Loading...
R-98-11-24-14E1 - 11/24/1998WHEREAS, the City of Round Rock has previously entered into a contract ( "Contract ") with C.P. Snider Construction Co., Inc. for the Library Addition and Remodel Project, and WHEREAS, it has been determined that it is necessary to change said Contract in accordance with the attached Contract Change Order No. 1, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Contract Change Order No. 1 to the Contract with C.P. Snider Construction Co., Inc. for the Library Addition and Remodel Project. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended, and the Act. RESOLVED this 24th day of November, 1998. ATTEST: K \WPDOCS\RESOLUT RSI I2.1E1 WPD /scy LAND, City Secretary RESOLUTION NO. R- 98- 11- 24 -14E1 CHARLES CULPEgPER, Mayor City of Round Rock, Texas C. P. SNIDER CONSTRUCTION COMPANY GENERAL CONTRACTOR _....$ PROJECT: ADDITIONS AND RENOVATIONS TO PUBLIC LIBRARY DATE: OCTOBER 27, 1998 LOCATION: ROUND ROCK, TEXAS CONTRACTOR: C.P. SNIDER CONSTRUCTION COMPANY PROPOSAL NUMBER: 11 DESCRIPTION OF CHANGE OF THE WORK: MECHANICAL AND ELECTRICAL REVISIONS PER RFP #11 NOTES: 1. WORK REQUESTED REQUIRES FIVE (5) ADDITIONAL WORK DAYS. 2. PROPOSAL RESPECTFULLY WITHDRAWN AFTER THIRTY (30) DAYS. 3. ADDTIONAL ITEM ITEM CHANGE ORDER PROPOSAL FORM QUAN COST SUB MATERIAL LABOR TOTAL READ TOTAL AMOUNT OF LABOR /MATERIALS /SUBCONTRACTOR.... 9919.03 INSURANCE AND PAYROLL TAXES OF $000.00 X 0.40% TOTAL PROPOSAL FOR THIS CHANGE PROPOSAL Page 1 (512) 288 -6030 P.O. BOX 90818 AUSTIN. TEXAS 78709-0818 FAX (512) 288-6440 0 SUBTOTAL 9919.03 PLUS 5% FOR SUBCONTRACTOR WORK 486.2015 PLUS 15% FOR PRIME CONTRACTOR WORK 29.25 ADJUSTMENT 0.52 I $ 10,435.00 I C. P. SNIDER CONSTRUCTION COMPANY GREGORY L. WARD DATE VICE PRESIDENT 0 0 ELECTRICAL 8074.03 0 0 8074.03 PLUMBING 1650 0 0 1650 0 0 0 0 0 BOND PREMIUM 0 195 0 195 0 0 0 0 0 0 SUBTOTALS 9724.03 195 0 9919.03 C. P. SNIDER CONSTRUCTION COMPANY GENERAL CONTRACTOR _....$ PROJECT: ADDITIONS AND RENOVATIONS TO PUBLIC LIBRARY DATE: OCTOBER 27, 1998 LOCATION: ROUND ROCK, TEXAS CONTRACTOR: C.P. SNIDER CONSTRUCTION COMPANY PROPOSAL NUMBER: 11 DESCRIPTION OF CHANGE OF THE WORK: MECHANICAL AND ELECTRICAL REVISIONS PER RFP #11 NOTES: 1. WORK REQUESTED REQUIRES FIVE (5) ADDITIONAL WORK DAYS. 2. PROPOSAL RESPECTFULLY WITHDRAWN AFTER THIRTY (30) DAYS. 3. ADDTIONAL ITEM ITEM CHANGE ORDER PROPOSAL FORM QUAN COST SUB MATERIAL LABOR TOTAL READ TOTAL AMOUNT OF LABOR /MATERIALS /SUBCONTRACTOR.... 9919.03 INSURANCE AND PAYROLL TAXES OF $000.00 X 0.40% TOTAL PROPOSAL FOR THIS CHANGE PROPOSAL Page 1 (512) 288 -6030 P.O. BOX 90818 AUSTIN. TEXAS 78709-0818 FAX (512) 288-6440 0 SUBTOTAL 9919.03 PLUS 5% FOR SUBCONTRACTOR WORK 486.2015 PLUS 15% FOR PRIME CONTRACTOR WORK 29.25 ADJUSTMENT 0.52 I $ 10,435.00 I C. P. SNIDER CONSTRUCTION COMPANY GREGORY L. WARD DATE VICE PRESIDENT 08127/1998 16:07 5125568309 WESLEYCROWELECTRIC PAGE 02 !,5 /2)556 -6 Office August 27, 1998 C.P. Snider Construction Co. P.O. Box 90818 Austin, Tx. 78709 -0818 ATT: Greg Ward RE: Proposal