Loading...
R-99-03-25-10D7 - 3/25/1999WHEREAS, the City of Round Rock has previously entered into a contract ( "Contract ") with ECO Resources, Inc. for the Greenslopes Waterline Replacement project, and WHEREAS, it has been determined that it is necessary to change said Contract in accordance with the attached Contract Change Order No. 2, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Contract Change Order No. 2 to the Contract with ECO Resources, Inc. for the Greenslopes Waterline Replacement project. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended, and the Act. RESOLVED this 25th day of March, 19 9. ATTEST: E LAND, City Secretary K: \WPDOCS \RESOLOTI \11903250] .WPO /scg RESOLUTION NO. R- 99- 03- 25 -10D7 CHARLES CULPEP•E• Mayor City of Round Rock, Texas TITLE_ 03/19/99 14:21 '$218 5563 PUBLIC WORKS DEPARTMENT: Public Works PROJECT: Greenslopes Waterline Replacements ORIGINAL CONTRACT PRICE: PREVIOUS CHANGE ORDERS: THIS CHANGE ORDER: CHANGE ORDERS TO DATE: PREPARED BY: Alysha Girard ENGINEERING ASSISTANT CONTRACTOR: ECO Resources BY: ,IIa.-. 2 APPROVED: CITY OF ROUND ROCK CONSTRUCTION CHANGE ORDER $356,401.00 $4,200.00 $53,425.00 $57,625.00 CHANGE DATA DATE CITY OF ROUNDJeOCK U002/002 PAGE 1 OF 1 DATE: 3/19/99 CHANGE ORDER NO: 2 JUSTIFICATION:Additional services needed ITEM # 1 1A 2 5 DESCRIPTION OF CHANGES Remove and replace existing long -side water service including street repair Remove and replace existing short-side water service Remove and replace concrete curb and gutter Remove and replace concrete driveway UNIT EA EA LF SF QTY. 25 24 30 800 UNIT PRICE $1,325.00 $700.00 $10.00 $4.00 TOTAL: AMOUNT $33,125.00 $16,800.00 $300.00 $3,200.00 $53,425.00 ADDED DAYS CALENDAR/ WORKING 12 8 2 2 24 3/16/99 PERCENT OF ORIGINAL CONTRACT PRICE THIS CHANGE ORDER: PREVIOUS CHANGE ORDER TOTAL % CHANGE: ORIGINAL CONTRACT PRICE PLUS CHANGE ORDERS: $414,026.00 14.99% 1.78% 16.17% gm co2Jgreensbps-3/project specs DATE: March 19, 1999 SUBJECT: City Council Meeting — March 25, 1999 ITEM: 10.D.7. Consider a resolution authorizing the Mayor to execute Change Order No. 2 with ECO Resources, Inc. for blue tubing waterline replacements in Kennsington Place. The contractor, ECO Resources, is currently under contract for the Greenslopes Waterline Replacement project. Although Kennsington Place has always experienced some groundwater, this year there may be an increase in the amount of standing water. Public Works wants to eliminate any concerns that water leaks may be contributing to this year's increased groundwater. Kennsington Place is scheduled for the "blue tubing replacement program" in the spring of 2001. However, we believe the responsible action is to immediately replace any services that could possibly be contributing to the stagnant water which could eventually lead to health and safety issues. ECO Resources, Inc. is currently under contract to execute similar repairs in the Greenslopes neighborhood and will immediately begin repairs. The change order allows for the replacement of all "blue tubing" services upstream of the problematic area to include Windsor Road, Cambridge Drive, Westminster Place, and a portion of Surrey Drive. The amount of the change order is $53,425. Staff recommends approval. Staff Resource Person: Jim Nuse, Public Works Director.