R-99-02-25-13G6 - 2/25/1999RESOLUTION NO. R- 99- 02- 25 -13G6 WHEREAS, the City of Round Rock has previously entered into a contract ( "Contract ") with Chasco Contracting, Inc. for the Downtown Storm Drainage and Street Improvement Project, and WHEREAS, it has been determined that it is necessary to change said Contract in accordance with the attached Contract Change Order No. 4, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Contract Change Order No. 4 to the Contract with Chasco Contracting, Inc. for Downtown Storm Drainage and Street Improvement Project. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended, and the Act. RESOLVED this 25th day of February, 1999. ATTEST: E LAND, City Secretary K: \WP00CS \RBSOLOTI \R90225G6. WPO /ccg elAt CHARLES CULPEPP ER, 'Mayor City of Round Rock, Texas Project Title: Downtown Storm Drainage and Street Improvements Project No.: 702 -02A/B Contract No.: SUN 201719 Contract Date:May 28, 1998 Contractor: Chasco Contracting The following changes are hereby made to the Contract Documents: DRAWINGS 15 & 16, REVISION 1 1/99 RECONSTRUCTION AREA AT LIBERTY AVE. FROM STA. 8 +50 TO STA. 12 +56 (FROM LAMPASAS TO SHEPPARD) Item No. Work Description Quantity Unit Price Amount 110 -B Street Excavation 1,483 S.Y. $8.00 $11,864.00 210 -Al 12" Flexible Base 1,483 S.Y. $6.20 $9,194.60 201 Subgrade Preparation 1,483 S.Y. $1.00 $1.483.00 $22,541.60 Justification: Changes are due to existing pavement structure being only 4" to 0" of flexible base. Require improving the design life of the pavement. CHANGE TO CONTRACT PRICE Original Contract Price: $1,075,693.45 Current Contract Price as adjusted by previous change orders: Change Order No. 1. $24,900.00 t z. 7, 2 00.00 km Change Order No. 2: $46,985.75 Change Order No. 3: $4,760.00 TOTAL. $1,152,339.20 } 4.,639, The Contract Price due to this change order will be [increased] [decreased] by $22 541.60 The new Contract Price due to this Change Order will be $1 174 880.80. 4 CHANGE TO CONTRACT TIME Additional calendar days for previous Change Orders No. 1 + 5, No. 2 + 18, No. 3 + 5. The Contract Time for this change order will be [increased] [decreased] by calendar days. 12. The date for completion of all work under the contract will be Junes 1999. 3o Approvals required: To be effective, this order must be approved by the Owner if it changes the scope or objective of the project, or as may otherwise be required under the terms of the Supplementary General Conditions of the Contract. Requested by: R �ertg o O. Martz. Iv,�WM Inc. Date: February 16, 1999 Signature: e-� c C� ai Recommends, . _Wille Ci of S . d Rock 1 Date: 2-P7/99 Signature:,,. _. _ // del Accepted by: Chasco Con Date: 2 ` �7' Signature: / Rccepr. by; fr 51 Change Order No. 4 Date: 02/17/1999 DATE: February 19, 1999 SUBJECT: City Council Meeting — February 25, 1999 ITEM: 13.G.6. Consider a resolution authorizing the Mayor to execute Contract Change Order No. 4 to Chasco Contracting for the Downtown Storm Drainage and Street Improvement Project. During the construction of the storm sewer system on Liberty Street between Sheppard Street and Lampasas Street it was discovered the existing roadway base varied in quality and constant thickness from that indicated by the soils investigation boring taken on this block. The soil boring indicate 6 inches of flexible base and 1 -1/4 inches of asphalt surface which led to the design of a strengthening 3 -1/2 inch asphaltic concrete level -up and overlay course which would provide an adequate section for this street. The storm sewer excavation exposed the inconsistent quality and thickness of existing base in this block and our consulting engineer, Martinez, Wright and Mendez, Inc. recommends reconstruction of this block with which staff concurs. This change order, which is an increase in quantities at the contract unit prices, is $22,541.60, which makes the current contract amount $1,177,180.80. The funding source is 1996 General Obligation Bond Program. Staff recommends approval. Staff Resource Person: Jim Nuse, Public Works Director. y '+w.ierrt t Mayor Charles Culpepper Mayor Pro-tem Robert Sthcka Connell Members Earl M. Hairston Rick Stewart Far! Palmer Martha Chem Jimmy Joseph City Manager Robert L. Bennett, Jr. City Attorney Stephan L Sheets ITY OF ROUND ROCK April 28, 1999 Mr. Roberto O. Martinez, P.E. Martinez, Wright & Mendez, Inc. Twin Towers 1106 Clayton Lane, Suite 400W Austin, Texas 78723 Dear Mr. Martinez: Sincerely, Joanne Land Assistant City Manager/ City Secretary Enclosures Fax: 512 - 218-7097 howl- 1-800-735-2989 TDD 1- 800 - 735 -2988 Voice www.ci.round-rccictx.us 221 Fast Main Street Round Rock. Texas 78663 512 - 218-5400 The Round Rock City Council approved Resolution No. R- 99- 02- 25 -13G6 at their regularly scheduled meeting on February 25, 1999. This resolution approves Change Order No. 4 to the Contract with Chasco Contracting, Inc. for the Downtown Storm Drainage and Street Improvement Project. Enclosed is a copy of the resolution and agreement for your files. If you have any questions, please do not hesitate to call.