Request #11 for Round Rock Library Project. Check out counter El & E2 7 - Duplex Receptacles 6.15 ea 43.05 Labor .296 man hr ea 62.95 7 - 4 square box 2.18 ea 15.26 Labor .400 man hr ea 85.06 7 - Single Duplex Ind Cover 1.17 ea 8.19 Labor .125 man hr ea 26.58 35' -'/x" Flex .20 per' 7.00 Labor .040 man hr per' 42.56 14 - W' Flex Connectors .74 ea 10.36 Labor .100 man hr ea 42.53 11 - 4 square box 2.18 ea 23.98 Labor .400 man hr ea 133.67 55' -3" Flex W /string . 27 per' 14.85 Labor .050 man hr ea 83.54 11 - %" Flex Connectors 1.02 ea 11.22 Labor .114 man hr ea 38.09 105' - #12 THHN .04 per' 4.20 Labor .008 man hr per' 23.10 20 -14" 1 hole straps .30 ea 6.00 Labor .018 man hr ea 10.93 Network Media 714.00 Information Desk E 3 Wesley Crow Electric, Inc. P -O. Box 70 Lampasas, Texas 76550 2 - Duplex receptacles 6.15 ea 12.30 Labor .296 man hr ea 17.98 2 - 4 square box 2.18 ea 4.36 Labor .400 man hr ea 24.30 �t / 2) tf6_ ())J'),x 08/27/1998 16:07 5125568309 WESLEYCROWELECTRIC PAGE 03 (512)556 -6532 Office Page 2 2 - Single Duplex Ind Cover Labor 10' - W' Flex Labor 4 -'/ Flex Connectors Labor 2 - 4 square box Labor 2 - Single Gang Palster Ring Labor 10' -' /" Flex Labor 4 -'/e" Flex Connectors Labor 4 -'/4" 1 Hole straps Labor 30' - #12 THHN Labor Network Media Meeting Room E4 1 - Fixture Labor 1 - GFCI Ckt Breaker Labor 10' -' /" EMT Labor 2 -' EMT Connectors Labor 4 -'/x" EMT Couplings Labor 6 - �' /n" 1 Hole Straps Labor 30' - #12 THHN Labor 1 - Single Pole Switch Labor Wesley Crow Electric, Inc. P.O. Box 70 Lampasas, Texas 76550 1.17 ea .125 man hr ea .20 per' .040 man hr per' .74 ea .100 man hr per' 2.18 ea .400 man hr ea 1.29 ea .125 man hr ea .27 per' .050 man hr per' 1.02 ea .114 man hr ea .30 ea .018 man hr ea .04 per' .22 per' 75.00 ea 2.500 man hr ea 91.20 ea 1.143 man hr ea .13 per' .047 man hr per' .17 ea .067 man hr ea .26 ea .067 man hr ea .19 ea .017 man hr ea .04 per' .22 per' 3.93 ea .296 man hr ea 2.34 7.59 2.00 12.15 2.96 12.15 4.36 24.30 2.58 7.59 2.70 15.19 4.08 13.85 1.20 2.18 1.20 6.60 238.00 75.00 75.95 91.20 34.72 1.30 14.27 .34 4.07 1.04 8.14 1.14 3.09 1.20 6.60 3.93 8.99 ii (2) .59,-,,;(01,,, 08/27/1998 16:07 5125568309 WESLEYCROWELECTRIC PAGE 04 01215566532 Once Page 3 1 - 4 square box Labor 1 - Single gang plaster ring Labor 1 - Single gang duplex cover Labor 6' - Flex Labor 2 -'/a" Flex Connectors Labor Meeting Room E5 Wesley Crow Electric, Inc. P.O. Box 70 Lampasas, Texas 76550 2.18 ea .400 man hr ea 1.29 ea .125 man hr ea 1.34 ea .125 man hr ea .20 per' .040 man hr per' .74 ea .100 man hr ea 2.18 12.15 1.29 3.79 1.34 3.79 1,20 7,29 1.48 6.07 Credit (3) Duplex Receptacles 1 - 40 AMP 12 pole Ckt Breaker 3 - GFCI 1 - Duplex Receptacle Labor 1 - Single Pole - Double Throw Labor 1 - 4 square box Labor 1 - Single Plaster Ring Labor 1 - Single Switch Plate Labor 30' - EMT Labor 90' - #8 THHN Labor 6' -' /." Flex Labor 18' - #8 THIN Labor Water Heater (not included) Labor 40 AMP - 2pole CKT Breaker 30.38 6.15 ea - 18.45 31.08 ea 31.08 14.29 ea 42.87 6.15 ea 6.15 .296 