Loading...
R-98-11-12-10B5 - 11/12/1998RESOLUTION NO. R- 98- 11- 12 -10B5 WHEREAS, V.T.C.A., Government Code, Chapter 791, the Texas Interlocal Cooperation Act, provides that any one or more public agencies may contract with each other for the performance of governmental functions and services under the terms of the Act, and WHEREAS, the City of Round Rock wishes to enter into an Interlocal Agreement ( "Agreement ") with Williamson County for improvements to County Road 122 from U.S. 79 to Forest Creek Drive, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City said Agreement, a copy of same being attached hereto and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended, and the Act. RESOLVED this 12th day of November, 1998. ATTEST: 1 J NE LAND, City Secretary tt:\ WPOOCS \RESOLITTI \RB1112BS•WPD /scg CHARLES CUT,PMPER, Mayor City of Round Rock, Texas Interiocat Agreement L The following agreement has been entered into between Williamson County, Texas, ("County"), and the City of Round Rock, Texas ("City"), pursuant to the Texas Interiocal Cooperation Act, Texas Government Code, Chapter 791. 2. In consideration of the undertakings by City under this agreement, County agrees to pay City the sum of Four Hundred Thousand Dollars ($400,000.00) within 30 days of the signing of this agreement. This payment will be from current revenues available to County, and City agrees that it constitutes fair compensation. County further hereby cedes to City all its right, title, and interest to that portion of County Road 122 located south from U.S. Highway 79 to the existing City limits, subject to reverter if City fails to meet its obligations under this agreement. 3. In consideration of these undertakings by County, City agrees to accept control, responsibility, and liability immediately as of the date of payment for that portion of County Road 122 located south from U.S. Highway 79 to the existing City limits. City further agrees to annex this portion of the road into its corporate limits and let contracts for the improvement of the road to the standards for City arterial streets within one year from the date of payment. Time is of the essence. 4. If either party fails to meet its obligations under this agreement, the other party may seek liquidated damages in an amount equal to $400,000 plus 10% annual interest from the date this agreement is signed, together with all costs of collection. Signed on / L&LkP J r . / 1XJ.1 1 / 1998. CTTY OF ROUND ROCK OF THE STATE OF TEXAS By: Charles Culp Mayor ATTEST: COUNTY OF WILLIAMSON OF THE STATE OF TEXAS By: John C. Doerrfler County Judge ATTEST: �.;.....i � MIMI M. .I.M ___ ___ ___ ___ offal! ' . �" ii _111111__ � *;41,2 Nosonsua - l a 1111111111 Dallnia 111111111111 r. MU 1111111111 i ii rIif4t' MUM . wair i►•a�� ' s � •1I� r sinumpeatts, .4, ow . ___ „..„7„...z.sarAaatip. Am IWO UV° • Nib 7%AV Om A aliv411110 ili 4 Ira '114 14 `�� s.. -- 01 e 4u' • / � / • SAM ZOO Non VE in DATE: November, 6, 1998 SUBJECT: City Council Meeting — November 12, 1998 ITEM: 10.B.5. Consider a retolution authorizing the Mayor to execute an interlocal agreement with Williamson County for improvements to County Road 122. A portion of County Road 122 from US79 to Forest Creek Drive in Williamson County. This interlocal agreement will transfer the right -of- way to the City of Round Rock as well as provide $400,00.00 to improve the road. Staff Resource Person: Jim Nuse, Public Works Director. GREG BERGERON County Road Administrator January 15, 1998 Jim Nuse, Public Works Director City of Round Rock Public Works 2008 Enterprise Round Rock, Texas 78664 Dear Jim: Williamson County Unified Road System As you know, the County has set aside $400,000 of bond money for improvements to CR 122 South of Highway 79. I believe it is the consensus of the Commissioners Court to make these funds available to the City of Round Rock at this time. Naturally, this transfer of funds will have to be made by Commissioners Court. As soon as the City is ready to take control of this money and agree to annex CR 122 South of Highway 79 I believe the Court will be agreeable. Please let me know if there is any information on this matter that you can provide as to what the City's plans are for this area in the near