Loading...
R-97-12-18-10B - 12/18/1997Mayor Charles Culpepper Mayor Pro -tem Earl Palmer Coundl Members Robert Stluka Rod Morgan Rick Stewart Martha Chavez Jimmy Joseph City Manager Robert L Bennett, Jr. City Attorney Stephan L Sheets CITY OF ROUND ROCK December 30, 1997 Mr. Garrett J. Tuttle, P.E. Baker- Aicklen & Associates, Inc. 203 East Main Street Suite 201 Round Rock, TX 78664 Dear Mr. Tuttle: Sincerely, Enclosure(s) Fax: 512 -21B -7097 Joanne Land Assistant City Manager/ City Secretary 1-800-735-2989 TDD 1-800-735-2988 Voice 221 East Main Street Round Rock, Texas 78664 512- 218 -5400 The Round Rock City Council approved Resolution No. R- 97- 12- 18 -10B at their regularly scheduled meeting on December 18, 1997. Enclosed is a copy of the resolution and an original Contract Change Order No 2 for your files. If you have any questions, please do not hesitate to call. a contract ( "Contract ") with NBS Construction, Inc. for the Dove Creek Street Improvements project, and WHEREAS, it has been determined that it is necessary to change said Contract in accordance with the attached Contract Change Order No. 2, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Contract Change Order No. 2 to the Contract with NBS Construction, Inc. for the Dove Creek Street Improvements project. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended, and the Act. RESOLVED this 18th day of Decembex, 1997. ATTEST: WHEREAS, the City of Round Rock has previously entered into E LAND, City Secretary R:\ WPOOCS \RRSOLUTI \RS711188.WPO /ecg RESOLUTION NO. R- 97- 12- 18 -10B CHARLES �P�R, Mayor City of Round Rock, Texas Baker- Aicklen & Associates, Inc. Consulting Engineers Contract For Dove Creek Street Reconstruction Owner: City of Round Rock Description of Changes Justification: To keep driveway slopes less than 10 %. CONTRACT CHANGE ORDER NO. 2 Contractor: NBS Construction Inc. Drawer P Manor, TX 78653 Date: 12/5/97 Sheet No. 1 of 2 Job No. 601 - 533 -32 You are hereby requested to comply with the following changes from the contract plans and specifications: DECREASE INCREASE Contract Price Contract Price 1) Sawcut 40 Driveways @ $54.00/Driveway $ $ 2,160.00 2) Expansion Joint (40 w/ dowels @ ROW) @ $19.00 /Driveway $ $ 760.00 3) Remove 7,786 SF of Concrete Driveways @ $1.80 /SF $ $ 14,014.00 4) Excavate and Grade 11,670 SF from Back of Sidewalk $ $ 16,338.00 to Tie -in @ 1.40 /SF 5) Add 7,786 SF of Standard Concrete Driveway Approach $ $ 23,358.00 @ $3.00 /SF Credit the Amount Approved for Change Order #1 $ 17,121.20 $ 17,121.20 $ 56,630.00 Net Changes in Contract Price $ $ 39,508.80 Baker - Aicklen & Associates, Inc. Consulting Engineers CONTRACT CHANGE ORDER NO. 2 Date: 12/5/97 Sheet No. 2 of 2 Job No. 601 - 533 -32 The amount of the Contract before this Change Order is Five Hundred Sixty Two Thousand, Eight Hundred Thirty and 05 /100 Dollars $ 562,830.05 The Amount of the Contract will DECREASE /INCREASE by the sum of Fifty Three Thousand, Five Hundred Eight and 80/100 Dollars $ 39,508.80 The CONTRACT TOTAL including this Change Order will be Six Hundred Two Thousand, Three Hundred Thirty Eight and 85/100 Dollars $ 602,338.85 The Contract Completion Date has been extended by 28 calendar days to reflect 17 days for Change Order #1 and 11 days for Change Order #2. This revises the contract completion date from October 1, 1997 to October 29, 1997. This document will become a supplement to the Contract and all provisions will apply hereto. -\\ NBS Construction, Inc., (Contractor) Baker Aickle& Associates, Inc., (Engineer) Date RAKER - AICKLEN 6 ASSOCIATES, INC. ��:•� Consulting Engineers ginee r5 December 5, 1997 Mr. David Price, P.E. NBS Construction Co., Inc. Drawer P Manor, TX. 78653 Re: Dove Creek Street Reconstruction - Change Order #2 Dear Mr, Price, Please find enclosed four (4) copies of Change Order No. 2 for the Dove Creek Street Reconstruction project. This change order will adjust the bid items to reflect the additional driveway reconstruction (in addition to Change Order #l) back beyond the ROW so that the driveways do not have slopes exceeding 10 %. It also includes a contract time extension total of 28 days for the driveway work. Please execute all four copies, keep one copy for your files and return three executed copies to our office for further processing. Should you have any questions, please advise. Sincerely, Garrett J. Tuttle, P.E Enclosures file: 601 - 533 -32 cc: Mr. Al Wille, P.E., R.P.L.S. Mr. Larry Madsen, Construction Manager 203 E. Main St., Site 201 • Round Rock. Texas 79664 • 512/244 -9620 • FAX 512/244 -9623 DATE: December 10, 1997 SUBJECT: City Council Meeting, December 18, 1997 STAFF RESOURCE PERSON: Jim Nuse STAFF RECOMMENDATION: ITEM: 10B. Consider a resolution authorizing the Mayor to execute Change Order No. 2 with NBS Construction for the Dove Creek Street Improvements Project. This change order provides for the additional work involved in constructing the driveway approaches within the street right -of -way and the driveways on private property so an acceptable and workable driveway grade is achieved in the areas where it was necessary to lower the reconstructed street elevations to provide proper drainage. Staff recommends approval.