R-98-12-22-10A7 - 12/22/1998RESOLUTION NO. R- 98- 12- 22 -10A7 WHEREAS, the City of Round Rock desires to retain inspection services in connection with the construction of the Chisholm Valley Elevated Water Tank, and WHEREAS, HOT Inspection has submitted a testing inspection proposal to provide said services, and WHEREAS, the City Council desires to approve said proposal, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City a testing inspection proposal with HOT Inspection for inspection services in connection with the construction of the Chisholm Valley Elevated Water Tank, a copy of said proposal being attached hereto and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended, and the Act. RESOLVED this 22nd day of Decembe /, 198. ATTEST: LAND, City Secretary R: \WPDOCS \RESOLUTI \RB1222aP. WPD /se, (7,6 , 7/ CHARLES CU PER, Mayor City of Round Rock, Texas 1.25 MMG COMPOSITE WATER TANK INSPECTION PROPOSAL HOT Inspection Services, Inc. (HOT) hereby offers to perform the following work on the Chisholm Valley Reservoir Project at the price, terms, and conditions listed herein: SCOPE: HOT proposes to provide welding inspection and testing and coating inspection and testing on the referenced project for The City of Round Rock. The objective of this project is to provide quality assurance surveillance of the welding, erection, sandblasting, and painting during the construction of the water tank. Inspection and testing visits will be strategic and at the discretion of the Owner /Engineer. The services to be rendered will include the following: Welding, Fabrication and Erection Inspection - Review tank project drawings to provide comments to owner. - Review welder qualification records, welding procedures, and mill test reports before any welding commences. - Verify proper welding electrodes and electrode storage to be used on project. - Conduct inspections on shop fabricated components. - Conduct tank erection practices and fit -up. - Conduct Certified Welding Inspection per AWWA D100 during construction. - Furnish Radiographic Testing as per AWWA D100 App. C. - Witness vacuum testing of floor lap welds. The inspection methods to be implemented for the above inspection will consist of Visual Testing (VT), Solution film Testing (SFT) and Radiographic Testing (RT). All inspections will verify compliance with the AWWA D100 -96 Standard and Contract Specifications. 1. Shop fabricated items will be inspected on site as they arrive unless a shop visit is requested by the owner. The fabrication and weld quality will be inspected for compliance to AWWA D 100 -96. If a shop inspection is required by the owner, it shall consist of a visual inspection of the fabricating practices and operations to determine compliance with the AWWA Standard. 2. Field erection and welding will be inspected for compliance to the AWWA Standard. The inspection procedures will parallel the procedures listed in Section 11.2. The quality of field welding shall be determined by visual inspections on all joint fit -up and welding. Radiographic testing will be conducted as specified in Section 11.5. All test locations will be selected by HOT and the radiographs will be graded. 3. HOT will provide the location selection of each shot and grade each radiograph. Sandblasting and Coating Inspection - Pre - surface preparation inspection. - Measurement of ambient conditions. - Evaluation of compressor and surface preparation equipment. - Determination of surface preparation cleanliness and profile. - Inspection of application equipment. - Witnessing coating mixing. - Inspecting coating application. - Determination of wet film thickness. - Determination of dry film thickness. - Evaluating cleanliness between coats. - Conduct holiday testing of the inside coating system below the top capacity level. - Evaluate cure. - Finalize inspection and testing of project by submitting a final report to engineer and owner. The inspection methods to be implemented for the sandblasting and coating inspections will consist of visual inspections, mil gauging, holiday testing, profile gauging and atmospheric measuring. All inspections will verify compliance with the AWWA D102 -97 and contract specifications. 