man hr ea 8.99 15.40 ea 15.40 .296 man hr ea 8.99 2.18 ea 2.18 .400 man hr ea 12.15 1.29 ea 1.29 .125 man hr ea 3.79 1.57 ea 1.57 .125 man hr ea 3.79 .23 per' 6.90 .062 man hr ea 56.50 .13 per' 11.70 .30 man hr per' 27.00 .27 per' 1.62 .050 man hr per' 9.11 .13 per' 2.34 .30 man hr per' 5.40 08/27/1998 16:07 5125568309 WESLEYCROWELECTRIC PAGE 05 (512)556 -1 (Mica Page 4 Coffee Bar E6 Wesley Crow Electric, Inc. P.O. Box 70 Lampasas, Texas 76550 20' - 2" EMT .86 per' 17.20 Labor .1'00 man hr per' 60.26 1 - 2" EMT 90 6.34 ea 6.34 Labor .400 man hr ea 12.15 2 - 2" EMT Couplings 2.03 ea 4.06 Labor .160 man hr ea 9.72 4 - 2" Standoff Straps 1.35 ea 5.40 Labor .062 man hr ea 7.53 80' - 1/0 Copper .74 per' 59.20 Labor .025 man hr per' 60.76 20' - #6 THHN .20 per' 4.00 Labor ( pulled W/ copper) Computer Room 212 E7 Delete "FG" Fixture Add "FA" Fixture Total ( Credit Computer Room 212 Power E8 - 137.00 117.00 - 20.00 10' - 2" EMT .86 per' 8.60 Labor .100 man hr per' 30.38 2 - 2" EMT Coupling 2.03 ea 4.06 Labor .160 man hr ea 9.72 40' - 1/0 .74 per' 29.60 Labor .025 man hr per' 30.38 10' - # 6 .20 per' 7.40 4 - Duplex Receptacles 6.15 ea 24.60 Labor .296 man hr ea 35.97 4 - 4 square box 2.18 ea 8.72 Labor .400 man hr ea 48.60 4 - Single plaster rings 1.29 ea 5.16 Labor .125 man hr ea 15.90 2 - 1 pole 20A Ckt Breaker 14.14 ea 28.28 Labor .800 man hr ea 48.60 / 2) 5 S6.,v,r'' ) ■,■ 08/27/1998 16:07 5125568309 WESLEYCROWELECTRIC PAGE 06 (5/2).556-6.5.72 Office Page 5 1 - 2 pole 15A Ckt Breaker 31.08 ea 31.08 Labor 1 man hr ea 30.38 1 - 2 pole 20A Ckt Breaker 31.08 ea 31.08 Labor 1 man br ea 30.38 - 30A /2pole NF Nema Disc. 87.50 ea 87.50 Labor 2.50 man hr ea 75.95 1 - 30A /2pole NF 3R Disc 151.00 ea 151.00 Labor 2,581 man hr ea 78.41 - GFCI 14.29 ea 14.29 Labor .296 man hr ea 8.99 1 - Single Bell Box 4.93 ea 4.93 Labor .125 man hr ea 3 -79 1 - GFCI WP Cover 6.86 ea 6.86 Labor .125 man hr ea 3.79 40' -'/4" EMT .23 per' 9.20 Labor .062 man br per' 75.34 240' - #10 THHN .07 per' 16.80 Labor .24 man hr per' 57.60 60' - #12 THHN .04 per' 2.40 Labor .22 man hr per' 13.20 Spare Conduit E9 Wesley Crow Electric, Inc. P.D. Box 70 Lampasas, Texas 76550 4 - Core 1" Holes 25.84 ea 103.36 290' - 1" EMT .41 per' 118.90 Labor .070 man hr per' 616.71 4 - 1" EMT Connector .53 ea 2.12 Labor .089 man hr ea 10.81 29 - t" EMT Couplings .60 ea 17.40 Labor .089 man hr ea 78.41 41 - 1" Standoff straps .54 ea 22.14 Labor .045 man hr ea 56.05 41 - Toggle Bolts 4 "X 3/16 .19 ea 7.79 Labor .100 man hr ea 124.55 41 - Fender Washer .04 ea 1.64 2 - Core 2" Holes (Machine) 25.84 ea 51.68 2 - 1 '/:" X 12" Rigid Nipple 1.68 ea 3.36 Labor .145 man hr ea 8.81 1 - 4 square box 2.18 ea 2.18 �•J2J 55(r- .YZl14 J•c�.