdivision Plat. The Owners will be responsible for paying for the line relocation. 11782 Jollyvdle Road • Suite 103 • Austin, Texas 78759 • (512) 219 -4041 • FAX (512) 219 -4042 • 4. The distribution of cost sharing for the East Channel Improvements will be that described on the attached letter from Doucet & Associates, Inc., which is identified as Exhibit A. 5. The West Channel Improvements will remain the responsibility of the Owners. Please arrange for this agreement to be confirmed by the City Council at the earliest possible date. If you require any additional information or documentation please call. Thank you for your assistance with this matter. Yours truly, James Stendebach, AICP. DATE: May 21, 1996 SUBJECT: City Council Meeting, May 23, 1996 ITEM: 14C. Consider a resolution authorizing the Mayor to enter into a cost participation agreement for drainage improvements at Interchange Business Park. STAFF RESOURCE PERSON: Jim Nuse STAFF RECOMMENDATION: Attached is a letter from Stendebach and Associates regarding regional drainage improvements at Interchange Business Park. This plan will provide for conveyance of the ultimate drainage flows from property south and east of Interchange Business Park. The offsite portion to be picked up by the regional detention fund is $42,415.00. Staff recommends this agreement. Mayor Charles Culpepper Mayor Pro-tem Earl Palmer Council Members Robert Stluka Rod Morgan Rick Steuart Martha Chavez Jimmy Joseph City Manager Robert L, Bennett, Jr City Attorney Stephan L Sheets May 24, 1996 Jim Stendebach, AICP Stendebach & Associates, Inc. 11782 Jollyville Road Suite 103 Austin, TX 78759 Enclosure(s) Dear Mr. • _ • ach: THE CITY OF ROUND ROCK 221 East Main Street Round Rock, Texas 78664 512- 218 -5400 • Resolution No. R- 96- 05- 23 -14C was approved by the Round Rock City Council on May 23, 1996. Enclosed is a copy of the resolution and letter agreement for your files. If you have any questions, please do not hesitate to call. Sincerely, CUYVVili Joanne Land Assistant City Manager/ City Secretary Fax 512-218-7097 1-800-735-2989 (TDD) 1- 800 - 735 -2988 (Voice)