R-98-11-12-10B2 - 11/12/1998WHEREAS, the City of Round Rock has previously entered into a contract ( "Contract ") with C.C. Carlton Construction of Austin, Inc. for the Wilderness Way Drainage Improvements project, and WHEREAS, it has been determined that it is necessary to change said Contract in accordance with the attached Contract Change Order No. 1, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Contract Change Order No. 1 to the Contract with C.C. Carlton Construction of Austin, Inc. for the Wilderness Way Drainage Improvements project. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended, and the Act. RESOLVED this 12th day of November, 1998. ATTEST: ANNE LAND, City Secretary K: \WPDOCSVtESOLVINt61112B2.WPDhcg RESOLUTION NO. R- 98- 11- 12 -10B2 - 'P /14 CHARLES CULPEPPER, Mayor City of Round Rock, Texas ITEM N0. DESCRIPTION OF CHANGES QUANTITIES, UNITS, UNIT PRICES CHANGE IN CONTRACT PRICE 1. Install concrete bottom in the channel end modify the mortared rock (as per attached letter) $11,910.00 2. Delete storm sewer manhole. Install transition fitting. (See attached). (500.00) 3. Install double wastewater service. Remove & Dispose of existing service. 5,210.80 TOTAL $16, 620.80 Change in Contract Price 1. Original Contract Amount: 2. Net Previous Changes: 3. Price Prior to this Change Order: 4. Net Amount of Change Order: 5. New Contract Price: 6. Cumulative % Change in Contract Price: Change in Contract Time Period 1. Original Contract Time: 2. Net Previous Changes: 3. Contract Time Prior to Change Order: 4. Time Change in this Change Order: 5. Final Contract Time: Name l Title Name CNAka6s amegepee frow 2 Date CITY OF ROUND ROCK WILDERNESS WAY DRAINAGE IMPROVEMENTS HLA Project No. 13572 CHANGE ORDER NO. 1 / Ix( Title City of Round Rock Hejl, Lee & Associates, Inc. (Owner) (Engineer) Date $98,170.00 0.00 98,170.00 16, 620.80 8114,790.80 16.93% 90 Days (August 03, 1998) 0 Days 120 Days (November 01, 1998) 12 Days 132 Days (November 13, 1998) G•.�> A'7 Na• e C.C. Carlt•n Construction of Austin, Inc. (Contractor) i/ a 9� Date 60 39tid phei- '0 1yP/ 0 4/ Afro /$ ° Le ilG LrwreSSa.le /1 sG; amteitcre Pr-Ate a g•rw L f a five leaves Le No/es: $togs or QnSav et- ^- O 91 NI "OOSSC B 331 1f 3H g, z it b Amur k ris ,(07y06.L/,Q.rsT✓ Vi LVI6L94ZTS LT:OT 866T/6Z/OT 11/10/98 19:07 NOV-10-1998 13:09 1'218 5583 218 5563 PUBLIC WORKS +4+ CITY HALL fit /001 MOM VIM mum nil. MOM Mg 1 MI WO l III lial mow 1111111. alfW wkwaia de Iiii liripteSZ: 104• • 1 .....A PAr VA11111111k. 411. General Obligation Bond Pro jests Q. Oak Bluff Drainage 99% P.01 DATE: November 6, 1998 SUBJECT: City Council Meeting — November 12, 1998 ITEM: 10.B.2 . Consider a resolution authorizing the Mayor to execute Contract Change Order No. 1 to C C. Carlton Construction of Austin, Inc. for the Wilderness Way Drainage Improvements. This change order will provide for the relocation and construction of a double wastewater service which conflicts with the proposed improvements, the addition of a concrete bottom to the out -fall channel which accepts the storm - sewer flow and modification to the mortared rock channel side - slopes to provide mortared limestone rock extending above the concrete bottom. These changes are necessary to accommodate utility conditions encountered and to provide a low maintenance out -fall channel. This change order in the amount of $16,620.80 will make the current contract amount $114,790.80. This change order and the project are funded from the 1996 General Obligation Bond Program. Staff recommends approval. Staff Resource Person: Jim Nuse, Public Works Director. Mayor Charles Culpepper Mayor Pro-tem Robert SRuka Connell Members Earl Ai. Hairston Rick Stewart Earl Palmer Murtha Chavez Jimmy Joseph City Manager Robert L. Bennett. Jr. City Attorney Stephan L Sheen CITY OF ROUND ROCK January 6, 1999 Mr. Hugo Elizondo, Jr., Vice President C. C. Carlton Construction of Austin, Inc. 612 Brazos, Suite 210 Austin, Texas 78701 Dear Mr. Elizondo: 221 Fast Main Street Road Rec0;.Texas 78664 512418.5400 The Round Rock City Council approved Resolution No. R- 98- 11- 12 -10B2 at their regularly scheduled meeting on November 12, 1998. This resolution approves Change Order No. 1 to the contract with C.C. Carlton Construction of Austin, Inc. for the Wilderness Way Drainage Improvements Project. Enclosed is a copy of the resolution and change order for your files. If you have any questions, please do not hesitate to contact me. Sincerely, Joanne Land, Assistant City Manager/ City Secretary Enclosure Fax 512-21S-7097 1- 800-735-2989 TIM 1800- 735 -2986 Voice www.ci.rounGtocku.uv Mayor Charles Culpepper Mayor Protem Robert Stinker Connell Members Earl M. Hairston Rick Stewart Earl Palmer Martha Chavez Jimmy Joseph City Manager Roberto Bennett, Jr. City Attorney Stephan L. Sheets CITY OF ROUND ROCK January 6,1999 Hejl, Lee & Associates, Inc. Mr. Chien Y. Lee, P.E., AICP 2207 Hancock Drive Austin, Texas 78756 Dear Mr. Lee: 221 East Main Street Round Rack, Texas 78664 512-218-5400 The Round Rock City Council approved Resolution No. R- 98- 11- 12 -10B2 at their regularly scheduled meeting on November 12, 1998. This resolution approves Change Order No. 1 to the contract with C.C. Carlton Construction of Austin, Inc. for the Wilderness Way Drainage Improvements Project. Enclosed is a copy of the resolution and chane order for your files. If you have any questions, please do not hesitate to contact me. Sincerely, Enclosure Fax: 512- 218 -7097 oanne Land, Assistant City Manager/ City Secretary 1- 800.735- 2989TD0 1- 800-735-2988 Voice www.ci. round -rock tx. us