R-98-09-10-10A1 - 9/10/1998RESOLUTION NO. R- 98- 09- 10 -10A1
WHEREAS, the City of Round Rock has previously entered into
a contract ( "Contract ") with Chasco Contracting, Inc. for the Egger
Acres Street, Drainage, and Waterline Improvements Project, and
WHEREAS, it has been determined that it is necessary to
change said Contract in accordance with the attached Contract
Change Order No. 3, Now Therefore
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK,
TEXAS,
That the Mayor is hereby authorized and directed to execute on
behalf of the City Contract Change Order No. 3 to the Contract with
Chasco Contracting, Inc. for the Egger Acres Street, Drainage, and
Waterline Improvements Project.
The City Council hereby finds and declares that written notice
of the date, hour, place and subject of the meeting at which this
Resolution was adopted was posted and that such meeting was open to
the public as required by law at all times during which this
Resolution and the subject matter hereof were discussed, considered
and formally acted upon, all as required by the Open Meetings Act,
Chapter 551, Texas Government Code, as amended, and the Act.
RESOLVED this 10th day of September, 1998.
ATTEST:
E LAND, City Secretary
%:\ NPDOCS \RSSOIUTI \RBO91OA1.NPD /scg
CHARLES CUL Mayor
City of Round Rock, Texas
S. D. KALLM M,JNc.
ENRON/MAN° ENVIRONMENTAL CONSULTANTS
1108 South Meye,.QM 100
Wend Rock. TX teem
Pupae: (612)31e-4404
Fix (B12)2i8 -teat
CONTRACT FOR:
OWNER City of
CONTRACTOR'
CONTRACT CHANGE ORDER NO. 3
Date: Auga tt 2e. 19 8
Sheet of 1_
Jeb No: 343 -331
1S =o It - ut3,
1 bP11-nI_ 1
Ric. Texas
•, - _ +• 0 1. 11. .V r •
You are hereby requested to comply with the following changes from the contract plans and
specifications:
2
Add 784 S.F. Reconstruct ExlstIng Concrete Driveway $5.00 /S.F.
Add Construct 30" x 30" Reinforced Concrete Inlet Box W /18" Ring and
Cover @ $1,870.00/EA.
TOTAL DECREASE/INCREASE
$ 3,920,00
$ 1,870.00
$ 5,790.00
NET CHANRE TO CONTRACT 1 +1 9 5 790 00
JUSTIFICATION: Item 1. Additional concrete driveway replacement required on existing driveways.
Item 2. Required to alleviate side yard storm water ponding.
The amount of the Contract before this Change Order is JF HUNDRED NINETY THOUSAND SEVEN HUNDRED
TWENTY FIVE DOLLARS AND TEN CENTS
(dollars & cents in words)
The amount (riffle Contract will INCREASE by the sum of FIVE THOUSAND SEVEN HUNDRED NINETY DOLLARS
AND NO CENTS
The Contract Total including this Change Order will be NIN N
FIFTEEN 0011 ARS AND TEN CENTS
(dollars & cents in words)
This Do my, co
. ��iti4� .
LLM
EERS
S.D.
ENG
N, INC. --
Ch
City of Round Rock
C:1 W P DOCSIEGG ER.3311343 331. CO3
(dollars & cents in words)
• ■ !
H
R
a s pplement to the Contract and all provisions will apply hereto.
8-'26. -98
Date
Date
Date
NINE
I T
$ 990.725,10
$ -996 515.10
9-10-98'
8 790 00
N•R D
DATE: September 4,1998
SUBJECT: City Council Meeting - September 10,1998
ITEM: 10.A.1. Consider a resolution authorizing the Mayor to execute Contract
Change Order No. 3 to Chasco Contracting, Inc. for the Egger Acres
Street and Drainage improvement Project This change order will
provide additional quantities for driveway replacement where actual
field conditions required us to provide an acceptable driveway slope
and will also provide an additional area inlet and pipe to remedy a yard
drainage condition encountered on Karolyn Drive. This change order,
in the amount of $ 5,790.00, will make the current contract amount
$996,515,10, This change order and the project is funded from the
1996 General Obligation Bond Program. Staff Recommends approval.
Staff Resource Person: Jim Nuse, Public Works Director.
S. D. KALLMAN, INC.
ENGINEERS AND ENVIRONMENTAL CONSULTANTS
1106 South Mays, Suite 100
Round Rock, TX 78664
Phone: (512) 218 -4404
Fax: (512) 218 -1668
CONTRACT CHANGE ORDER NO. 3
Date: August 26 •?998
Sheet 1 of 1
Job No: 343 -331
CONTRACT FOR: Egger Acres - Water. Street and Drainage Improvements
OWNER: City of Round Rock, Texas
CONTRACTOR: Chasco Contracting
You are hereby requested to comply with the following changes from the contract plans and
specifications:
NO_
1
2
DESCRIPTION OF CHANGES
DECREASE
CONTRACT
INCREASE
CONTRACT _.
-; - PRICE
Add 784 S.F. Reconstruct Existing Concrete Driveway @ $5.00 /S.F.
Add Construct 30" x 30" Reinforced Concrete Inlet Box W /18" Ring and
Cover @ $1,870.00 /EA.
$ 3,920.00
$ 1,870.00
TOTAL DECREASE/INCREASE
NET CHANGE TO CONTRACT ( +1
$ 5,790.00
$ 5 790 00
JUSTIFICATION: Item 1. Additional concrete driveway replacement required on existing driveways.
Item 2. Required to alleviate side yard storm water ponding.
The amount of the Contract before this Change Order is NINE HUNDRED NINETY THOUSAND SEVEN HUNDRED
TWENTY FIVE DOLLARS AND TEN CENTS
(dollars & cents in words)
The amount of the Contract will INCREASE by the sum of FIVE THOUSAND SEVEN HUNDRED NINETY DOLLARS
AND NO CENTS
The Contract Total including this Change Order will be NINE HUNDRED NINETY SIX THOUSAND FIVE HUNDRED
FIFTEEN DOLLARS AND TEN CENTS
(dollars & cents in words)
This Do. m ,.
LLM
EERS
N, INC. --
NVIRONMENTAL C
S.D.
ENGI
Ch
co a s pplement to the Contract and all provisions will apply hereto.
$ULTANTS
(dollars & cents in words)
Date
City of Round Roc Date
C:1WPDOCS EGGER331X343- 331.0O3
Date
9 -/o -9g
$ 990,725.10
$ 5,790.00
$ 996.515.10