R-99-06-24-10F4 - 6/24/1999Client
City of Round Rock
Project No
601 -537
Project
Lee and Summit Street Reconstruction
Contract Date
2/13 -97
Subject of Additional Services
Removal of the Low Water Crossing
Addl. Svcs. Project No.
601- 537 -21
Description:
1. Remove proposed low water crossing items from the construction plans.
2. Design transition from proposed street section to existing low water crossing and re -align 2" Force Main.
3. Submit and Address CORR comments.
4. Revise Contract Documents.
5. Re- Advertise and Re -Bid project.
Reason for Change:
Clients request
Compensation:
Hourly charge plus relmbursable- expense basis, as defined in the
PROFESSIONAL SERVICES AGREEMENT, and
charges for these ADDITIONAL SERVICES are
the PROFESSIONAL SERVICES AGREEMENT,
for these ADDITIONAL SERVICES are to
in addition to the compensation for BASIC SERVICES. Total
estimated to be approximately $ .
X Lump sum charge basis plus reimbursable expenses, as defined in
and in addition to the compensation for BASIC SERVICES. Total charges
be $ 9,520 .
Estimated Date of Completion:
PROPOSED BY: BAKEObi' & AP C IIiC�
6 � % �
aeltz,, P B'. nch Maana,er Date
APPROVED BY: IIG hi 1 /. z v
elien- -,, ,1� l / 1
n Y®�
Date
Title: /
(Sign, keep Client's copy & return all others.)
4 W.:.
Baker - Aicklen
& Associates, Inc.
Consulting Engineers
ADDITIONAL SERVICES AUTHORIZATION
Date 6/10/99
Proposal No. 99 - 5054
cut P 141 c_54
BA R c / I Qo--
4 u
.QI_ cam. a..
1
Baker - Aicklen
& Associates, Inc.
Consulting Engineers
Effective August 1, 1998, the following rates are recommended for work performed on an hourly- charge basis. Rates
include company overhead and profit for services accomplished during regular working hours.
DIRECT LABOR
OFFICE PERSONNEL SERVICES
STANDARD RATE SCHEDULE
(Labor Rate Table 34)
Classification Rates
Project Engineer $100.00 per hour
Staff Engineer $85.00 per hour
Project Surveyor $80.00 per hour
Project Designer /Coordinator $70.00 per hour
Staff Surveyor /Engineering AssistantlGPS Processor $65.00 per hour
Senior Engineering /Surveying CAD Technician/Designer $55.00 per hour
Engineering/Surveying CAD Technician/Designer $50.00 per hour
CAD Draftsman/Field Representative $45.00 per hour
Secretary $45.00 per hour
Expert Witness/Testimony/Deposition Services Two Times Rates
Principal (as appropriate) $120.00 per hour
FIELD PARTY SERVICES Rates
1 -Man Field Party $65.00 per hour
2 -Man Field Party $90.00 per hour
3 -Man Field Party $110.00 per hour
4 -Man Field Party $130.00 per hour
GPS Field Unit with Operator (Note 5) $100.00 per hour
GPS Field Unit without Operator (Note 5) $60.00 per hour
DIRECT EXPENSES
Transportation:
By Firm's Passenger Vehicles (Note 1) $ 0.35 per mile
By Firm's Survey Trucks (Notes 1, 2, 3 & 4) $ 0.35 per mile
Subsistence of out -of -city work $100.00 per day
Reproduction & Printing by Firm, Prevailing Com-
Survey Stakes, Lathes, Iron Rods mercial Rates Or
and other Direct Expense Cost, Plus 10%
Notes:
1. A mileage charge will be billed for projects exceeding a 50 -mile radius of the base office only.
2. Field Party rates include conventional equipment, supplies and survey vehicles. Abnormal use of stakes, lathes,
etc., used such as during the construction phase of a project will be charged as indicated.
3. A minimum of two (2) hours field party time charge will be made for show -up time and return to office, resulting
from inclement weather conditions, etc.
4. Field Party stand -by time will be charged for at the above -shown appropriate rates.
5. Rates apply to actual time GPS units are in use. All other time will be charged as appropriate normal field party
rates.
6. The firm's professional liability is limited to the total amount of compensation associated with a specific project up
to a maximum of $50,000.
Baker-Aicklen
& Associates, Inc.
