R-98-11-24-14E1 - 11/24/1998WHEREAS, the City of Round Rock has previously entered into
a contract ( "Contract ") with C.P. Snider Construction Co., Inc.
for the Library Addition and Remodel Project, and
WHEREAS, it has been determined that it is necessary to
change said Contract in accordance with the attached Contract
Change Order No. 1, Now Therefore
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK,
TEXAS,
That the Mayor is hereby authorized and directed to execute on
behalf of the City Contract Change Order No. 1 to the Contract with
C.P. Snider Construction Co., Inc. for the Library Addition and
Remodel Project.
The City Council hereby finds and declares that written notice
of the date, hour, place and subject of the meeting at which this
Resolution was adopted was posted and that such meeting was open to
the public as required by law at all times during which this
Resolution and the subject matter hereof were discussed, considered
and formally acted upon, all as required by the Open Meetings Act,
Chapter 551, Texas Government Code, as amended, and the Act.
RESOLVED this 24th day of November, 1998.
ATTEST:
K \WPDOCS\RESOLUT RSI I2.1E1 WPD /scy
LAND, City Secretary
RESOLUTION NO. R- 98- 11- 24 -14E1
CHARLES CULPEgPER, Mayor
City of Round Rock, Texas
C. P. SNIDER CONSTRUCTION COMPANY
GENERAL CONTRACTOR
_....$
PROJECT: ADDITIONS AND RENOVATIONS TO PUBLIC LIBRARY DATE: OCTOBER 27, 1998
LOCATION: ROUND ROCK, TEXAS
CONTRACTOR: C.P. SNIDER CONSTRUCTION COMPANY PROPOSAL NUMBER: 11
DESCRIPTION OF CHANGE OF THE WORK: MECHANICAL AND ELECTRICAL REVISIONS PER RFP #11
NOTES: 1. WORK REQUESTED REQUIRES FIVE (5) ADDITIONAL WORK DAYS.
2. PROPOSAL RESPECTFULLY WITHDRAWN AFTER THIRTY (30) DAYS.
3. ADDTIONAL ITEM
ITEM
CHANGE ORDER PROPOSAL FORM
QUAN COST SUB MATERIAL LABOR TOTAL
READ
TOTAL AMOUNT OF LABOR /MATERIALS /SUBCONTRACTOR.... 9919.03
INSURANCE AND PAYROLL TAXES OF $000.00 X 0.40%
TOTAL PROPOSAL FOR THIS CHANGE PROPOSAL
Page 1
(512) 288 -6030
P.O. BOX 90818
AUSTIN. TEXAS 78709-0818
FAX (512) 288-6440
0
SUBTOTAL 9919.03
PLUS 5% FOR SUBCONTRACTOR WORK 486.2015
PLUS 15% FOR PRIME CONTRACTOR WORK 29.25
ADJUSTMENT 0.52
I $ 10,435.00 I
C. P. SNIDER CONSTRUCTION COMPANY
GREGORY L. WARD DATE
VICE PRESIDENT
0
0
ELECTRICAL
8074.03
0
0
8074.03
PLUMBING
1650
0
0
1650
0
0
0
0
0
BOND PREMIUM
0
195
0
195
0
0
0
0
0
0
SUBTOTALS
9724.03
195
0
9919.03
C. P. SNIDER CONSTRUCTION COMPANY
GENERAL CONTRACTOR
_....$
PROJECT: ADDITIONS AND RENOVATIONS TO PUBLIC LIBRARY DATE: OCTOBER 27, 1998
LOCATION: ROUND ROCK, TEXAS
CONTRACTOR: C.P. SNIDER CONSTRUCTION COMPANY PROPOSAL NUMBER: 11
DESCRIPTION OF CHANGE OF THE WORK: MECHANICAL AND ELECTRICAL REVISIONS PER RFP #11
NOTES: 1. WORK REQUESTED REQUIRES FIVE (5) ADDITIONAL WORK DAYS.
2. PROPOSAL RESPECTFULLY WITHDRAWN AFTER THIRTY (30) DAYS.
3. ADDTIONAL ITEM
ITEM
CHANGE ORDER PROPOSAL FORM
QUAN COST SUB MATERIAL LABOR TOTAL
READ
TOTAL AMOUNT OF LABOR /MATERIALS /SUBCONTRACTOR.... 9919.03
INSURANCE AND PAYROLL TAXES OF $000.00 X 0.40%
TOTAL PROPOSAL FOR THIS CHANGE PROPOSAL
Page 1
(512) 288 -6030
P.O. BOX 90818
AUSTIN. TEXAS 78709-0818
FAX (512) 288-6440
0
SUBTOTAL 9919.03
PLUS 5% FOR SUBCONTRACTOR WORK 486.2015
PLUS 15% FOR PRIME CONTRACTOR WORK 29.25
ADJUSTMENT 0.52
I $ 10,435.00 I
C. P. SNIDER CONSTRUCTION COMPANY
GREGORY L. WARD DATE
VICE PRESIDENT
08127/1998 16:07 5125568309 WESLEYCROWELECTRIC PAGE 02
!,5 /2)556 -6 Office
August 27, 1998
C.P. Snider Construction Co.
