Loading...
R-97-09-25-13T - 9/25/1997BAKER- AICKLEN S. ASSOCIATES, INC. Consulting Engineers September 18, 1997 Mr. David Price, P.E. NBS Construction Co., Inc. Drawer P Manor, TX. 78653 Re: Dove Creek Street Reconstruction - Change Order #1 Dear Mr. Price, Please find enclosed four (4) copies of Change Order No. 1 for the Dove Creek Street Reconstruction project. This change order will adjust the bid items to reflect the additional driveway reconstruction back beyond the ROW so that the driveways do not have slopes exceeding 10 %. Please execute all four copies, keep one copy for your files and return three executed copies to our office for further processing. Should you have any questions, please advise. Sincerely, Garrett J. Tuttle, P.E. Enclosures file: 601 - 533 -32 cc: Mr. Al Wille, P.E., R.P.L.S. 203 E. Main St.. Suite 201 • Round Rock, Texas 78664 • 512/244 -9620 • FAX 512/244-9623 WHEREAS, the City of Round Rock has previously entered into a contract ( "Contract ") with NBS Construction, Inc. for driveway improvements associated with the Dove Creek Street Improvements project, and WHEREAS, it has been determined that it is necessary to change said Contract in accordance with the attached Contract Change Order No. 1, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Contract Change Order No. 1 to the Contract with NBS Construction, Inc. for driveway improvements associated with the Dove Creek Street Improvements project. RESOLVED this 25th day of September„ 1997. ATTEST: E LAND, City Secretary K:\ WPOOCS \RBSOLUTI \R$709 25T.WPO /acg RESOLUTION NO. R- 97- 09- 25 -13T CHARLES CULP ER, Mayor City of Round Rock, Texas Baker- Aicklen & Associates, Inc. Consulting Engineers Contract For: Dove Creek Street Reconstruction Owner: City of Round Rock Description of Changes CONTRACT CHANGE ORDER NO. 1 Contractor: NBS Construction, Inc. Drawer P, Manor, TX 78653 Date: 9/18/97 Sheet No. 1 of 2 Job No. 601-533-32 You are hereby requested to comply with the following changes from the contract plans and specifications: DECREASE INCREASE Contract Price Contract Price I) Sawcut 23 Driveways @ $54.00/Driveway $ $ 1,242.00 2) Expansion Joint (23 w/ dowels @ROW) @ $19.00/Driveway $ $ 437.00 3) Remove Concrete driveways @ $1.80 /SF $ $ 3,726.00 (Avg. Driveway (23) = 18' wide by 5' beyond ROW = 90 SF) 4) Excavate and Grade from back of sidewalk to tie -in @ 1.40 /SF $ $ 5,506.20 (Avg. Driveway (23) = 18' wide by 9.5' = 171 SF) 5) Standard Concrete Driveway Approach @ $3.00 /SF $ $ 6,210.00 (Avg. Driveway (23) = 18' wide by 5' beyond ROW = 90 SF) Net Changes in Contract Price $ $ 17,121.20 Justification: To keep driveway slopes Tess than 10% The amount of the Contract before this Change Order is Five Hundred Forty Five Thousand, Seven Hundred Eight and 85/100 Dollars $ 545,708.85 The Amount of the Contract will DECREASE/INCREASE by the sum of Seventeen Thousand, One Hundred Twenty One and 20/100 Dollars $ 17,121.20 The CONTRACT TOTAL including this Change Order will be Five Hundred Sixty Two Thousand, Eight Hundred Thirty and 05/100 Dollars $ 562 830.05 The Contract Time will be unchanged. This document will become a supplement to the Contract and all provisions will apply hereto. Baker - Aicklen & Associates, Inc. Consulting Engineers NBS Construction, Inc., (Contractor) CONTRACT CHANGE ORDER NO. 1 Date 2' /Oh? Baker -mac - T Associates, Inc., (Engineer) Date City of Round Iro er) Date Date: 9/18/97 Sheet No. 2 of 2 Job No. 601-533-32 DATE: September 17, 1997 SUBJECT: City Council Meeting, September 25, 1997 ITEM: 13T. Consider a resolution authorizing the Mayor to execute Change Order No. 1 with NBS Construction, Inc. for driveway improvements associated with the Dove Creek Street Improvements Project. STAFF RESOURCE PERSON: Jim Nuse STAFF RECOMMENDATION: MEMORANDUM DATE: September 18, 1997 TO: Jim Nuse FROM: Larry Madsen Al Wille and myself reviewed a change order request from NBS Construction for the Dove Creek Project in the amount of $17,121.20. This request is to remove and replace portions of concrete driveways behind the city right -of -way. This is needed to maintain a ten percent slope in driveways so that they are not to steep for vehicles to enter. Changes in grades to the original street elevations for proper drainage resulted in this need to adjust driveway slopes. Baker - Aicklen & Associates, Inc., the consulting engineers have provided the change order request #1 ($17,121.20) and I recommend approval of this request.