Loading...
R-99-05-27-11C3 - 5/27/1999tttr °� - i f fi : CITY OF ROUND ROCK ;tr en rr it Mayor Robert A. Srluka, .1 Mayor Pro -tem Martha A. Chavez Council Members Tom Nielson Earl M. Hairston Rick Stewart Earl Painter Jimmy Joseph City Manager RobertL Bennett, Jr. City Attorney Stephan L Sheets October 7, 1999 Mr. Michael E. Tibbetts The Arkitex Studio, Inc. 2505 Messick Loop W Round Rock, Texas 78681 Dear Mr. Tibbetts: 221 East Main Street Round Rock, Texas 78664 512 - 218 -5410 The Round Rock City Council approved Resolution No. R- 99- 05- 27 -11C3 at their regularly scheduled meeting on May 27, 1999. This resolution approves Changer Order No. 3 to the contract with Setpoint Builders Inc. for the Public Works Building Expansion and Addition Project. Enclosed is a copy of the resolution and change order for your files. If you have any questions, please do not hesitate to contract Larry Madsen at 218 -5555. Sincerely, g ti owytt,40-41- Joanne Land Assistant City Manager/ City Secretary Enclosure(s) Fax: 512-218-7097 1 -800- 735 -2989 TDD 1 -800- 735 -2988 Voice www.ci.round- rock.tx.us Mayor Robert A. Siluka, Jr. Mayor Pro -tem Martha A. Chavez Council Members Tom Nielson Earl M. Hairston Rick Stewart Earl Palmer Jimmy Joseph City Manager Robert L Bennett, Jr. City Attorney Stephan L Sheets CITY OF ROUND ROCK October 7, 1999 Mr. Richard C. Harris SetPoint Builders Inc. P.O. Box 164262 Austin, Texas 78716 Dear Mr. Harris: The Round Rock City Council approved Resolution No. R- 99- 05- 27 -11C3 at their regularly scheduled meeting on May 27, 1999. This resolution approves Change Order No. 3 for the Public Works Building Expansion and Addition Project. Enclosed is a copy of the resolution and change order for your files. If you have any questions, please do not hesitate to contact Larry Madsen at 218 -5555. Sincerely, Joanne Land Assistant City Manager/ City Secretary Enclosure(s) Fax: 512- 218 -7097 1 -800- 735 -2989 TDD 1- 800 -735 -2988 Voice www.ci.round- rock.tx.us 221 East Main Street Round Rock, Texas 78664 512 -218 -5400 RESOLUTION NO. R- 99- 05- 27 -11C3 WHEREAS, the City of Round Rock has previously entered into a contract ( "Contract ") with Setpoint Builders, Inc. for the Public Works Building Expansion and Addition Project, and WHEREAS, it has been determined that it is necessary to change said Contract in accordance with the attached Contract Change Order No. 3, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Contract Change Order No. 3 to the Contract with Setpoint Builders, Inc. for the Public Works Building Expansion and Addition Project. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended, and the Act. A EST: RESOLVED this 27th day of May, J.- � E LAND, City Secretary K: \WPOOCS \RESOLUTI \R90527C3. WPO /scg RO= 'T STLUKA, Mayor City of Round Rock, Texas CHANGE ORDER AIA DOCUMENT G701 PROJECT: (name, address) TO CONTRACTOR (name, address) The Contract is changed as follows: OWNER ARCHITECT CONTRACTOR FIELD OTHER Additions & Alterations to City of Round Rock Public Works Building 2008 Enterprise Round Rock, Texas 78664 SetPoint Builders, Inc PO Box 164262 Round Rock, Texas Proposal 3- Builders Profit, Overhead & Bond for Changes, Proposal 9 – Install steel support at new door opening cut in existing concrete tiltwall as required by engineer. Proposal 10 – Revisions to rooms #I27, #I28 & #129. Room #127 changed from storage to rest room. Revisions at existing rest rooms #128 & #129 to meet TAS (Texas Accessibility Standards) Proposal 12 – Revisions to civil drawings required to meet TAS review comments. Replace existing walks at building entrance. Provide accessible route to existing lab building. Proposal 13A – Delete all work in rooms #119 & #120 (deduct) Proposal 14 – Additional site work required for proper drainage at parking lot. Revise finish elevations at existing asphalt drive. Total for above items $14,865.00 Not valid until signed by the Owner, Architect