Loading...
R-98-04-23-10D2 - 4/23/1998S. D. KALLMAN, INC. --- ENGINEERS AND ENVIRONMENTAL CONSULTANTS 1106 South Mays, Suite 100 Round Rock, TX 78664 (512) 218 -4404 (512) 218 -1668 (FAX) To: C1 Ty d F , ? /'Jb 0e.g. Attention: Project: Enclosures: Remarks: cc: Th sr OL Paes ue Soitxt * ,g666 /1-6/26s- Date: 15 Correspondence Field Notes Specifications Prints Pay Estimates Submittal Data Original Drawings x Change Orders Other ITEM # #SETS/COPIES DESCRIPTION Date: 4 — /� ie From: iI b #: 3 '3 al nd Delivere r Mail Other l ! Cha TRANSMITTAUDELIVERY FORM Enclosures Transmitted: For Your Files For Review & Comment Specifications As Requested For Your Signature Return for Corrections For Your Info. For Approval & Signature Other RECEIVED BY: RESOLUTION NO. R- 98- 04- 23 -10D2 WHEREAS, the City of Round Rock has previously entered into a contract ( "Contract ") with Chasco Contracting, Inc. for the Egger Acres Street, Drainage, and Waterline Improvements Project, and WHEREAS, it has been determined that it is necessary to change said Contract in accordance with the attached Contract Change Order No. 1, Now Therefore ATTEST: BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Contract Change Order No. 1 to the Contract with Chasco Contracting, Inc. for the Egger Acres Street, Drainage, and Waterline Improvements Project. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended, and the Act. RESOLVED this 23rd day of April, 1;98. LAND, City Secretary %:\ WPDOOS \RRSOLDTI \R8042]D2.WPD /•eg CHARLES CU R, Mayor City of Round Rock, Texas No - DESCRIPTION OF CHANGES DECREASE CONTRACT PRICE INCREASE CONTRACT PRICE 29 Deduct 3 EA. Install Short 1% "Double Water Service on Proposed Water Line including Reconnection of New Line with Existing Meter @ $1,300. /EA. $ 3,900.00 30 Add 2 EA. Install 1%" Long Double Water Service on Proposed Water Line including Casing, © $1,700. /EA. $ 3,400.00 31 Add 0.21 Ton Cast Iron Fittings per Ton @ $3,000./TON $ 630.00 32 Deduct 2 EA. Install 1% " Long Double Water Service on Existing Water Line, including Casing @ $1,900. /EA. $ 3,800.00 33 Deduct 50 L.F. Rock Berm © $15. /L.F. $ 1,500.00 34 Add 2 EA. Adjust Existing Cast -in -Place Manhole to Match Grade, including Flat -Top Lid and New 24" Bolted Ring and Cover @ $1,000. /EA. $ 2,000.00 35 Add 6" Thick Gravel Bedding Beneath 2' x 4' Concrete Box Culvert @ $875. /L.S. $ 875.00 36 Add 2 EA. 6" Wet Connection © $1,000. EA. $ 2,000.00 37 Add A/C Pipe Disposal © $1,709. per Lump Sum $ 1,700.00 38 Add Lower6" Water Line with Restrained Joint Fittings on West Karolyn Drive @ $1,500. per Lump Sum $ 1,500.00 39 Add Additional Street Excavation for Grade Revisions on Oak Street @ $3,800. per Lump Sum $ 3,800.00 40 Add - Change 1" Water Service Line to 2" on Lilac Street @ $1,200. per Lump Sum $ 1,200.00 41 Add 5 - Install 1" Lona Sinale Water Service on Proposed Water Line $ 9,000.00 S. D. KALLMAN, INC. Date: April 14 1998 ENGINEERS AND ENVIRONMENTAL CONSULTANTS 1106 South Mays, Suite 100 Round Rock, TX 78664 Phone: (512) 218 -4404 Fax: (512) 218 -1668 CONTRACT CHANGE ORDER NO. 1 Sheet 2 of 3 Job No: 343 -331 CONTRACT FOR Egger Acres - Water, Street and Drainage Improvements OWNER: City of Round Rock, Texas CONTRACTOR: Chasco Contracting No. DESCRIPTION OP CHANGES DECREASE CONTRACT PRICE INCREASE CONTRACT PRICE 1 Add 126 S.Y. Unclassified Street Excavation including Subgrade Preparation, @ 6.25/S.Y. $ 787.50 2 Add 135 S.Y. 11" Compacted Flexible Base @ $5.50 /S.Y. $ 742.50 3 Add 135 S.Y. 1 %" HMAC Pavement @$2.70 /S.Y. $ 364.50 4 Deduct 9 L.F. Standard Concrete Curb and Gutter @ $6.50 /L.F. $ 58.50 5 Deduct 1,543 S.F. 4' Wide Reinforced Concrete Sidewalk, including Handicap Ramps © 2.90 /S.F. $ 4,474.70 6 Deduct 344 S.F. Reinforced Concrete Driveway @ $3.00 /S.F. $ 1,032.00 7 Deduct 1 EA. Standard 10' Curb Inlet $2,200. /EA. $ 2,200.00 8 Add 1 EA. Texas Department of Transportation (TxDOT) Type "C" Curb Inlet. @ $2,000. /EA. $ 2,000.00 9 Add 1 EA. Reconstruction of Existing 10' Curb Inlet to Correct Line and Grade at Station 0 +36 (left) Lilac Street @ $1,000. /EA. $ 1,000.00 10 Add 1 L.S. Construct Concrete Cradle over Existing Wastewater Line at Station 1 +63.27 Storm Sewer Line "D" @ $500. /L.S. $ 500.00 11 Add 1 L.S. Construct "Special Service" Junction Box on Existing Wastewater Line at Station 0 +34 Line "F" (Revised) @ $2,700. /L.S. $ 2,700.00 12 Add 3 L.F. 18" Class III RCP @ $33.00 /L.F. $ 99.00 13 Deduct 193 L.F. 21" Class III RCP @ $40.00 /L.F. $ 7,720.00 S. D. KALLMAN, INC. ENGINEERS AND ENVIRONMENTAL CONSULTANTS 1106 South Mays, Suite 100 Round Rock, TX 78664 Phone: (512) 218 -4404 Fax: (512) 218 -1668 CONTRACT CHANGE ORDER NO. 1 Date: April 14, 1998 Sheet 1 of 3 Job No 343 -331 CONTRACT FOR: Egger Acres - Water Street and Drainage Improvements OWNER: City of Round Rock. Texas CONTRACTOR: Chasco Contracting You are hereby requested to comply with the following changes from the contract plans and specifications: S. D. KALLMAN, INC. Date: April 14•, 1998 • ENGINEERS AND ENVIRONMENTAL CONSULTANTS 1106 South Mays, Suite 100 Sheet 3 of 3 Round Rock, TX 78664 Phone: (512) 218 -4404 Job No: 343 -331 Fax: (512) 218 -1668 CONTRACT CHANGE ORDER NO. 1 CONTRACT FOR Egger Acres - Water. Street and Drainage Improvements OWNER: City of Round Rock, Texas CONTRACTOR: Chasco Contracting 5. Change Order Items 24 -35 reflect approved water line revisions associated with the additional 6" water line installed in Lilac Street. 6. Change Order Items 36 -38 and 40 -42 reflect approved revisions to water services on West Karolyn Drive. 7. Change Order Item 39 reflects approved street grade revisions on East and West Oak Drive. 8. Change Order Items 43 and 44 reflect the deletion of the concrete rip -rap and handrail along Larry Lane. The amount of the Contract before this Change Order is The amount of the Contract will INCREASE by the sum of The Contract Total including this Change Order will be C� �� Ise .� GINEE LL AN, INC. -- & VIRONMENTAL C This Doc entw becoy fan S. E a supplement to the Contract and all provisions will apply hereto. iq — 96 Date Date Client f Date /.5 -YB 6 -9k $ 909,084.50 $ 705.80 $ 909,790.30 DATE: April 16, 1998 SUBJECT: City Council Meeting - April 23,1998 ITEM: 10.D.2. Consider a resolution authorizing the Mayor to execute Contract Change Order No. 1 to Chasco Contracting, Inc. for the Egger Acres Street and Drainage Improvement Project. This change order will provide for various quantity adjustments made necessary by the actual field conditions, re- alignment of the storm sewer on West Oak Street, replacement of existing water lines on Lilac Street and Larry Lane due to elevation conflicts and elimination of concrete slope protection and handrail on Larry Lane. The original contract amount was $909,084.50. This Change Order is in the amount of $705.80 and will make the current contract amount $909,790.30. The project is funded by the 1996 General Obligation Bond Program. Staff recommends approval. Staff Resource Person: Jim Nuse, Public Works Director