Loading...
R-98-12-10-13B5 - 12/10/1998RESOLUTION NO. R- 98- 12- I1 -13B5 WHEREAS, Brushy Creek Municipal District ( "District ") and the City of Round Rock ( "City ") entered into a Water Supply Agreement dated October 14, 1986, and WHEREAS, the City desires to install air gap devices at certain locations where it transmits water to the District, and WHEREAS, the District has submitted an Agreement Between the City of Round Rock and Brushy Creek Municipal District Relating to the Installation of Air Gap Devices ( "Agreement "), and WHEREAS, the City Council wishes to enter into said Agreement with the District, Now Therefore, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City an Agreement between the City of Round Rock and Brushy Creek Municipal District Relating to the Installation of Air Gap Devices, a copy of said agreement being attached hereto and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolutione was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended, and the Act. RESOLVED this 10th day of December, 1998. K- \WPDOCS \RESOLUTI \R8121OB5.11PD /scg ATTEST: NE LAND, City Secretary 2 CHARLES CULPE Eyt, Mayor City of Round Rock, Texas Mayor Charles Culpepper Mayor Pro -tem Robert Stluka Connell Members Earl M. Hairston Rick Stewart Earl Pakner Martha Chavez Jimmy Joseph City Manager Robert L. Bennett, Jr. CIO Attorney Stephan L Sheets CITY OF ROUND ROCK December 1, 1998 Mr. Edward J. Herman The Southland Corporation P. O. Box 711 Dallas, TX 75221 RE: Brushy Creek MUD Water Well / Backflow Preventers Dear Mr. Herman, RECEIVED n". Q 3199f 221 East Main Street Round Rock, Texas 78664 512-218-5400 Pursuant to your letter of June 27,1997 and other correspondence, enclosed please find an invoice for $59,176.28 which brings the to date total paid to Psencik Construction for the backflow preventers at Brushy Creek to $81,600.82. Please forward funds payable to the City of Round Rock. As agreed upon please forward $80,000 to the attention of David Kautz, 221 E. Main St., Round Rock, Texas 78664. Thank you for your cooperation in this matter. Since Robert L. Be City Manager Fax: 512- 218 -7097 Jr., AICP 1- 800 - 735- 2989TDD 1-8C0-735-2988 Voice www.ci.mund-rocictx.us x 1 a } 1 D PAYMENT APPLICATION - B#CKFL0W PREVENTIDN DEVICES AT INTERCONNECTS BETWEEN CITY OF ROUND ROCK MD BRUSHY CREEK MUD WATER DLSTRIBUTKON SYSTEMS Page 1 0 0 ID ID m 0 -- - - DATE NOVEMBER SO, IBM Ne:g10101,33 CONTRACTORS PSENCIR CONSTRUCTION LTD- ESTIMATE I. THREE {31 PA, BOX 3007 TEMPLE, TEXAS TOWS PERIOD: 097093 TO 11.3000 PER PROJECT: BACKPLOW PREVENTION DEVICES AT INTERCONNECTS ENGINEER, _ BETWEEN CITY OP ROUND ROCK AND BRUSHY MUD WATER DISTRIBUTION SYSTEMS CREEK 2213 SOUTH 0- 33.5351E300 AUSTIN, TEXAS T3741 ATM JAMES R. GLASER, ►E- RBI N0A OESCAPNDN INSTALLED SCHEMED W0RK C0MPLETED WORK COMPLETED MATERIALS TVGLCONPLETEDAN• PERCENT TO DATE VALUE PREVIOUS APPL TNIS PERIOD STORED STORED 30 DATE COMPLETE 1 SSTALUT1ON OF RACRFL0W PREVENII➢HDEVICES LS 1 102,H00.00 1 6.230.0 3 17,213 -03 P 50.32522 3 51. 553.32 m � ox., 1 3 5 - 2 ' CHANGE ORDER NO, ONE DI - DEDUCT L6 3 (379-00). - 3 - .�._...s�ae : @a- samza;z :.se =Rae • :a �'=- � s_ -0 TOTALS 1 (033.00 5 4.240.00 17.215.03 3 00. 125.3! 1 6 %001/2 TOLIMI x 1 a } 1 D PAYMENT APPLICATION - B#CKFL0W PREVENTIDN DEVICES AT INTERCONNECTS BETWEEN CITY OF ROUND ROCK MD BRUSHY CREEK MUD WATER DLSTRIBUTKON SYSTEMS Page 1 0 0 ID ID m 0 PAYMENT APPLICATION - BACKFLOW PREVENTION DEVICES AT INTERCONNECTS BETWEEN CRY OF ROUND ROCK AND BRUSHY CREEK MUD WATER DISTRIBUTION SYSTEMS Page l CONTRACT 1 105,600.00 pgmTm FOR GATE- ft FOR DATE FOR DATE Y: L�w - _ .. CHANGE E O CHANGE ORD9L4 TNfi1 NO, 1 RS THE/ / N 1 (31900) w. PSBILfI y ^1^ ETO _ — • - CONTRACT SUM 1T1 DATE 1 10E211 CO TOTAL COMPLETED AND STORED TO DATE 1 61800,027 R[TAINAUE N374 1 9,03004 / BY: 1 � / `• EARNED LESS RETMNAGE T1 ,$ .7I s7 LESS LESS PIt4V1011G PAYMENTS S 1 f62090 I EDE ENGINEERS 1/1 7ak (7 LEPPERTPAYMp(TDUE 1 59,17E.z!'/ BAIMICETO F0$SN. F]'LLUDINO RETAINAGE 4 213190.11 ^ FOR PAYMENT: CITY OF ROUND ROCK 02.0030 Seed CIE* T C NOM WA lk Conshvdten LTD. Nees ARO ONE Tern TS501 AN, 761/4935 tp: Peenrit Caneux0on SpNANAcwun Lm, MMES 491 Temple, Amount AAA, Cow ol Meek ._� Po.1ca3441 Temple, Taxes MAN UNITE deeeA PAYMENT APPLICATION - BACKFLOW PREVENTION DEVICES AT INTERCONNECTS BETWEEN CRY OF ROUND ROCK AND BRUSHY CREEK MUD WATER DISTRIBUTION SYSTEMS Page DATE: December 7, 1998 SUBJECT: City Council Meeting — December 10, 1998 ITEM: 13.B.5. Consider a resolution authorizing the Mayor to execute an agreement with Brushy Creek Municipal District for the installation of air gaps on Sam Bass Road. Staff Resource Person: Jim Nuse, Public Works Director. This will authorize the Mayor to enter into an agreement with Brushy Creek Municipal Utility District (MUD) to reimburse the MUD for two air gap connections, which eliminate the requirement for backflow devices at these locations. This agreement will reduce the contract with Psencik Construction by more than the $7,000 reimbursement.