R-99-05-13-13B5 - 5/13/1999RESOLUTION NO. R- 99- 05- 13 -13B5
WHEREAS, the City of Round Rock has previously entered into a
contract ( "Contract ") with Landmark Structures, Inc. for improvements
to the Chisholm Valley elevated tank, and
WHEREAS, it has been determined that it is necessary to change
said Contract in accordance with the attached Contract Change Order No.
1, Now Therefore
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS,
That the Mayor is hereby authorized and directed to execute on
behalf of the City Contract Change Order No. 1 to the Contract with
Landmark Structures, Inc. for improvements to the Chisholm Valley
elevated tank.
The City Council hereby finds and declares that written notice of
the date, hour, place and subject of the meeting at which this
Resolution was adopted was posted and that such meeting was open to the
public as required by law at all times during which this Resolution and
the subject matter hereof were discussed, considered and formally acted
upon, all as required by the Open Meetings Act, Chapter 551, Texas
Government Code, as amended, and the Act.
RESOLVED this 13th day of May,
NE LAND, City Secretary
K: \WPOOCS \RSSOLULI \R9051385. WPO /scy
CHARLES CULP AWL, Mayor
City of Round Rock, Texas
CPR No.
Item and Description of Changes
Contract Price
Contract Time
Decrease
Increase
Decrease
Increase
1
Delete fencing, access drive, portions of paving, and
site lights. Provide additional outlet and water meter
tap.
17,747.00
0
0
0
2
Provide for shop blasting and priming in liue of field
blasting and priming,
41,400.00
0
0
0
3
Delete retaining wall and add layer of topsoil.
7,180.00
0
0
0
Sub - Total
Difference Net
66,327.00
0
0
0
66,327,00
0
0
0
1- Da
Project Name:
City of Round Rock Water System Improvements
Contract No. 1 - Elevated Water Storage Reservoirs
Protect Owner: (Name, Address)
City of Round Rock, Texas
2008 Enterprise Dr.
Round Rock, Texas 78664
Project Contractor: (Name, Address)
Landmark Structures, Inc.
1665 Harmon Road
Fort Worth, Texas 76177
he Contract referred to above as follows:
Summary: It Is agreed to modify the Contract referred to above as follows:
Contract Price prior to this Change Order
1 52,776,000.00
Net Increase (decrease) of this Change Order
1 <666,327.00>
Revised Contract Price with all approved Change Orders
1 52,709,673.00
Approved: (Other - when requjle
Distribution:
I 'owner
I contraetor
HDR Project No.:
07225 - 036 - 036 -02
Owner's Project No.:
N/A
Date of Issuance: March 30, 1999
Date of Contract: December 10, 1998
Contract Period: 480 Days
Contract Time prior to this Change Order
(February 9, 2000 (480 days)
Net Increase (decrease) of this Change Order
1 0 days
Revised Contract Time with all approved Change Orders
1 February 9, 2000 (480 days)
The changes included in this Change Order are to be accomplished in accordance with the terms, stipulations and conditions of the
original Contract as though included therein.
1 1rn5.b. 4 aM� k , r I Y— z (— s s
Accepted for ntractor by: Date
3 — 3o
Recommende for AApY (11019 Engineering, Inc.) Date
Attest Date
'Office
Change Order No. 1
5 -13 -199
Date
1 'Field 1 'Other
FORM 111 - 5020 - (Version 1.0 Oct 90) Task 5020 111 - 5020 -2
Copyright 1991 HDR Engineering, Inc.
Lo
Lo
w
N
DATE: May 7, 1999
SUBJECT: City Council Meeting — May 13, 1999
ITEM: 13.B.5. Consider a resolution authorizing the Mayor to execute a change
order for Landmark Structures, Inc. for improvements to Chisholm
Valley Elevated Tank. The modifications involve several credits for
tank access changes; pavement reduction, a shop painting credit and
deletion of retaining wall for a total deduct in contract price of
$66,327.00. Staff recommends approval. Staff Resource Person: Jim
Nuse, Public Works Director.