1. The measurement of air temperature, surface temperature, humidity, dew point, coating thickness and holiday detection will be recorded in an inspectors log book. The equipment to obtain such measurements will be supplied by HOT. WORK EXCLUDED: Work required for safely accessing the tank is not included in the cost of this project. It will be the contractor's responsibility for providing safe access to all areas of the tank for inspection and testing during the construction. OSHA approved scaffolding and shell buggies will be necessary for the complete access of the tank. PRICE: The cost for the above mentioned service is based on an hourly rate of $50.00/hr for Welding Inspection and Coating Inspection. WELDING AND ERECTION INSPECTION $5,000.00 NOTE: BASED ON 100 HOURS (2 HR MIN. CHARGED EACH SITE VISIT) SURFACE PREPARATION AND PAINTING $3,500.00 NOTE: BASED ON 70 HOURS (2 HR MIN. CHARGED EACH SITE VISIT) TOTAL COST OF SERVICE $8,500.00 All work will be conducted and billed at an hourly rate as shown above. The estimated amount of time for steel erection and coating is 12 -14 weeks. The budget cost for conducting the inspection will not exceed the cost above without written approval from the owner /representative. Once the cost approaches the budget cost, the owner will be notified and informed of the remaining work required to complete project TERMS: This proposal is offered to acceptance within 45 days. Payments to be made within 30 days of invoice date. CONDITIONS: This proposal assumes that the tank will be accessible for inspection and that any restrictions requiring special work will affect the cost of this proposal. Page 5. Chisholm Valley Reservoir Proposal INSURANCE: HOT to provide insurance certificate upon request. TIME OF PERFORMANCE: All inspection visits will be scheduled with the engineer and contractor if required for performing the necessary inspection and testing. ACCEPTANCE: Should you find this proposal acceptable at the prices, terms, and conditions offered, please indicate your acceptance by signing in the space provided. ^^n Executed on this the day of DC6mbet 1998. ACCEPTED / ACC John H Presid HOT n tion ervices, Inc. " SU it Charles Culpepper, yor City of Round Rock, Texas December 7, 1998 Bob Bennett City Manager 221 E. Main Street Round Rock, Texas 78664 Re: Inspection Proposal for the Chishlom Valley Reservoir Dear Bob: HOT INSPECTION SERVICES, INC. Welding Consultants & Inspection Speciallsts P.O. Box 1208 Round Rock, Tx 78680 (512) 244 -2523 FAX (512) 244 -0607 E -Mail: HOT @io.com Web Site: wWw.io.com / —hot Please find the attached proposal requested by the City of Round Rock for the quality assurance surveillance of the referenced water tank. I am delighted to be considered for the welding and coating inspection of the Chisholm Valley Reseervior. The proposal lists the scope of services to be rendered by me as well as the projected amount of time required to assure a quality product. The proposed amount of time that I have allotted should be adequate, based on my experience with 1.25MMG Composite Water Tanks. Please give me a call if you need any further information concerning this project proposal. DATE: December 18, 1998 SUBJECT: City Council Meeting — December 22, 1998 ITEM: 10.A.7. Consider a resolution authorizing the Mayor to sign a testing inspection proposal by HOT Inspection for services associated with construction of Chisholm Valley Elevated Tank. The cost of the services is $8,500.00. Staff recommends acceptance. Staff Resource Person: Jim Nuse, Public Works Director. Mayor Charles Culpepper Mayor Pro-tem Robert Stluka Council Members Earl M. Hairston Rick Stewart Earl Palmer Martha Chaver Jimmy Joseph CIty Manager Robert L. Bennett, Jr City Attorney Stephan L. Shenk CITY OF ROUND ROCK May 29, 1998 Mr. John H. Konzen, CWI, President Hot Inspection Services, Inc. P.O. Box 1208 Round Rock, Texas 78680 Sincerely, The Round Rock City Council approved Resolution No. R- 98- 12- 22 -10A7 at their regularly scheduled meeting on December 22, 1998. This resolution approves the testing inspection proposal for services in connection with the construction of the Chisholm Valley Elevated Water Tank. Enclosed is a copy of the resolution and proposal for your files. If you have any questions, please do not hesitate to call. Joanne Land Assistant City Manager/ City Secretary Enclosures Fax; 512- 218 -7047 1 -830- 735 -2989 TDD 1 -800.735 -2988 Voice www.ci.round-reck.tx.us 221 East Main Street Sound Rock. Texas 78664 512 - 218 -5400