Loading...
R-98-06-11-13B2 - 6/11/1998RESOLUTION NO. R- 98- 06- 11 -13B2 WHEREAS, the City of Round Rock, on February 13, 1997, entered into an agreement for engineering services ( "Agreement ") with Baker - Aicklen & Associates, Inc. for the Vista Lane, Lee Street and Summit Street Road Improvements, and WHEREAS, - Aicklen & Associates, Inc. has submitted an Additional Services Authorization to the Agreement to provide for architectural design concepts for the bridge at Brushy Creek, and WHEREAS, the City Council desires to approve said Authorization with Baker- Aicklen & Associates, Inc., Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City an Additional Services Authorization with Baker - Aicklen & Associates, Inc., to provide for architectural design concepts for the bridge at Brushy Creek, a copy of said Authorization being attached hereto and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended, and the Act. RESOLVED this llth day of June, 1998. K \ WP00®\886OLOTI\88061182 .LPO /0c9 ATTEST: LAND, City Secretary 2 CHARLES CI.t PVPPER, Mayor City of Round Rock, Texas Client City of Round Rock Project No. 601 -537 Project Lee and Summit Street Contract Date 2/13/97 Subject of Additional Services Architectural Work by Robert Belanger Associates Addl. Svcs. Project No. 601- 537 -20 Description: 1) Design concepts and meeting. 2) Design Rendering /Illustration Reason for Change: Client trying to accommodate neighborhood association. Compensation: Hourly charge plus reimbursable- expense basis, as defined In the PROFESSIONAL SERVICES AGREEMENT, and charges for these ADDITIONAL SERVICES are the PROFESSIONAL SERVICES AGREEMENT, for these ADDITIONAL SERVICES are to in addition to the compensation for BASIC SERVICES. Total estimated to be approximately $ X Lump sum charge basis plus reimbursable expenses, as defined In and In addition to the compensation for BASIC SERVICES. Total charges he $ 1.650.00 Estimated Date of Completion: May 1998. Baker - Aicklen & Associates, Inc. Consulting Engineers PROPOSED BY: BA N & ASSOCIATES, INC. Tinr/ W tz, P APPROVED BY: Client: MRYo» Title: ADDITIONAL SERVICES AUTHORIZATION nager (Sign, keep Client's copy & return all others.) Date 5/13/98 Proposal No. 98 -5050 Baker - Alcklen & Associates, Inc. Consulting Engineers Effective January 1, 1998, the following rates are recommended for work performed on an hourly - charge basis. Rates include company overhead and profit for services accomplished during regular working hours. DIRECT LABOR OFFICE PERSONNEL SERVICES STANDARD RATE SCHEDULE (Labor Rate Table 33) Classification Rates Project Engineer $90.00 per hour Project Surveyor $80.00 per hour Staff Engineer/Designer /Coordinator $70.00 per hour Staff Surveyor/Engineering Assistant/GPS Processor $65.00 per hour Senior Engineering/Surveying CAD Technician/Designer $55.00 per hour Engineering/Surveying CAD Technician/Designer $50.00 per hour CAD Draftsman $40.00 per hour Secretary $37.50 per hour Expert Witness/festimony/Deposition Services Two Times Rates Principal (as appropriate) $120.00 per hour FIELD PARTY SERVICES Rates 1 -Man Field Party $65.00 per hour 2 -Man Field Party $85.00 per hour 3 -Man Field Party $100.00 per hour 4-Man Field Party $115.00 per hour 1 -Man GPS RTK Field Party (Note 5) $125.00 per hour 2 -Man GPS RTK Field Party (Note 5) $150.00 per hour 2 -Man GPS Static Field Party (Note 5) $175.00 per hour DIRECT EXPENSES Transportation: By Firm's Passenger Vehicles (Note 1) $ 0.35 per mile By Firm's Survey Trucks (Notes 1, 2, 3 & 4) $ 0.35 per mile Subsistence of out -of -city work $100.00 per day Reproduction & Printing by Firm, Prevailing Com- Survey Stakes, Lathes, Iron Rods mercial Rates Or and other Direct Expense Cost, Plus 10% Notes: 1. A mileage charge will be billed for projects exceeding a 50 -mile radius of the base office only. 2. Field Party rates include conventional equipment, supplies and survey vehicles. Abnormal use of stakes, lathes, etc., used such as during the construction phase of a project will be charged as indicated. 3. A minimum of two (2) hours field party time charge will be made for show -up time and return to office, resulting from inclement weather conditions, etc. 4. Field Party stand -by time will be charged for at the above -shown appropriate rates. 5. Rates apply to actual time GPS units are in use. All other time will be charged as appropriate normal field party rates. 6. The firm's professional liability is limited to the total amount of compensation associated with a specific project up to a maximum of $50,000. I BAKER - AICKLEN & ASSOCIATES. INC. Consulting Engineers May 13, 1998 Mr. Jim Nuse, P.E. Director of Public Works City of Round Rock 2008 Enterprise Round Rock, Texas 78664 Re: Additional Services Authorization for the Lee and Summit Street Project Dear Mr. Nuse, Please find enclosed the Additional Services Authorization for the work being performed by Robert Belanger Associates for the above referenced project. After your review, please sign both copies and return one copy to our office. If you have any questions, please feel free to call. Sincerely, Garrett J. Tuttle, P.E. File: 601 -537 enc. CORRLDOC MAY 1 5 1998 I , 1 4 203 E. Main St.. Suite 201 • Round Rook. Texas 78884 • 512/244 -9520 • FAX 512/244 -9823 DATE: June 5, 1998 SUBJECT: City Council Meeting - June 11, 1998 ITEM: 13.B.2. Consider a resolution authorizing the Mayor to execute an additional services authorization to the Baker - Aicklen & Associates, Inc engineering services agreement for the Lee and Summit Street project. This authorization is for $1,650.00 which makes the current total for engineering services at $148,715.00. This authorization provides for architectural design concepts for the bridge at Brushy Creek. Staff recommends approval. Staff Resource Person: Jim Nuse, Public Works Director.