Loading...
R-99-01-14-14A5 - 1/14/1999Mayor Charles Culpepper - Mayor Pro-tem Robert Shako Council Members Earl M. Hairston Rick Stewart Earl Palmer Martha Chavez Jimmy Joseph City Manager Robert L. Bennett, Jr. City Attorney Stephan L Sheets CITY OF ROUND ROCK February 18, 1999 Mr. James R. Glaser, P.E. HDR Engineering, Inc. 2211 South IH 35. Ste 300 Austin, TX 78741 Dear Mr. Glaser: The Round Rock City Council approved Resolution No. R- 99- 01- 14 -14A5 at their regularly scheduled meeting on January 14, 1999. This resolution approves Change Order No. 2 for the installation of backflow prevention devices at the interconnects between the City's water distribution system and the Brushy creek MUD water distribution system. Enclosed is a copy of the resolution and original change order for your files and for Psencik's files. If you have any questions, please do not hesitate to contact me. Sincerely, Joanne Land Assistant City Manager/ City Secretary Enclosures Fax 512- 218 -7097 1- 800 - 735- 2989TDD 1- 800 - 735 -2988 Voice www c i. round -rock tx. u s 221 East Main Street Round Rock,Texas 78664 512- 218 -5400 RESOLUTION NO. R- 99- 01- 14 -14A5 WHEREAS, the City of Round Rock has previously entered into a contract ( "Contract ") with Psencik Construction Company, Inc. for the installation of backflow prevention devices at the interconnects between the City's water distribution system and the Brushy Creek MUD water distribution system, and WHEREAS, it has been determined that it is necessary to change said Contract in accordance with the attached Contract Change Order No. 2, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Contract Change Order No. 2 to the Contract with Psencik Construction Company, Inc. for the installation of backflow prevention devices at the interconnects between the City's water distribution system and the Brushy Creek MUD water distribution system. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended, and the Act. RESOLVED this 14th day of January 1999 ATEST: NE LAND, City Secretary k: \ WPDOCS \nzsocvrx \R9Oiians_wno /any CHARLES CULPEPPER, Mayor City of Round Rock, Texas 0P RAIAsSD f6 OC K Date 'CQIFI l0ANCE'ORDERNt0 2 _ _ -, I N la �r • Contract: Insmllation of Backllow ;. e Pre vyntiotl DevioesL Water DisOntiu @System • . iOw ner. City of Round Rack 221 East Aldo SWeet, Rath [{oak, T 7$ 664 Contractor: PxnoikCAn5truction LTD., PA). Box 1207, Temple Texas 76505 11 is agreed to modify the above Contract Documents as follows: Item No - - - - Description of Changes ... Contract Amoun Decrease - Increase -: I Relocate vault et Fern Bluff elevated tank site and connect l0 existing pipe using tapping sleeves so that the existing lines can remain in service during connection. Relocate installation at RR620 site to the east to minimize conflicts with existing facilities and make connections using lapping sleeves. Fern Bluff site and 620 site also t0 include piping revisions to 6t sites. Delete installations at Locations identified as Locations A and D on project drawings 523T4200 JUSTIFICATION: See above. Contract Amount prior to this Change Order: 5106,281.00 Contract Time prior to this Change Orden 180 calendar days Net Increase of this Change Order: 823,242.00 Net Increase of this Change Order: 0 calendar days Revised Contract Amount including this Change Order: 8129,523.00 Revised Contract Time including this Change Order: 180 calendar days The changes included in This Change Order are to be accomplished in accordance with the terms, stipulations and conditions of the original Con.. t Documents as , • gh incl •e•.tberein. / x/99 Accepled fo 'enncik Co .t , LTD. by: Date l D a l e R m • ded t' A al fo. . ' Engineering, Inc. by: / -iy 99 Ayproved for the City of Ron Ro k ,y: Da te January G, t998 Steve Miller, P. E. Public Works City of' Round Rock 2008 Enterprise Round Rock, Texas 78664 Re: Change Order No. 2 Backflow Prevention Device Project Dear Mr. Miller: Enclosed are five copies of Change Order No. 2 for the backflow prevention device project. The Change Order has been executed by Psencik Construction Company. Major changes included in the Change Order are described below. • Revision in procedures for connecting piping at the RR 620 location near the HEB store to allow connections to existing piping to be made such that the lines remain in