P.O. Box 90818
Austin, Tx. 78709 -0818
ATT: Greg Ward
RE: Proposal Request #11 for Round Rock Library Project.
Check out counter El & E2
7 - Duplex Receptacles 6.15 ea 43.05
Labor .296 man hr ea 62.95
7 - 4 square box 2.18 ea 15.26
Labor .400 man hr ea 85.06
7 - Single Duplex Ind Cover 1.17 ea 8.19
Labor .125 man hr ea 26.58
35' -'/x" Flex .20 per' 7.00
Labor .040 man hr per' 42.56
14 - W' Flex Connectors .74 ea 10.36
Labor .100 man hr ea 42.53
11 - 4 square box 2.18 ea 23.98
Labor .400 man hr ea 133.67
55' -3" Flex W /string . 27 per' 14.85
Labor .050 man hr ea 83.54
11 - %" Flex Connectors 1.02 ea 11.22
Labor .114 man hr ea 38.09
105' - #12 THHN .04 per' 4.20
Labor .008 man hr per' 23.10
20 -14" 1 hole straps .30 ea 6.00
Labor .018 man hr ea 10.93
Network Media 714.00
Information Desk E 3
Wesley Crow Electric, Inc.
P -O. Box 70
Lampasas, Texas 76550
2 - Duplex receptacles 6.15 ea 12.30
Labor .296 man hr ea 17.98
2 - 4 square box 2.18 ea 4.36
Labor .400 man hr ea 24.30
�t / 2) tf6_ ())J'),x
08/27/1998 16:07 5125568309 WESLEYCROWELECTRIC PAGE 03
(512)556 -6532 Office
Page 2
2 - Single Duplex Ind Cover
Labor
10' - W' Flex
Labor
4 -'/ Flex Connectors
Labor
2 - 4 square box
Labor
2 - Single Gang Palster Ring
Labor
10' -' /" Flex
Labor
4 -'/e" Flex Connectors
Labor
4 -'/4" 1 Hole straps
Labor
30' - #12 THHN
Labor
Network Media
Meeting Room E4
1 - Fixture
Labor
1 - GFCI Ckt Breaker
Labor
10' -' /" EMT
Labor
2 -' EMT Connectors
Labor
4 -'/x" EMT Couplings
Labor
6 - �' /n" 1 Hole Straps
Labor
30' - #12 THHN
Labor
1 - Single Pole Switch
Labor
Wesley Crow Electric, Inc.
P.O. Box 70
Lampasas, Texas 76550
1.17 ea
.125 man hr ea
.20 per'
.040 man hr per'
.74 ea
.100 man hr per'
2.18 ea
.400 man hr ea
1.29 ea
.125 man hr ea
.27 per'
.050 man hr per'
1.02 ea
.114 man hr ea
.30 ea
.018 man hr ea
.04 per'
.22 per'
75.00 ea
2.500 man hr ea
91.20 ea
1.143 man hr ea
.13 per'
.047 man hr per'
.17 ea
.067 man hr ea
.26 ea
.067 man hr ea
.19 ea
.017 man hr ea
.04 per'
.22 per'
3.93 ea
.296 man hr ea
2.34
7.59
2.00
12.15
2.96
12.15
4.36
24.30
2.58
7.59
2.70
15.19
4.08
13.85
1.20
2.18
1.20
6.60
238.00
75.00
75.95
91.20
34.72
1.30
14.27
.34
4.07
1.04
8.14
1.14
3.09
1.20
6.60
3.93
8.99
ii (2) .59,-,,;(01,,,
08/27/1998 16:07 5125568309 WESLEYCROWELECTRIC PAGE 04
01215566532 Once
Page 3
1 - 4 square box
Labor
1 - Single gang plaster ring
Labor
1 - Single gang duplex cover
Labor
6' - Flex
Labor
2 -'/a" Flex Connectors
Labor
Meeting Room E5
Wesley Crow Electric, Inc.
