R-98-04-09-10B3 - 4/9/1998THE STATE OF TEXAS
THE COUNTY OF WILLIAMSON
SUPPLEMENTAL AGREEMENT NO. 1
TO CONTRACT FOR ENGINEERING SERVICES
This Amendment to the Contract for Engineering Services is made by and between the City of
Round Rock, Texas, hereinafter called the "City" and Rodriguez & Huggins, Inc., hereinafter
called the "Engineer."
WHEREAS, the City and the Engineer executed a Contract for Engineering Services, hereinafter
called the "Contract ", on the 26th day of June, 1997 to develop a design schematic for the
extension of Park Valley Drive from Wyoming Springs Drive to Oakwood Boulevard, study
hospital access to RM 620, and develop improvement scenarios for RM 620 from Wyoming
Springs Drive to Deepwood Drive, and
WHEREAS, Article 4, COMPENSATION, establishes the maximum lump sum payable under
this contract at $29,796.12 without modification of the contract, and
WHEREAS, the City proposes to change the scope of work of the contract to include the
development of construction plans, specifications, estimates, and contract bid documents for the
construction of the Park Valley Drive extension from Wyoming Springs Drive to Oakwood
Boulevard, the associated water quality and detention facilities, and an 8" waterline for the same
limits, and
WHEREAS, the Engineer has agreed to perform the additional work for $96,443.80 increasing
the lump sum fee for the contract to $126,239.32.
NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is
amended as follows:
Page 1, paragraph 3 shall be amended to change the scope of work of the contract to include the
development of construction plans, specifications, estimates, and contract bid documents for the
construction of the Park Valley Drive extension from Wyoming Springs Drive to Oakwood
Boulevard, the associated water quality and detention facilities, and an 8" waterline for the same
limits.
"Article 3 CONTRACT PERIOD" shall be amended by extending the termination date of the
contract to the close of business on October 1, 1998.
"Article 4 COMPENSATION" shall be amended by changing the lump sum amount payable
under this contract to $126,239.92.
EXHIBIT B - SERVICES TO BE PROVIDED BY THE ENGINEER shall be amended to
include development of construction plans, specifications, estimates, and contract bid documents
for the construction of the Park Valley Drive extension from Wyoming Springs Drive to
Oakwood Boulevard, the associated water quality and detention facilities, and an 8" waterline for
the same limits surveying, design, and preparation of all required railroad exhibits.
IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental
Agreement in duplicate.
THE ENGINEER
By
Signature
4i (c,8
Date
CITY r jR�O`CK%``
Char el s'( iilpepper, Mayor
-1- 9- 9,E
Date
Page 2 of 2
K:\ NPDOCS \RBBOLOTI \RS09O983.NPD /Bcg
RESOLUTION NO. R- 98- 04- 09 -10B3
WHEREAS, the City of Round Rock, on June 26, 1997, entered
into a contract for engineering services ( "Contract ") with
Rodriguez & Huggins, Inc. for a roadway schematic for Park Valley
Drive, a Round Rock Hospital traffic study, and alternatives and
schematics for improvements to RM 620, and
WHEREAS, Rodriguez & Huggins, Inc. has submitted Supplemental
Agreement No. 2 to the Contract to increase the scope of the
project and extend the termination date of the Contract, as more
particularly described in the attached Supplemental Agreement No.
2, and
WHEREAS, the City Council desires to enter into said
Supplemental Agreement No. 2 to the Contract with Rodriguez &
Huggins, Inc., Now Therefore
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK,
TEXAS,
That the Mayor is hereby authorized and directed to execute on
behalf of the City Supplemental Agreement No. 2 to the Contract
with Rodriguez & Huggins, Inc. to increase the scope of the project
and extend the termination date of the Contract, a copy of said
supplemental agreement being attached hereto and incorporated
herein for all purposes.
The City Council hereby finds and declares that written notice
of the date, hour, place and subject of the meeting at which this
Resolution was adopted was posted and that such meeting was open to
the public as required by law at all times during which this
Resolution and the subject matter hereof were discussed, considered
and formally acted upon, all as required by the Open Meetings Act,
Chapter 551, Texas Government Code, as amended, and the Act.
RESOLVED this 9th day of April, x998.
