R-98-10-22-10B2 - 10/22/1998RESOLUTION NO. R- 98- 10- 22 -10B2 WHEREAS, the City of Round Rock has previously entered into a contract ( "Contract ") with Chasco Contracting, Inc. for the Egger Acres Street, Drainage, and Waterline Improvements Project, and WHEREAS, it has been determined that it is necessary to change said Contract in accordance with the attached Contract Change Order No. 4, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Contract Change Order No. 4 to the Contract with Chasco Contracting, Inc. for the Egger Acres Street, Drainage, and Waterline Improvements Project. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended, and the Act. RESOLVED this 22nd day of October, 1998. ATTEST: 1141Kii oe .oL - E LAND, City Secretary K. \ WPOOCS \REBOLllTI \RS1022B2.WPO /scg (/// // • CHARLES CULPEP.ER, Mayor City of Round Rock, Texas • S. D. KALLMAN, INC. Date: October 7 . 199$ ENGINEERS AND ENVIRONMENTAL CONSULTANTS 1106 South Mays, Suite 100 Sheet 1 of 1 Round Rock, TX 78664 Phone: (512) 218 -4404 Fax: (512) 218 -1668 CONTRACT FOR: Eager Acres - Water. Street and Drainage Imorovements OWNER: City of Round Rock. Texas CONTRACTOR: Chasco Contracting You are hereby requested to comply with the following changes from the contract plans and specifications: 1 2 DESCRIPTION OF CHANGES Add 4,042 S.F. Reconstruct Existing Concrete Driveway @ $5.00/S.F. 3 4 5 6 7 8 9 10 11 Add 1 EA. 6' Wide Concrete Valley Gutter @ $1,400.00 /EA. Add 1,946 S.F. 4' Wide Reinforced Sidewalk @ $2.90 /S.F. Add 1,190 S.F. Reinforced Concrete Driveway @ $3.00 /S.F. Add 2 EA. 2' x 2' Concrete Grate Inlet @ $1,000. /EA. NET CHANGE TO CONTRACT ( +) DECREASE CONTRACT PRICE Ad 1,169 S.F. Reconstruct Existing Base /Asphalt Driveway @ $2.60 /S.F. Deduct 3,406 S.F. 5' Wide Reinforced Concrete Sidewalk @ $2.50 /S.F. Add 40 L.F. 18" Class III RCP @ $28. /L.F. $ 8,515.00 Add 10 L.F. - Remove and Replace Existing Curb and Gutter @ $9. /L.F. Add 44 S.F. - Remove and Replace Existing Reinforced 4' Concrete Sidewalk @ $4.90. /S.F. Add 192 S.F. Concrete Driveway Removal @ $2. /S.F. TOTAL DECREASE/INCREASE $ 8,515.00 INCREASE CONTRACT PRICE $ 20,210.00 $ 1,400.00 $ 5,643.40 $ 3,570.00 $ 3,039.40 $ 1,120.00 $ 2,000.00 $ 90.00 $ 215.60 $ 384.00 $ 37,672.40 $ 29,157.40 JUSTIFICATION: Item 1. Additional concrete driveway replacement required on existing driveways. Item 2. Concrete valley gutter constructed but not included in original contract quantities. Item 3. & 6. Field adjustment in sidewalk from 5' wide to 4' wide. Item 4. Field adjustment for driveway approach construction. Item 5. Additional AsphalUBase Driveway Replacement Required on Existing Driveways. Item 7. - 10. Additional Items Required to Resolve Yard Ponding. Item 11. Removal of Existing Driveway Approach on Egger Avenue. The amount of the Contract before this Change Order is NINE HUNDRED NINETY SIX THOUSAND FIVE HUNDRED FIFTEEN DOLLARS AND TEN CENTS (dollars & cents in words) The amount of the Contract will INCREASE by the sum of TWENTY -NINE THOUSAND ONE HUNDRED FIFTY -SEVEN DOLLARS AND FORTY CENTS (dollars & cents in words) The Contract Total including this Change Order will be ONE MILLION TWFNTY FIVE THOUSAND SIX HUNDRED SEVENTY TWO DOI I ARS AND FIFTY CENTS (dollars & cents in words) N, INC. - — NVIRONMENTA This • . um: t will b m upplement to the Contract and all provisions will apply hereto. I %BA /O -/3- 9C3 City of Round Rock C: \weDOCS\EGGER.3311343331.004 CONTRACT CHANGE ORDER NO. 4 Date Job No: 343 -331 /0 - /3 - Date /0/2/) ( Y Date $ 996.515.10 $ 29.157.40 $ 1.025.672.50 DATE: October 16, 1998 SUBJECT: City Council Meeting — October 22, 1998 ITEM: 10.B.2. Consider a resolution authorizing the Mayor to execute Contract Change Order No. 4 to Chasco Contracting, Inc. for the Egger Acres Street and Drainage Improvement Project. This change order will provide additional quantities for driveways, driveway approaches, resolution of two lot drainage problems and adjusts the sidewalk width on Larry Lane from five (5) feet to four (4) feet. These changes are necessary to accommodate actual field conditions. This change order is in the amount of $29,157.40 and will make the current contract amount $1,025,672.50. This change order and the project are funded from the 1996 General Obligation Bond Program. Staff recommends approval. Staff Resource Person: Jim Nuse, Public Works Director. Mayor Charles Culpepper Mayor Psotem Robert SRulw Connell Members Earl M. Hairston Rick Stewart Furl Palmer Martin Chavez Jimmy Joseph City Manager Robert L Bennett. Jr. city Attorney Stephan L Sheets CITY OF ROUND ROCK October 26, 1998 Mr. Wayne Harter S.D. Kaltman, Inc. Engineers and Environmental Consultants 1106 South Mays, Suite 100 Round Rock, Texas 78664 Dear Mr. Harter: 221 East Main Sheet Round Rock, Taxes 78664 S12- 2.18-5900 The Round Rock City Council approved Resolution No. R- 98- 10- 22 -10B2 at their regularly scheduled meeting on October 22, 1998. This resolution pertains to Change Order No. 4 to the Contract with Chasco Contracting, Inc. for the Egger Acres Street, Drainage and Waterline Improvements Projects. Enclosed is a copy of the resolution and Change Order for your files. If you have any questions, please do not hesitate to call. Sincerely, Joanne Land Assistant City Manager/ City Secretary Enclosures Fax 512 -218 -7097 1- 800- 7352989 1735 -2988 Voice www. ci. round -tock tt us