Loading...
R-97-11-13-10H - 11/13/1997CDM Camp Dresser & McKee Inc. consulting engineering construction operations Westech 360 8911 Capital of Texas Highway, Suite 4240 Austin, Texas 78759 Tel: 512 345 -6651 Fax: 512 345 -1483 November 6, 1997 Mr. Steve Miller Public Works Department City of Round Rock 2008 Enterprise Drive Round Rock, TX 78664 RE: City of Round Rock Water Treatment Plant Disinfection Basin Dear Mr. Miller: Transmitted with this letter are two originals of Amendment No. 4 to our professional services agreement. Amendment No. 4 is for the design of the 300,000 Gallon Combined Filtered Water Disinfection Basin and associated yard piping, chlorinator and ammoniator improvements and electrical improvements. The total professional services fee for Amendment No. 4 is $40,000. If you have any questions regarding the disinfection basin, or Amendment No. 4, please call. Sincerely, CAMP DRESSER & MCKEE I C. Allen D. Woelke, P.E. Associate xc: Greg Swoboda Danny Shannon ENCLOSURES N2358N04.LTR Mayor Charles Culpepper Mayor Pro -tem Earl Palmer Coundl Members Robert Stluka Rod Morgan Rick Stewart Marsha Chavez Jimmy Joseph City Manager Robert L Bennett, Jr. City Attorney Stephan L Sheets CITY OF ROUND ROCK November 18, 1997 Mr. Allen D. Woelke, P.E. Associate Camp Dresser & McKee Inc. Westech 360 8911 Capital of Texas Highway Suite 4240 Austin, TX 78759 Dear Mr. Woelke: 221 East Main Street Round Rock, Texas 78664 512-218-5400 The Round Rock City Council approved Resolution No. R- 97- 11- 13 -10H at their regularly scheduled meeting on November 13, 1997. Enclosed is a copy of the resolution and an original Engineering Services Agreement Amendment No. 4 for your files. If you have any questions, please do not hesitate to call, Sincerely, Joanne Land - Assistant City Manager/ City Secretary Enclosure(s) Fax: 512-218-7097 4 44.0(- 1- 800- 735 -2989 TDD 1-800-735-2988 Voice R:\ HPDOCS \RRSOLHTI \RS]1113H.HPD /SCS RESOLUTION NO. R- 97- 11- 13 -10H WHEREAS, the City of Round Rock, on July 13, 1995, entered into an agreement ( "Agreement ") with Camp Dresser & McKee Inc. for engineering services for the Water Treatment Plant Expansion, and WHEREAS, Camp Dresser & McKee Inc. has submitted Amendment No. 4 to the Agreement to increase the scope of the project, as more particularly described in the attached Amendment No. 4, and WHEREAS, the City Council desires to enter into said Amendment No. 4 to the Agreement with Camp Dresser & McKee Inc., Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Amendment No. 4 to the Agreement with Camp Dresser & McKee Inc., to increase the scope of the project, as more particularly described in the attached Amendment No. 4. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended, and the Act. ATTEST: RESOLVED this 13th day of November, /1997. LAND, City Secretary 2 CHARLES CULPtPPLR, Mayor City of Round Rock, Texas Amend the Agreement for Engineering Services dated July 13, 1995 between City of Round Rock, Texas ( "Owner ") and Camp Dresser & McKee Inc. ( "Engineer ") as follows. 1. Section II - Character and Extent of Service Paragraph B - Design Phase Subparagraph II, add the following language: 300,000 Gallon Combined Filtered Water Disinfection Basin. r. Yard Piping Modifications to Accommodate the Disinfection Basin. s. Chlorine and Ammonia Feed Modifications to Accommodate the Disinfection Basin." 2. Section VI - The Engineer's Compensation Paragraph A - Basic Services Revise Design Phase II budget from "$608,000" to "640,000 ". Revise Construction Phase budget from "$126,200" to "$134,200 ". Revise the Total Budget from "$933,200" to "$973,200 ". EXECUTED in two counterparts (each of which is an original) on behalf of the Engineer by its Associate shown below, an on behalf of the Owner by its Mayor (thereunto duly authorized) this the l' day of /,..1997. OWNER: CITY OF ROUND ROCK ENGINEERING SERVICES AGREEMENT AMENDMENT NO. 4 ne Land, City Secretary Charles Culpepper, ayor ENGINEER: CAMP DRESSER & McKEE INC. Allen D. Woelke, Associate A2956AMD.N04 Greg T. Swoboda DATE: November 3, 1997 SUBJECT: City Council Meeting, November 13, 1997 ITEM: 10H. Consider a resolution authorizing the Mayor to execute Amendment No. 4 to the engineering contract with Camp Dresser McKee contract for the Water Treatment Plant. STAFF RESOURCE PERSON: Jim Nuse STAFF RECOMMENDATION: The new water treatment facility was designed to accommodate changes in treatment processes for future Federal rules and regulations as mandated under the Safe Drinking Water Act, SDWA. The water treatment plant was brought on -line this summer and operational data indicates that levels of Total Trihalomethanes (TTHMs) can be exceeded under certain plant process situations. Further tests conducted by city staff indicates a need for a chlorine contact basin to ensure accurate dosage of ammonia for production of chloramines. This problem was anticipated in the design by constructing piping stub -outs in the finish water line immediately after the treatment structure. These stub -outs will help facilitate the construction of the contact basin. Additionally, the basin will provide increased finish water storage. City staff recommends amending the engineering contract and assigning the construction to the existing contractor.