and Contractor. CHANGE ORDER NUMBER: DATE: ARCHITECT'S PROJECT NO: CONTRACT DATE: CONTRACT FOR: The original (Contract Sum) (Guaranteed Maximum Price) was Net change by previously authorized Change Orders Y The (Contract Sum) (Guaranteed Maximum Price) prior to this Change Order was $ The (Contract Sum) (Guaranteed Maximum Price) will be (increased) (decreased) (unchanged) by this Change Order in the amount of 5 'File new (Contract Sum) (Guaranteed Maximum Price) including this Change Order will be 5 The Contract Time will be (increased) (decreased) (unchanged) by The date of Substantial Completion as of the date of this Change Order therefore is NOTE: This summary does not reflect changes in the (untrac7 Suni, Contract Time or (,u2r:t11lced Maximum Price which have been aueh h� Construction Change Directive. The Arkitex Studio, Inc. AR(:I II 'I'ECT 2505 W. Messick Loop Address Round Roc Texas 78681 Addre Aus BY DATE 1.4 MN< 11 AIA SetPoint Builders, Inc CONTRACTOR PO Box a 262 DATE 14 141. R 9 AIA DOCUMENT G701 • CHANGE ORDER • 195' EDITION • AIA. • ©198' • 'IHE AMERICAN INSTI"rl "FE ()F ARCHITECTS. ITS) NEW YORK AVE., N.V4"., WASHINGTON, D.C. 211006 Address WARNING: Unlicensed photocopying vlolales US. copyright laws and is subject to legal prosecution. Three 14 May 1999 9808 17 August 1998 Additions & Alterations to City of Round Rock Public Works Building $ 524,000.00 $ 15,179.00 $ 539,179.00 $ 14,865.00 $ 554,044.00 City of Round Rock owNER 211 E. Main Street days. CAUTION: You should sign an original AIA document which has this caution printed in red. An original assures that changes will not be obscured as may occur when documents are reproduced. G701 -1987 INSTRUCTION SHEET 1 >k kt \ Doc t \II N1 G ()RD! k A. GENERAL INFORMATION 1. Purpose kit ir.i,ticlikt! it, -,.. 1 iti In [1, 't ■1,17.111.1■11 2. Related Documents I ;he \ , irirtitici , \ 1,11, lit 1201. ( 1,1', ■11 lc 111,1: ilk AI, I ■Ilt ,, .11, \ I %. 3, Use of Current Documents 111( \ 4 ,111 A(.4 11.711,, 4. Limited License for Reproduction 4I I itoi rkrkkiikikkl 0,1 11i0111 th.. \ 1 4 1, 11 0 1C ill, 1 mu i.rigirrki Wk. , iri 1,1 111, 0,17, .1,11 ThCIV tninit111 11I11111F,17 I, 1,1 ,111,13.1,'.111. ■ 111,1111,,i1117 , t1 4:k Ittrihrt ■V,1 ILV,70.1.F., [11,111. .1 1,1,111{,1 1,1',11■ 11 . 1111 11 .1 :11:1,1,1E1111 1,•■1 .1 W t:1 .1 C‘,111.10.,, 111,1 ■■14 1.1, B. CHANGES FROM THE PREVIOUS EDITION k i1, tr 1,41. 111111'(l: 1, 'LJl' 11 k r.lc onir.lor IA: , 1 , 011,1 chr.71.A1, 1111 d 1,1,41, C. COMPLETING THE G701 FORM 1. Description of Change in the Contract hi• L.,1;11, I 1, 11'.1‘,11:.y.. (1,11111,,, j1,4 ■1! 11,1),2 2. Determination of Costs 1 1 1 ',it,: tiitt,ritkri: igt: r)rktcri. 11:4 411:, i:ckk l'riik• k >IA 3. Change in Contract Time 111.1,1.1(,11 , I, ,ir wrr, ir■ t 1 D. EXECUTION OF THE DOCUMENT 44 :1;41,,11,11 t. irt li, Gin il:, 6 .t1 t. 1 ;11 0,1;41:1111 1194 DATE: May 21, 1999 SUBJECT: City Council Meeting, May 27, 1999 ITEM: 11.C.3. Consider a resolution authorizing the Mayor to execute Contract Change Order No. 3 with SetPoint Builders Inc. for the remodeling and addition to the Public Works Building. The total amount of the change order is $14,865 and increases the contract amount to $554,044. The change order includes the following items: 1. Additional site work required for drainage at existing parking lot to new asphalt drive. 2. Delete all work in offices #119 & #120 (deduct) 3. Revisions to civil drawings required to meet TAS review (Texas Accessibility Standards). Replace existing walks at building entrance. Provide accessible route to existing lab building. 4. Revisions to room #127, #128, #129. Additional restroom added. Two existing restrooms at front entry revised as required by TAS. 5. Install steel support at new door opening and cut in existing concrete tiltwall as required by engineer. 6. Builders Profit, Overhead & Bond for change order. Staff Resource Person: Jim Nuse, Public Works Director.