R-97-06-26-10B - 6/26/1997WHEREAS, the City of Round Rock desires to hire a contractor
for the re- roofing of the old Public Works Building, Fire Station
No. 2 at South Blair, and
WHEREAS, Porter Austin, Inc. has submitted an agreement to
provide said re- roofing, and
WHEREAS, the City Council desires to enter into said
agreement with Porter Austin, Inc., Now Therefore
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK,
TEXAS,
That the Mayor is hereby authorized and directed to execute on
behalf of the City an agreement with Porter Austin, Inc., for the
re- roofing of the old Public Works Building, Fire Station No. 2 at
South Blair, a copy of said agreement being attached hereto and
incorporated herein for all purposes.
RESOLVED this 26th day of June, 1997.
ATTEST:
E LAND, City Secretary
A:\ WPOOCS \RRSOLUrI \RS]O6I65.HPO /acg
RESOLUTION NO. R- 97- 06- 26 -10B
CHARLES CULPEPPER, Mayor
City of Round Rock, Texas
Proposal & Agreement
To: City of Round Rock
Public Works Department
2008 Enterprise
Round Rock, Texas
Porter Austin, Inc.
117 East Street
Hutto, Texas 78634
Date: June 25, 1997
Job location: 300 South
Street, Round Rock,Tx.
We hereby submit specifications and estimates for:
*Sweep back gravel and install 1/2 inch Asphalt coated wood fiber board in
Hot asphalt
*Install glass base sheet in hot asphalt
*Install new modified SBS cap sheet in hot asphalt
*Install new 24 gauge Gravel Guard around edge of roof
*Install roof vents in roof
We agree hereby to furnish material and labor - complete in accordance with
above specifications, and professional roofing practices, for the sum of
Thirteen Thousand Nine Hundred Twenty Six Dollars -- /100 ($13,926)
Payment made upon completion and acceptance of project by owner's
representative and in reasonable time of owner's monthly pay schedule.
All material is guaranteed to be as specified. All work to be completed in
workmanlike manner according to standard practices. Any alteration or
deviation from above specification involving extra costs will be executed
only upon written orders, and will become extra charge over and above the
estimate. All agreements contingent upon strikes, accidents or delays beyond
our control. Owner to carry Fire, Tornado and other necessary insurance.
Contractor to carry general liability insurance . • d workers to be fully covered
by workman's compensation
Authorized Signature:
Charles Porter, Porter Austin Inc.
Page 2
Acceptance of proposal and agreement - The above prices, specifications and
conditions are satisfactory and are hereby accepted. You are authorized to
do the work as specified. Payment will be made as outlined above.
Date of Acceptance:
Signature:
7 -2 -97
CHARLES EPPER,
Mayor City of Round Rock, Texas
05/02/1997 14:36 .512- 759 -1447
AWAPIAN PREMIUM
GRANULE SURFACED
TYPE 111 OR TYPE IV ASPHALT
TAMKO BASE
PLY SHEET
INSULATION
Posedur dtainase up to 3 tn. per 0neat ft.
Material Per
Requirements 100 Sq. Ft.
T'IMKO GLASCBASE, TAM•GLASS PREMIUM. or TAM•PLY IV
Elbe trio Sheet 1 Ply
F F nr,
AWAPLAN Beat Welding Grade
(Granule Surfaced)
Asphalt
Ply
Ahroz.5316.
Deck: The deck should conform toTAMKO general requirement (See Section 4.0
Ioauladon: the insulation shall be installed uw rdiug to the manufacturer's spoofs
rayon in the thickness reouired. The insulation should a to TAMKO
reoulrements Polyiaocyanurate insulation must have an ovrray el a muumuu, 1/2
in. caverboard insulation or ate Specification 105 Expanded polystyrene or pheno-
lic 'mutation must have an overlay ors minimum 1/3 in fiberboard. p.•rlps.arfiber-
glass roof insulation, (See section 6.0)
Aaphalt: The asphalt shall be certified by the mar ufa turcr w meet ASrM (,41
84,1yp0111 for slope up to I/4 in. and Type TV for slogan Mt to 3 m. (•ts
Section 12.0)
•
RASE Fly: Staring of the low point .d the roof. install one layer of TAh1K(t
GLASS EASE TAM -GLASS PREMIUM or TAM -PLY IV. side lapped 2 in. and .rod
hppcd 4 90. Apply at a right angle to the slope of the roof, Solid pup to the ins,,la•
licnwith approximately ' - 31bs. (t 1318 of sonif •ati4n fript d( per IRty, ft.
AWAPIAN PREMIUM: Starting at due low ppillt of the m4.1001011001' layer of
TAMKO AWAPLAN PREMIUM granule surfaced *heel, side lapped 4 M. and end
lapped 6 in. The AWAPIAN PREMIUM should be solidly adhered to the base ply
(pnnsed into the hot asphalt) with approaimately 301bs. (2 (IK) of Stn dicatinn
asphalt per 100 aq n. The asphalt should be above 400.1 at the point of apuio'arion
and (pop not mare than 4 ft. in front of the roll.
