Loading...
R-99-05-13-13B5 - 5/13/1999RESOLUTION NO. R- 99- 05- 13 -13B5 WHEREAS, the City of Round Rock has previously entered into a contract ( "Contract ") with Landmark Structures, Inc. for improvements to the Chisholm Valley elevated tank, and WHEREAS, it has been determined that it is necessary to change said Contract in accordance with the attached Contract Change Order No. 1, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Contract Change Order No. 1 to the Contract with Landmark Structures, Inc. for improvements to the Chisholm Valley elevated tank. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended, and the Act. RESOLVED this 13th day of May, NE LAND, City Secretary K: \WPOOCS \RSSOLULI \R9051385. WPO /scy CHARLES CULP AWL, Mayor City of Round Rock, Texas CPR No. Item and Description of Changes Contract Price Contract Time Decrease Increase Decrease Increase 1 Delete fencing, access drive, portions of paving, and site lights. Provide additional outlet and water meter tap. 17,747.00 0 0 0 2 Provide for shop blasting and priming in liue of field blasting and priming, 41,400.00 0 0 0 3 Delete retaining wall and add layer of topsoil. 7,180.00 0 0 0 Sub - Total Difference Net 66,327.00 0 0 0 66,327,00 0 0 0 1- Da Project Name: City of Round Rock Water System Improvements Contract No. 1 - Elevated Water Storage Reservoirs Protect Owner: (Name, Address) City of Round Rock, Texas 2008 Enterprise Dr. Round Rock, Texas 78664 Project Contractor: (Name, Address) Landmark Structures, Inc. 1665 Harmon Road Fort Worth, Texas 76177 he Contract referred to above as follows: Summary: It Is agreed to modify the Contract referred to above as follows: Contract Price prior to this Change Order 1 52,776,000.00 Net Increase (decrease) of this Change Order 1 <666,327.00> Revised Contract Price with all approved Change Orders 1 52,709,673.00 Approved: (Other - when requjle Distribution: I 'owner I contraetor HDR Project No.: 07225 - 036 - 036 -02 Owner's Project No.: N/A Date of Issuance: March 30, 1999 Date of Contract: December 10, 1998 Contract Period: 480 Days Contract Time prior to this Change Order (February 9, 2000 (480 days) Net Increase (decrease) of this Change Order 1 0 days Revised Contract Time with all approved Change Orders 1 February 9, 2000 (480 days) The changes included in this Change Order are to be accomplished in accordance with the terms, stipulations and conditions of the original Contract as though included therein. 1 1rn5.b. 4 aM� k , r I Y— z (— s s Accepted for ntractor by: Date 3 — 3o Recommende for AApY (11019 Engineering, Inc.) Date Attest Date 'Office Change Order No. 1 5 -13 -199 Date 1 'Field 1 'Other FORM 111 - 5020 - (Version 1.0 Oct 90) Task 5020 111 - 5020 -2 Copyright 1991 HDR Engineering, Inc. Lo Lo w N DATE: May 7, 1999 SUBJECT: City Council Meeting — May 13, 1999 ITEM: 13.B.5. Consider a resolution authorizing the Mayor to execute a change order for Landmark Structures, Inc. for improvements to Chisholm Valley Elevated Tank. The modifications involve several credits for tank access changes; pavement reduction, a shop painting credit and deletion of retaining wall for a total deduct in contract price of $66,327.00. Staff recommends approval. Staff Resource Person: Jim Nuse, Public Works Director.