R-97-11-25-10G - 11/25/1997a contract ( "Contract ") with Viking Construction Co. for the 1997 Street Maintenance /Micro Surfacing Program, Phase 1„ and WHEREAS, it has been determined that it is necessary to change said Contract in accordance with the attached Contract Change Order No. 1, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Contract Change Order No. 1 to the Contract with Viking Construction, Co. for the 1997 Street Maintenance /Micro Surfacing Program, Phase 1. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended, and the Act. RESOLVED this 25th day of November, 1997. ATTEST: WHEREAS, the City of Round Rock has previously entered into LAND, City Secretary K: \WPDOCS \AESOLUTI \ASJ1125G.WPD /, g RESOLUTION NO. R- 97- 11- 25 -10G CHARLES CUTGPEPPER, Mayor City of Round Rock, Texas ITEM # DESCRIPTION OF CHANGES UNIT QTY. UNIT PRICE ADDED AMOUNT DAYS CALENDARI WORKING INCREASE THE FOLLOWING BID ITEMS 2 Pavement Repair ,complete in place, per Square Yard; S.Y. 564 525.00 $41,100.00 2 NEW 2/a Pavement Repair ( RECYCLED) complete in place,per Square Yard; S.Y. 559 $22.00 512,298.00 2 3 HMAC ,type D, Level - ups, complete in place, per ton TON 53.4 $165.00 $9,145.95 2 4 Remove and Replace concrete curb and gutter complete in place OF 1300 $24.00 $31,200.00 2 5 Remove and Replace concrete S.F. 5174 $6.75 $34,924.00 2 Driveway complete in place TOTAL: $128,667.95 10 CITY OF ROUND ROCK CONSTRUCTION CHANGE ORDER PAGE 1 OF DEPARTMENT: Public Works DATE: 11 -17 -97 PROJECT: Street Maintenance Program CHANGE ORDER NO: 1 Micro - Surfacing -1997 JUSTIFICATION: ORIGINAL CONTRACT PRICE: PREVIOUS CHANGE ORDERS: THIS CHANGE ORDER: CHANGE ORDERS TO DATE: $519,183.50 $0.00 $128,667.95 $128,667.95 CHANGE DATA PREPARED BY: Todd Keltgen Operations Manager DATE VIKING CONSTRUCTION Co. CONTRACTOR TITLE: APPROVED This was due to the large amount of waterline repairs in the program area These streets needed to be repaired to complete the maintenance program. 11/17/97 PERCENT OF ORIGINAL CONTRACT PRICE THIS CHANGE ORDER: 24.7% PREVIOUS CHANGE ORDER: 0% TOTAL % CHANGE: 24.7% ORIGINAL CONTRACT PRICE PLUS CHANGE ORDERS: $647,851.45 BY: / CITY • F 0 jr D ROCK constco2/formseJlk DATE: November 18, 1997 SUBJECT: City Council Meeting, November 25, 1997 ITEM: 10G. Consider a resolution authorizing the Mayor to execute Change Order No. 1 with Viking Construction, Inc. for the Street Maintenance Program Phase 1 / Micro Surfacing 1997 STAFF RESOURCE PERSON: Jim Nuse STAFF RECOMMENDATION: DATE: November 18, 1997 TO: James R. Nuse, P.E. Director of Public Works FROM: Todd Keltgen P. W. Operations Manager RE: 1997 Street Maintenance Program Change Order Due to the increased amount of waterline repairs in the program area, these street repairs needed to be fixed before the program could continue. There is also a new item, 2a, this item was for the ground water infiltration into the sub -grade of Strafford Drive. This process was discussed with the City Engineer and was used to prevent this from reoccurring. Staff recommends approval. MEMORANDUM