Loading...
R-97-09-25-13O - 9/25/1997a contract ( "Contract ") with Bay Maintenance Co., Inc. For the Mesa Ridge Channel Improvements, and WHEREAS, it has been determined that it is necessary to change said Contract in accordance with the attached Contract Change Order No. 2, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Contract Change Order No. 2 to the Contract with Bay Maintenance Co., Inc. For the Mesa Ridge Channel Improvements. RESOLVED this 25th day of September, 1997. ATTEST: WHEREAS, the City of Round Rock has previously entered into K: \WPDOCS \RESOLVfI \KS7D9250. WPO /Beg RESOLUTION NO. R- 97- 09- 25430 City Secretary CHARLES CtTLPPER, Mayor City of Round Rock, Texas Baker- Aicklen & Associates, Inc. Consulting Engineers CONTRACT CHANGE ORDER NO. 2 Contract For: Mesa Ridge Channel Improvements Owner: City of Round Rock Contractor: Bay Maintenance, P.O. Box 5589, Horseshoe Bay, TX 78657 You are hereby requested to comply with the following changes from the contract plans and specifications: DECREASE INCREASE Description of Changes Contract Price Contract Price 1) Retaining Wall (8.0 CY) at the Upstream end of the project $ $ 4,600.00 2) Galvanized Steel Handrail (80 FT) including cold galvanized paint at the welds and the entire handrail painted silver $ $ 2,400.00 3) Rip -Rap (2 CY) at the Downstream end of the project $ $ 600.00 4) Headwall for Existing 36" RCP (1) $ $ 2,100.00 5) 7 foot pilot channel from 36" RCP to proposed channel $ $ 200.00 Net Changes in Contract Price $ $ 9,900.00 Justification: Side slopes are too steep, erosion protection and pedestrian safety The amount of the Contract before this Change Order is Thirty Six Thousand, Two Hundred Thirty Two and 20 /100 Dollars $ 36,232.20 The Amount of the Contract will DECREASE/INCREASE by the sum of Nine Thousand Nine Hundred and 00 /100 Dollars The Contract Time will be extended 10 more days. This document will become a supplement to the Contract and all provisions will apply hereto . see aL D 1)-wX 6� erices - U� gl(119' Date: 8/12/97 Sheet No. 1 of 2 Job No. 601 - 540 -12 $ 9 900.00 The CONTRACT TOTAL including this Change Order will be Forty Six Thousand, One Hundred Thirty Two and 20/100 Dollars $ 46,132.20 Baker - Aicklen & Associates, Inc. Consulting Engineers Bay Maintenance, (Contractor) Baker- ' City of Round bock, (Owner) & Associates, Inc., (Engineer) CONTRACT CHANGE ORDER NO. 2 Date 7 Date Date Date: 8/12/97 Sheet No. 2 of 2 Job No. 601 - 540 -12 Baker - Aicklen & Associates attn: Mr. Garret Tuttle, P.E. 203 E. Main St, Ste 201 Round Rock, Tx 78664 Mr. Tuttle, Sincerely, V ( Valentin J. Gomez, Jr. Vice - president CU MAINTENANCE COMPANY, INC. GENERAL CONTRACTOR HORSESHOE BAY BOX 8859 HORSESHOE BAY, TEXAS 78657 (210) 598 -2535 Fax (210) 598 - ^ 06 September 12, 1997 Re: City of Round Rock Mesa Ridge Channel Improvements C.O. #2 Below is the pricing for Change Order No. 2; Retaining Wall 8 cy @ $575.00 /cy = $ 4600.00 Hand Rail 60 if @ 40.00 /lf = 2400.00 Riprap (DS end) 2 cy @ 300.00 /cy = 600.00 36" Headwall 1 ea @ 2100.00 /ea = 2100.00 7' Channel 80 sf @ 2.50 /sf = 200.00 Total Change Order No. 2 $ 9,900.00 Please let me know as soon as possible if you would like to pursue this so we can continue with the work. Please add 10 days to the contract time with this Change Order No. 2. If you have any questions, please don't hesitate to call me. DATE: September 17, 1997 SUBJECT: City Council Meeting, September 25, 1997 ITEM: 130. Consider a resolution authorizing the Mayor to execute Change Order No. 2 with Bay Maintenance for the Mesa Ridge Channel Improvements. STAFF RESOURCE PERSON: Jim Nuse STAFF RECOMMENDATION: This change order will provide for additional concrete work that is necessary where the channel side slopes are greater than planned because of physical constraints. Also, it will provide safety handrail at three locations. Staff recommends approval. �y /i /li Mayor Charles Culpepper Mayor Pro -tem Earl Palmer Coamil Members Robert Stluka Rod Morgan Rick Stewart Martha Chorea Awry Joseph m Manager RobertL Bennet It Uty Attorney StephanL Sheets CITY OF ROUND ROCK October 1, 1997 Valentin J. Gomez, Jr. Vice - President Bay Maintenance Company, Inc. Horseshoe Bay Box 8859 Horseshoe Bay, TX 78657 Dear Mr. Gomez: 221 East Main Street Round Rock, Texas 78664 512 -218 -5400 The Round Rock City Council approved Resolution No. R- 97 -09 -25 -130 at their regularly scheduled meeting on September 25,1997. Enclosed is a copy of the resolution and an original Contract Change Order No. 2 for your files. If you have any questions, please do not hesitate to call. Sincerely, Joanne Land Assistant City Manager/ City Secretary Enclosure(s) Fax 512-218-7097 1- 800 - 735 -2989 MD 1- 800. 735 -2988 Voice Mayor Charles Culpepper Mayor Pro Earl Palmer Connell Members Robert Stluka Rod Morgan Rick Stewart Martha Chavez !balmy Joseph aty Merger Robert L Bennett. Jr. City Attorney Stephan L. Sheets CITY OF ROUND ROCK October 1, 1997 Garret Tuttle, P.E. Baker - Aicklen & Associates, Inc. 203 East Main Street Suite 201 Round Rock, TX 78664 Dear Mr. Tuttle: The Round Rock City Council approved Resolution No. R- 97 -09 -25 -130 at their regularly scheduled meeting on September 25, 1997. Enclosed is a copy of the resolution and an original Contract Change Order No. 2 for your files. If you have any questions, please do not hesitate to call. Sincerely, Joanne Land Assistant City Manager/ City Secretary Enclosure(s) Fax: 512 -218 -7097 1- 800.735.2989 TDD - 1- 800735- 2988'bice 221 East Main Street Round Rock, Texas 78664 512 -218 -5400