future. If there is anything I can do to aid in this transfer please let me know. Sincerely, Greg Bergeron GB:scb cc: John C. Doerfler, County Judge Mike Heiligenstein, Pct. 1 Commissioner Greg Boatright, Pct. 2 Commissioner David Hays, Pct. 3 Commissioner Jerry Mehevec, Pct. 4 Commissioner b \greglrrl 1900 Georgetown Inner Loop, Ste.B Georgetown, Ted 75926 Telephone (512) 930 -9330 Fax (512) 930435 BAKER - AICKLEN & ASSOCIATES. INC. Consulting Engineers May 9, 1997 Mr. James R. Nuse, P.E. Director of Public Works City of Round Rock 221 East Main St. Round Rock, Texas 78664 Re: County Road 122 Opinion of Probable Cost Dear Jim, Attached, please find a preliminary Engineer's Opinion of Probable Cost for improvements to County Road 122 from Highway 79 to the City Limit line just north of Forest Creek Drive. Included in these calculations was the realignment of County Road 122, north of Highway 79, eliminating the offset now occurring at Highway 79. The estimate was prepared with the following assumptions: 1. The cross section of the improved C.R. 122 will be identical to the previous improvements. (Widen roadway to 26 feet with asphalt stabilized base & overlay with 21/4" avg. thickness H.M.A.C.) 2. Add center left turn lanes at County Road 123, Forest Ridge/Evergreen Drive and Woodland Loop. 3. The design speed for the reverse curve north of Highway 79 is 45 mph. 4. For the purpose of this estimate, we have used the prices quoted by Hunter Industries for the previous improvements plus 10 %. Based upon the above assumptions, we would estimate the total construction cost of the County Road 122 Phase II improvements to be approximately: $428,716.00. Mr. James R. Nuse May 9, 1997 Page 2 Should you have any questions or comments, please advise. Sincerely, Iliiam Waeltz, P.E. AWW/md c:\ winworcNewMcr122nus.doc cc: Mr. Tom Word, P.E. PRELIMINARY ENGINEER'S OPINION OF PROBABLE COST COUNTY ROAD 122 End of existing improvements -Sta. 100+07 70 Sta. 175+90 (southern side of R.R. @ Hwy. 79) Existing bridge located -Sta. 172 +57 to 174 +97 Roadway Widening (7 1. Unclassified Street Widening Excavation (inc. ditch work) 3,000 S.Y. @ 14.30 /S.Y. $42,900 2. Asphalt Stabilized Base (8" nominal thickness) 1,267 Ton @ 35.20/Ton 44,598 3. HMAC (2Y" avg. thickness) 2,601 Ton @ 31.90/Ton 82,972 4. Pavement Markings 30,332 L.F. @ 0.25/Ft 7,583 5. Traffic Buttons 285 Each @ 4.50/Ea. 1,283 6. Traffic Control 1 L.S. @ $5,000 5000 Subtotal $184,336 Turn Lanes (3 locations) 1. Unclassified Street Excavation (inc. ditch work) 2,767 S.Y. @14.30 /S.Y. $39,568 2. Asphalt Stabilized Base (8" nominal thickness) 1,168 Ton @ 35.20/Ton 41,114 3. HMAC (2" avg. thickness) 292 Ton @ 31.90/Ton 9,315 4. Pavement Markings 3,300 L.F. @ 0.25/L.F. 825.00 5. Traffic Buttons 42 Each @ 4.50/Ea. 189.00 Subtotal $91,011 Construction North of Flighway 79 (1,300 L.F.) (30' Edge-Edge on Base, 26' Edge -Edge on Surface) 1. Unclassified Street Excavation (inc. ditch work) 4,333 S.Y. @ 8.00/S.Y. $34,664 2. Flexible Base (12 ") 4,333 S.Y. @ 6.00 /S.Y. 25,998 3. 2" HMAC 3,756 S.Y. @ 4.00/S.Y. 15,024 4. Pavement Markings 5,200 L.F. @ 0.25/L.F. 1,300 5. Traffic Buttons 5/Ea. @ 4.50/Ea. 230.00 6. Culverts & Headwalls Lump Sum 5.000 Subtotal $82,216 Total Estimated Project Construction Cost $357,563 20% Engineering & Contingency 71,513 Total Estimate Project Cost $429,076 Note: The above estimate does not include revisions to traffic signals @ Highway 79, modifications to bridge structure or demolition of existing C.R. 122 North of Highway 79. VARIES EXISTING DRAINAGE SWALE— MATERIAL DEPTH VARIES 'SEE EXISTING PAVEMENT WIDTH CHART R.O.W. VARIES PROF EXISTING ASPH. PVMT. ROAD SECTION* COUNTY ROAD 122 TYPICAL ROADWAY SECTION 1 " =5' [,—PROP. CENTERLINE OF ROAD WIDENING OSED 26' ROADWAY WIDTH 13' VARIED ROAD WIDENING PROP. DRAINAGE EXISTING ASPHALT H OVE AVG. SURFACING 3" AVG. 2% t - AVG. %///// / / / /.I// / / / / /// / /IV/ - i17::::" :". /.` S EXISTING BASE I EXISTIN DRAINAGE SWALE DEPTH WIDTH VARIES MALE 1 PROPOSED 8 —INCH ASPHALT STABILIZED BASE MATERIAL B aker-Alokien & Associates, Inc. Consulting Engineers 203 C Nein SfM, Su0. 201 Rack Reek. 74x64 70664 (512) 244-6620 Baker-Alokilon & rameo-uom, be. Corm/ling. Engh4"r6 MG • lt16 sen mg IMMO OM IV= INS4 26-11100