Engineers /Surveyors
06/16/99 WED_01:44 FAX 5122449623
06/
- 0
— ....
10!99 TERI 0225 FAX 5122449623
Baker - Aicklen
P AL 8 Assoccalas.frc-
JUN -16 - 1999 13:47
TRANSMISSION OK
Baker - Aicklen /RR
Esker- Aicklen /RR
*** TX REPORT ***
TX/EX NO 4038
CONNECTION TEL
SUBADDRESS
CONNECTION ID PUBLIC WORKS
ST. TIME 06 /10 02:23
USAGE T 01'46
PGS. 4
RESULT OK
FAX TRANSMITTAL !l) / 9
�' 1 p _' Jp DATE: � / /
FIRM: G.-�-e� �/ � TE
- ((( f
ATTN.: & vv._ /.Q�� TIME: cd : b
FAX: /_
FROM: if )o ti 5 FAX: (5l2) -244 -9623
SUI3JIEC r: No. Pages .V /Cover
Message:
a .4_10 4a-we
v �Q
dL •
2185563
5122449623 97%
a,4 RR PLANNINING IQJ
P.04
06/16/99 WED 01:43 FAX ,122449623
[ -�, Baker
7:L\ & Associates, Inc
FIRM: tSh`Ts
ATTN.: • rlec-t-ey
CP�SSF/ e c f3
FAX:
FROM: 6/4-(-- CJAE�T�
MessaQe:
rf-ccey
S JMn rT
SUBJECT:
ADD r-ro.o4c. SEedccE5 cuJ
Baker- Aicklen /RR -44, RR PLANNINING IQ
FAX TRANSMITTAL
DATE: 6/ /
TIME: ' 30
FAX: (512) -244 -9623
No. Pages w /Cover
SE 1+ee / 5e7 A SEA- EIZ .4 Il/c1 - 64 �Ec2��5T
Original to be mailed: Yes No
cc: Firm: C, ? . 0 . R• Attn.: Gt.4.e_ee
Film:
Firm: Attn.:
Firm: Attn. :
203 1. Main Street, Suite 201. Round Rock Texas 78664 (512) 244 -9620 Fax: (512) 244 -9623
JUN -16 -1999 13 46 5122449623 97% P.01
Mayor
Robert A. Stlak% Jr
Mayor Pro -tem
Martha A. Chavez
Council Members
Tom Nielson
Earl M. Hairston
Rick Stewart
Earl Palmer
Jimmy Joseph
City Manager
Robert L. Bennett Jr
City Attorney
Stephan L Sheets
CITY OF ROUND ROCK
June 23, 2000
Mr. A. William Waeltz, P. E.
Baker - Aicklen & Associates, Inc.
203 E. Main Street, Suite 201
Round Rock, Texas 78664
Dear Mr. Waeltz:
The Round Rock City Council approved Resolution No. R- 99- 06- 24 -10F4 at their
regularly scheduled meeting on June 24, 1999. This resolution approves additional
services to provide for the removal of a low water crossing concerning the Lee and
Summit Street Reconstruction.
Enclosed is a copy of the resolution and agreement for your files. If you have any
questions, please do not hesitate to contact Jim Nuse at 218 -5555.
Sincerely,
puutlytp`ONAti-
Christine Martinez
Assistant City Secretary
Enclosures
Fax 512 -218 -7097
221 East Main Street
Round Rock, Texas 78664
512 -218 -5400
1 -800- 735 -2989 TDD 1 -800- 735 -2988 Voice
www.ci.round- rock.tx.us
Kt \WPOOCS \RESOLUTx \KSO6a4ra. wen /SC9
RESOLUTION NO. R- 99- 06- 24 -10F4
WHEREAS, the City of Round Rock previously entered into an
agreement for engineering services ( "Agreement ") with Baker - Aicklen
& Associates, Inc. for the Vista Lane, Lee Street and Summit Street
Drainage Improvements project, and
WHEREAS,Baker - Aicklen & Associates, Inc. has submitted an
Additional Services Authorization to the Agreement to provide for
the removal of a low water crossing, and
WHEREAS, the City Council desires to approve said
Authorization with Baker - Aicklen & Associates, Inc., Now Therefore
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK,
TEXAS,
That the Mayor is hereby authorized and directed to execute on
behalf of the City an Additional Services Authorization with Baker -
Aicklen & Associates, Inc., to provide for the removal of a low
water crossing, a copy of said Authorization being attached hereto
and incorporated herein for all purposes.