P.O. Box 70
Lampasas, Texas 76550
2.18 ea
.400 man hr ea
1.29 ea
.125 man hr ea
1.34 ea
.125 man hr ea
.20 per'
.040 man hr per'
.74 ea
.100 man hr ea
2.18
12.15
1.29
3.79
1.34
3.79
1,20
7,29
1.48
6.07
Credit (3) Duplex Receptacles
1 - 40 AMP 12 pole Ckt Breaker
3 - GFCI
1 - Duplex Receptacle
Labor
1 - Single Pole - Double Throw
Labor
1 - 4 square box
Labor
1 - Single Plaster Ring
Labor
1 - Single Switch Plate
Labor
30' - EMT
Labor
90' - #8 THHN
Labor
6' -' /." Flex
Labor
18' - #8 THIN
Labor
Water Heater (not included)
Labor 40 AMP - 2pole CKT Breaker 30.38
6.15 ea - 18.45
31.08 ea 31.08
14.29 ea 42.87
6.15 ea 6.15
.296 man hr ea 8.99
15.40 ea 15.40
.296 man hr ea 8.99
2.18 ea 2.18
.400 man hr ea 12.15
1.29 ea 1.29
.125 man hr ea 3.79
1.57 ea 1.57
.125 man hr ea 3.79
.23 per' 6.90
.062 man hr ea 56.50
.13 per' 11.70
.30 man hr per' 27.00
.27 per' 1.62
.050 man hr per' 9.11
.13 per' 2.34
.30 man hr per' 5.40
08/27/1998 16:07 5125568309 WESLEYCROWELECTRIC PAGE 05
(512)556 -1 (Mica
Page 4
Coffee Bar E6
Wesley Crow Electric, Inc.
P.O. Box 70
Lampasas, Texas 76550
20' - 2" EMT .86 per' 17.20
Labor .1'00 man hr per' 60.26
1 - 2" EMT 90 6.34 ea 6.34
Labor .400 man hr ea 12.15
2 - 2" EMT Couplings 2.03 ea 4.06
Labor .160 man hr ea 9.72
4 - 2" Standoff Straps 1.35 ea 5.40
Labor .062 man hr ea 7.53
80' - 1/0 Copper .74 per' 59.20
Labor .025 man hr per' 60.76
20' - #6 THHN .20 per' 4.00
Labor ( pulled W/ copper)
Computer Room 212 E7
Delete "FG" Fixture
Add "FA" Fixture
Total ( Credit
Computer Room 212 Power E8
- 137.00
117.00
- 20.00
10' - 2" EMT .86 per' 8.60
Labor .100 man hr per' 30.38
2 - 2" EMT Coupling 2.03 ea 4.06
Labor .160 man hr ea 9.72
40' - 1/0 .74 per' 29.60
Labor .025 man hr per' 30.38
10' - # 6 .20 per' 7.40
4 - Duplex Receptacles 6.15 ea 24.60
Labor .296 man hr ea 35.97
4 - 4 square box 2.18 ea 8.72
Labor .400 man hr ea 48.60
4 - Single plaster rings 1.29 ea 5.16
Labor .125 man hr ea 15.90
2 - 1 pole 20A Ckt Breaker 14.14 ea 28.28
Labor .800 man hr ea 48.60
/ 2) 5 S6.,v,r'' ) ■,■
08/27/1998 16:07 5125568309 WESLEYCROWELECTRIC PAGE 06
(5/2).556-6.5.72 Office
Page 5
1 - 2 pole 15A Ckt Breaker 31.08 ea 31.08
Labor 1 man hr ea 30.38
1 - 2 pole 20A Ckt Breaker 31.08 ea 31.08
Labor 1 man br ea 30.38
- 30A /2pole NF Nema Disc. 87.50 ea 87.50
Labor 2.50 man hr ea 75.95
1 - 30A /2pole NF 3R Disc 151.00 ea 151.00
Labor 2,581 man hr ea 78.41
- GFCI 14.29 ea 14.29
Labor .296 man hr ea 8.99
1 - Single Bell Box 4.93 ea 4.93
Labor .125 man hr ea 3 -79
1 - GFCI WP Cover 6.86 ea 6.86
Labor .125 man hr ea 3.79
40' -'/4" EMT .23 per' 9.20
Labor .062 man br per' 75.34
240' - #10 THHN .07 per' 16.80
Labor .24 man hr per' 57.60
60' - #12 THHN .04 per' 2.40
Labor .22 man hr per' 13.20
Spare Conduit E9
Wesley Crow Electric, Inc.
