Loading...
R-98-01-22-10E - 1/22/1998Mayor Charles Culpepper Mayor Pro -tem Earl Palmer Coundl Members Robert Stluka Rod Morgan Rick Stewart Martha Chavez Jimmy Joseph City Manager Robert Bennett, Jr. City Attorney Stephan L Sheers CITY OF ROUND ROCK January 27, 1998 NBS Construction, Inc. Drawer P Manor, TX 78653 To Whom It May Concern: 221 East Main Street Round Rock, Texas 78664 512- 218 -5400 The Round Rock City Council approved Resolution No. R- 98- 01- 22 -10E at their regularly scheduled meeting on January 22, 1998. Enclosed is a copy of the resolution and an original Contract Change Order No. 3 for your files, If you have any questions, please do not hesitate to call. Sincerely, Joanne Land Assistant City Manager/ City Secretary Enclosure(s) Fax; 512.218 -7097 1- 800 - 735 -2989 TDD 1 -800 -735 -2988 Voice TEXAS, ATTEST NE LAND, City Secretary K.\ WPDOC S \RESOLUTI \R88012]6.WPD /ecg RESOLUTION NO R- 98 -01- X 22 -1DE WHEREAS, the City of Round Rock_ has previously entered into a contract , "Contract" with NBS Construction, Inc. tor •he Dove Creek Street Improvements project, and. WHEREAS, it has been determined that it is necessary to change said Contract in accordance with the attached Contract Change , Order No. 3, Nbw Therefore BE IT RESOLVED BY THE, COUNCIL OF THE CITY OF ROUND ROCK. That the Mayor is hereby authorized and directed to execute on behalf of the City Contract Change Order No. 3 to the Contract with NBS Construction, Inc. for the Dove Creek Street Improvements project. The City Council hereby finds and declares that written notice of the -date, hour, place and snbect of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted. upon, all as required by the Open Meetings Act_, Chapter 551, Texas Government Code, as amended, and the .Act, RESOLVED this 22nd day of January, 1 1.998, CHARLES CUL R, Mayor City of Round Rock, Texas Baker - Aicklen & Associates, Inc. Consulting Engineers CONTRACT CHANGE ORDER NO. 3 Contract For: Dove Creek Street Reconstruction Owner: City of Round Rock Contractor: NBS Construction Inc_ Drawer P, Manor, TX 78653 You are hereby requested to comply with the following changes from the contract plans and specifications: Description of Changes 1) Sawcut 38 Driveways @ $54.00/Driveway Date 12/23/97 Sheet No_ 1 of 2 Job No. 601- 533 -32 DECREASE INCREASE Contract Price Contract Price $ $ 2,052.00 2) Expansion Joint (38 w/ dowels @ ROW) @ $19.00/Driveway $ $ 722.00 3) Remove 7,972 SF of Concrete Driveways @ $1.80 /SF $ $ 14,349.60 4) Excavate and Grade 10,869 SF from Back of Sidewalk $ $ 15,216.60 to Tie -in @ 1.40 /SF 5) Add 24,220 SF of Standard Concrete Driveway Approach $ $ 72,660.00 @ $3.00 /SF Credit the Amount Approved for the Original Contract $ 41,223.00 $ Credit the Amount Approved for Change Order #1 $ 17,121.20 $ Credit the Amount Approved for Change Order #2 $ 39,508.80 $ 6) Add Relocation of Fire Hydrant @ White Wing Way and $ $ 1,350.10 Dove Haven 7) Add 122.5 SF Sidewalk along Dove Haven and Dove Creek @ $2.20 /SF $ $ 269.50 8) Add 14.5 LF of Curb & Gutter along Dove Haven at Dove Creek @ $9.00/LF $ $ 130.50 $ 97,853.00 $ 106,750.30 Net Changes in Contract Price $ $ 8,897.30 Baker - Aicklen & Associates, Inc. Consulting Engineers CONTRACT CHANGE ORDER NO. 3 Date 12/23/97 Sheet No. 2 of 2 Job No 601- 533 -32 Justification: To finalize the driveway extension quantities, provide a functional fire hydrant at White Wing Way and Dove Haven and provide a smooth transition of sidewalk and curb and gutter from the curb return (at Dove Creek and Dove Ilaven) to the existing driveway on Dove Haven. The amount of the Contract before this Change Order is Six Hundred Two Thousand Three Hundred Thirty Eight and 85/100 Dollars $ 602,338.85 The Amount of the Contract will DECREASE /INCREASE by the sum of Eight Thousand, Eight Hundred Ninety Seven and 30/100 Dollars $ 8,897.30 The CONTRACT TOTAL including this Change Order will be Six Hundred Eleven Thousand Two Hundred Thirty Six and 15 /100 Dollars $ 611 236.15 This document will become a supplement to the Contract and all provisions will apply hereto. NBS Construction, Inc., (Contractor) Date Baker / Aicklen & Associates, Inc., (Engineer) Date ; City of Round Rock! (Owner) Date DATE: January 16, 1998 SUBJECT: City Council Meeting - January 22, 1998 ITEM: 10.E. Consider a resolution authorizing the Mayor to execute Change Order No. 3 with NBS Construction, Inc. for quantity adjustment for the Dove Creek Street Improvements Project. STAFF RESOURCE PERSON: Jim Nuse STAFF RECOMMENDATION: DATE: January 13, 1998 TO: Jim Nuse Director of Public Works FROM: Larry Madsen P.W. Construction Manager RE: Dove Creek Bond Project MEMORANDUM Bakcr-Aicklen Engineers for the Dove Creek Bond Project has verified quantities for driveway, curb & gutter, and sidewalk construction. The increase from original plan and specification quantities has increased and is shown with the attached signed change order. A fire hydrant also needed to be relocated and is also in this total. The total amount for the change order is $8,897.30.