�' 08/27/1998 16:07 5125568309 WESLEYCRQWELECTRIC PAGE 07 (5I 2)5S6 -6532 t7Jj Page 6 1 - Single Gang Plaster ring 1.29 ea 1.29 Labor .125 man hr ea 3.79 10' -3/4" EMT .23 per' 2.30 Labor .062 man hr per' 18.83 2 - 3 /4" EMT Connectors .30 ea .60 Labor .073 man hr ea 4.43 2 -' /a" 1 hole strap .30 ea .60 Labor .018 man hr ea 1.09 Network Media 119.00 Reference Desk 2" Floor W /additional terminal tables E 10 - 11 - 12 14 - Duplex receptacles 6.15 ea 86.10 Labor .296 man hr ea 125.89 Network Media Computer outlets 238.00 14 - 4 square boxes 2.10 ea 30.52 Labor .400 man hr ea 170.12 250' -'/4" EMT .23 per' 57.50 Labor .062 man hr per' 470.89 56' - %" EMT Connectors .30 ea 16.80 Labor .062 man hr ea 105.48 25 - EMT Couplings .34 ea 8.50 Labor .073 man hr ea 55.44 36 -'/4" EMT Straps 1 hole .30 ea 10.80 Labor .018 man hr ea 19.68 14 - Single Duplex Indus. Cover 1.17 ea 16.38 Labor .125 man hr ea 53.16 30 - Drill 1" boles in desk 2.09 ea 62.70 Computer Revision E 13 No Charge Panel Board Revisions E 14 No charge E 15 No charge E 16 Refer to E S Wesley Crow Electric, Inc. P.O. Box 70 Lampasas, Texas 76550 57 ,) 55( . ((91 ,�s From Joe Clark To: GREG Ref: Round Rock Library Proposal Request #] 1 rh October 9, 1998 Attn Greg Floor drain cannot be routed as shown on either plan due to structural conclitions. 1 have priced the floor drain to tie into existing plumbing adjacent to where we will have W relocate the floor drain. Visual inspection did not indicate existing rough in at the location indicated for sk -3. 1 cannot verify existing rough in without some demo work. Assuming that the rough -in is there the price for the new sink, water heater, floor drain (relocated and Lied in to existing plumbing immediately adjacent Lo it) and hose bib (tied in to existing water line immediately adjacent to it) is 91650.00 This does not include any waterproofing or patching of concrete which may have Lo be demolished to obtain access to the plumbing. P Joseph D. Clark Project Manager!Estimator Date: 10!9t98 lime: 9:05:46 AM Page 1 of 1 Biggs Plumbing Company SERVING THE CONSTRUCTIONINDUSTRY WITH QUALITY PLUMBING SINCE 1972 1615 Dungan tat. - Austin, TX 78751 (512) 837 -5955 - Fax (512) 837 -3108 08!2711998 16:07 5125568309 (513)556.6532 (eke Page 7 E 17 Refer to E 3 &4 E 18 Addendum E 19 Refer to E 13 E 20 Refer to E 10 — 11-12 Subtotal 10% Overhead 10% Profit Total for RFP # 11 Signed Wesley Crow Electric, Inc. P.O. Box 70 Lampasas, Texas 76550 Wesley Crow, President Wesley Crow Electric, Inc. WESLEYCROWELECTRIC PAGE 08 6,672.75 667.28 7,340.03 734.00 8,074.03 a ,) 5.5r..v_ wQ DATE: November 20, 1998 SUBJECT: City Council Meeting —November 24, 1998 ITEM: 14.E.1. Consider a resolution authorizing the Mayor to execute Contract Change Order No. 1 with C.P. Snider Construction Company for the Library addition and remodel project. This change order request was made by library staff and includes the following items: Computer room enlarged, a counter top and cabinet along with water and wastewater plumbing for sink is added to meeting room 106, and electrical and telephone data modifications at reference desk. The change order totals $10,435.00 and increases the total contract to $2,870,435.00. This project is funded by the General Obligation Bond Program. Staff recommends acceptance. Staff resource person: Dale Ricklefs, Library Director.