ATTEST:
IT
JOANNE LAND, City Secretar
CNQ1577416 fible77,4161, /}5ST
2
4 » - f�C -/ ' , ' ry J 'l 1S
CHARLES CULPE ER, Mayor
City of Round Rock, Texas
THE STATE OF TEXAS
THE COUNTY OF WILLIAMSON §
SUPPLEMENTAL AGREEMENT NO. 1
TO CONTRACT FOR ENGINEERING SERVICES
This Amendment to the Contract for Engineering Services is made by and between the City of
Round Rock, Texas, hereinafter called the "City" and Rodriguez & Huggins, Inc., hereinafter
called the "Engineer."
WHEREAS, the City and the Engineer executed a Contract for Engineering Services, hereinafter
called the "Contract ", on the 26th day of June, 1997 to develop a design schematic for the
extension of Park Valley Drive from Wyoming Springs Drive to Oakwood Boulevard, study
hospital access to RM 620, and develop improvement scenarios for RM 620 from Wyoming
Springs Drive to Deepwood Drive, and
WHEREAS, Article 4, COMPENSATION, establishes the maximum lump sum payable under
this contract at $29,796.12 without modification of the contract, and
WHEREAS, the City proposes to change the scope of work of the contract to include the
development of construction plans, specifications, estimates, and contract bid documents for the
construction of the Park Valley Drive extension from Wyoming Springs Drive to Oakwood
Boulevard, the associated water quality and detention facilities, and an 8" waterline for the same
limits, and
WHEREAS, the Engineer has agreed to perform the additional work for $96,443.80 increasing
the lump sum fee for the contract to $126,239.32.
NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is
amended as follows:
Page 1, paragraph 3 shall be amended to change the scope of work of the contract to include the
development of construction plans, specifications, estimates, and contract bid documents for the
construction of the Park Valley Drive extension from Wyoming Springs Drive to Oakwood
Boulevard, the associated water quality and detention facilities, and an 8" waterline for the same
limits.
"Article 3 CONTRACT PERIOD" shall be amended by extending the termination date of the
contract to the close of business on October 1, 1998.
"Article 4 COMPENSATION" shall be amended by changing the lump sum amount payable
under this contract to $126,239.92.
EXHIBIT B - SERVICES TO BE PROVIDED BY THE ENGINEER shall be amended to
include development of construction plans, specifications, estimates, and contract bid documents
for the construction of the Park Valley Drive extension from Wyoming Springs Drive to
Oakwood Boulevard, the associated water quality and detention facilities, and an 8" waterline for
the same limits surveying, design, and preparation of all required railroad exhibits.
IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental
Agreement in duplicate.
THF
•
ignature
14 l`f
Date
CITY
RUN /v D / ROCK
111 !x / / (( /C C / hharllpepper, Mayor
1 It
Date
Page 2 of 2
DATE: April 3, 1998
SUBJECT: City Council Meeting, April 9, 1998
ITEM: 10.B.3. Consider a resolution authorizing the Mayor to execute
Supplemental Agreement No. 2 to the Engineering Services
Contract with Rodriguez & Huggins, Inc. for Park Valley
Drive. Supplemental Agreement No. 2 revises the scope of
work to include the preparation of construction plans,
estimates, and bidding documents for the construction of the
Park Valley Drive and a water line from Wyoming Springs
Drive to Oakwood Boulevard behind the Round Rock Hospital;
increases the compensation due the Engineer because of the
added work; and adds additional time to complete the work to
the contract. Staff Resource Person: Jim Nuse, Public Works
Director
The City of Round Rock has an engineering contract with the firm of Rodriguez &
Huggins, Inc. to prepare a roadway schematic and a construction estimate for the
extension of Park Valley Drive from Wyoming Springs Drive to Oakwood Boulevard
and the construction of an 8" water line within the right -of -way. The schematic was
prepared for use in an application for a Texas Capital Fund Infrastructure Grant to pay
for the construction described above. The grant requested $500,000 for construction and
was recently approved.
The proposed Supplemental Agreement No. 2 revises the scope of the work of the
existing Rodriguez & Huggins, Inc. engineering contract to include the preparation of
construction plans, estimates, and bidding documents for the construction of the Park
Valley Drive roadway extension and an 8" water line from Wyoming Springs Drive to
Oakwood Boulevard. The Supplement Agreement also increases the compensation for
the increased scope of work. Finally, the contract will be extended until October 1, 1998
to allow time for additional work.
The time and compensation proposed is reasonable for the work to be performed and
staff would recommend approval.