AWAPLAN Heat Welding Starting at the low point alike roof. install 1 ply nl
TAMKO welding grade AWAPIAN side lapped a in and cod lapped b in The
AWAPIAN should be solidly adhered to the base ply by heatmglhe back•aide with
a torch at the juncture of the base ply and the AWAPIAN roll tof0ciendy to from a
brad of melted asphalt as the AWAPLAN is rolled out.
Flesh'etgt 1110 flashing ma(erU( must be granule surfaced TAMKO AWAPLAN
PPe?OUM AWAPIAN 170011 VERSA-FLASK 160. (See xerwn 294)
Far slopas abuse 3/4' per lineal h.. fastening of the AWAPIAN PREMIUM ,6
•12 )0011.1 800 8001)00 10.0)
PORTER AUSTIN INC
INSULATED DECKS
Specification
102 HW AWAPLAN Naet WeMAinj
AWAPIAN PREMIUM
GRANULE SURFACED
PAGE 03
07600/TAM
BuyIJne 3120
TYPE III OR TYPE IV ASPHALT
TAMKO FIBERGLASS
FLYSHEETS
Slope
Poaiim drainage up to 31s trr (meal R •
Material Per
Re uiremente 100 Sq. R.
'? U TAM•G1.�SS PREMIUM or TAM•PLY IV
Fberalrns Fly Sheet 2 9)101
PAM Kt) AWAltA7VPREMIDM2 r
AWAPIAN Heat Welding Grade
ranule surfaced) 1 fly
.4aphNl Ap�7610.
Deck: lye deck should conform lo TAM 40 general rcauifements.(See Sec0on 4.0)
Inn st:Won: The insulation shall be installed areordutg to the manufactures specifi-
cation )a the thickness moulted. The insulation should conform to TAME('
requirements. Pnlyisocyanuraie Insulation must have an overlay of u minimum 1/2
In enverboard insulation or ace Specifva:ion 105. Expanded polystyrene or phenolic
insulation 01001 have an overlay of a nue,mum 1/2 in• fiberboard. perllte. or 6brr-
gla•s roof inaulalian. (Set section 5.0)
Asphalt:'11tr oophalt shall be certified by the manufacturer m meet Ati fM D.31204,
ly's,, III for damson to 1/4 In. and Type IV for slopes op to 3 m. (See section 12 0)
Fibellassa Ply Sheet-2 Ply Installation:Over the Insulation. Ironalt 2 plies of
TAM-GLASS PREMIUM or TAM-PLY TV in aped0c0uon siphon. Starting from the
Ina faint of the roof, apply an lain. width. then • full 36 io . and follow Wahl m.
width% ahutgk' fashion. lapping sac, pb :9 in , in such • manner so that at least 2
plies 0000r the mmuWtan al any ogre pmt. Approximately 23 lb; (x 156) of speci0ca-
non asphalt per 100 sq. R . should be used to embed rash ply.
AWAPLAN PREMIUM: Storting at the low print of the root Install our layer of
TAMKO AWAPIAN PREMIUM granola. outfaced sheet. side lapped 4 M. and end
lopped ti )n. The AWAP1Af' PREMIUM should be solidly adhered to the base ply
(pressed int51110 1101 asphalt) with appmxima(ely 30 lb. (t 154) of apR••
asphalt per 100 so h The o,nhnll should be above 400'F m the pclm of appbeadon
and mop nut more than 4 0. in front of the roll.
AWAPLAN Heat Welding: Starting at the low point of We roof. inst 1 ply of
TAMKO wetdtng grade AWAPIAN side lapped 4 in and rnd lapped 6 in. The
AWAPIAN should be solidly adhered to the base ply by heating the bock side with a
torch at the junction Mille base plies and the AWAPLAN ro11 sufficiently to soon a
bead of melted asphalt as the AWAPLAN is rolled nut.
Finahinip The flashing material must be granule surfaced TAMED AWAPLAN
PREMIUM. AWAPIAN 170 or VERSA -Fl ASH 100. (See Section 22.0)
• Fur slopes above 3 /0 per lineal n . fastening of the AWAPIAN PREMIUM is
required. (See Section 1001
11
DATE: June 23, 1997
SUBJECT: City Council Meeting, June 26, 1997
ITEM: 10B. Consider a resolution authorizing the Mayor to execute an agreement
with Porter Austin, Inc. for the re- roofing the old Public Works Building
& Fire Station No. 2 at South Blair.
STAFF RESOURCE PERSON: Jim Nuse
STAFF RECOMMENDATION:
MEMORANDUM
DATE: June 10, 1997
TO: Jim Nuse, Director of Public Works
FROM: Larry Madsen, Public Works Construction Manager
We have received three quotes for roof replacement for the City Building at 300
South Blair Street. The quotes are as listed:
*Vanstar Roofing Systems Inc. Austin, Texas .... $25,000
*MRI Talon Building Services Georgetown, Texas .... $19,285
*Porter Austin, Inc. Hutto, Texas .... $13,926
I have checked references for Charles Porter owner of Porter Austin, Inc. as well as
examined work they have done and recommend we select them to do this project.
The roof is leaking in the shop area, parts department area, waterline maintenance
area, as well as over the fire department and is beyond patching and repairing. If
this work is not scheduled soon I am concemed for future damage that will be
beyond the cost of these quotes as well as damage to property within the buildings.
A copy of the attached agreement and specifications are included.