P.D. Box 70
Lampasas, Texas 76550
4 - Core 1" Holes 25.84 ea 103.36
290' - 1" EMT .41 per' 118.90
Labor .070 man hr per' 616.71
4 - 1" EMT Connector .53 ea 2.12
Labor .089 man hr ea 10.81
29 - t" EMT Couplings .60 ea 17.40
Labor .089 man hr ea 78.41
41 - 1" Standoff straps .54 ea 22.14
Labor .045 man hr ea 56.05
41 - Toggle Bolts 4 "X 3/16 .19 ea 7.79
Labor .100 man hr ea 124.55
41 - Fender Washer .04 ea 1.64
2 - Core 2" Holes (Machine) 25.84 ea 51.68
2 - 1 '/:" X 12" Rigid Nipple 1.68 ea 3.36
Labor .145 man hr ea 8.81
1 - 4 square box 2.18 ea 2.18
�•J2J 55(r- .YZl14 J•c�.�'
08/27/1998 16:07 5125568309 WESLEYCRQWELECTRIC PAGE 07
(5I 2)5S6 -6532 t7Jj
Page 6
1 - Single Gang Plaster ring 1.29 ea 1.29
Labor .125 man hr ea 3.79
10' -3/4" EMT .23 per' 2.30
Labor .062 man hr per' 18.83
2 - 3 /4" EMT Connectors .30 ea .60
Labor .073 man hr ea 4.43
2 -' /a" 1 hole strap .30 ea .60
Labor .018 man hr ea 1.09
Network Media 119.00
Reference Desk 2" Floor W /additional terminal tables
E 10 - 11 - 12
14 - Duplex receptacles 6.15 ea 86.10
Labor .296 man hr ea 125.89
Network Media Computer outlets 238.00
14 - 4 square boxes 2.10 ea 30.52
Labor .400 man hr ea 170.12
250' -'/4" EMT .23 per' 57.50
Labor .062 man hr per' 470.89
56' - %" EMT Connectors .30 ea 16.80
Labor .062 man hr ea 105.48
25 - EMT Couplings .34 ea 8.50
Labor .073 man hr ea 55.44
36 -'/4" EMT Straps 1 hole .30 ea 10.80
Labor .018 man hr ea 19.68
14 - Single Duplex Indus. Cover 1.17 ea 16.38
Labor .125 man hr ea 53.16
30 - Drill 1" boles in desk 2.09 ea 62.70
Computer Revision E 13
No Charge
Panel Board Revisions
E 14 No charge
E 15 No charge
E 16 Refer to E S
Wesley Crow Electric, Inc.
P.O. Box 70
Lampasas, Texas 76550
57 ,) 55( . ((91 ,�s
From Joe Clark To: GREG
Ref: Round Rock Library
Proposal Request #] 1
rh
October 9, 1998
Attn Greg
Floor drain cannot be routed as shown on either plan due to structural conclitions. 1 have priced the floor drain to tie
into existing plumbing adjacent to where we will have W relocate the floor drain. Visual inspection did not indicate
existing rough in at the location indicated for sk -3. 1 cannot verify existing rough in without some demo work.
Assuming that the rough -in is there the price for the new sink, water heater, floor drain (relocated and Lied in to
existing plumbing immediately adjacent Lo it) and hose bib (tied in to existing water line immediately adjacent to it)
is 91650.00
This does not include any waterproofing or patching of concrete which may have Lo be demolished to obtain access
to the plumbing.
P
Joseph D. Clark
Project Manager!Estimator
Date: 10!9t98 lime: 9:05:46 AM Page 1 of 1
Biggs Plumbing Company
SERVING THE CONSTRUCTIONINDUSTRY WITH QUALITY PLUMBING SINCE 1972
1615 Dungan tat. - Austin, TX 78751
(512) 837 -5955 - Fax (512) 837 -3108
08!2711998 16:07 5125568309
(513)556.6532 (eke
Page 7
E 17 Refer to E 3 &4
E 18 Addendum
E 19 Refer to E 13
E 20 Refer to E 10 — 11-12
Subtotal
10% Overhead
10% Profit
Total for RFP # 11
Signed
Wesley Crow Electric, Inc.
P.O. Box 70
Lampasas, Texas 76550
Wesley Crow, President
Wesley Crow Electric, Inc.
WESLEYCROWELECTRIC PAGE 08
6,672.75
667.28
7,340.03
734.00
8,074.03
a ,) 5.5r..v_ wQ
DATE: November 20, 1998
SUBJECT: City Council Meeting —November 24, 1998
ITEM: 14.E.1. Consider a resolution authorizing the Mayor to execute Contract
Change Order No. 1 with C.P. Snider Construction Company for the
Library addition and remodel project. This change order request was
made by library staff and includes the following items: Computer
room enlarged, a counter top and cabinet along with water and
wastewater plumbing for sink is added to meeting room 106, and
electrical and telephone data modifications at reference desk. The
change order totals $10,435.00 and increases the total contract to
$2,870,435.00. This project is funded by the General Obligation Bond
Program. Staff recommends acceptance. Staff resource person: Dale
Ricklefs, Library Director.