The City Council hereby finds and declares that written notice
of the date, hour, place and subject of the meeting at which this
Resolution was adopted was posted and that such meeting was open to
the public as required by law at all times during which this
Resolution and the subject matter hereof were discussed, considered
and formally acted upon, all as required by the Open Meetings Act,
Chapter 551, Texas Government Code, as amended, and the Act.
ATTEST:
RESOLVED this 24th day of June, 1999.
E LAND, City Secretary
2
City of Round Rock, Texas
Client
City of Round Rock
Project No.
601 -537
Project
Lee and Summit Street Reconstruction
Contract Date
2113 -97
l Services
Subject of Additional
Removal of the Low Water Crossing
Addl. Svcs. Project No.
Description:
1. Remove proposed low water crossing items from the construction plans.
2. Design transition from proposed street section to existing low water crossing and re -align 2" Force Main.
3. Submit and Address CORR comments.
4. Revise Contract Documents.
5. Re- Advertise and Re -Bid project.
Reason for Change:
Clients request
Compensation:
Hourly charge plus reimbursable- expense basis, as defined In the
PROFESSIONAL SERVICES AGREEMENT, and
charges for these ADDITIONAL SERVICES are
charges sfor these ADDITIONAL SERVICES are to
In addition to the compensation for BASIC SERVICES. Total
estimated to be approximately $ .
defined
X
and n addition to the com for BASIC SERVICES.
be $ 9.520 .
Estimated Date of Completion:
PROPOSED BY: BAKER -' - KLEN & ASSOCIDTES, NC.
.i ! /`1 A �t
to / /e ?
_
Date
A: llam Waeltz, P.E., Branc'=nagar
BY:
Date
APPROVED
Client:
Title:
Si • n, kee • Client's co • & return all others.
06/16/99 WED 01:46 FAX 5122449623
11 \I
Baker- Aicklen
& Associates, Inc.
Consulting Engineers
Baker- Alcklen /RR
ADDITIONAL SERVICES AUTHORIZATION
Date 6/10/99
IQ 002
Proposal No. 99-5054
06/16/99 WED 01:47 FAX 5122449623
TASK NAME
Remove Low Water Crossing
from Plans
Design 1)Transition Lee and
Summit Streets to the Existing
Low Water Crossing 2) Re-
alignment of 2" Force Main
Submit Plans for Review and
Address CORR comments
Revise Contract Documents
Re- Advertise and Re-Bid Project $
TASK
SUBTOTALS
TOTAL THIS PROPOSAL S 9,520
N: i 601- 537 1ASA a, 28:S nm m( ASA sls
Baker - Alcklen /RR
LEE & SUMMIT STREET RECONSTRUCTION
PROPOSAL FOR ADDITIONAL SERVICES: MANIIOUR ESTIMATES
Baker- Aicklen & Associates, Inc
RESOURCE ALLOCATION
RESOURCE
$ 2,120 Project Engineer
CAD Technician
$ 2,520 Project Engineer
CAD Technician
$ 1,680 Project Engineer
CAD Technician
$ 1,420 Project Engineer
CAD Technician
Secretary
1,780 Project Engineer
CAD Technician
Secretary
NOTES:
1. Work to be billed in accordance with Baker - Aicklen & Assoc., Inc.
Standard Rate Schedule - 34 (Effective Aug. 1, 1998)
WORK
(hrs)
RATE
COST
8 $ 100 $ 800
24 $ 55 $ 1,320
12 $ 100 $ 1,200
24 $ 55 $ 1,320
8 $ 100 $ 800
16 $ 55 $ 880
8 $ I00 $ 800
8 $ 55 $ 440
4 $ 45 $ 180
12 $ 100 $ 1,200
4 $ 55 $ 220
8 $ 45 $ 360
Baker -A kklen & Assoc.
10003
DATE: June 21, 1999
SUBJECT: City Council Meeting — June 24, 1999
ITEM: 10.F.4. Consider a resolution authorizing the Mayor to execute an Additional
Services Authorization with Baker-Aicklen & Associates, Inc. for the
Vista, Lee and Summit Street Drainage Improvements. Staff Resource
Person: Jim Nuse, Public Works Director.