R-97-08-28-10B - 8/28/1997a contract ( "Contract ") with Craig, Sheffield & Austin for the
Water Treatment Plant Expansion, Phase III, and
WHEREAS, it has been determined that it is necessary to
change said Contract in accordance with the attached Contract
Change Order No. 4, Now Therefore
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK,
TEXAS,
That the Mayor is hereby authorized and directed to execute on
behalf of the City Contract Change Order No. 4 to the Contract with
Craig, Sheffield & Austin for the Water Treatment Plant Expansion,
Phase III.
RESOLVED this 28th day of August, 997.
ATTEST:
f \
WHEREAS, the City of Round Rock has previously entered into
LAND, City Secretary
R:\ WPDOC S \RRSOLUTI \RS70B28g.RPD /scg
RESOLUTION NO. R- 97- 08- 28 -1OB
/
CHARLES C PD•FER, Mayor
City of Round Rock, Texas
d¢-" ; CITY OF ROUND ROCK
e �4m Date:
1� ra )74 Sheet:
r ' CONTRACT CHANGE ORDER NO.: 4
ADDED
TIME
DAYS
1 of 1
Contract: WATER TREATMENT PLANT EXPANSION, PHASE III
Owner: City of Round Rock, 221 East Main Street, Round Rock, Texas 78664
TO: CRAIG, SHEFFIELD & AUSTIN
(Contractor)
You are hereby requested to comply with the following
and Specifications:
changes from the Contract
Plans
Increase
$2,226.00
314,303.00
37,535.00
Description of Changes
(Supplemental Platy and Specification Anecked)
1)Add condhllANlre for pump status on sump areas(cp25)
2)Replace bearings on floccubtcr drives with proper sea(s(cp29)
3)Add drain line to capture tap samples from clanflers(cp34)
Dcacssc
JUSTIFICATION:
The above items are improvements determined during the course of
construction. No time extensions associated with these additions /changes.
ORIGINAL CONTRACT AMT: Dollars ($ $10,116,000.00
)
)
)
)
)
THIS CHANGE ORDER (C.O.) A .ff.: Dollars ($ $24,064.00
PREVIOUS CHANGE ORDER AMT: Dollars ($ $34,177.00
CHANGE ORDERS TO -DATE AMT: Dollars ($ $58,241.00
ORIGINAL CONTRACT PLUS C.O.S Dollars ($
510,174,241.00
0.57
TOTAL PERCENT CHANGE PERCENT %:
This document will bio , e a supplement to the contract and all provisions will apply hereto:
IS 3. .1-4, '6. q'. 11'1
CD
Data
0-5-11
�., /_ .. i
e, A / Contractor Date
•
Clty of Round ' +. " Owner Date '
f
DATE: August 22,1997
SUBJECT: City Council Meeting - August 28,1997
ITEM: 10.B. Consider a resolution authorizing the Mayor to execute
Change Order No. 4 for the Water Treatment Plant.
STAFF RESOURCE PERSON: Jim Nuse
STAFF RECOMMENDATION:
Change Order No. 4 to the water treatment plant cover the following items for
$24,064:
1. Add conduit /wire for pump status on sump areas (cp 25)
2. Replace bearings on flocculator drives with proper seals (cp 29)
3. Add drain line capture tap samples from clarifiers (cp 34)
If approved, the total change orders total $58,241 which is 0.57% of the contract
amount.