service during connection. Original plans involved the existing lines being out of service during the period in which connections are made, but it has been determined that the lines need to remain in service to serve a church near the connection point. • Increase in the sizes of vaults at the RR 620 and the Fern Bluff elevated tank sites to allow better access to equipment in the vaults. • Additional site work, piping, and valves, plus additional costs to allow connections to existing pipes to be made with the existing pipes in service at the Fern Bluff tank site. These changes are required because the installation location had to be relocated from a Brushy Creek MUD easement near the Fern Bluff elevated tank site to the Fern Bluff elevated tank site and attendant site constraints at the tank site. • Deletion of work associated with installation of backflow prevention equipment at a location adjacent to Sam Bass Road, as it has been determined that the work will not be needed due to improvements being implemented by Brushy Creek MUD at their pumping station at which the installation was planned. The Change Order involves a $23,242 increase in contract amount. The changes are necessary for project implementation, and we recommend approval of the change order. Following execution by the City, please transmit two copies to the Contractor, and one copy to our office. Call if you have questions. We appreciate having the opportunity to provide services on this project. Sincerely, HDR Engineering, Inc. d' J es R. Glaser, P. E. Enclosures HDR Engineering, Inc. Employee -owned hU. 1 2211 South IH 35 Telephone Suite 300 512 912 -5100 Forum Park Fax Austin, Texas 512 442 -5069 78741 DATE: January 7, 1999 SUBJECT: City Council Meeting — January 14, 1999 ITEM: 14.A.5. Consider a resolution authorizing the Mayor to execute a Change Order No. 2 with Psencik Construction Ltd. for work associated with the installation of backflow prevention devices of water interconnect points with Brushy Creek MUD. The change order describes proposed changes at the Fern Bluff and FM 620 interconnect sites. The Fern Bluff tank site was added after Brushy Creek MUD refused to give the City access to the original contract site located inside their jurisdictional area. This relocation required extra work due to the existing piping layout inside the tank site. The second site, (FM 620), was relocated to ensure the backflow prevention devices remained in Round Rock's ETJ boundary. The relocation requires a larger vault and "hot" taps to complete the installation. The total for this change order is $23,242.00. Staff recommends acceptance. Staff Resource Person: Jim Nuse, Public Works Director. CITY Op"RS1UND ROCK ` Dates ,+►: 3 CDRACT CHANGE BIRDER' Mime NT 4�.: 2 Df Cornragl: Installation of Backfow Prevention Ekviees - Water Distributioe System Owner. Ci of Round Rock, 223 East Main Street, Round Rock, Texas 78664 Contractor: Pseneik Construction LTD, P.O. Roo 3207, Temple Texas 76505 It k agreed to modify the above Contract Documents as follows: Item No. - - Description of Changes - - - Contract Amount Decrease Increase I • Relocate vault at Fern Bluff elevated tank site and connect to existing pipe using tapping sleeves so that the existing lines can remain in service during connection. Relocate installation at RR620 site to the east to minimize conflicts with existing facilities and make connections using lapping sleeves. Fern Bluff site and 620 sire also to include piping revisions to fit sites. Delete installations at Locations identified as Locations A and D on project drawings. 223.242.00 JUSTIFICATION: See above. Contract Amount prior to this Change Order. 2106,281.00 Contract Time prior to this Change Order: 180 calendar days Net Increase of this Change Order. 523,242.00 Net Increase of this Change Order: 0 calendar days Revised Contract Amount including this Change Order: 8129,023.00 Revised Contract Time including this Change Orden 160 calendar days The ch ges included in this Change Order are to be accomplished in accordance with the tens, stipulations and condilions of the original Con, .ct Documents as . gh inelu d therein. L q I � + Accepted for 3'senciki Co 3 LTD. by: e 1 • ' p / /Y /4y Date i - 99 Date • • ay; j •n ded f pproval for R Engineering, Inc. by: • pproved for the City of Rou d Rock